Cost Breakdown.docx

DOCX document 20 KB Posted

Attached to
P400--512A5-23-311 - Demolish Building 9H
Solicitation number
36C24525B0005
Issued by

About this file

The document is a Cost Breakdown file and Statement of Work for a demolition project at the VA Maryland HealthCare System in Perry Point, MD. The project involves completely demolishing Building 9H, a 54,500 square foot, two-story concrete and masonry structure originally built in 1924, which has been vacant since 2014. Key project requirements include comprehensive hazardous material abatement (asbestos, lead-based paint, PCBs, mercury), complete building and utility demolition, site restoration, and complex telecommunications infrastructure relocation.

The project is solicited under VA Solicitation Number 36C24525B0005, with a total project duration of 400 calendar days. Critical project elements include relocating the campus fiber-optic network hub, constructing a new telecommunications closet, installing new network infrastructure, and performing utility relocations while maintaining campus operational continuity. Contractors must meet stringent safety, environmental, and technical requirements, including Maryland state licensing, OSHA certifications, and specialized electrical and telecommunications expertise. The project has a comprehensive waste management mandate, requiring 50% demolition debris diversion and detailed tracking of waste streams.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST BREAKDOWN

Offeror Name:

Project Title: Demolish Building 9H

Project Number: 512A5-23-311

Project Location: Perry Point

Date:

Specification Division
Labor Cost
Material/Equipment Costs
Total Cost

Division 01 - General Requirements

Division 02 - Existing Conditions

Division 04 – Masonry

Division 06 – Wood, Plastics, and Composites

Division 07 – Thermal and Moisture Protection

Division 09 – Finishes

Division 10 – Specialties

Division 26 – Electrical

Division 27 – Communications

Division 31 – Earthwork

Division 32 – Exterior Improvements

Division 33 – Utilities

Subtotal:

Overhead:

Profit:

Bond:

Grand Total: