This document is a Statement of Work (SOW) for a demolition project at the VA Maryland HealthCare System in Perry Point, MD. The project involves the complete demolition of Building 9H, a 54,500 square foot, two-story concrete and masonry structure originally built in 1924, which has been vacant since 2014. Key project requirements include comprehensive hazardous material abatement (including asbestos, lead-based paint, PCBs, mercury, and refrigerants), total building and site demolition, utility relocation, and site restoration.

The project scope extends beyond physical demolition to include complex telecommunications infrastructure modifications, such as relocating the central campus fiber-optic network distribution hub to Building 361 and constructing a new OIT closet in Building 314C with advanced security access systems. The contract has a 400-calendar day completion timeline, with a planned Notice to Proceed approximately 30 days post-award. Contractors must meet stringent qualifications, including OSHA safety training, electrical licensing, and extensive experience in healthcare facility construction. The project is valued at an undisclosed amount and will be managed by the VA Veterans Integrated Service Network 5, with strict environmental, safety, and waste management protocols throughout the demolition process.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST BREAKDOWN

Offeror Name:

Project Title: Demolish Building 9H

Project Number: 512A5-23-311

Project Location: Perry Point

Date:

Specification Division
Labor Cost
Material/Equipment Costs
Total Cost

Division 01 - General Requirements

Division 02 - Existing Conditions

Division 04 – Masonry

Division 06 – Wood, Plastics, and Composites

Division 07 – Thermal and Moisture Protection

Division 09 – Finishes

Division 10 – Specialties

Division 26 – Electrical

Division 27 – Communications

Division 31 – Earthwork

Division 32 – Exterior Improvements

Division 33 – Utilities

Subtotal:

Overhead:

Profit:

Bond:

Grand Total: