512A5-23-311_DRAWINGSPart-3.pdf
PDF 20 MB Posted
- Attached to
- P400--512A5-23-311 - Demolish Building 9H
- Solicitation number
- 36C24525B0005
About this file
These technical drawing files detail a comprehensive demolition project for Buildings 9H and 344 at the Perry Point VA Medical Center in Maryland. The project involves complete demolition of Building 9H, a two-story concrete and masonry structure originally built in 1924, encompassing approximately 54,500 gross square feet. Key technical requirements include hazardous material abatement, utility relocation, fiber optic network redistribution, and site restoration.
Specific technical scope includes removing all building components, abating asbestos and lead-based paint, disconnecting and relocating telecommunications infrastructure, relocating emergency power systems, constructing a new telecommunications closet in Building 314C, and installing new fiber optic cabling to multiple campus buildings. The project requires extensive coordination with VA infrastructure teams, adherence to strict environmental and safety protocols, and completion within 400 calendar days. The demolition will involve precise utility management, infrastructure preservation for active campus systems, and comprehensive waste management with requirements for recycling and proper hazardous material disposal.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PANEL "GB 344"
GEN.
200KW/
250KVA.
AT 0.8PF.
GEN. SWGR. 6
EMERGENCY POWER DISCONNECT TO BLDG 9H
CABLE TRAY FOR
EMERGENCY POWER
DIESEL DAY TANK
CONTROL PANEL
PRIMARY POWER SWITCH FOR BLDG 9H
500KVA TRANSFORMER SUBSTATION "SS-6"
NORMAL POWER
DISCONNECT TO BLDG 9H
FIRE ALARM
CONTROL PANEL
MUFFLER
DUAL 3ɸ FEEDERS (NORMAL)
TO 12-DUCT BANK TO BLDG 9H
SOUND
CASING
DUAL 3ɸ FEEDERS (EMERGENCY)
TO 12-DUCT BANK TO BLDG 9H
4160V PRIMARY FEEDER
FROM MANHOLE E45
EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
344-ED102
KEY PLAN
NOT TO SCALE
F9
BUILDING 344 -
ELECTRICAL EXISTING CONDITIONS AND
DEMOLITION PLAN 344
BVG JDM
BUILDING 344 EXTERIOR - FRONT ENTRANCE
SCALE: N/A
C5EXISTING FLOOR PLANS - GENERATOR BUILDING NO. 344
SCALE: NTS
C1 EXISTING DIESEL DAY TANK
SCALE: N/A
C7
FIRE ALARM PULLBOX IN CORRIDOR C400
SCALE: N/A
E6
A. THE GENERAL SCOPE OF WORK FOR BUILDING 344 IN THIS PROJECT IS TO DEMOLISH ENTIRE BUILDING AND ALL ASSOCIATED COMPONENTS. REMOVE ALL EQUIPMENT, LIGHTING, PANELS, BRANCH CIRCUITS, ALL ELECTRICAL POWER CABLING FEEDING INTO AND OUT OF THE BUILDING, AND EXISTING DUCT BANK BETWEEN BUILDING 344 AND BUILDING 9H. NO BURIED CABLES SHALL BE ABANDONED IN PLACE. SEE DETAIL C1 ON 344-ED102 FOR THE EXISTING PLANS FOR INFORMATION. PICTURES AND OTHER DETAILS ON THIS 344-ED102 AND 344-EK102 ARE TO GIVE OVERALL GENERAL INFORMATION RELATED TO THE SOW.
CONTRACTOR SHALL DISCONNECT ALL INCOMING AND OUTGOING FEEDERS AND SIGNAL CABLING
COMPLETE.
B. PANEL EP1-314 LOCATED IN BUILDING 314C MUST BE CONNECTED TO NEW SOURCE OF POWER AS SHOWN ON DRAWING EP105 PRIOR TO POWER DEMOLITION WHICH WOULD INTERRUPT THE EXISTING SOURCE OF POWER (VIA CONNECTION BACK TO THIS EMERGENCY GENERATOR VIA EMERGENCY PANEL IN BUILDING 9H).
C. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION. PROVIDE ALL LABOR AND
MATERIAL WHERE REQUIRED.
D. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, SYSTEMS EQUIPMENT, CIRCUITS, FEEDERS, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES.
THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS.
IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. DETAIL C1 IS FROM A PREVIOUS INITIAL BUILD OF THE BUILDING, IT IS NOT VERIFIED FOR ALL CIRCUITS, LAYOUT, CONDUITS, PLACEMENTS, ETC. IT IS A GENERAL REPRESENTATION OF THE BUILDING FOR OVERALL GENERALIZED INFORMATION ONLY. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO THEIR SATISFACTION THAT THEY WILL BE
ABLE TO COMPLETE ALL WORK REQUIRED FOR THE BID AMOUNT PROPOSED.
E. REMOVE EXISTING 250KVA EMERGENCY GENERATOR SET AND FUEL TANK AND ALL ASSOCIATED COMPONENTS AND WIRING COMPLETE. PICTURE C4 ON 344-EK102 SHOWS GENSET. PICTURE F1 HAS
GENERATOR INFORMATION.
F. REMOVE UNIT SUBSTATION: PRIMARY SWITCH, 500KVA TRANSFORMER AND SECONDARY COMPARTMENTS
AND MAIN SWITCH. PICTURE C1 ON 344-EK102 SHOWS UNIT SUB.
G. EXISTING FIRE ALARM SYSTEM TO BE DISCONNECTED FROM CAMPUS FA SYSTEM. DETAIL E7 ON 344-ED102 SHOWS EXISTING PULL BOX AT CEILING LEVEL IN CORRIDOR C400. DISCONNECT ALL DEVICES IN 344 AND PULL ALL CABLING FROM DEVICES BACK TO THIS PULL BOX. CONTRACTOR SHALL ENSURE ANY DOWN STREAM DEVICES SERVED FROM PULL BOX ARE KEPT IN SERVICE. DETAIL F7 ON 344-ED102 SHOWS
THESE FIRE ALARM CONDUITS PENETRATING BUILDING 344 – FOR REFERENCE ONLY.
H. SEE DRAWING EJ101 FOR SINGLE-LINE DIAGRAM ASSOCIATED WITH BUILDING 344 COMPONENTS AND
CONNECTIONS TO BUILDING 9H WHICH ARE BEING REMOVED.
I. DRAWING 344-EK102 FOLLOWING SHOWS MORE PICTURES OF EQUIPMENT IN BUILDING 344.
J. REMOVE LIGHTING AND APPLIANCE PANEL GB-344, SEE PICTURE F3 AND F5 ON 344-EK102.
K. PRIOR TO THE REMOVAL OF THE DIESEL DAY TANK, THE TANK IS TO BE DRAINED AND ANY REMAINING
FUEL IS TO BE DISPOSED OF PROPERLY.
FIRE ALARM PENETRATIONS ON EXT. BLDG 344
SCALE: N/A
F6
FA PULLBOX IN
CORRIDOR C400BUILDING 344 - EMERGENCY POWER GENERATOR AND EQUIPMENT TO BLDG 9H - EXISTING CONDITIONS
SCALE: NTSF1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
BUILDING 9H & CORRIDOR -
ELECTRICAL
EXISTING CONDITIONS
BVG JDM
9H-EK101
BUILDING 9H TO BUILDING 314C CORRIDOR - EXISTING CONDITIONS
SCALE: NTS
C1
9H
KEY PLAN
NOT TO SCALE
C9
A. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION
AND/OR RELOCATION OF THEIR EQUIPMENT. PROVIDE ALL LABOR AND
MATERIAL WHERE REQUIRED.
B. THE PURPOSE OF THIS DRAWING IS TO SHOW GENERAL CONDITIONS. NOT ALL
WORK IS DEPICTED. CONTRACTOR SHALL COORDINATE ALL REMOVAL,
WHETHER SHOWN OR NOT.
1. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.
2. PIPING. CAP OFF AT NEAREST POINT IN BUILDING 314C AND DEMOLISH.
3. 1 1/2" CONDUIT WITH POWER OVER ETHERNET CABLE. DISCONNECT AT
JUNCTION BOX ABOVE DROP CEILING IN BUILDING 314C. DEMOLISH THE
REMAINING CONDUIT AND CABLE.
4. (2) SETS OF ARMORED CABLE. DISCONNECT AND DEMOLISH.
5. FIRE ALARM CONDUIT AND CABLE. DISCONNECT AND DEMOLISH.
6. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.
7. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.
BUILDING 9H ELECTRICAL ROOM - EXISTING ATS TO BE DEMOLISHED
SCALE: NTS
C5
BUILDING 9H ELECTRICAL ROOM - EXISTING DUCT FEEDS FROM BLDG 344
SCALE: NTS
F1
BUILDING 9H ELECTRICAL ROOM - NORMAL POWER DISCONNECT
SCALE: NTS
C7
ATS
BUILDING 9H NEAR ELECTRICAL ROOM ENTRANCE - FA CONTROL PANEL
SCALE: NTS
F3 BUILDING 9H ELECTRICAL ROOM 16-A - PANEL MDP
SCALE: NTS
F5 BUILDING 9H ELECTRICAL ROOM 16-A - PANEL EMDP
SCALE: NTS
F7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
BUILDING 344 -
ELECTRICAL EXISTING CONDITIONS
BVG JDM
344-EK102
NORMAL POWER DISCONNECT (LEFT), 500KVA XFMR (CENTER), PRIMARY VOLTAGE SWITCH (RIGHT)
SCALE: NTS
C1
GENERATOR NAMEPLATE
SCALE: N/A
F1
KEY PLAN
NOT TO SCALE
F9
DDC CONTROL PANEL
SCALE: N/A
F7EMERGENCY POWER AND CONTROL PANELS
SCALE: N/A
F3 PANEL GB-344 SCHEDULE
SCALE: N/A
F5
A. THE GENERAL SCOPE OF WORK FOR BUILDING 344 IN THIS PROJECT IS TO DEMOLISH ENTIRE BUILDING AND ALL ASSOCIATED COMPONENTS. REMOVE ALL EQUIPMENT, LIGHTING, PANELS, BRANCH CIRCUITS, ALL ELECTRICAL POWER CABLING FEEDING INTO AND OUT OF THE BUILDING, AND EXISTING DUCT BANK BETWEEN BUILDING 344 AND BUILDING 9H. NO BURIED CABLES SHALL BE ABANDONED IN PLACE. SEE DETAIL C3 ON 344-ED102 FOR THE EXISTING PLANS FOR INFORMATION. PICTURES AND OTHER DETAILS ON THIS 344-ED102 AND 344-EK102 ARE TO GIVE OVERALL GENERAL INFORMATION RELATED TO THE SOW.
CONTRACTOR SHALL DISCONNECT ALL INCOMING AND OUTGOING FEEDERS AND SIGNAL CABLING
COMPLETE.
B. PANEL EP1-314 LOCATED IN BUILDING 314C MUST BE CONNECTED TO NEW SOURCE OF POWER AS SHOWN ON DRAWING 314&9H-EP101 PRIOR TO POWER DEMOLITION WHICH WOULD INTERRUPT THE EXISTING SOURCE OF POWER (VIA CONNECTION BACK TO THIS EMERGENCY GENERATOR VIA EMERGENCY PANEL IN
BUILDING 9H).
C. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION. PROVIDE ALL LABOR AND
MATERIAL WHERE REQUIRED.
D. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, SYSTEMS EQUIPMENT, CIRCUITS, FEEDERS, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES.
THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS.
IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO THEIR SATISFACTION THAT THEY WILL BE ABLE TO COMPLETE ALL WORK
REQUIRED FOR THE BID AMOUNT PROPOSED.
E. REMOVE EXISTING 250KVA EMERGENCY GENERATOR SET AND FUEL TANK AND ALL ASSOCIATED COMPONENTS AND WIRING COMPLETE. PICTURE C4 ON 344-EK102 SHOWS GENSET. PICTURE F1 HAS
GENERATOR INFORMATION.
F. REMOVE UNIT SUBSTATION: PRIMARY SWITCH, 500KVA TRANSFORMER AND SECONDARY COMPARTMENTS
AND MAIN SWITCH. PICTURE C1 ON 344-EK102 SHOWS UNIT SUB.
G. EXISTING FIRE ALARM SYSTEM TO BE DISCONNECTED FROM CAMPUS FA SYSTEM. DETAIL E7 ON 344-ED102 SHOWS EXISTING PULL BOX AT CEILING LEVEL IN CORRIDOR C400. DISCONNECT ALL DEVICES IN 344 AND PULL ALL CABLING FROM DEVICES BACK TO THIS PULL BOX. CONTRACTOR SHALL ENSURE ANY DOWN STREAM DEVICES SERVED FROM PULL BOX ARE KEPT IN SERVICE. DETAIL F7 ON 344-ED102 SHOWS
THESE FIRE ALARM CONDUITS PENETRATING BUILDING 344 – FOR REFERENCE ONLY.
H. SEE DRAWING EJ101 FOR SINGLE-LINE DIAGRAM ASSOCIATED WITH BUILDING 344 COMPONENTS AND
CONNECTIONS TO BUILDING 9H WHICH ARE BEING REMOVED.
I. REMOVE LIGHTING AND APPLIANCE PANEL GB-344, SEE PICTURE F3 AND F5 ON 344-EK102.
TRANSFORMER NAMEPLATE
SCALE: N/A
C4
CORRIDOR
MEN
B5
WOMEN
STAIR 2
B3
ELEVATOR
ELEVATOR
MACH RM
B4
BILLARD'S
B8
CRAWL SPACE
SVC RM
B2
MECH
B1
OUTDOOR
DRAIN
SPACE
UP
UP
UP
UP
TO BLDG 9H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
BUILDING 314A, B, C, AND 17H - FIRST FLOOR PLAN
ELECTRICAL POWER PLAN
314&17H-EP101
314, 17H
KAP JDM
BUILDING 314A, B, C & 17H - PARTIAL FIRST FLOOR PLAN - ELECTRICAL POWER NEW WORK
SCALE: 3/32" = 1'-0"
A
GENERAL NOTES
A. ALL NEW ELECTRICAL WORK TO RE-FEED THE EMERGENCY POWER PANEL IN BLDG 314C MUST BE COMPLETED
TO THE GREATEST EXTENT POSSIBLE BEFORE ANY DEMOLITION WORK IS TO TAKE PLACE. NEW POWER TO EP1-314 MUST BE IN PLACE AND SWITCHOVER IN POWER MADE PRIOR TO DEMOLITION OF EXISTING POWER IN
9H OR 344, ETC.
B. DISPLACED CEILING TILES ARE TO BE REUSED FOR ELECTRIC WORK IN CORRIDOR CEILING. CEILING TILES DAMAGED BY CONTRACTOR ARE TO BE REPAIRED OR REPLACED TO MATCH IN KIND TO SATISFACTION OF COR.
C. CONTRACTOR SHALL REVIEW AND COORDINATE WITH EXISTING FIELD CONDITIONS AT CEILING TO DETERMINE
THE BEST LOCATION AND METHOD OF INSTALLATION OF FEEDER CONDUIT.
KEY NOTES
1. EXISTING EMERGENCY PANEL EP1-314 (150A MCB, 120V/208Y, 3 PHASE) TO REMAIN. EXISTING MAIN BREAKER
TO BE REMOVED AND REPLACED WITH 100A MCB. THE EXISTING FEEDER, CONDUIT TO SERVICE FROM
BUILDING 9H TO BE REMOVED PER DEMOLITION PLANS COMPLETE.
2. PROVIDE NEW ELECTRICAL FEEDER FOR EP1-314 ALONG CORRIDOR CEILING. EXISTING CEILING CONTAINS SEVERAL EXISTING CONDUITS FOR OTHER SYSTEMS. FEEDER SHALL BE PER SINGLE-LINE ON SHEET EJ101, FROM EP1-314 TO BUILDING 17H PANEL EMDP. REFERENCE SINGLE-LINE DRAWING EJ101 FOR ADDITIONAL
INFORMATION.
3. REMOVE ATS COMPONENTS AND LEAVE ONLY SPLICED, PERMANENT CONNECTION TO SERVE EMDP.
REFERENCE SINGLE-LINE DRAWING EJ101 FOR ADDITIONAL INFORMATION.
4. PROVIDE CORE DRILL AND SLEEVE AT WALL PENETRATIONS FOR FEEDER CONDUIT AS NECESSARY. FIELD
COORDINATE.
EP1-314
BUILDING 314C
BUILDING 314B
BUILDING 314A
BUILDING 17H
EMDP ATS
WAITING
CG-2B
VESTIBULE
LOBBY
CG-2A
SCREEN
TRIAGE
GB-100
ANTE RM
GB-104A
MENS
TOILET
GB-101
CORRIDOR
CG-4
TRIAGE
EXAM RM
GB-102
VESTIBULE
CRASH
CART
GB-106
LIFE
SUPPORT
CG-5B
LAV CLOSET
GB-106A
NURSE
STATION
CG-5A
SUPPLY
RM
GB-107
MED
CLOSET
CG-4A
TOILET
GB-107A
SOCIAL
WORK
OFFICE
GB-105
TREATMENT
RM
GB-103
TOILET
GB-103A
STR W/C
STORAGE
CG-8A
WOMENS
GB-114
EXAM RM
GB-116
EXAM RM
GB-118
EXAM RM
GB-120
PULM
LAB
GB-122
EXAM RM
GB-124
S U
GB-109MEDICATION
RM
GB-108
TOILET
GB-112A
NURSE
TOILET
GB-110
CORRIDOR
GB-6
ON CALL
GB-112
STAIR-2
HAC
GB-128
MENS
TOILET
GB-130 LOUNGE
GB-132
NURSE
MGR
OFFICE
GB-148
EXAM RM
PHYSICIANS
OFFICE
GB-150
PAT ED
GB-152
NUTRITION
THERAPY
GB-170
FOLDING
PARTITION
DIETICIAN
OFFICE
GB-172
OCCUPATIONAL
HEALTH
OFFICE
GB-192
CO-ORDR VAMHCS
OCCUPATIONAL HEALTH OFFICE
GB-194
SPEECH/
LANGUAGE
PATHOLOGIST
OFFICE
GB-196
GA
VESTIBULE
SECY/WAITING
PHARMACY
SVC
CG-14A
ASST CHIEF
PHARMACY
SVC OFFICE
GC-100 HAC
GC-104
MENS
TOILET
GC-106 CONTROLLED
SUBSTANCE
GC-108A
IV ADMIN AND ASEPTIC
TRANSFER
GC-108B
IV ANTE
RM
GC-108BA
EXTEMPORANEOUS
COMPOUNDING
REPACK
GC-108C
ACTIVE
STORAGE
FP
SWING SPACE
OFFICE
CB-14B
CORRIDOR
CG-14
OFFICE
CUBICLES
CG-14B
PHARMACY
CONSULT
OFFICE
GC-101
FP
FOLDING
PARTITION
STORAGE
CORRIDOR
CG-1C
PHARMACY
GC-108
DISPENSING
DISPENSING
WAITING
AREA
CG-1B
CO-PAY
CASHIER
GC-108E
MAIL-OUT
ELECTRICAL
GD-110
UNIT
DOSE
STERILE
FLUID
STORAGE
MED SUPPLY
AND PROSTHETICS
CENTRAL
RECEIVING
GC-108D
FP
FUTURE
STAIR
STAIR-1
ELEVATOR
MACH RM
GD-100
ELEVATOR
P1ELEVATOR
LOBBY
CG-1A
CORRIDOR
CG-1
VESTIBULE
DIST
REPRODUCTION
RM
GD-101
METERING
GD-103
SUPV
OFFICE
GD-103A
ADMITTING
GA-118
EQUIP
EMBOSSER
GA-118E
INTERVIEW
GA-118D
MAS COPIER
GA-118B
CHIEF M I S
OFFICE
GA-118C FP
OFFICE SUPPLY
GA-118A
MED
RECORD
STORAGE
GA-116H
CLOSET
FILE RM
GA-116
ASST CHIEF M
A S OFFICE
GA-111
HIMS
CODING
OFFICE
GA-116I
LOUNGE
GA-116G
HIMS
EDUCATOR
OFFICE
GA-116F
GEN OFFICE AND
TRANSCRIPT
GA-116
RELEASE
OF INFO
OFFICE
GA-114
AGENT
CASHIER
GA-112
AGENT
CASHIER
GA-110
HIMS
SUPV
OFFICE
GA-116A
SECY
OFFICE
GA-116B
CHIEF M
I S
OFFICE
GA-116C
ADMINISTRATIVE
OFFICE
GA-104B
SWING
SPACE
OFFICE
GA-104C
SOCIAL
WORK
OFFICE
GA-108
CONSUMER
RELATIONS
OFFICE
GA-106
MANAGED
CARE
OFFICES
GA-104
HAC
GA-102
TEL
CLOSET
GA-100
SITE MGR
MANAGED CAR
GA-104A
WOMENS
TOILET
GA-116E
CORRIDOR
CG-7
WAITING
CG-2C
TEL/FIRE ALARM
CLOSET
GB-115
ELECTRICAL
CLOSET
GB-113
TEL CLOSET
GB-117
EXAM RM
GB-119
EXAM RM
GB-140
NURSE/MAS
CB-2D
MENS
TOILET
GB-161
WOMENS
TOILET
GB-163
SOCIAL
WORKER
MENTAL HEALTH
SVC OFFICE
GB-165
NURSE
OFFICE
GB-182
CONFERENCE
RM
GB-180
PATIENT
REP
OFFICE
GB-181
PATIENT
ADVOCATE
OFFICE
GB-183
NURSE
OFFICE
GB-185
EXAM RM AND
TOILET
GB-187
WOMENS
HEALTH
EXAM RM
GB-189
AUDIOLOGY
OFFICE
GB-191
CORRIDOR
CG-11
AUDIO
BOOTH
GB-193
WOMENS
HEALTH
GB-190
WOMENS
HEALTH
EXAM RM
GB-188
DUMB WAITER
CG-11A
FP
SUPPLY RM
GB-186TOILET
GB-184
TREATMENT
GB-167
EXAM RM
GB-169
CONS
EXAM RM
GB-171
CONS
EXAM RM
GB-173
FPMED
GB-168
EXAM RM
GB-166
N PRAC
EXAM RM
GB-164
PA EXAM
RM
GB-162
EXAM RM
GB-160
SUPPLIES
GB-141
CORRIDOR
CG-12
FP
NURSING
TRIAGE
GB-143
ENT
EXAM RM
GB-145
CORRIDOR
CG-9
TOILET
GB-142A
GI/GU
SUITE
EXAM RM
GB-142
EXAM RM
GB-121
EXAM RM
GB-123
STORAGE
GI/GU
SUITE
GB-114
EXAM RM
GB-125
EXAM RM
GI/GU
SUITE
GB-146TOILET
GB-125A
TOILET
CORRIDOR
CG-8
FPELEVATOR
P2
FP
WOMENS
TOILET
GC-102
WOMENS
TOILET
GB-126
MED
TRANSCRIPTION
MENS
TOILET
GA-116D
SUPPORT FOR CABLE TRAY
AND BACK BOXES
FIBER CABLE TRAY
COPPER CABLE TRAY
MI
N.
L3-L1L3-L1
512A5-361-GB-117-A
E1E2E2E1
RPDU-GB-117-A.GL.R(B)UPS-GB-117-A-01(A)
SEE PLANS SEE PLANS
exex ex
CONTROLS
ex
CONTROLS
ex
CNTRLS
ex
RP-GA2RP-G1A E2LP-G
E2RP-G
E2RP-G (SUB-PANEL)
LP-GA
E2RP-G(SUB-2)
E3 exexex ex ex ex ex
AT&T EQUIPMENT
ex
ACCESS CONTROL
ex
CTRL
ex
FIBER
ex
CARDKEY
ex ex ex ex
L21-20R
L21-20R
E1 E2
FI
BE
R ex
RP-GA2(31,33,35)
E2RP-G(SUB-2)/(1,3,5)
LP
EX
WPL
ex
EX
E4
UP
TEL CLOSET GB-117
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
ELECTRICAL CLOSET GB-113
1/2" = 1'-0"
NORTH
PLAN
1/2" = 1'-0"
NORTH
PLAN
1/2" = 1'-0"
NORTH
PLAN
1/2" = 1'-0"
NORTH
PLAN
ELECTRICAL CLOSET C-102A
CONDUIT ENTRY FROM DUCTBANK
PROVIDE A NEW 20A/3P CIRCUIT BREAKER
E2
ET101
REWBVG
BUILDING 361 - TR SPACES GB-113, GB117, AND
BUILDING 314C - CONDUIT ENTRY FROM
DUCTBANK - ELECTRICAL POWER PLANS 314C, 361
or or or or or or or or
J M
THCC
A
OS OCor ex or EX
SYMBOL
ELECTRICAL SHEET LEGEND (ENLARGED PLANS)
ALL DEVICE MAY NOT APPLY TO THIS SHEET AND SOME MAY NOT BE SHOWN:
(REFER TO SCHEDULES, DETAILS, ALL GENERAL NOTES, KEYNOTES, AND PLANS FOR ADDITIONAL INFORMATION)
DESCRIPTION
KEYNOTE TAG: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION
GROUND BAR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION
FIRE-RATED 3/4" AC GRADE PLYWOOD, WITH TWO COATS OF HIGH-GLOSS WHITE FIRE-RESISTANT PAINT.
DUPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
SPECIALTY RECEPTACLE (VERIFY NEMA STYLE), UNO.
JUNCTION BOX
MOTOR RATED SWITCH W/ ENCLOSURE: M=SINGLE POLE, 2M=TWO POLE, 3M=THREE POLE, UNO.
LUMINAIRE: REFER TO LUMINAIRE SCHEDULE
LUMINAIRE TAG: REFER TO LUMINAIRE SCHEDULE
CEILING LUMINAIRE OCCUPANCY SENSOR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION NEW ROOM/RACK TEMPERATURE AND HUMIDITY MONITORING CONTROL CABINET: INTEGRATED INTO BAS WITH AUTOMATIC ALARMING WHEN
CONDITIONS EXCEED PRESCRIBED LIMITS.
LIGHT SWITCH: REFER TO LIGHTING CONTROL (SWITCHES) SCHEDULE.
