512A5-23-311_DRAWINGSPart-3.pdf

PDF 20 MB Posted

Attached to
P400--512A5-23-311 - Demolish Building 9H
Solicitation number
36C24525B0005
Issued by

About this file

These technical drawing files detail a comprehensive demolition project for Buildings 9H and 344 at the Perry Point VA Medical Center in Maryland. The project involves complete demolition of Building 9H, a two-story concrete and masonry structure originally built in 1924, encompassing approximately 54,500 gross square feet. Key technical requirements include hazardous material abatement, utility relocation, fiber optic network redistribution, and site restoration.

Specific technical scope includes removing all building components, abating asbestos and lead-based paint, disconnecting and relocating telecommunications infrastructure, relocating emergency power systems, constructing a new telecommunications closet in Building 314C, and installing new fiber optic cabling to multiple campus buildings. The project requires extensive coordination with VA infrastructure teams, adherence to strict environmental and safety protocols, and completion within 400 calendar days. The demolition will involve precise utility management, infrastructure preservation for active campus systems, and comprehensive waste management with requirements for recycling and proper hazardous material disposal.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PANEL "GB 344"

GEN.

200KW/

250KVA.

AT 0.8PF.

GEN. SWGR. 6

EMERGENCY POWER DISCONNECT TO BLDG 9H

CABLE TRAY FOR

EMERGENCY POWER

DIESEL DAY TANK

CONTROL PANEL

PRIMARY POWER SWITCH FOR BLDG 9H

500KVA TRANSFORMER SUBSTATION "SS-6"

NORMAL POWER

DISCONNECT TO BLDG 9H

FIRE ALARM

CONTROL PANEL

MUFFLER

DUAL 3ɸ FEEDERS (NORMAL)

TO 12-DUCT BANK TO BLDG 9H

SOUND

CASING

DUAL 3ɸ FEEDERS (EMERGENCY)

TO 12-DUCT BANK TO BLDG 9H

4160V PRIMARY FEEDER

FROM MANHOLE E45

EXHAUST

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

344-ED102

KEY PLAN

NOT TO SCALE

F9

BUILDING 344 -

ELECTRICAL EXISTING CONDITIONS AND

DEMOLITION PLAN 344

BVG JDM

BUILDING 344 EXTERIOR - FRONT ENTRANCE

SCALE: N/A

C5EXISTING FLOOR PLANS - GENERATOR BUILDING NO. 344

SCALE: NTS

C1 EXISTING DIESEL DAY TANK

SCALE: N/A

C7

FIRE ALARM PULLBOX IN CORRIDOR C400

SCALE: N/A

E6

A. THE GENERAL SCOPE OF WORK FOR BUILDING 344 IN THIS PROJECT IS TO DEMOLISH ENTIRE BUILDING AND ALL ASSOCIATED COMPONENTS. REMOVE ALL EQUIPMENT, LIGHTING, PANELS, BRANCH CIRCUITS, ALL ELECTRICAL POWER CABLING FEEDING INTO AND OUT OF THE BUILDING, AND EXISTING DUCT BANK BETWEEN BUILDING 344 AND BUILDING 9H. NO BURIED CABLES SHALL BE ABANDONED IN PLACE. SEE DETAIL C1 ON 344-ED102 FOR THE EXISTING PLANS FOR INFORMATION. PICTURES AND OTHER DETAILS ON THIS 344-ED102 AND 344-EK102 ARE TO GIVE OVERALL GENERAL INFORMATION RELATED TO THE SOW.

CONTRACTOR SHALL DISCONNECT ALL INCOMING AND OUTGOING FEEDERS AND SIGNAL CABLING

COMPLETE.

B. PANEL EP1-314 LOCATED IN BUILDING 314C MUST BE CONNECTED TO NEW SOURCE OF POWER AS SHOWN ON DRAWING EP105 PRIOR TO POWER DEMOLITION WHICH WOULD INTERRUPT THE EXISTING SOURCE OF POWER (VIA CONNECTION BACK TO THIS EMERGENCY GENERATOR VIA EMERGENCY PANEL IN BUILDING 9H).

C. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION. PROVIDE ALL LABOR AND

MATERIAL WHERE REQUIRED.

D. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, SYSTEMS EQUIPMENT, CIRCUITS, FEEDERS, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES.

THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS.

IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. DETAIL C1 IS FROM A PREVIOUS INITIAL BUILD OF THE BUILDING, IT IS NOT VERIFIED FOR ALL CIRCUITS, LAYOUT, CONDUITS, PLACEMENTS, ETC. IT IS A GENERAL REPRESENTATION OF THE BUILDING FOR OVERALL GENERALIZED INFORMATION ONLY. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO THEIR SATISFACTION THAT THEY WILL BE

ABLE TO COMPLETE ALL WORK REQUIRED FOR THE BID AMOUNT PROPOSED.

E. REMOVE EXISTING 250KVA EMERGENCY GENERATOR SET AND FUEL TANK AND ALL ASSOCIATED COMPONENTS AND WIRING COMPLETE. PICTURE C4 ON 344-EK102 SHOWS GENSET. PICTURE F1 HAS

GENERATOR INFORMATION.

F. REMOVE UNIT SUBSTATION: PRIMARY SWITCH, 500KVA TRANSFORMER AND SECONDARY COMPARTMENTS

AND MAIN SWITCH. PICTURE C1 ON 344-EK102 SHOWS UNIT SUB.

G. EXISTING FIRE ALARM SYSTEM TO BE DISCONNECTED FROM CAMPUS FA SYSTEM. DETAIL E7 ON 344-ED102 SHOWS EXISTING PULL BOX AT CEILING LEVEL IN CORRIDOR C400. DISCONNECT ALL DEVICES IN 344 AND PULL ALL CABLING FROM DEVICES BACK TO THIS PULL BOX. CONTRACTOR SHALL ENSURE ANY DOWN STREAM DEVICES SERVED FROM PULL BOX ARE KEPT IN SERVICE. DETAIL F7 ON 344-ED102 SHOWS

THESE FIRE ALARM CONDUITS PENETRATING BUILDING 344 – FOR REFERENCE ONLY.

H. SEE DRAWING EJ101 FOR SINGLE-LINE DIAGRAM ASSOCIATED WITH BUILDING 344 COMPONENTS AND

CONNECTIONS TO BUILDING 9H WHICH ARE BEING REMOVED.

I. DRAWING 344-EK102 FOLLOWING SHOWS MORE PICTURES OF EQUIPMENT IN BUILDING 344.

J. REMOVE LIGHTING AND APPLIANCE PANEL GB-344, SEE PICTURE F3 AND F5 ON 344-EK102.

K. PRIOR TO THE REMOVAL OF THE DIESEL DAY TANK, THE TANK IS TO BE DRAINED AND ANY REMAINING

FUEL IS TO BE DISPOSED OF PROPERLY.

FIRE ALARM PENETRATIONS ON EXT. BLDG 344

SCALE: N/A

F6

FA PULLBOX IN

CORRIDOR C400BUILDING 344 - EMERGENCY POWER GENERATOR AND EQUIPMENT TO BLDG 9H - EXISTING CONDITIONS

SCALE: NTSF1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

BUILDING 9H & CORRIDOR -

ELECTRICAL

EXISTING CONDITIONS

BVG JDM

9H-EK101

BUILDING 9H TO BUILDING 314C CORRIDOR - EXISTING CONDITIONS

SCALE: NTS

C1

9H

KEY PLAN

NOT TO SCALE

C9

A. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION

AND/OR RELOCATION OF THEIR EQUIPMENT. PROVIDE ALL LABOR AND

MATERIAL WHERE REQUIRED.

B. THE PURPOSE OF THIS DRAWING IS TO SHOW GENERAL CONDITIONS. NOT ALL

WORK IS DEPICTED. CONTRACTOR SHALL COORDINATE ALL REMOVAL,

WHETHER SHOWN OR NOT.

1. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.

2. PIPING. CAP OFF AT NEAREST POINT IN BUILDING 314C AND DEMOLISH.

3. 1 1/2" CONDUIT WITH POWER OVER ETHERNET CABLE. DISCONNECT AT

JUNCTION BOX ABOVE DROP CEILING IN BUILDING 314C. DEMOLISH THE

REMAINING CONDUIT AND CABLE.

4. (2) SETS OF ARMORED CABLE. DISCONNECT AND DEMOLISH.

5. FIRE ALARM CONDUIT AND CABLE. DISCONNECT AND DEMOLISH.

6. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.

7. POWER CABLE AND CONDUIT. DISCONNECT AND DEMOLISH.

BUILDING 9H ELECTRICAL ROOM - EXISTING ATS TO BE DEMOLISHED

SCALE: NTS

C5

BUILDING 9H ELECTRICAL ROOM - EXISTING DUCT FEEDS FROM BLDG 344

SCALE: NTS

F1

BUILDING 9H ELECTRICAL ROOM - NORMAL POWER DISCONNECT

SCALE: NTS

C7

ATS

BUILDING 9H NEAR ELECTRICAL ROOM ENTRANCE - FA CONTROL PANEL

SCALE: NTS

F3 BUILDING 9H ELECTRICAL ROOM 16-A - PANEL MDP

SCALE: NTS

F5 BUILDING 9H ELECTRICAL ROOM 16-A - PANEL EMDP

SCALE: NTS

F7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

BUILDING 344 -

ELECTRICAL EXISTING CONDITIONS

BVG JDM

344-EK102

NORMAL POWER DISCONNECT (LEFT), 500KVA XFMR (CENTER), PRIMARY VOLTAGE SWITCH (RIGHT)

SCALE: NTS

C1

GENERATOR NAMEPLATE

SCALE: N/A

F1

KEY PLAN

NOT TO SCALE

F9

DDC CONTROL PANEL

SCALE: N/A

F7EMERGENCY POWER AND CONTROL PANELS

SCALE: N/A

F3 PANEL GB-344 SCHEDULE

SCALE: N/A

F5

A. THE GENERAL SCOPE OF WORK FOR BUILDING 344 IN THIS PROJECT IS TO DEMOLISH ENTIRE BUILDING AND ALL ASSOCIATED COMPONENTS. REMOVE ALL EQUIPMENT, LIGHTING, PANELS, BRANCH CIRCUITS, ALL ELECTRICAL POWER CABLING FEEDING INTO AND OUT OF THE BUILDING, AND EXISTING DUCT BANK BETWEEN BUILDING 344 AND BUILDING 9H. NO BURIED CABLES SHALL BE ABANDONED IN PLACE. SEE DETAIL C3 ON 344-ED102 FOR THE EXISTING PLANS FOR INFORMATION. PICTURES AND OTHER DETAILS ON THIS 344-ED102 AND 344-EK102 ARE TO GIVE OVERALL GENERAL INFORMATION RELATED TO THE SOW.

CONTRACTOR SHALL DISCONNECT ALL INCOMING AND OUTGOING FEEDERS AND SIGNAL CABLING

COMPLETE.

B. PANEL EP1-314 LOCATED IN BUILDING 314C MUST BE CONNECTED TO NEW SOURCE OF POWER AS SHOWN ON DRAWING 314&9H-EP101 PRIOR TO POWER DEMOLITION WHICH WOULD INTERRUPT THE EXISTING SOURCE OF POWER (VIA CONNECTION BACK TO THIS EMERGENCY GENERATOR VIA EMERGENCY PANEL IN

BUILDING 9H).

C. COORDINATE WITH ALL TRADES AND THEIR DOCUMENTS FOR THE DEMOLITION. PROVIDE ALL LABOR AND

MATERIAL WHERE REQUIRED.

D. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, SYSTEMS EQUIPMENT, CIRCUITS, FEEDERS, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES.

THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS.

IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO THEIR SATISFACTION THAT THEY WILL BE ABLE TO COMPLETE ALL WORK

REQUIRED FOR THE BID AMOUNT PROPOSED.

E. REMOVE EXISTING 250KVA EMERGENCY GENERATOR SET AND FUEL TANK AND ALL ASSOCIATED COMPONENTS AND WIRING COMPLETE. PICTURE C4 ON 344-EK102 SHOWS GENSET. PICTURE F1 HAS

GENERATOR INFORMATION.

F. REMOVE UNIT SUBSTATION: PRIMARY SWITCH, 500KVA TRANSFORMER AND SECONDARY COMPARTMENTS

AND MAIN SWITCH. PICTURE C1 ON 344-EK102 SHOWS UNIT SUB.

G. EXISTING FIRE ALARM SYSTEM TO BE DISCONNECTED FROM CAMPUS FA SYSTEM. DETAIL E7 ON 344-ED102 SHOWS EXISTING PULL BOX AT CEILING LEVEL IN CORRIDOR C400. DISCONNECT ALL DEVICES IN 344 AND PULL ALL CABLING FROM DEVICES BACK TO THIS PULL BOX. CONTRACTOR SHALL ENSURE ANY DOWN STREAM DEVICES SERVED FROM PULL BOX ARE KEPT IN SERVICE. DETAIL F7 ON 344-ED102 SHOWS

THESE FIRE ALARM CONDUITS PENETRATING BUILDING 344 – FOR REFERENCE ONLY.

H. SEE DRAWING EJ101 FOR SINGLE-LINE DIAGRAM ASSOCIATED WITH BUILDING 344 COMPONENTS AND

CONNECTIONS TO BUILDING 9H WHICH ARE BEING REMOVED.

I. REMOVE LIGHTING AND APPLIANCE PANEL GB-344, SEE PICTURE F3 AND F5 ON 344-EK102.

TRANSFORMER NAMEPLATE

SCALE: N/A

C4

CORRIDOR

MEN

B5

WOMEN

STAIR 2

B3

ELEVATOR

ELEVATOR

MACH RM

B4

BILLARD'S

B8

CRAWL SPACE

SVC RM

B2

MECH

B1

OUTDOOR

DRAIN

SPACE

UP

UP

UP

UP

TO BLDG 9H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

BUILDING 314A, B, C, AND 17H - FIRST FLOOR PLAN

ELECTRICAL POWER PLAN

314&17H-EP101

314, 17H

KAP JDM

BUILDING 314A, B, C & 17H - PARTIAL FIRST FLOOR PLAN - ELECTRICAL POWER NEW WORK

SCALE: 3/32" = 1'-0"

A

GENERAL NOTES

A. ALL NEW ELECTRICAL WORK TO RE-FEED THE EMERGENCY POWER PANEL IN BLDG 314C MUST BE COMPLETED

TO THE GREATEST EXTENT POSSIBLE BEFORE ANY DEMOLITION WORK IS TO TAKE PLACE. NEW POWER TO EP1-314 MUST BE IN PLACE AND SWITCHOVER IN POWER MADE PRIOR TO DEMOLITION OF EXISTING POWER IN

9H OR 344, ETC.

B. DISPLACED CEILING TILES ARE TO BE REUSED FOR ELECTRIC WORK IN CORRIDOR CEILING. CEILING TILES DAMAGED BY CONTRACTOR ARE TO BE REPAIRED OR REPLACED TO MATCH IN KIND TO SATISFACTION OF COR.

C. CONTRACTOR SHALL REVIEW AND COORDINATE WITH EXISTING FIELD CONDITIONS AT CEILING TO DETERMINE

THE BEST LOCATION AND METHOD OF INSTALLATION OF FEEDER CONDUIT.

KEY NOTES

1. EXISTING EMERGENCY PANEL EP1-314 (150A MCB, 120V/208Y, 3 PHASE) TO REMAIN. EXISTING MAIN BREAKER

TO BE REMOVED AND REPLACED WITH 100A MCB. THE EXISTING FEEDER, CONDUIT TO SERVICE FROM

BUILDING 9H TO BE REMOVED PER DEMOLITION PLANS COMPLETE.

2. PROVIDE NEW ELECTRICAL FEEDER FOR EP1-314 ALONG CORRIDOR CEILING. EXISTING CEILING CONTAINS SEVERAL EXISTING CONDUITS FOR OTHER SYSTEMS. FEEDER SHALL BE PER SINGLE-LINE ON SHEET EJ101, FROM EP1-314 TO BUILDING 17H PANEL EMDP. REFERENCE SINGLE-LINE DRAWING EJ101 FOR ADDITIONAL

INFORMATION.

3. REMOVE ATS COMPONENTS AND LEAVE ONLY SPLICED, PERMANENT CONNECTION TO SERVE EMDP.

REFERENCE SINGLE-LINE DRAWING EJ101 FOR ADDITIONAL INFORMATION.

4. PROVIDE CORE DRILL AND SLEEVE AT WALL PENETRATIONS FOR FEEDER CONDUIT AS NECESSARY. FIELD

COORDINATE.