RECESSED AND SURFACE MOUNTED 208V-240V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR
NAME, VOLTAGE AND SIZE.
INDICATES EXISTING TO REMAIN
DUPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
G.F.C.I. DUPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
G.F.C.I. DUPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
QUADRAPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
QUADRAPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
G.F.C.I. QUADPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
G.F.C.I. QUADRAPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.
RECESSED AND SURFACE MOUNTED 208V-240V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR
NAME, VOLTAGE AND SIZE.
RECESSED AND SURFACE MOUNTED 480V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE.
RECESSED AND SURFACE MOUNTED 480V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE.
(ALL NOTES MAY NOT APPLY TO THIS SHEET)
A. PROVIDE ALL LABOR AND MATERIALS TO INSTALL, AT A MINIMUM, ALL REQUIREMENTS/RECOMMENDATIONS IDENTIFIED ALL VA DOCUMENTS, SCOPE OF WORK DOCUMENTS, SPECIFICATIONS, PLANS, SCHEDULES, AND DETAILS FOR ADDITIONAL INFORMATION.
B. REFER TO GENERAL NOTES, SYMBOLS LEGEND, ABBREVIATIONS, DETAILS, ETC. ON OTHER SHEETS ON SHEETS EG000, EG001, ET401, ET402, ET403, AND REFER TO "ISTS - V4.0, JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO)", SECTION 4.2.8 BONDING AND GROUNDING" FOR ADDITIONAL INFORMATION.
C. REFER TO TYPICAL ROOM LAYOUTS, AND DETAILS IN THE VA OIT STANDARDS, THE "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES, VERSION 4.0, JUNE 1, 2023 |
INFRASTRUCTURE OPERATIONS (IO): APPENDIX B" FOR ADDITIONAL INFORMATION.
D. COORDINATE EXACT MOUNTING HEIGHTS AND LOCATIONS WITH ARCHITECTURAL ELEVATIONS, NEW WORK, AND ALL TRADES.
E. FOR BONDING OF RACEWAY SYSTEMS REFER TO SHEET TK102, AND REFER TO "ISTS - 4.0, JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO): SECTION 4.2.8 BONDING AND GROUNDING" FOR
ADDITIONAL INFORMATION
F. DURING THE RENOVATION AND INSTALLATION OF NEW INFRASTRUCTURE CONNECTED TO AGED BUILDINGS ON CAMPUS, AVOID ACCIDENTAL DISTURBANCE OF STRUCTURES WHICH MAY CONTAIN HAZADOUS MATERIALS. ASBESTOS CONTAINING MATERAILS AND LEAD BASED PAINT ARE LOCATED THROUGHOUT THE PROJECT. REFER TO SPECIFICATIONS 02 82 13.41 ASBESTOS ABATEMENT AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND DISPOSAL FOR AREAS BEING DISTURBANCE. REFER TO "ASBESTOS CONTAINING MATERIAL NOTES","LEAD BASED NOTES", AND "OTHER IDENTIFIED HAZARDOUS MATERIALS NOTES" ON "HAZARDOUS MATERIALS" DRAWINGS "9H-HA" SERIES.
(ALL NOTES MAY NOT APPLY TO THIS SHEET)
E1 PROVIDE (A TOTAL OF 2) 20A, 208V, 5 WIRE NEMA L21-20R RECEPTACLES, EACH MOUNTED AND SEISMICALLY SECURED TO CABLE TRAY SUPPORT SYSTEM (DO NOT SUPPORT TO CABLE TRAY) ABOVE IN A 2-GANG BACK BOX WITH A NEMA L21-20R DEVICE AND FACEPLATE, LABEL FACEPLATE WITH CIRCUIT NUMBER AND DEVICE IDENTIFICATION THAT IT SERVES (UNO). EACH POWERED FROM AN INDEPENDENT POWER SOURCE AS INDICATED, MOUNTED ON CABLE TRAY SUPPORTS: ONE SERVING RACK MOUNTED UPS LOCATED IN "UPS-(ROOM_NUMBER)-(RACK_IDENTIFIER)-01"; AND THE OTHER SERVING RACK MOUNTED PDU LOCATED IN "RPDU-(ROOM_NUMBER)-(RACK_IDENTIFIER).GL.R8". PROVIDE A 10' POWER CORD FOR EACH TERMINATING IN A L21-20P (PLUG). REFER TO TYPICAL ROOM LAYOUTS, AND DETAILS IN THE VA STANDARDS, THE "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES, VERSION 3.1, JULY 1, 2021 | SOLUTION DELIVERY-DATA CENTER
AND INFRASTRUCTURE ENGINEERING: APPENDIX B" FOR ADDITIONAL INFORMATION.
E2 ROUTE 3#12, 1#10 NEUTRAL, 1#12 GROUND IN 3/4" CONDUIT, UNO, THE NEUTRAL CONDUCTOR TO BE ONE SIZE LARGER THAT PHASE CONDUCTOR) TO A 20-AMP/3-POLE CIRCUIT BREAKER IN A 120/208V, 3P, 4W BRANCH PANEL AS INDICATED. SEE FULL FLOOR PLAN(S) FOR LOCATION OF EXISTING PANELBOARDS INDICATED. BACK BOX AND CONDUIT MOUNTED AND SEISMICALLY SECURED TO CABLE TRAY SUPPORT SYSTEM (DO NOT SUPPORT TO CABLE TRAY) WITHOUT EFFECTING THE SEISMIC SUPPORT, AND INTEGRITY OF THE CABLE TRAY SYSTEMS OR DEVICES.
· PROVIDE (1) 20A, 208V, 5 WIRE NEMA L21-30R RECEPTACLE FROM NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)/(1,3,5)" WITH 3#12H, 1#10N, 1#12G, IN 3/4" CONDUIT, THE NEUTRALS WILL BE UPSIZED ONE GAUGE TO MATCH THE CONDUCTORS IN THE PDUS. PROVIDE A 10' POWER CORD FOR EACH CONNECTION. PROVIDE A NEW
20A/3P CIRCUIT BREAKER.
· PROVIDE (1) 20A, 208V, 5 WIRE NEMA L21-30R RECEPTACLE FROM EXISTING NORMAL PANELBOARD "RP-GA2(31,33,35)" WITH 3#12H, 1#10N, 1#12G, IN 3/4" CONDUIT, THE NEUTRALS WILL BE UPSIZED ONE GAUGE TO MATCH THE CONDUCTORS IN THE PDUS. PROVIDE A 10' POWER CORD FOR EACH CONNECTION. PROVIDE A NEW
20A/3P CIRCUIT BREAKER.
E3 PROVIDE A NEW 40 AMP, 3 POLE, 4 WIRE, 120/208 VOLT ,12 CIRCUIT EMERGENCY PANELBOARD "E2RP-G(SUB-2)". FEED FROM EXISTING PANELBOARD "E2RP-G" WITH 3#8H, 1#6N, 1#10G, IN 1" CONDUIT. REWORK EXISTING EMERGENCY PANELBOARD "E2RP-G" AND RELOCATE THREE CONSECUTIVE 20A/1P CIRCUIT BREAKERS TO NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)". NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)" TO HAVE (3) 20A/1P CIRCUIT BREAKERS FOR RELOCATED CIRCUITS AND (1) 20A/3P CIRCUIT BREAKER FOR EMERGENCY FEED TO RACK “512A5-361-GB-117-A”.
E4 ADD NEW 120V GFCI LOCKABLE "IN-USE" RECEPTACLE AT 42" AFF CONNECTED COMPLETE TO CIRCUIT/PANELBOARD INDICATED, UNO. WITH 3#12,3/4"C, UNO. SEE FULL FLOOR PLAN(S) FOR LOCATION OF EXISTING PANELBOARDS INDICATED. (TYPICAL WHERE INDICATED WITH A "/"). REUSE EXISTING 120V RECEPTACLE LOCATIONS AND CIRCUITS WHERE POSSIBLE, PROVIDE ALL LABOR AND MATERIALS TO EXTEND DEVICE FLUSH TO NEW WALL/PLYWOOD SURFACE AND PROVIDE NEW DEVICE AND
FACEPLATE. UNO. REFER TO SYMBOLS ON "SHEET LEGEND" FOR DEVICE TYPE
GENERAL NOTES - ELECTRICAL:
KEYNOTES - ELECTRICAL:
RP-GA2 LOAD CALCULATIONS
225 AMP MCB, 120/208 VOLT, 3 PHASE / 4 WIRE
EXISTING ESTIMATE PANEL LOAD
CONNECTED
DEMAND
CONNECTED
DEMAND
VA 30 AMPS
VA 38 AMPS
VA 44 AMPS
VA 52 AMPS
NEW ESTIMATE PANEL LOAD
E2RP-G LOAD CALCULATIONS
100 AMP MCB, 120/208 VOLT, 3 PHASE / 4 WIRE
EXISTING ESTIMATE PANEL LOAD
CONNECTED
DEMAND
CONNECTED
DEMAND
VA 67 AMPS
VA 84 AMPS
VA 81 AMPS
VA 94 AMPS
NEW ESTIMATE PANEL LOAD
E2RP-G (SUB-2)
CONNECTED
DEMAND
VA 81 AMPS
VA 94 AMPS
BRANCH PANEL BOARD
60 AMP BUS
40 AMP BUS
DISCRIPTION CT
RELOCATED EXIST LOAD 2
RELOCATED EXIST LOAD
RELOCATED EXIST LOAD
SPARE
SPARE
SPARE
BKR
20/1
LF
R C C R R R
20/1 20/1 20/1 20/1 20/1
C
1666 0
0 0
3 PHASE / 4 WIRE
120/208 VOLT
B
1667 0
0 0
A 1666 0
0 0
BOLT-ON BREAKERS
MATCH EXISTING - AIC
LF
C C C L L H
BKR
20/3
20/1 20/1 20/2
CT
RPDU-GB-117-A.GL.R(B)
SPARE
SPARE
SPARE
DESCRIPTION
NEMA 1
SURFACE MOUNTED
LF = LOAD FACTOR C = CONTINUOUS, L = LIGHTING, R = RECEPTACLE, H = HACR (PER NAMEPLATE)
S = SUB FEED, K = KITCHEN, N = NON-CONTINUOUS
NOTES:
FEEDER: 3#8H, 1#6N, 1#10G, IN 1" CONDUIT
RELOCATE (3) CONSECUTIVE EXISTING 20A/1P CIRCUITS FROM EXISTING PANEL "E2RP-G"
ELECTRICAL SINGLE-LINE DIAGRAM
EJ101
314,9H,344,17H
BVG JDM
ELECTRICAL SINGLE-LINE DIAGRAM
NO SCALEF1
GENERAL NOTES
A. ALL NEW ELECTRICAL WORK TO RE-FEED THE EMERGENCY POWER PANEL IN BLDG 314C MUST BE COMPLETED
TO THE GREATEST EXTENT POSSIBLE BEFORE ANY DEMOLITION WORK IS TO TAKE PLACE. NEW POWER TO EP1-314 MUST BE IN PLACE AND SWITCHOVER IN POWER MADE PRIOR TO DEMOLITION OF EXISTING POWER IN
9H OR 344, ETC.
B. DISPLACED CEILING TILES ARE TO BE REUSED FOR ELECTRIC WORK IN CORRIDOR CEILING. CEILING TILES DAMAGED BY CONTRACTOR ARE TO BE REPAIRED OR REPLACED TO MATCH IN KIND TO SATISFACTION OF COR.
EDP
EXISTING OIL
FILLED
TRANSFORMER
500KVA
15KV - 208Y/120V
ATS
600A 208Y/120V 3Ø, 4W
GB 344
100A
MLO
208Y/120V 3Ø, 4W
BLDG 344
ALL TO BE
DEMOLISHED
BLDG 9H
ALL TO BE
DEMOLISHED
BLDG 314C
EXISTING
PANEL
EP1-314
150A
MCB
BLDG 17H
EXISTING
SHUNTED
ATS
208Y/120V
3Ø, 4W 600A
EXISTING
17H PANEL
EMDP
208Y/120V
600A
EXISTING
17H PANEL
MDP
208Y/120V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
TG001
9H
TELECOMMUNICATIONS SHEET INDEX,
SYMBOLS, ABBREVIATIONS,
AND GENERAL NOTES
REWKAP
20714
PHARIS
KEITH A.
L I C E N S E D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
PERRY POINT VA
MEDICAL CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
100% BID DOCUMENTS DEMOLISH BUILDING 9H
512A5-23-311
05-NOV-2024
VA MARYLAND HEALTHCARE SYSTEM
(502) 890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218
PERRY POINT VAMC - PERRY POINT, MD
1 1/05/2024
ABBREVIATIONS
ABBREV DESCRIPTION
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT, ARMORED CABLE, OR
ABOVE FINISHED COUNTER
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
AFC AUTOMATIC FREQUENCY CONTROL, AVAILABLE
FAULT CURRENT, OR ABOVE FINISHED COUNTER
AFCI ARC-FAULT CURRENT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
cd CANDELA
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DB DECIBEL OR DIRECT BURIAL
dB DECIBEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
ABBREVIATIONS
ABBREV DESCRIPTION
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPRF EXPLOSION PROOF
EWC ELECTRIC WATER COOLER
EXIST,(E),EX EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FP FIRE PROTECTION
FT FEET OR FOOT
G ELECTRICAL GROUND
G OR GND GROUND OR GENERATOR
GTB GROUND TERMINAL BOX
HT HEIGHT
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PNL PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
WP WEATHERPROOF
ACRONYMS
ACRONYM DEFINITION
AC ALTERNATING CURRENT
ACEG ALTERNATING CURRENT EQUIPMENT GROUND
AES ADVANCED ENCRYPTION STANDARD
AHJ AUTHORITY HAVING JURISDICTION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APC ANGLED PHYSICAL CONTACT
ARU AIR REMOVAL UNITS
ASD ASPIRATED SMOKE DETECTION
ASHRAE AMERICAN SOCIETY OF HEATING AND AIR-CONDITIONING
ENGINEERS
AWG AMERICAN WIRE GAUGE
BACnet BUILDING AUTOMATION AND CONTROL NETWORKING
PROTOCOL
BAS BUILDING AUTOMATION SYSTEM
BCM BRANCH CIRCUIT MONITORING
BCP BRANCH CIRCUIT PANELBOARD
BICSI BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL
BMS BATTERY MONITORING SYSTEM
CAB CHANGE ADVISORY BOARD
CANbus CONTROLLER AREA NETWORK BUS
CFM VA OFFICE OF CONSTRUCTION AND FACILITIES MANAGEMENT
CM COMMUNICATIONS
CMMS COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM
CMOP CONSOLIDATED MAIL OUTPATIENT PHARMACY
CMP COMMUNICATIONS PLENUM
CMR COMMUNICATIONS RISER
CRAC COMPUTER ROOM AIR CONDITIONER
CRAH COMPUTER ROOM AIR HANDLER
CSC CAMPUS SUPPORT CENTER
DC DIRECT CURRENT
DCIE DATA CENTER AND INFRASTRUCTURE ENGINEERING
DCIM DATA CENTER INFRASTRUCTURE MANAGEMENT
DR DISASTER RECOVERY
DX DIRECT EXPANSION
EBSR ENTERPRISE BASELINE AND STANDARD REVIEW
EC ELECTRONICALLY COMMUTATED
ED EQUIPMENT DISTRIBUTOR
EDICT ENTERPRISE DATA CENTER INFRASTRUCTURE
COLLABORATION TEAM
EGS EARTH GROUND SYSTEM
EIA ELECTRONIC INDUSTRIES ALLIANCE
FCU FAN COIL UNITS
FEC FACILITY TOTAL ELECTRICAL CONSUMPTION
GbE GIGABIT ETHERNET
Gb/s GIGABIT PER SECOND
HA HIGH AVAILABILITY
HC HORIZONTAL CROSS CONNECT
HD HIGH DENSITY
HD HORIZONTAL DISTRIBUTION
HDA HORIZONTAL DISTRIBUTION AREA
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
IAW IN ACCORDANCE WITH
ICC INTERMEDIATE CROSS CONNECT
IEC INTERNATIONAL ELECTROTECHNICAL COMMISSION
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IO INFRASTRUCTURE OPERATIONS