EP1-314

BUILDING 314C

BUILDING 314B

BUILDING 314A

BUILDING 17H

EMDP ATS

WAITING

CG-2B

VESTIBULE

LOBBY

CG-2A

SCREEN

TRIAGE

GB-100

ANTE RM

GB-104A

MENS

TOILET

GB-101

CORRIDOR

CG-4

TRIAGE

EXAM RM

GB-102

VESTIBULE

CRASH

CART

GB-106

LIFE

SUPPORT

CG-5B

LAV CLOSET

GB-106A

NURSE

STATION

CG-5A

SUPPLY

RM

GB-107

MED

CLOSET

CG-4A

TOILET

GB-107A

SOCIAL

WORK

OFFICE

GB-105

TREATMENT

RM

GB-103

TOILET

GB-103A

STR W/C

STORAGE

CG-8A

WOMENS

GB-114

EXAM RM

GB-116

EXAM RM

GB-118

EXAM RM

GB-120

PULM

LAB

GB-122

EXAM RM

GB-124

S U

GB-109MEDICATION

RM

GB-108

TOILET

GB-112A

NURSE

TOILET

GB-110

CORRIDOR

GB-6

ON CALL

GB-112

STAIR-2

HAC

GB-128

MENS

TOILET

GB-130 LOUNGE

GB-132

NURSE

MGR

OFFICE

GB-148

EXAM RM

PHYSICIANS

OFFICE

GB-150

PAT ED

GB-152

NUTRITION

THERAPY

GB-170

FOLDING

PARTITION

DIETICIAN

OFFICE

GB-172

OCCUPATIONAL

HEALTH

OFFICE

GB-192

CO-ORDR VAMHCS

OCCUPATIONAL HEALTH OFFICE

GB-194

SPEECH/

LANGUAGE

PATHOLOGIST

OFFICE

GB-196

GA

VESTIBULE

SECY/WAITING

PHARMACY

SVC

CG-14A

ASST CHIEF

PHARMACY

SVC OFFICE

GC-100 HAC

GC-104

MENS

TOILET

GC-106 CONTROLLED

SUBSTANCE

GC-108A

IV ADMIN AND ASEPTIC

TRANSFER

GC-108B

IV ANTE

RM

GC-108BA

EXTEMPORANEOUS

COMPOUNDING

REPACK

GC-108C

ACTIVE

STORAGE

FP

SWING SPACE

OFFICE

CB-14B

CORRIDOR

CG-14

OFFICE

CUBICLES

CG-14B

PHARMACY

CONSULT

OFFICE

GC-101

FP

FOLDING

PARTITION

STORAGE

CORRIDOR

CG-1C

PHARMACY

GC-108

DISPENSING

DISPENSING

WAITING

AREA

CG-1B

CO-PAY

CASHIER

GC-108E

MAIL-OUT

ELECTRICAL

GD-110

UNIT

DOSE

STERILE

FLUID

STORAGE

MED SUPPLY

AND PROSTHETICS

CENTRAL

RECEIVING

GC-108D

FP

FUTURE

STAIR

STAIR-1

ELEVATOR

MACH RM

GD-100

ELEVATOR

P1ELEVATOR

LOBBY

CG-1A

CORRIDOR

CG-1

VESTIBULE

MAIL

DIST

REPRODUCTION

RM

GD-101

MAIL

METERING

GD-103

SUPV

OFFICE

GD-103A

ADMITTING

GA-118

EQUIP

EMBOSSER

GA-118E

INTERVIEW

GA-118D

MAS COPIER

GA-118B

CHIEF M I S

OFFICE

GA-118C FP

OFFICE SUPPLY

GA-118A

MED

RECORD

STORAGE

GA-116H

CLOSET

FILE RM

GA-116

ASST CHIEF M

A S OFFICE

GA-111

HIMS

CODING

OFFICE

GA-116I

LOUNGE

GA-116G

HIMS

EDUCATOR

OFFICE

GA-116F

GEN OFFICE AND

TRANSCRIPT

GA-116

RELEASE

OF INFO

OFFICE

GA-114

AGENT

CASHIER

GA-112

AGENT

CASHIER

GA-110

HIMS

SUPV

OFFICE

GA-116A

SECY

OFFICE

GA-116B

CHIEF M

I S

OFFICE

GA-116C

ADMINISTRATIVE

OFFICE

GA-104B

SWING

SPACE

OFFICE

GA-104C

SOCIAL

WORK

OFFICE

GA-108

CONSUMER

RELATIONS

OFFICE

GA-106

MANAGED

CARE

OFFICES

GA-104

HAC

GA-102

TEL

CLOSET

GA-100

SITE MGR

MANAGED CAR

GA-104A

WOMENS

TOILET

GA-116E

CORRIDOR

CG-7

WAITING

CG-2C

TEL/FIRE ALARM

CLOSET

GB-115

ELECTRICAL

CLOSET

GB-113

TEL CLOSET

GB-117

EXAM RM

GB-119

EXAM RM

GB-140

NURSE/MAS

CB-2D

MENS

TOILET

GB-161

WOMENS

TOILET

GB-163

SOCIAL

WORKER

MENTAL HEALTH

SVC OFFICE

GB-165

NURSE

OFFICE

GB-182

CONFERENCE

RM

GB-180

PATIENT

REP

OFFICE

GB-181

PATIENT

ADVOCATE

OFFICE

GB-183

NURSE

OFFICE

GB-185

EXAM RM AND

TOILET

GB-187

WOMENS

HEALTH

EXAM RM

GB-189

AUDIOLOGY

OFFICE

GB-191

CORRIDOR

CG-11

AUDIO

BOOTH

GB-193

WOMENS

HEALTH

GB-190

WOMENS

HEALTH

EXAM RM

GB-188

DUMB WAITER

CG-11A

FP

SUPPLY RM

GB-186TOILET

GB-184

TREATMENT

GB-167

EXAM RM

GB-169

CONS

EXAM RM

GB-171

CONS

EXAM RM

GB-173

FPMED

GB-168

EXAM RM

GB-166

N PRAC

EXAM RM

GB-164

PA EXAM

RM

GB-162

EXAM RM

GB-160

SUPPLIES

GB-141

CORRIDOR

CG-12

FP

NURSING

TRIAGE

GB-143

ENT

EXAM RM

GB-145

CORRIDOR

CG-9

TOILET

GB-142A

GI/GU

SUITE

EXAM RM

GB-142

EXAM RM

GB-121

EXAM RM

GB-123

STORAGE

GI/GU

SUITE

GB-114

EXAM RM

GB-125

EXAM RM

GI/GU

SUITE

GB-146TOILET

GB-125A

TOILET

CORRIDOR

CG-8

FPELEVATOR

P2

FP

WOMENS

TOILET

GC-102

WOMENS

TOILET

GB-126

MED

TRANSCRIPTION

MENS

TOILET

GA-116D

SUPPORT FOR CABLE TRAY

AND BACK BOXES

FIBER CABLE TRAY

COPPER CABLE TRAY

MI

N.

L3-L1L3-L1

512A5-361-GB-117-A

E1E2E2E1

RPDU-GB-117-A.GL.R(B)UPS-GB-117-A-01(A)

SEE PLANS SEE PLANS

exex ex

CONTROLS

ex

CONTROLS

ex

CNTRLS

ex

RP-GA2RP-G1A E2LP-G

E2RP-G

E2RP-G (SUB-PANEL)

LP-GA

E2RP-G(SUB-2)

E3 exexex ex ex ex ex

AT&T EQUIPMENT

ex

ACCESS CONTROL

ex

CTRL

ex

FIBER

ex

CARDKEY

ex ex ex ex

L21-20R

L21-20R

E1 E2

FI

BE

R ex

RP-GA2(31,33,35)

E2RP-G(SUB-2)/(1,3,5)

LP

EX

WPL

ex

EX

E4

UP

TEL CLOSET GB-117

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

ELECTRICAL CLOSET GB-113

1/2" = 1'-0"

NORTH

PLAN

1/2" = 1'-0"

NORTH

PLAN

1/2" = 1'-0"

NORTH

PLAN

1/2" = 1'-0"

NORTH

PLAN

ELECTRICAL CLOSET C-102A

CONDUIT ENTRY FROM DUCTBANK

PROVIDE A NEW 20A/3P CIRCUIT BREAKER

E2

ET101

REWBVG

BUILDING 361 - TR SPACES GB-113, GB117, AND

BUILDING 314C - CONDUIT ENTRY FROM

DUCTBANK - ELECTRICAL POWER PLANS 314C, 361

or or or or or or or or

J M

THCC

A

OS OCor ex or EX

SYMBOL

ELECTRICAL SHEET LEGEND (ENLARGED PLANS)

ALL DEVICE MAY NOT APPLY TO THIS SHEET AND SOME MAY NOT BE SHOWN:

(REFER TO SCHEDULES, DETAILS, ALL GENERAL NOTES, KEYNOTES, AND PLANS FOR ADDITIONAL INFORMATION)

DESCRIPTION

KEYNOTE TAG: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION

GROUND BAR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION

FIRE-RATED 3/4" AC GRADE PLYWOOD, WITH TWO COATS OF HIGH-GLOSS WHITE FIRE-RESISTANT PAINT.

DUPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

SPECIALTY RECEPTACLE (VERIFY NEMA STYLE), UNO.

JUNCTION BOX

MOTOR RATED SWITCH W/ ENCLOSURE: M=SINGLE POLE, 2M=TWO POLE, 3M=THREE POLE, UNO.

LUMINAIRE: REFER TO LUMINAIRE SCHEDULE

LUMINAIRE TAG: REFER TO LUMINAIRE SCHEDULE

CEILING LUMINAIRE OCCUPANCY SENSOR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION NEW ROOM/RACK TEMPERATURE AND HUMIDITY MONITORING CONTROL CABINET: INTEGRATED INTO BAS WITH AUTOMATIC ALARMING WHEN

CONDITIONS EXCEED PRESCRIBED LIMITS.

LIGHT SWITCH: REFER TO LIGHTING CONTROL (SWITCHES) SCHEDULE.

RECESSED AND SURFACE MOUNTED 208V-240V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR

NAME, VOLTAGE AND SIZE.

INDICATES EXISTING TO REMAIN

DUPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

G.F.C.I. DUPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

G.F.C.I. DUPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

QUADRAPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

QUADRAPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

G.F.C.I. QUADPLEX RECEPTACLE ON NORMAL POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

G.F.C.I. QUADRAPLEX RECEPTACLE ON EMERGENCY POWER, 20A, 125V, 2P, 3W. MOUNTED AT 18" AFF. ("/" INDICATES 42" AFF.), UNO.

RECESSED AND SURFACE MOUNTED 208V-240V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR

NAME, VOLTAGE AND SIZE.

RECESSED AND SURFACE MOUNTED 480V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE.