ISP INSIDE PLANT
IT INFORMATION TECHNOLOGY
ITOPS IT OPERATIONS AND SERVICES
ITS INFORMATION TRANSPORT SYSTEMS
ACRONYMS
ACRONYM DEFINITION
LAN LOCAL AREA NETWORK
LED LIGHT EMITTING DIODE
LFMC LIQUID-TIGHT FLEXIBLE METAL CONDUIT
LP LIMITED POWER
MATV MASTER ANTENNA TELEVISION SYSTEM
MCC MAIN CROSS CONNECT
MM MULTIMODE
MPDU MASTER POWER DISTRIBUTION UNIT
MPO MULTI-FIBER PUSH ON
NEC® NATIONAL ELECTRICAL CODE®
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NETWORK INTERFACE CARD
NSC NETWORK SUPPORT CENTER
O&M OPERATIONS AND MAINTENANCE
OIFO OFFICE OF INFORMATION FIELD OFFICE
OIT OFFICE OF INFORMATION AND TECHNOLOGY
OM OPTICAL MULTIMODE
PBB PRIMARY BONDING BUSBAR
PDU POWER DISTRIBUTION UNIT
PoE POWER-OVER-ETHERNET
PVC POLYVINYL CHLORIDE
PS POWER SUPPLY
PUE POWER USAGE EFFECTIVENESS
RBB RACK BONDING BUSBAR
RBC RACK BONDING CONDUCTOR
RCDD REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER
RDC REGIONAL DATA CENTER
RDC REMOTE DISTRIBUTION CABINET
rPDU RACK POWER DISTRIBUTION UNIT
RU RACK UNIT
SBB SECONDARY BONDING BUSBAR
SAN STORAGE AREA NETWORK
SD SOLUTION DELIVERY
SD STANDARD DENSITY
SIEER SITE INFRASTRUCTURE ENERGY EFFICIENCY RATING
SM SINGLE-MODE
SSL SECURE SOCKETS LAYER
SWDM SHORT WAVELENGTH DIVISION MULTIPLEXING
TBB TELECOMMUNICATION BONDING BACKBONE
TEBC TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR
TEC TOTAL DATA CENTER ENERGY CONSUMPTION
TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION
TIL TECHNICAL INFORMATION LIBRARY
TITEC TOTAL IT EQUIPMENT ENERGY CONSUMPTION
TPIEC TOTAL DATA CENTER PHYSICAL INFRASTRUCTURE ENERGY
CONSUMPTION
TR TELECOMMUNICATIONS ROOM
TUPSC TOTAL UPS LOAD ENERGY CONSUMPTION
UL UNDERWRITERS LABORATORIES INC
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
VA DEPARTMENT OF VETERANS AFFAIRS
VAMC VETERANS AFFAIRS MEDICAL CENTER
VACO VA CENTRAL OFFICE
VHA VETERANS HEALTH ADMINISTRATION
WC WATER COLUMN
zPDU ZONE POWER DISTRIBUTION UNIT
A. REFER TO SHEET 9H&314C-AD099 AND NARRATIVE FOR PHASING INFORMATION.
B. THE CONTRACTOR SHALL FOLLOW SEISMIC RESTRAINT AND DESIGN REQUIREMENTS IN ALL LATEST ADOPTED ALL FEDERAL, NATIONAL, AND ALL ASSOCIATED NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES WITH ALL AMENDMENTS AS ADOPTED BY THE CURRENT LEGISLATION.
INCLUDING BUT NOT LIMITED TO INTERNATIONAL BUILDING CODE (IBC), NFPA 70 - NATIONAL ELECTRIC CODE (NEC), NFPA 72 - NATIONAL FIRE
ALARM AND SIGNALING CODE, ETC. (COORDINATE WITH ALL APPLICABLE VA OIT STANDARDS)
C. THE TERM "PROVIDE" SHALL MEAN THE CONTRACTOR SHALL FURNISH AND INSTALL ITEMS AND CONNECT AS REQUIRED TO OBTAIN A COMPLETE
WORKING SYSTEM.
D. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL FEDERAL, NATIONAL, AND ALL ASSOCIATED NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES. INCLUDING BUT NOT LIMITED TO INTERNATIONAL BUILDING CODE (IBC), NFPA 70 - NATIONAL ELECTRIC CODE (NEC), NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, ETC. (COORDINATE WITH ALL APPLICABLE VA OIT STANDARDS)
E. ALL WORK SHALL BE COORDINATE WITH VA COR, EXISTING CONDITIONS, NEW CONSTRUCTION, MANUFACTURERS, ALL TRADES, AND THEIR DOCUMENTS. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING THEIR BID. CONTRACTOR SHALL CONTACT VA COR FOR AN APPOINTMENT TO VISIT THE SITE. NO ALLOWANCE WILL BE MADE FOR EXISTING CONDITIONS NOT KNOWN BY THE CONTRACTOR.
F. ALL EXISTING SYSTEMS MUST REMAIN OPERATIONAL DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR TIE-IN/CUT-OVER OF EXISTING SYSTEMS THAT ARE AFFECTED BY THIS PROJECT (INCLUDING BUT NOT LIMITED TO SECURITY/ACCESS CONTROL, PAGING, TELEPHONE, ANY BUILDING MANAGEMENT SYSTEM, AND ALL OTHER NECESSARY CONTROL AND EXISTING SYSTEMS APPLICABLE TO THIS REQUIREMENT). THE CONTRACTOR AND ENGINEERING ARE RESPONSIBLE FOR SUBMITTING TICKETS TO IT DEPARTMENT TO ASSIST IN TIE-IN/CUT-OVER AND SCHEDULING OF NETWORK SWITCHES AND SYSTEMS AS NEEDED. TICKETS MUST BE SUBMITTED NOT LESS THAN 14 CALENDAR DAYS IN ADVANCE OF THE TIE-IN/CUT-OVER AND
OTHER SUPPORT AS NEEDED.
G. PROVIDE ALL LOW-VOLTAGE CABLE MANAGEMENT SYSTEMS AND ROOM FITTINGS TO SUPPORT THE NEW RACK MOUNTED UPS SYSTEM, INCLUDING ALL REQUIRED GROUNDING, BRACING, BACKING, MOUNTING MATERIALS, AND BACK BOXES TO SUPPORT INSTALLATION OF THE NEW EQUIPMENT.
ETC.
H. PROVIDE ALL THE REQUIRED POWER, GROUNDING, BUILDING MANAGEMENT SYSTEM INTERFACES, AND OTHER SYSTEM REQUIREMENTS FOR
INSTALLATION OF THE NEW RACK MOUNTED UPS SYSTEM.
I. INSTALLATION OF NEW EQUIPMENT AND INTERIOR FINISHES IN ALL AREAS AFFECTED BY WORK UNDER THE SCOPE OF THIS PROJECT TO MEET ALL VA OIT STANDARDS. INCLUDING BUT NOT LIMITED TO: "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES (ISTS), VERSION 4.0; JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO)", "ISTS, V4.0, APPENDIX B: OIT DESIGN GUIDE TEMPLATE FOR CRITICAL INFRASTRUCTURE IN TELECOMMUNICATIONS SPACES", AND "PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (PSRDM), OCTOBER 1, 2020, REVISED May 1, 2024".
J. REMOVAL OF ANY EQUIPMENT AND ROOM FITTINGS FROM ANY AREA UNDER THE SCOPE OF WORK SHALL BE STORED PER VA DIRECTION.
K. ALL IDENTIFIED ASBESTOS CONTAINING MATERIALS AND LEAD BASED PAINT AFFECTED BY CONSTRUCTION ACTIVITIES SHALL BE ABATED AND DISPOSED OF IN ACCORDANCE WITH THE GOVERNING CODES OF THIS CONTRACT. REFER TO (AMA) DRAWINGS.
L. A CODE-SIZE INSULATED GROUND CONDUCTOR SHALL BE PROVIDED IN ALL FEEDER AND BRANCH CIRCUIT CONDUITS. THIS INCLUDES EXISTING DEVICES LOCATED WITHIN THE RENOVATED AREA THAT ARE TO REMAIN, REPLACE DEVICES AS REQUIRED.
M. ALL THHN/THWN/THHW/THW/XHHW CONDUCTORS ARE SIZED BASED ON 75°C TEMPERATURE RATING. ALL TERMINATIONS FOR ALL EQUIPMENT AND DEVICES SHALL BE LISTED AND IDENTIFIED FOR USE WITH 75°C CONDUCTORS. IF THE CONTRACTOR PROVIDES TERMINATIONS OF LESS THAN 75°C, THE ASSOCIATED CONDUCTOR SIZES SHALL BE INCREASED DUE TO THE DERATING AMPACITY PER NEC TABLE 310-16. CONTRACTOR SHALL MAKE ALL CHANGES (I.E. CONDUIT SIZES, ETC.) AS NECESSARY AND SHALL MAKE ALL REVISIONS ON "AS-BUILT" DRAWINGS.
N. MINIMUM CONDUIT SIZE IS 3/4 INCH, MINIMUM WIRE SIZE IS #12 AWG (COPPER CONDUCTOR THHN/THWN), UNLESS OTHERWISE NOTED ON PLANS
OR IN CIRCUIT REVIEWS.
O. ALL CONDUIT SHALL BE RUN CONCEALED WHEREVER POSSIBLE ABOVE CEILINGS, INSIDE WALLS, OR UNDER FLOOR SLAB (ONLY WHERE SHOWN DASHED ON PLAN), UNLESS OTHERWISE NOTED ON PLAN. IN HIGH-BAY (NO CEILING) AREAS, RUN EXPOSED CONDUIT HIGH AS POSSIBLE. ALL CONDUIT SHALL BE RUN PARALLEL OR PERPENDICULAR TO NEARBY SURFACE OR STRUCTURAL MEMBERS AND FOLLOW THE SURFACE CONTOURS AS MUCH AS PRACTICAL. NO CONDUIT SHALL BE INSTALLED IN FLOOR SLAB UNLESS SPECIFICALLY NOTED OTHERWISE. CONDUITS IN
TELECOMMUNICATIONS SPACES MAY BE RAN EXPOSED.
P. CONTRACTOR SHALL PROVIDE RIGID METAL SLEEVES TO FACILITATE PATHWAY (I.E. THRU BLOCK WALLS) FOR ELECTRICAL AND
TELECOMMUNICATION DEVICES.
Q. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR CONDUITS. DO NOT LEAVE PIPING/ CONDUITS OPEN ENDED. PROVIDE END BUSHINGS FOR ALL STUB-OUTS AND SLEEVES DESIGNATED TO BE UTILIZED FOR THIS PROJECT. COORDINATE WITH THE VA COR FOR SYSTEMS
NOT PROVIDED UNDER THIS CONTRACT.
R. PROVIDE FIRE STOP TO ALL CONDUITS AND DEVICES PENETRATING FIRE RATED WALLS, SMOKE WALLS AND FLOORS. REPLACE IN EXISTING CONDUITS AND SLEEVES WHERE EXISTING FIRE STOP HAS BE DISTURBED OR NEEDS TO BE ADDED DUE TO DEMOLITION, REWORKING, AND NEW WORK.
S. MOUNTING HEIGHTS ABOVE FINISHED FLOOR (AFF) ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
T. DEVICES/OUTLETS SHALL BE COORDINATED WITH EXISTING CONDITIONS FOR EXACT LOCATIONS AND MOUNTING, PRIOR TO ROUGH-IN. IF EXACT LOCATIONS AND MOUNTING ARE NOT INDICATED ON THE DRAWINGS, FIELD VERIFY EXACT LOCATIONS AND MOUNTING WITH VA COR AND ALL
TRADES.
U. DEVICES SHALL NOT BE INSTALLED BACK-TO-BACK ON A COMMON WALL WHERE CONDITION EXISTS FOR ADJACENT OFFICE ROOMS OR ROOMS
WHERE SOUND TRANSMISSION IS NOT PERMITTED. OR PROVIDE SOUND INSULATION.
V. TELECOMMUNICATIONS DRAWINGS SHALL BE COORDINATED WITH EXISTING CONDITIONS, ASSOCIATED ELECTRICAL DRAWINGS, AND ELECTRICAL CONTRACTOR FOR ALL NEW DEVICES, FIXTURES, ETC. FOR EXACT LOCATIONS BEFORE ROUGH-IN OF CONDUIT SYSTEM.
W. FROM EACH TELECOMMUNICATIONS EQUIPMENT AND TYPE OUTLET SIZE EACH CONDUIT PER NEC, BICSI AND VA OIT STANDARDS WITH A MINIMUM
40% FILL. PROVIDE A (MIN.) 1 INCH CONDUIT (WITH TWO PULL WIRES).
X. ALL TELECOMMUNICATIONS CABLING SHALL BE PLENUM RATED AND ROUTED IN A COMPLETE CABLE MANAGEMENT SYSTEM. (NO PVC CONDUIT SHALL BE INSTALLED). COORDINATE ALL CONDUIT RUNS WITH ALL EXISTING CONDITIONS, ALL TRADES AND THEIR DOCUMENTS.
Y. TURN OVER TO THE VA COR ALL MANUFACTURERS' WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED.
AC. TURN OVER TO THE VA COR ALL SPARE PARTS AND CABLING.
AD. INCLUDING BUT NOT LIMITED TO: ALL RATED AND NON-RATED PENETRATIONS, CUTTING, PATCHING, PAINTING OF CONDUITS, BOXES, WALLS, SUPPORTS, RACEWAY SYSTEMS, CABLING SYSTEMS, EQUIPMENT, ADJUSTMENTS DUE TO EXISTING CONDITIONS, AND ALL ADDITIONAL LABOR AND MATERIALS SHALL BE PROVIDED TO FOR COMPLETE AND OPERATIONAL SYSTEMS WHERE AS INDICATED IN THESE CONTRACT DOCUMENTS.
AE. COORDINATE ALL SECURITY AND DOOR ACCESS WORK WITH SYSTEM'S VENDOR REPRESENTATIVE AND VA COR BEFORE SUBMITTING BIDS AND PROVIDE A COMPLETE AND FULLY CONDUITED SYSTEM. IDENTIFY THE OUTSIDE ALL COVER PLATES IN THE TELECOMMUNICATIONS SPACES AND
ABOVE CEILINGS.
AI. COORDINATE EXACT POWER AND SIGNAL-VOLTAGE REQUIREMENTS, LOCATIONS, CONDUITS, AND CABLING REQUIREMENTS FOR ALL SECURITY AND DOOR ACCESS WORK WITH SYSTEM'S VENDOR REPRESENTATIVE AND VA COR BEFORE SUBMITTING BIDS . PROVIDE ALL LABOR AND MATERIALS TO
CONNECT COMPLETE.
ALL DEVICE MAY NOT APPLY TO THIS SHEET AND SOME MAY NOT BE SHOWN: REFER TO OTHER PLANS FOR ADDITIONAL INFORMATION
SYMBOL DESCRIPTION
KEYNOTE TAG: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION
DEVICE WITH DASHED LINES INDICATE ITEMS TO BE REMOVED/ABANDONED. IN WALL BEING REMOVED, REMOVE AS INDICATED. IN WALLS TO REMAIN, REMOVE DEVICE AND FACEPLATE, REFER TO PLANS FOR ADDITIONAL INFORMATION. (TYPICAL OF ALL DEVICE, REFER TO PLANS)
HOMERUN
ex or EX INDICATES EXISTING TO REMAIN
SYMBOL DESCRIPTION
TELECOMMUNICATIONS MANHOLE (NEW, UNO)
EXISTING CABLE TRAY SYSTEM.
NEW PLASTIC OPTICAL FIBER CABLE TRAY COVER: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI
REQUIREMENTS, AND ALL APPLICABLE CODES.
NEW OPTICAL FIBER CONDUIT PATH: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI REQUIREMENTS, AND ALL APPLICABLE CODES.
NEW OPTICAL FIBER CONDUIT PATH RAN IN SPACE BELOW: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI REQUIREMENTS, AND ALL APPLICABLE CODES.
NEW CONDUIT SLEEVE, NUMBER AND SIZE PER BISCI REQUIREMENTS. FIRESTOP PER ALL CODE AND BICSI REQUIREMENTS
EXISTING CONDUIT SLEEVE. FIRESTOP PER ALL CODE AND BICSI REQUIREMENTS
-EF- EXISTING FIBER TO REMAIN: ALL PROTECTION MEASURES SHALL BE TAKEN TO PROTECT ALL EXISTING OPTICAL FIBER SYSTEM AT ALL TIMES.
-DF- DEMOLITION OF EXISTING FIBER ROUTED IN BUILDINGS AND THROUGH CONNECTION CORRIDOR PATHS: REMOVE EXISTING FIBER AS INDICATED.
REFER TO RENOVATION FLOOR PLANS. UNO.
-NF-
NEW FIBER ROUTED THROUGH BUILDING FROM PATCH PANEL TO CONNECTION CORRIDOR PATHS: SEPARATE PATHWAYS (FOR REDUNDANT SIDE A AND SIDE B). ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE. REFER TO RENOVATION FLOOR PLANS. (MINIMUM 4'-0" SEPARATION).
UNO.
-2NF-
NEW FIBER ROUTES: INDICATES (2) REDUNDANT SEPARATE PATHWAYS (SIDE A AND SIDE B). ROUTED THROUGH BUILDING FROM PATCH PANEL TO CONNECTION CORRIDOR PATHS. ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE. REFER TO RENOVATION FLOOR PLANS. (MINIMUM
4'-0" SEPARATION). UNO.
-NOF- NEW OVERHEAD FIBER: REDUNDANT PATHWAYS (SIDE A AND SIDE B). ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE.
-NUF- NEW UNDER FIBER: REDUNDANT PATHWAYS (SIDE A AND SIDE B). ROUTED UNDERGROUND OR UNDER FLOOR (CRAW SPACE OR FLOOR BELOW).
-DOF- DEMOLITION OVERHEAD FIBER: PATHWAY(S) ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE.
-DUF- DEMOLITION UNDER FIBER: PATHWAY(S) ROUTED UNDERGROUND OR UNDER FLOOR (CRAW SPACE OR FLOOR BELOW).
12SM 12 STRAND SINGLE-MODE OPTICAL FIBER LINE: BLANK = (1) SET, (#) NUMBER OF SETS: i.e. (2)12SM = 2 SETS OF 12SM
SMPC SINGLE-MODE DUAL CABLE PATCH CORD (2) LC TO (2) LC CONNECTORS
OPTICAL FIBER DISTRIBUTION EQUIPMENT - FIBER PATCH PANEL (WITH FDCs AS INDICATED): "A SIDE" OF REDUNDANT RUNS
OPTICAL FIBER DISTRIBUTION EQUIPMENT - FIBER PATCH PANEL (WITH FDCs AS INDICATED): "B SIDE" OF REDUNDANT RUNS
EXISTING SERVER SWITCH
NEW OPTICAL FIBER DISTRIBUTION JUNCTION / PULL BOX, SIZE PER NEC "314.28 PULL AND JUNCTION BOXES AND CONDUIT BODIES."