RECESSED AND SURFACE MOUNTED 480V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE.

(ALL NOTES MAY NOT APPLY TO THIS SHEET)

A. PROVIDE ALL LABOR AND MATERIALS TO INSTALL, AT A MINIMUM, ALL REQUIREMENTS/RECOMMENDATIONS IDENTIFIED ALL VA DOCUMENTS, SCOPE OF WORK DOCUMENTS, SPECIFICATIONS, PLANS, SCHEDULES, AND DETAILS FOR ADDITIONAL INFORMATION.

B. REFER TO GENERAL NOTES, SYMBOLS LEGEND, ABBREVIATIONS, DETAILS, ETC. ON OTHER SHEETS ON SHEETS EG000, EG001, ET401, ET402, ET403, AND REFER TO "ISTS - V4.0, JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO)", SECTION 4.2.8 BONDING AND GROUNDING" FOR ADDITIONAL INFORMATION.

C. REFER TO TYPICAL ROOM LAYOUTS, AND DETAILS IN THE VA OIT STANDARDS, THE "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES, VERSION 4.0, JUNE 1, 2023 |

INFRASTRUCTURE OPERATIONS (IO): APPENDIX B" FOR ADDITIONAL INFORMATION.

D. COORDINATE EXACT MOUNTING HEIGHTS AND LOCATIONS WITH ARCHITECTURAL ELEVATIONS, NEW WORK, AND ALL TRADES.

E. FOR BONDING OF RACEWAY SYSTEMS REFER TO SHEET TK102, AND REFER TO "ISTS - 4.0, JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO): SECTION 4.2.8 BONDING AND GROUNDING" FOR

ADDITIONAL INFORMATION

F. DURING THE RENOVATION AND INSTALLATION OF NEW INFRASTRUCTURE CONNECTED TO AGED BUILDINGS ON CAMPUS, AVOID ACCIDENTAL DISTURBANCE OF STRUCTURES WHICH MAY CONTAIN HAZADOUS MATERIALS. ASBESTOS CONTAINING MATERAILS AND LEAD BASED PAINT ARE LOCATED THROUGHOUT THE PROJECT. REFER TO SPECIFICATIONS 02 82 13.41 ASBESTOS ABATEMENT AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND DISPOSAL FOR AREAS BEING DISTURBANCE. REFER TO "ASBESTOS CONTAINING MATERIAL NOTES","LEAD BASED NOTES", AND "OTHER IDENTIFIED HAZARDOUS MATERIALS NOTES" ON "HAZARDOUS MATERIALS" DRAWINGS "9H-HA" SERIES.

(ALL NOTES MAY NOT APPLY TO THIS SHEET)

E1 PROVIDE (A TOTAL OF 2) 20A, 208V, 5 WIRE NEMA L21-20R RECEPTACLES, EACH MOUNTED AND SEISMICALLY SECURED TO CABLE TRAY SUPPORT SYSTEM (DO NOT SUPPORT TO CABLE TRAY) ABOVE IN A 2-GANG BACK BOX WITH A NEMA L21-20R DEVICE AND FACEPLATE, LABEL FACEPLATE WITH CIRCUIT NUMBER AND DEVICE IDENTIFICATION THAT IT SERVES (UNO). EACH POWERED FROM AN INDEPENDENT POWER SOURCE AS INDICATED, MOUNTED ON CABLE TRAY SUPPORTS: ONE SERVING RACK MOUNTED UPS LOCATED IN "UPS-(ROOM_NUMBER)-(RACK_IDENTIFIER)-01"; AND THE OTHER SERVING RACK MOUNTED PDU LOCATED IN "RPDU-(ROOM_NUMBER)-(RACK_IDENTIFIER).GL.R8". PROVIDE A 10' POWER CORD FOR EACH TERMINATING IN A L21-20P (PLUG). REFER TO TYPICAL ROOM LAYOUTS, AND DETAILS IN THE VA STANDARDS, THE "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES, VERSION 3.1, JULY 1, 2021 | SOLUTION DELIVERY-DATA CENTER

AND INFRASTRUCTURE ENGINEERING: APPENDIX B" FOR ADDITIONAL INFORMATION.

E2 ROUTE 3#12, 1#10 NEUTRAL, 1#12 GROUND IN 3/4" CONDUIT, UNO, THE NEUTRAL CONDUCTOR TO BE ONE SIZE LARGER THAT PHASE CONDUCTOR) TO A 20-AMP/3-POLE CIRCUIT BREAKER IN A 120/208V, 3P, 4W BRANCH PANEL AS INDICATED. SEE FULL FLOOR PLAN(S) FOR LOCATION OF EXISTING PANELBOARDS INDICATED. BACK BOX AND CONDUIT MOUNTED AND SEISMICALLY SECURED TO CABLE TRAY SUPPORT SYSTEM (DO NOT SUPPORT TO CABLE TRAY) WITHOUT EFFECTING THE SEISMIC SUPPORT, AND INTEGRITY OF THE CABLE TRAY SYSTEMS OR DEVICES.

· PROVIDE (1) 20A, 208V, 5 WIRE NEMA L21-30R RECEPTACLE FROM NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)/(1,3,5)" WITH 3#12H, 1#10N, 1#12G, IN 3/4" CONDUIT, THE NEUTRALS WILL BE UPSIZED ONE GAUGE TO MATCH THE CONDUCTORS IN THE PDUS. PROVIDE A 10' POWER CORD FOR EACH CONNECTION. PROVIDE A NEW

20A/3P CIRCUIT BREAKER.

· PROVIDE (1) 20A, 208V, 5 WIRE NEMA L21-30R RECEPTACLE FROM EXISTING NORMAL PANELBOARD "RP-GA2(31,33,35)" WITH 3#12H, 1#10N, 1#12G, IN 3/4" CONDUIT, THE NEUTRALS WILL BE UPSIZED ONE GAUGE TO MATCH THE CONDUCTORS IN THE PDUS. PROVIDE A 10' POWER CORD FOR EACH CONNECTION. PROVIDE A NEW

20A/3P CIRCUIT BREAKER.

E3 PROVIDE A NEW 40 AMP, 3 POLE, 4 WIRE, 120/208 VOLT ,12 CIRCUIT EMERGENCY PANELBOARD "E2RP-G(SUB-2)". FEED FROM EXISTING PANELBOARD "E2RP-G" WITH 3#8H, 1#6N, 1#10G, IN 1" CONDUIT. REWORK EXISTING EMERGENCY PANELBOARD "E2RP-G" AND RELOCATE THREE CONSECUTIVE 20A/1P CIRCUIT BREAKERS TO NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)". NEW EMERGENCY PANELBOARD "E2RP-G(SUB-2)" TO HAVE (3) 20A/1P CIRCUIT BREAKERS FOR RELOCATED CIRCUITS AND (1) 20A/3P CIRCUIT BREAKER FOR EMERGENCY FEED TO RACK “512A5-361-GB-117-A”.

E4 ADD NEW 120V GFCI LOCKABLE "IN-USE" RECEPTACLE AT 42" AFF CONNECTED COMPLETE TO CIRCUIT/PANELBOARD INDICATED, UNO. WITH 3#12,3/4"C, UNO. SEE FULL FLOOR PLAN(S) FOR LOCATION OF EXISTING PANELBOARDS INDICATED. (TYPICAL WHERE INDICATED WITH A "/"). REUSE EXISTING 120V RECEPTACLE LOCATIONS AND CIRCUITS WHERE POSSIBLE, PROVIDE ALL LABOR AND MATERIALS TO EXTEND DEVICE FLUSH TO NEW WALL/PLYWOOD SURFACE AND PROVIDE NEW DEVICE AND

FACEPLATE. UNO. REFER TO SYMBOLS ON "SHEET LEGEND" FOR DEVICE TYPE

GENERAL NOTES - ELECTRICAL:

KEYNOTES - ELECTRICAL:

RP-GA2 LOAD CALCULATIONS

225 AMP MCB, 120/208 VOLT, 3 PHASE / 4 WIRE

EXISTING ESTIMATE PANEL LOAD

CONNECTED

DEMAND

CONNECTED

DEMAND

VA 30 AMPS

VA 38 AMPS

VA 44 AMPS

VA 52 AMPS

NEW ESTIMATE PANEL LOAD

E2RP-G LOAD CALCULATIONS

100 AMP MCB, 120/208 VOLT, 3 PHASE / 4 WIRE

EXISTING ESTIMATE PANEL LOAD

CONNECTED

DEMAND

CONNECTED

DEMAND

VA 67 AMPS

VA 84 AMPS

VA 81 AMPS

VA 94 AMPS

NEW ESTIMATE PANEL LOAD

E2RP-G (SUB-2)

CONNECTED

DEMAND

VA 81 AMPS

VA 94 AMPS

BRANCH PANEL BOARD

60 AMP BUS

40 AMP BUS

DISCRIPTION CT

RELOCATED EXIST LOAD 2

RELOCATED EXIST LOAD

RELOCATED EXIST LOAD

SPARE

SPARE

SPARE

BKR

20/1

LF

R C C R R R

20/1 20/1 20/1 20/1 20/1

C

1666 0

0 0

3 PHASE / 4 WIRE

120/208 VOLT

B

1667 0

0 0

A 1666 0

0 0

BOLT-ON BREAKERS

MATCH EXISTING - AIC

LF

C C C L L H

BKR

20/3

20/1 20/1 20/2

CT

RPDU-GB-117-A.GL.R(B)

SPARE

SPARE

SPARE

DESCRIPTION

NEMA 1

SURFACE MOUNTED

LF = LOAD FACTOR C = CONTINUOUS, L = LIGHTING, R = RECEPTACLE, H = HACR (PER NAMEPLATE)

S = SUB FEED, K = KITCHEN, N = NON-CONTINUOUS

NOTES:

FEEDER: 3#8H, 1#6N, 1#10G, IN 1" CONDUIT

RELOCATE (3) CONSECUTIVE EXISTING 20A/1P CIRCUITS FROM EXISTING PANEL "E2RP-G"

ELECTRICAL SINGLE-LINE DIAGRAM

EJ101

314,9H,344,17H

BVG JDM

ELECTRICAL SINGLE-LINE DIAGRAM

NO SCALEF1

GENERAL NOTES

A. ALL NEW ELECTRICAL WORK TO RE-FEED THE EMERGENCY POWER PANEL IN BLDG 314C MUST BE COMPLETED

TO THE GREATEST EXTENT POSSIBLE BEFORE ANY DEMOLITION WORK IS TO TAKE PLACE. NEW POWER TO EP1-314 MUST BE IN PLACE AND SWITCHOVER IN POWER MADE PRIOR TO DEMOLITION OF EXISTING POWER IN

9H OR 344, ETC.

B. DISPLACED CEILING TILES ARE TO BE REUSED FOR ELECTRIC WORK IN CORRIDOR CEILING. CEILING TILES DAMAGED BY CONTRACTOR ARE TO BE REPAIRED OR REPLACED TO MATCH IN KIND TO SATISFACTION OF COR.

EDP

EXISTING OIL

FILLED

TRANSFORMER

500KVA

15KV - 208Y/120V

ATS

600A 208Y/120V 3Ø, 4W

GB 344

100A

MLO

208Y/120V 3Ø, 4W

BLDG 344

ALL TO BE

DEMOLISHED

BLDG 9H

ALL TO BE

DEMOLISHED

BLDG 314C

EXISTING

PANEL

EP1-314

150A

MCB

BLDG 17H

EXISTING

SHUNTED

ATS

208Y/120V

3Ø, 4W 600A

EXISTING

17H PANEL

EMDP

208Y/120V

600A

EXISTING

17H PANEL

MDP

208Y/120V

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

TG001

9H

TELECOMMUNICATIONS SHEET INDEX,

SYMBOLS, ABBREVIATIONS,

AND GENERAL NOTES

REWKAP

20714

PHARIS

KEITH A.

L I C E N S E D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

PERRY POINT VA

MEDICAL CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

100% BID DOCUMENTS DEMOLISH BUILDING 9H

512A5-23-311

05-NOV-2024

VA MARYLAND HEALTHCARE SYSTEM

(502) 890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE, STE. 400 * LOUISVILLE, KY 40218

PERRY POINT VAMC - PERRY POINT, MD

1 1/05/2024

ABBREVIATIONS

ABBREV DESCRIPTION

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT, ARMORED CABLE, OR

ABOVE FINISHED COUNTER

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

AFC AUTOMATIC FREQUENCY CONTROL, AVAILABLE

FAULT CURRENT, OR ABOVE FINISHED COUNTER

AFCI ARC-FAULT CURRENT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ALT ALTERNATE

AMB OR A AMBIENT

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BLDG BUILDING

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS

cd CANDELA

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DB DECIBEL OR DIRECT BURIAL

dB DECIBEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

ABBREVIATIONS

ABBREV DESCRIPTION

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPRF EXPLOSION PROOF

EWC ELECTRIC WATER COOLER

EXIST,(E),EX EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FP FIRE PROTECTION

FT FEET OR FOOT

G ELECTRICAL GROUND

G OR GND GROUND OR GENERATOR

GTB GROUND TERMINAL BOX

HT HEIGHT

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

J-BOX JUNCTION BOX

LF LINEAR FEET (FOOT)

LV LOW VOLTAGE

MAX MAXIMUM

MC METAL-CLAD

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MT MOUNT

MTD MOUNTED

MTG MOUNTING

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR PUSHBUTTON

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SURF SURFACE

SW SWITCH

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UTIL UTILITY

WP WEATHERPROOF

ACRONYMS

ACRONYM DEFINITION

AC ALTERNATING CURRENT

ACEG ALTERNATING CURRENT EQUIPMENT GROUND

AES ADVANCED ENCRYPTION STANDARD

AHJ AUTHORITY HAVING JURISDICTION

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APC ANGLED PHYSICAL CONTACT

ARU AIR REMOVAL UNITS

ASD ASPIRATED SMOKE DETECTION

ASHRAE AMERICAN SOCIETY OF HEATING AND AIR-CONDITIONING

ENGINEERS

AWG AMERICAN WIRE GAUGE

BACnet BUILDING AUTOMATION AND CONTROL NETWORKING

PROTOCOL

BAS BUILDING AUTOMATION SYSTEM

BCM BRANCH CIRCUIT MONITORING

BCP BRANCH CIRCUIT PANELBOARD

BICSI BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL

BMS BATTERY MONITORING SYSTEM

CAB CHANGE ADVISORY BOARD

CANbus CONTROLLER AREA NETWORK BUS

CFM VA OFFICE OF CONSTRUCTION AND FACILITIES MANAGEMENT

CM COMMUNICATIONS

CMMS COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM

CMOP CONSOLIDATED MAIL OUTPATIENT PHARMACY

CMP COMMUNICATIONS PLENUM

CMR COMMUNICATIONS RISER

CRAC COMPUTER ROOM AIR CONDITIONER

CRAH COMPUTER ROOM AIR HANDLER

CSC CAMPUS SUPPORT CENTER

DC DIRECT CURRENT

DCIE DATA CENTER AND INFRASTRUCTURE ENGINEERING

DCIM DATA CENTER INFRASTRUCTURE MANAGEMENT

DR DISASTER RECOVERY

DX DIRECT EXPANSION

EBSR ENTERPRISE BASELINE AND STANDARD REVIEW

EC ELECTRONICALLY COMMUTATED

ED EQUIPMENT DISTRIBUTOR

EDICT ENTERPRISE DATA CENTER INFRASTRUCTURE

COLLABORATION TEAM

EGS EARTH GROUND SYSTEM

EIA ELECTRONIC INDUSTRIES ALLIANCE

FCU FAN COIL UNITS

FEC FACILITY TOTAL ELECTRICAL CONSUMPTION

GbE GIGABIT ETHERNET

Gb/s GIGABIT PER SECOND

HA HIGH AVAILABILITY

HC HORIZONTAL CROSS CONNECT

HD HIGH DENSITY

HD HORIZONTAL DISTRIBUTION

HDA HORIZONTAL DISTRIBUTION AREA

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

IAW IN ACCORDANCE WITH

ICC INTERMEDIATE CROSS CONNECT

IEC INTERNATIONAL ELECTROTECHNICAL COMMISSION

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS

IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA

IO INFRASTRUCTURE OPERATIONS

ISP INSIDE PLANT

IT INFORMATION TECHNOLOGY

ITOPS IT OPERATIONS AND SERVICES

ITS INFORMATION TRANSPORT SYSTEMS

ACRONYMS

ACRONYM DEFINITION

LAN LOCAL AREA NETWORK

LED LIGHT EMITTING DIODE

LFMC LIQUID-TIGHT FLEXIBLE METAL CONDUIT

LP LIMITED POWER

MATV MASTER ANTENNA TELEVISION SYSTEM

MCC MAIN CROSS CONNECT

MM MULTIMODE

MPDU MASTER POWER DISTRIBUTION UNIT

MPO MULTI-FIBER PUSH ON

NEC® NATIONAL ELECTRICAL CODE®

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NETWORK INTERFACE CARD

NSC NETWORK SUPPORT CENTER

O&M OPERATIONS AND MAINTENANCE

OIFO OFFICE OF INFORMATION FIELD OFFICE

OIT OFFICE OF INFORMATION AND TECHNOLOGY

OM OPTICAL MULTIMODE

PBB PRIMARY BONDING BUSBAR

PDU POWER DISTRIBUTION UNIT

PoE POWER-OVER-ETHERNET

PVC POLYVINYL CHLORIDE

PS POWER SUPPLY

PUE POWER USAGE EFFECTIVENESS

RBB RACK BONDING BUSBAR

RBC RACK BONDING CONDUCTOR

RCDD REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER

RDC REGIONAL DATA CENTER

RDC REMOTE DISTRIBUTION CABINET

rPDU RACK POWER DISTRIBUTION UNIT

RU RACK UNIT

SBB SECONDARY BONDING BUSBAR

SAN STORAGE AREA NETWORK

SD SOLUTION DELIVERY

SD STANDARD DENSITY

SIEER SITE INFRASTRUCTURE ENERGY EFFICIENCY RATING

SM SINGLE-MODE

SSL SECURE SOCKETS LAYER

SWDM SHORT WAVELENGTH DIVISION MULTIPLEXING

TBB TELECOMMUNICATION BONDING BACKBONE

TEBC TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR

TEC TOTAL DATA CENTER ENERGY CONSUMPTION

TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION

TIL TECHNICAL INFORMATION LIBRARY

TITEC TOTAL IT EQUIPMENT ENERGY CONSUMPTION

TPIEC TOTAL DATA CENTER PHYSICAL INFRASTRUCTURE ENERGY

CONSUMPTION

TR TELECOMMUNICATIONS ROOM

TUPSC TOTAL UPS LOAD ENERGY CONSUMPTION

UL UNDERWRITERS LABORATORIES INC

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

VA DEPARTMENT OF VETERANS AFFAIRS

VAMC VETERANS AFFAIRS MEDICAL CENTER

VACO VA CENTRAL OFFICE

VHA VETERANS HEALTH ADMINISTRATION

WC WATER COLUMN

zPDU ZONE POWER DISTRIBUTION UNIT

A. REFER TO SHEET 9H&314C-AD099 AND NARRATIVE FOR PHASING INFORMATION.

B. THE CONTRACTOR SHALL FOLLOW SEISMIC RESTRAINT AND DESIGN REQUIREMENTS IN ALL LATEST ADOPTED ALL FEDERAL, NATIONAL, AND ALL ASSOCIATED NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES WITH ALL AMENDMENTS AS ADOPTED BY THE CURRENT LEGISLATION.

INCLUDING BUT NOT LIMITED TO INTERNATIONAL BUILDING CODE (IBC), NFPA 70 - NATIONAL ELECTRIC CODE (NEC), NFPA 72 - NATIONAL FIRE

ALARM AND SIGNALING CODE, ETC. (COORDINATE WITH ALL APPLICABLE VA OIT STANDARDS)

C. THE TERM "PROVIDE" SHALL MEAN THE CONTRACTOR SHALL FURNISH AND INSTALL ITEMS AND CONNECT AS REQUIRED TO OBTAIN A COMPLETE

WORKING SYSTEM.

D. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ALL FEDERAL, NATIONAL, AND ALL ASSOCIATED NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES. INCLUDING BUT NOT LIMITED TO INTERNATIONAL BUILDING CODE (IBC), NFPA 70 - NATIONAL ELECTRIC CODE (NEC), NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, ETC. (COORDINATE WITH ALL APPLICABLE VA OIT STANDARDS)

E. ALL WORK SHALL BE COORDINATE WITH VA COR, EXISTING CONDITIONS, NEW CONSTRUCTION, MANUFACTURERS, ALL TRADES, AND THEIR DOCUMENTS. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING THEIR BID. CONTRACTOR SHALL CONTACT VA COR FOR AN APPOINTMENT TO VISIT THE SITE. NO ALLOWANCE WILL BE MADE FOR EXISTING CONDITIONS NOT KNOWN BY THE CONTRACTOR.

F. ALL EXISTING SYSTEMS MUST REMAIN OPERATIONAL DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR TIE-IN/CUT-OVER OF EXISTING SYSTEMS THAT ARE AFFECTED BY THIS PROJECT (INCLUDING BUT NOT LIMITED TO SECURITY/ACCESS CONTROL, PAGING, TELEPHONE, ANY BUILDING MANAGEMENT SYSTEM, AND ALL OTHER NECESSARY CONTROL AND EXISTING SYSTEMS APPLICABLE TO THIS REQUIREMENT). THE CONTRACTOR AND ENGINEERING ARE RESPONSIBLE FOR SUBMITTING TICKETS TO IT DEPARTMENT TO ASSIST IN TIE-IN/CUT-OVER AND SCHEDULING OF NETWORK SWITCHES AND SYSTEMS AS NEEDED. TICKETS MUST BE SUBMITTED NOT LESS THAN 14 CALENDAR DAYS IN ADVANCE OF THE TIE-IN/CUT-OVER AND

OTHER SUPPORT AS NEEDED.

G. PROVIDE ALL LOW-VOLTAGE CABLE MANAGEMENT SYSTEMS AND ROOM FITTINGS TO SUPPORT THE NEW RACK MOUNTED UPS SYSTEM, INCLUDING ALL REQUIRED GROUNDING, BRACING, BACKING, MOUNTING MATERIALS, AND BACK BOXES TO SUPPORT INSTALLATION OF THE NEW EQUIPMENT.

ETC.

H. PROVIDE ALL THE REQUIRED POWER, GROUNDING, BUILDING MANAGEMENT SYSTEM INTERFACES, AND OTHER SYSTEM REQUIREMENTS FOR

INSTALLATION OF THE NEW RACK MOUNTED UPS SYSTEM.

I. INSTALLATION OF NEW EQUIPMENT AND INTERIOR FINISHES IN ALL AREAS AFFECTED BY WORK UNDER THE SCOPE OF THIS PROJECT TO MEET ALL VA OIT STANDARDS. INCLUDING BUT NOT LIMITED TO: "INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES (ISTS), VERSION 4.0; JUNE 1, 2023 | INFRASTRUCTURE OPERATIONS (IO)", "ISTS, V4.0, APPENDIX B: OIT DESIGN GUIDE TEMPLATE FOR CRITICAL INFRASTRUCTURE IN TELECOMMUNICATIONS SPACES", AND "PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (PSRDM), OCTOBER 1, 2020, REVISED May 1, 2024".

J. REMOVAL OF ANY EQUIPMENT AND ROOM FITTINGS FROM ANY AREA UNDER THE SCOPE OF WORK SHALL BE STORED PER VA DIRECTION.

K. ALL IDENTIFIED ASBESTOS CONTAINING MATERIALS AND LEAD BASED PAINT AFFECTED BY CONSTRUCTION ACTIVITIES SHALL BE ABATED AND DISPOSED OF IN ACCORDANCE WITH THE GOVERNING CODES OF THIS CONTRACT. REFER TO (AMA) DRAWINGS.

L. A CODE-SIZE INSULATED GROUND CONDUCTOR SHALL BE PROVIDED IN ALL FEEDER AND BRANCH CIRCUIT CONDUITS. THIS INCLUDES EXISTING DEVICES LOCATED WITHIN THE RENOVATED AREA THAT ARE TO REMAIN, REPLACE DEVICES AS REQUIRED.

M. ALL THHN/THWN/THHW/THW/XHHW CONDUCTORS ARE SIZED BASED ON 75°C TEMPERATURE RATING. ALL TERMINATIONS FOR ALL EQUIPMENT AND DEVICES SHALL BE LISTED AND IDENTIFIED FOR USE WITH 75°C CONDUCTORS. IF THE CONTRACTOR PROVIDES TERMINATIONS OF LESS THAN 75°C, THE ASSOCIATED CONDUCTOR SIZES SHALL BE INCREASED DUE TO THE DERATING AMPACITY PER NEC TABLE 310-16. CONTRACTOR SHALL MAKE ALL CHANGES (I.E. CONDUIT SIZES, ETC.) AS NECESSARY AND SHALL MAKE ALL REVISIONS ON "AS-BUILT" DRAWINGS.

N. MINIMUM CONDUIT SIZE IS 3/4 INCH, MINIMUM WIRE SIZE IS #12 AWG (COPPER CONDUCTOR THHN/THWN), UNLESS OTHERWISE NOTED ON PLANS

OR IN CIRCUIT REVIEWS.

O. ALL CONDUIT SHALL BE RUN CONCEALED WHEREVER POSSIBLE ABOVE CEILINGS, INSIDE WALLS, OR UNDER FLOOR SLAB (ONLY WHERE SHOWN DASHED ON PLAN), UNLESS OTHERWISE NOTED ON PLAN. IN HIGH-BAY (NO CEILING) AREAS, RUN EXPOSED CONDUIT HIGH AS POSSIBLE. ALL CONDUIT SHALL BE RUN PARALLEL OR PERPENDICULAR TO NEARBY SURFACE OR STRUCTURAL MEMBERS AND FOLLOW THE SURFACE CONTOURS AS MUCH AS PRACTICAL. NO CONDUIT SHALL BE INSTALLED IN FLOOR SLAB UNLESS SPECIFICALLY NOTED OTHERWISE. CONDUITS IN

TELECOMMUNICATIONS SPACES MAY BE RAN EXPOSED.

P. CONTRACTOR SHALL PROVIDE RIGID METAL SLEEVES TO FACILITATE PATHWAY (I.E. THRU BLOCK WALLS) FOR ELECTRICAL AND

TELECOMMUNICATION DEVICES.

Q. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR CONDUITS. DO NOT LEAVE PIPING/ CONDUITS OPEN ENDED. PROVIDE END BUSHINGS FOR ALL STUB-OUTS AND SLEEVES DESIGNATED TO BE UTILIZED FOR THIS PROJECT. COORDINATE WITH THE VA COR FOR SYSTEMS

NOT PROVIDED UNDER THIS CONTRACT.

R. PROVIDE FIRE STOP TO ALL CONDUITS AND DEVICES PENETRATING FIRE RATED WALLS, SMOKE WALLS AND FLOORS. REPLACE IN EXISTING CONDUITS AND SLEEVES WHERE EXISTING FIRE STOP HAS BE DISTURBED OR NEEDS TO BE ADDED DUE TO DEMOLITION, REWORKING, AND NEW WORK.

S. MOUNTING HEIGHTS ABOVE FINISHED FLOOR (AFF) ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

T. DEVICES/OUTLETS SHALL BE COORDINATED WITH EXISTING CONDITIONS FOR EXACT LOCATIONS AND MOUNTING, PRIOR TO ROUGH-IN. IF EXACT LOCATIONS AND MOUNTING ARE NOT INDICATED ON THE DRAWINGS, FIELD VERIFY EXACT LOCATIONS AND MOUNTING WITH VA COR AND ALL

TRADES.

U. DEVICES SHALL NOT BE INSTALLED BACK-TO-BACK ON A COMMON WALL WHERE CONDITION EXISTS FOR ADJACENT OFFICE ROOMS OR ROOMS

WHERE SOUND TRANSMISSION IS NOT PERMITTED. OR PROVIDE SOUND INSULATION.

V. TELECOMMUNICATIONS DRAWINGS SHALL BE COORDINATED WITH EXISTING CONDITIONS, ASSOCIATED ELECTRICAL DRAWINGS, AND ELECTRICAL CONTRACTOR FOR ALL NEW DEVICES, FIXTURES, ETC. FOR EXACT LOCATIONS BEFORE ROUGH-IN OF CONDUIT SYSTEM.

W. FROM EACH TELECOMMUNICATIONS EQUIPMENT AND TYPE OUTLET SIZE EACH CONDUIT PER NEC, BICSI AND VA OIT STANDARDS WITH A MINIMUM

40% FILL. PROVIDE A (MIN.) 1 INCH CONDUIT (WITH TWO PULL WIRES).

X. ALL TELECOMMUNICATIONS CABLING SHALL BE PLENUM RATED AND ROUTED IN A COMPLETE CABLE MANAGEMENT SYSTEM. (NO PVC CONDUIT SHALL BE INSTALLED). COORDINATE ALL CONDUIT RUNS WITH ALL EXISTING CONDITIONS, ALL TRADES AND THEIR DOCUMENTS.

Y. TURN OVER TO THE VA COR ALL MANUFACTURERS' WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED.

AC. TURN OVER TO THE VA COR ALL SPARE PARTS AND CABLING.

AD. INCLUDING BUT NOT LIMITED TO: ALL RATED AND NON-RATED PENETRATIONS, CUTTING, PATCHING, PAINTING OF CONDUITS, BOXES, WALLS, SUPPORTS, RACEWAY SYSTEMS, CABLING SYSTEMS, EQUIPMENT, ADJUSTMENTS DUE TO EXISTING CONDITIONS, AND ALL ADDITIONAL LABOR AND MATERIALS SHALL BE PROVIDED TO FOR COMPLETE AND OPERATIONAL SYSTEMS WHERE AS INDICATED IN THESE CONTRACT DOCUMENTS.

AE. COORDINATE ALL SECURITY AND DOOR ACCESS WORK WITH SYSTEM'S VENDOR REPRESENTATIVE AND VA COR BEFORE SUBMITTING BIDS AND PROVIDE A COMPLETE AND FULLY CONDUITED SYSTEM. IDENTIFY THE OUTSIDE ALL COVER PLATES IN THE TELECOMMUNICATIONS SPACES AND

ABOVE CEILINGS.

AI. COORDINATE EXACT POWER AND SIGNAL-VOLTAGE REQUIREMENTS, LOCATIONS, CONDUITS, AND CABLING REQUIREMENTS FOR ALL SECURITY AND DOOR ACCESS WORK WITH SYSTEM'S VENDOR REPRESENTATIVE AND VA COR BEFORE SUBMITTING BIDS . PROVIDE ALL LABOR AND MATERIALS TO

CONNECT COMPLETE.

ALL DEVICE MAY NOT APPLY TO THIS SHEET AND SOME MAY NOT BE SHOWN: REFER TO OTHER PLANS FOR ADDITIONAL INFORMATION

SYMBOL DESCRIPTION

KEYNOTE TAG: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION

DEVICE WITH DASHED LINES INDICATE ITEMS TO BE REMOVED/ABANDONED. IN WALL BEING REMOVED, REMOVE AS INDICATED. IN WALLS TO REMAIN, REMOVE DEVICE AND FACEPLATE, REFER TO PLANS FOR ADDITIONAL INFORMATION. (TYPICAL OF ALL DEVICE, REFER TO PLANS)

HOMERUN

ex or EX INDICATES EXISTING TO REMAIN

SYMBOL DESCRIPTION

TELECOMMUNICATIONS MANHOLE (NEW, UNO)

EXISTING CABLE TRAY SYSTEM.

NEW PLASTIC OPTICAL FIBER CABLE TRAY COVER: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI

REQUIREMENTS, AND ALL APPLICABLE CODES.

NEW OPTICAL FIBER CONDUIT PATH: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI REQUIREMENTS, AND ALL APPLICABLE CODES.

NEW OPTICAL FIBER CONDUIT PATH RAN IN SPACE BELOW: PROVIDE ALL LABOR AND MATERIALS TO INSTALL COMPLETE PER VA OIT STANDARDS, BICSI REQUIREMENTS, AND ALL APPLICABLE CODES.

NEW CONDUIT SLEEVE, NUMBER AND SIZE PER BISCI REQUIREMENTS. FIRESTOP PER ALL CODE AND BICSI REQUIREMENTS

EXISTING CONDUIT SLEEVE. FIRESTOP PER ALL CODE AND BICSI REQUIREMENTS

-EF- EXISTING FIBER TO REMAIN: ALL PROTECTION MEASURES SHALL BE TAKEN TO PROTECT ALL EXISTING OPTICAL FIBER SYSTEM AT ALL TIMES.

-DF- DEMOLITION OF EXISTING FIBER ROUTED IN BUILDINGS AND THROUGH CONNECTION CORRIDOR PATHS: REMOVE EXISTING FIBER AS INDICATED.

REFER TO RENOVATION FLOOR PLANS. UNO.

-NF-

NEW FIBER ROUTED THROUGH BUILDING FROM PATCH PANEL TO CONNECTION CORRIDOR PATHS: SEPARATE PATHWAYS (FOR REDUNDANT SIDE A AND SIDE B). ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE. REFER TO RENOVATION FLOOR PLANS. (MINIMUM 4'-0" SEPARATION).

UNO.

-2NF-

NEW FIBER ROUTES: INDICATES (2) REDUNDANT SEPARATE PATHWAYS (SIDE A AND SIDE B). ROUTED THROUGH BUILDING FROM PATCH PANEL TO CONNECTION CORRIDOR PATHS. ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE. REFER TO RENOVATION FLOOR PLANS. (MINIMUM

4'-0" SEPARATION). UNO.

-NOF- NEW OVERHEAD FIBER: REDUNDANT PATHWAYS (SIDE A AND SIDE B). ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE.

-NUF- NEW UNDER FIBER: REDUNDANT PATHWAYS (SIDE A AND SIDE B). ROUTED UNDERGROUND OR UNDER FLOOR (CRAW SPACE OR FLOOR BELOW).

-DOF- DEMOLITION OVERHEAD FIBER: PATHWAY(S) ROUTED ABOVE ACCESSIBLE CEILING OR TIGHT TO STRUCTURE.

-DUF- DEMOLITION UNDER FIBER: PATHWAY(S) ROUTED UNDERGROUND OR UNDER FLOOR (CRAW SPACE OR FLOOR BELOW).

12SM 12 STRAND SINGLE-MODE OPTICAL FIBER LINE: BLANK = (1) SET, (#) NUMBER OF SETS: i.e. (2)12SM = 2 SETS OF 12SM

SMPC SINGLE-MODE DUAL CABLE PATCH CORD (2) LC TO (2) LC CONNECTORS

OPTICAL FIBER DISTRIBUTION EQUIPMENT - FIBER PATCH PANEL (WITH FDCs AS INDICATED): "A SIDE" OF REDUNDANT RUNS

OPTICAL FIBER DISTRIBUTION EQUIPMENT - FIBER PATCH PANEL (WITH FDCs AS INDICATED): "B SIDE" OF REDUNDANT RUNS

EXISTING SERVER SWITCH

NEW OPTICAL FIBER DISTRIBUTION JUNCTION / PULL BOX, SIZE PER NEC "314.28 PULL AND JUNCTION BOXES AND CONDUIT BODIES."

OPTICAL FIBER DISTRIBUTION WALL BOX

OPTICAL FIBER WALL BOX

GROUND BAR: REFER TO SCHEDULES, DETAILS, AND PLANS FOR ADDITIONAL INFORMATION

FIRE-RATED 3/4" AC GRADE FIRE-REATED PLYWOOD, WITH TWO COATS OF HIGH-GLOSS WHITE FIRE-RESISTANT PAINT: REFER TO DETAILS, AND

PLANS FOR ADDITIONAL INFORMATION

SYMBOL DESCRIPTION

TELECOMMUNICATIONS ROOM SECURITY/ACCESS CONTROL SYSTEM CABINET: CONNECT TELECOMMUNICATIONS ROOM'S ASSOCIATED DEVICES, UNO: COORDINATE WITH EXISTING CONDITIONS AND THE ALARM VENDOR FOR A COMPLETE AND OPERABLE SYSTEM. SEE ALL NOTES, PLANS, AND

DETAILS.

SECURITY DOOR ACCESS, MOUNT 46"AFF: KP = KEY PAD, CR = CARD READER. CONNECT INTO TELECOMMUNICATIONS ROOM'S NEW ALARM SYSTEM, UNO: COORDINATE WITH EXISTING CONDITIONS AND THE ALARM VENDOR FOR A COMPLETE AND OPERABLE SYSTEM. SEE ALL NOTES, PLANS, AND

DETAILS.

SYMBOL DESCRIPTION (SEE "NOTES")

FIRE ALARM: PULL STATION, UNO.

SYMBOL DESCRIPTION

RECESSED AND SURFACE MOUNTED 208V-240V (UNO) NORMAL POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR NAME, VOLTAGE AND SIZE .

RECESSED AND SURFACE MOUNTED 208V-240V (UNO) EMERGENCY POWER PANELBOARD: SEE PLANS, SINGLE-LINES, AND/OR SCHEDULES FOR

NAME, VOLTAGE AND SIZE .

NOTES:

1. SINGLE GANG WALL DEVICES TO HAVE 411

16" SQUARE, 21

2" DEEP BACK BOX WITH SINGLE GANG PLASTER RING.

2. DOUBLE GANG WALL DEVICES TO HAVE 411

16" SQUARE, 21

2" DEEP BACK BOX WITH TWO GANG PLASTER RING.

3. COORDINATE SIZE OF BACK BOX, PLASTER RING, CONDUIT(S), CABLING, SUPPORT, AND ALL ACCESSORIES FOR EACH DEVICE.

4. COORDINATE SIZE OF BACK BOX, PLASTER RING, CONDUIT(S), CABLING, SUPPORT, AND ALL ACCESSORIES FOR EACH DEVICE.

5. SEE VA BARRIER FREE DESIGN GUIDE PG-18-13.

C ex

A SIDE

B SIDE

EX SW

OFJ

OFD

OFB

SEC-AC

KP

F

A. COORDINATE WITH ANY CURRENT PERRY POINT EHRM PROJECT(S) TO AVOID POSSIBLE REDUNDANCIES.

B. ALL NEW FIBER WORK SHALL BE INSTALLED, TEST AND IN COMPLETE WORKING ORDER PRIOR TO THE DISCONNECTION AND/OR REMOVAL OF ANY AND

ALL EXISTING FIBER AND COPPER BACK BONE.

C. REFER TO GENERAL NOTES, SYMBOLS LEGEND, ABBREVIATIONS, ETC. ON SHEETS TG001.

D. REFER "SITE PLAN - ENLARGED TELECOM, FIBER OPTIC UTILITY CONDITIONS AND DEMOLITION", SHEET "CU405", "SITE PLAN - AREA "A" -

TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-A", "SITE PLAN - AREA "B" - TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-B", "SITE PLAN - AREA "C" - TELECOMMUNICATIONS DEMOLITION PLAN", SHEET "TSD01-C", "SITE PLAN - AREA "A" - TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-A", "SITE PLAN - AREA "B" - TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-B", AND "SITE PLAN - AREA "C" -

TELECOMMUNICATIONS RENOVATION PLAN", SHEET "TSN01-C" FOR ADDITIONAL INFORMATION.

E. ALL DEVICES AND PATHWAYS ARE NOT INDICATED ON DRAWINGS, DEVICE INDICATED ON DRAWINGS ARE FOR ADDITIONAL CLARIFICATION. FIELD VERIFY

WITH EXISTING CONDITIONS.

F. COORDINATE ALL DEMOLITION AND RELOCATION WORK WITH EXISTING CONDITIONS, ALL TRADES AND THEIR DOCUMENTS, VA COR, VA OIT STANDARDS, VA VENDORS, AND ALL NEW WORK. PROVIDE ALL LABOR AND MATERIAL WHERE REQUIRED.

G. THE LOCATION OF ALL ELECTRICAL DISTRIBUTION EQUIPMENT, DEVICES, TELECOMMUNICATIONS EQUIPMENT, CIRCUITS, FEEDERS, RACEWAY SYSTEMS, CABLING, TERMINATIONS, ETC., AS INDICATED ON THIS DRAWING WERE TAKEN FROM VARIOUS SOURCES. THE INFORMATION IS DIAGRAMMATIC ONLY AND IS SUBJECT TO VARIATION FROM EXISTING CONDITIONS. IN FACT, CERTAIN EXISTING CONDITIONS MAY NOT BE INDICATED AT ALL. CONTRACTORS PROPOSING TO DO ANY PART OF THE WORK INDICATED HEREIN OR AS DEFINED IN THE SCOPE OF WORK SHALL REVIEW THE COMPLETE SET OF CONTRACT DOCUMENTS, VISIT THE SITE AND DETERMINE TO HIS/HER SATISFACTION THAT HE/SHE WILL BE ABLE TO COMPLETE ALL WORK REQUIRED

FOR THE BID AMOUNT PROPOSED.

H. PROTECT AND MAINTAIN EXISTING UTILITY SERVICE THAT ARE TO REMAIN AND EXISTING SERVICES BEING REMOVED UNTIL THE NEW OPTICAL FIBER SYSTEM IS FULLY OPERATIONAL AND HAS BEEN COMMISSIONED. ALL SERVICES SHALL BE KEPT OPERATIONAL AT ALL TIMES DURING ALL PHASES OF CONSTRUCTION. ALL PROTECTION MEASURES SHALL BE TAKEN TO PROTECT AND MAINTAIN THE NEW OPTICAL FIBER SYSTEM AT ALL TIMES.

I. CONDUIT ROUTES, FIBER RUNS/COUNTS AND HANDHOLE LOCATIONS ARE DIAGRAMMATIC IN NATURE. COORDINATE WILL ALL TRADES AND VERIFY EXACT LOCATION IN FIELD PRIOR TO INSTALLATION. PROVIDE COORDINATION DRAWINGS FOR SITE UTILITY WORK.

J. ALL NECESSARY OUTAGES OF ANY UTILITY SERVICE OR ANY EXISTING TECHNOLOGY AND SECURITY SYSTEM SHALL BE SCHEDULED 14 DAYS IN

ADVANCE WITH THE OWNER.

K. PROTECT ALL NEW AND EXISTING WORK AGAINST DAMAGE.

L. CONDUIT ENDS SHALL BE SEALED. PROVIDE MECHANICAL PLUGS FOR EMPTY AND REWORKED DUCTS ON BOTH ENDS. PROVIDE TEMPORARY

MECHANICAL PLUGS FOR DUCTS UNTIL CABLING IS INSTALLED AND COMPLETED.

M. THE CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF EXISTING CIRCUITS THAT CONTAIN DEVICES OR EQUIPMENT THAT ARE TO REMAIN. WHERE

DEMOLITION/RELOCATION OF DEVICES AND EQUIPMENT IS INDICATED, THE CONTRACTOR SHALL ENSURE THAT OTHER DEVICES OR EQUIPMENT THAT ARE CONNECTED TO THE SAME CIRCUIT, WHETHER "UPSTREAM" OR "DOWNSTREAM", SHALL REMAIN OPERATIONAL.

N. COORDINATE WITH CAMPUS POLICE AND IT DEPARTMENT ALL WORK BEING PERFORMED ON ALL DEVICES ASSOCIATED WITH THE SECURITY SYSTEM.

PROVIDE A WRITTEN NOTICE WITHIN A MINIMUM OF TWO BUSINESS DAYS OF PRIOR OF ANY WORK BEING PERFORMED ON OR THAT EFFECTS THE SECURITY SYSTEM. CLARIFY THE WORK BEING DONE AND GET APPROVAL FROM CAMPUS POLICE ON ACTIONS TAKEN TO SECURE ALL AREAS EFFECTED.

O. DURING THE DEMOLITION AND REMOVAL OF INFRASTRUCTURE CONNECTED TO BUILDING 9H AND OTHER SIMILARLY AGED BUILDINGS ON CAMPUS, AVOID ACCIDENTAL DISTURBANCE OF STRUCTURES WHICH MAY CONTAIN HAZARDOUS MATERIALS. ASBESTOS CONTAINING MATERIALS AND LEAD BASED PAINT ARE LOCATED THROUGHOUT THE PROJECT. REFER TO SPECIFICATIONS 02 82 13.41 ASBESTOS ABATEMENT AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND DISPOSAL FOR AREAS BEING DISTURBANCE. REFER TO “ASBESTOS CONTAINING MATERIAL NOTES”, “LEAD BASED NOTES”, AND “OTHER IDENTIFIED HAZARDOUS MATERIALS NOTES” ON “HAZARDOUS MATERIALS” DRAWINGS “9H-HA” SERIES.

P. CONTRACTOR SHALL TAKE GREAT CARE IN THE REMOVING AND REPLACING CEILING TILES WHERE REQUIRED DURING RENOVATION AND DEMOLITION.

WHERE TILES ARE DAMAGE, CONTRACTOR SHALL REPLACE WITH NEW OR LIKE NEW TO MATCH EXISTING AREAS IN KIND.

ALL DEVICE MAY NOT APPLY TO…

This is the start of the file's text. The full file is on GovTribe.