OPTICAL FIBER DISTRIBUTION WALL BOX
OPTICAL FIBER WALL BOX
GROUND BAR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION
FIRE-RATED 3/4" AC GRADE FIRE-REATED PLYWOOD, WITH TWO COATS OF HIGH-GLOSS WHITE FIRE-RESISTANT PAINT: REFER TO DETAILS, AND
PLANS FOR ADDITIONAL INFORMATION
SYMBOL DESCRIPTION
TELECOMMUNICATIONS ROOM SECURITY/ACCESS CONTROL SYSTEM CABINET: CONNECT TELECOMMUNICATIONS ROOM'S ASSOCIATED DEVICES, UNO: COORDINATE WITH EXISTING CONDITIONS AND THE ALARM VENDOR FOR A COMPLETE AND OPERABLE SYSTEM. SEE ALL NOTES, PLANS, AND
DETAILS.
SECURITY DOOR ACCESS, MOUNT 46"AFF: KP = KEY PAD, CR = CARD READER. CONNECT INTO TELECOMMUNICATIONS ROOM'S NEW ALARM SYSTEM, UNO: COORDINATE WITH EXISTING CONDITIONS AND THE ALARM VENDOR FOR A COMPLETE AND OPERABLE SYSTEM. SEE ALL NOTES, PLANS, AND
DETAILS.
SYMBOL DESCRIPTION (SEE "NOTES")
FIRE ALARM: PULL STATION, UNO.
SYMBOL DESCRIPTION
RECESSED AND SURFACE MOUNTED 208V-240V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE .
RECESSED AND SURFACE MOUNTED 208V-240V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR
NAME, VOLTAGE AND SIZE .
NOTES:
1. SINGLE GANG WALL DEVICES TO HAVE 411
16" SQUARE, 21
2" DEEP BACK BOX WITH SINGLE GANG PLASTER RING.
2. DOUBLE GANG WALL DEVICES TO HAVE 411
16" SQUARE, 21
2" DEEP BACK BOX WITH TWO GANG PLASTER RING.
3. COORDINATE SIZE OF BACK BOX, PLASTER RING, CONDUIT(S), CABLING, SUPPORT, AND ALL ACCESSORIES FOR EACH DEVICE.
4. COORDINATE SIZE OF BACK BOX, PLASTER RING, CONDUIT(S), CABLING, SUPPORT, AND ALL ACCESSORIES FOR EACH DEVICE.
5. SEE VA BARRIER FREE DESIGN GUIDE PG-18-13.
C ex
A SIDE
B SIDE
EX SW
OFJ
OFD
OFB
SEC-AC
KP
F
A. COORDINATE WITH ANY CURRENT PERRY POINT EHRM PROJECT(S) TO AVOID POSSIBLE REDUNDANCIES.
B. ALL NEW FIBER WORK SHALL BE INSTALLED, TEST AND IN COMPLETE WORKING ORDER PRIOR TO THE DISCONNECTION AND/OR REMOVAL OF ANY AND
ALL EXISTING FIBER AND COPPER BACK BONE.
C. REFER TO GENERAL NOTES, SYMBOLS LEGEND, ABBREVIATIONS, ETC. ON SHEETS TG001.
D. REFER "SITE PLAN - ENLARGED TELECOM, FIBER OPTIC UTILITY CONDITIONS AND DEMOLITION", SHEET "CU405", "SITE PLAN - AREA "A" -
TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-A", "SITE PLAN - AREA "B" - TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-B", "SITE PLAN - AREA "C" - TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-C", "SITE PLAN - AREA "A" - TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-A", "SITE PLAN - AREA "B" - TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-B", AND "SITE PLAN - AREA "C" -
TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-C" FOR ADDITIONAL INFORMATION.
E. ALL DEVICES AND PATHWAYS ARE NOT INDICATED ON DRAWINGS, DEVICE INDICATED ON DRAWINGS ARE FOR ADDITIONAL CLARIFICATION. FIELD VERIFY
WITH EXISTING CONDITIONS.
F. COORDINATE ALL DEMOLITION AND RELOCATION WORK WITH EXISTING CONDITIONS, ALL TRADES AND THEIR DOCUMENTS, VA COR, VA OIT STANDARDS, VA VENDORS, AND ALL NEW WORK. PROVIDE ALL LABOR AND MATERIAL WHERE REQUIRED.
G. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, TELECOMMUNICATIONS EQUIPMENT, CIRCUITS, FEEDERS, RACEWAY SYSTEMS, CABLING, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES. THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS. IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK INDICATED HEREIN OR AS DEFINED IN THE SCOPE OF WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO HIS/HER SATISFACTION THAT HE/SHE WILL BE ABLE TO COMPLETE ALL WORK REQUIRED
FOR THE BID AMOUNT PROPOSED.
H. PROTECT AND MAINTAIN EXISTING UTILITY SERVICE THAT ARE TO REMAIN AND EXISTING SERVICES BEING REMOVED UNTIL THE NEW OPTICAL FIBER SYSTEM IS FULLY OPERATIONAL AND HAS BEEN COMMISSIONED. ALL SERVICES SHALL BE KEPT OPERATIONAL AT ALL TIMES DURING ALL PHASES OF CONSTRUCTION. ALL PROTECTION MEASURES SHALL BE TAKEN TO PROTECT AND MAINTAIN THE NEW OPTICAL FIBER SYSTEM AT ALL TIMES.
I. CONDUIT ROUTES, FIBER RUNS/COUNTS AND HANDHOLE LOCATIONS ARE DIAGRAMMATIC IN NATURE. COORDINATE WILL ALL TRADES AND VERIFY EXACT LOCATION IN FIELD PRIOR TO INSTALLATION. PROVIDE COORDINATION DRAWINGS FOR SITE UTILITY WORK.
J. ALL NECESSARY OUTAGES OF ANY UTILITY SERVICE OR ANY EXISTING TECHNOLOGY AND SECURITY SYSTEM SHALL BE SCHEDULED 14 DAYS IN
ADVANCE WITH THE OWNER.
K. PROTECT ALL NEW AND EXISTING WORK AGAINST DAMAGE.
L. CONDUIT ENDS SHALL BE SEALED. PROVIDE MECHANICAL PLUGS FOR EMPTY AND REWORKED DUCTS ON BOTH ENDS. PROVIDE TEMPORARY
MECHANICAL PLUGS FOR DUCTS UNTIL CABLING IS INSTALLED AND COMPLETED.
M. THE CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF EXISTING CIRCUITS THAT CONTAIN DEVICES OR EQUIPMENT THAT ARE TO REMAIN. WHERE
DEMOLITION/RELOCATION OF DEVICES AND EQUIPMENT IS INDICATED, THE CONTRACTOR SHALL ENSURE THAT OTHER DEVICES OR EQUIPMENT THAT ARE CONNECTED TO THE SAME CIRCUIT, WHETHER "UPSTREAM" OR "DOWNSTREAM", SHALL REMAIN OPERATIONAL.
N. COORDINATE WITH CAMPUS POLICE AND IT DEPARTMENT ALL WORK BEING PERFORMED ON ALL DEVICES ASSOCIATED WITH THE SECURITY SYSTEM.
PROVIDE A WRITTEN NOTICE WITHIN A MINIMUM OF TWO BUSINESS DAYS OF PRIOR OF ANY WORK BEING PERFORMED ON OR THAT EFFECTS THE SECURITY SYSTEM. CLARIFY THE WORK BEING DONE AND GET APPROVAL FROM CAMPUS POLICE ON ACTIONS TAKEN TO SECURE ALL AREAS EFFECTED.
O. DURING THE DEMOLITION AND REMOVAL OF INFRASTRUCTURE CONNECTED TO BUILDING 9H AND OTHER SIMILARLY AGED BUILDINGS ON CAMPUS, AVOID ACCIDENTAL DISTURBANCE OF STRUCTURES WHICH MAY CONTAIN HAZARDOUS MATERIALS. ASBESTOS CONTAINING MATERIALS AND LEAD BASED PAINT ARE LOCATED THROUGHOUT THE PROJECT. REFER TO SPECIFICATIONS 02 82 13.41 ASBESTOS ABATEMENT AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND DISPOSAL FOR AREAS BEING DISTURBANCE. REFER TO “ASBESTOS CONTAINING MATERIAL NOTES”, “LEAD BASED NOTES”, AND “OTHER IDENTIFIED HAZARDOUS MATERIALS NOTES” ON “HAZARDOUS MATERIALS” DRAWINGS “9H-HA” SERIES.
P. CONTRACTOR SHALL TAKE GREAT CARE IN THE REMOVING AND REPLACING CEILING TILES WHERE REQUIRED DURING RENOVATION AND DEMOLITION.
WHERE TILES ARE DAMAGE, CONTRACTOR SHALL REPLACE WITH NEW OR LIKE NEW TO MATCH EXISTING AREAS IN KIND.
ALL DEVICE MAY NOT APPLY TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .