This document appears to be a technical specification for the Marquette Armory Replace Boiler project in Alger County and Menominee City, Michigan. The project involves the removal and replacement of existing building systems and equipment, including selective demolition, asbestos and lead abatement, concrete work, and HVAC, electrical, and plumbing systems. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Military and Veterans Affairs (DMVA). Bids are due by 2:00 PM on a date not specified, and the contract term is not provided.

The technical specification outlines detailed requirements for the various work components, including material specifications, testing and inspection procedures, and quality control measures. It includes specific requirements for worker qualifications, safety protocols, and waste disposal. Pricing terms, set asides, funding information, and other commercial details are not provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

E C

H N

IC

A

L S

P E

C

IF

IC

A

T

IO

N S

Table of Contents Generated by SpecBuilder: 6/17/2022 Division Section Title Pages

DIVISION 02 - EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION 2

02 82 13.33 ASBESTOS ABATEMENT FOR UTILITIES 3

02 83 00 LEAD ABATEMENT 11

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE 15

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 13 PENETRATION FIRESTOPPING 4

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD 7

09 51 23 ACOUSTICAL TILE CEILINGS 5

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING (HVAC)

23 05 23.12 BALL VALVES FOR HVAC PIPING 3

23 05 23.13 BUTTERFLY VALVES FOR HVAC PIPING 3

23 05 23.14 CHECK VALVES FOR HVAC PIPING 4

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 4

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 4

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 11

23 07 19 HVAC PIPING INSULATION 9

23 11 23 FACILITY NATURAL-GAS PIPING 8

23 21 13 HYDRONIC PIPING 5

23 21 16 HYDRONIC PIPING SPECIALTIES 3

23 21 23 HYDRONIC PUMPS 6

23 23 00 REFRIGERANT PIPING 7

23 52 16 CONDENSING BOILERS 6

23 82 23 UNIT VENTILATORS 7

23 82 39.16 PROPELLER UNIT HEATERS 3

DIVISION 26 - ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 6

26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES 5

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 5

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 4

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 14

26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND

CABLING

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 4

26 09 23 LIGHTING CONTROL DEVICES 6

26 27 26 WIRING DEVICES 7

26 28 13 FUSES 3

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 6

26 51 19 LED INTERIOR LIGHTING 6

26 52 13 EMERGENCY AND EXIT LIGHTING 6

END OF TABLE OF CONTENTS

SUBMITTAL ITEM CONTRACTOR DATE FIRM DUE DATE

SUBCONTRACTOR SENT DATE REC'D

028213.33 ASBESTOS ABATEMENT FOR UTILITIES

Product Data

Manufacturer's Certificate

Field Quality-Control Submittals

Qualifications Statements

028300 Lead abatement

Submit under provisions of Division 01 Section

"General Requirements" for review and approval by the University’s Project Manager

Product Data

Quality Assurance/Control Submittals

Closeout / Ongoing Project Submittals

Submittals will be provided to LBNL 3 working days prior to mobilization for each individual site job and must be approved prior to work commencing

033000 CAST-IN-PLACE CONCRETE

Product Data

Design Mixtures

Shop Drawings

Qualification Data

Material Test Reports

Field quality-control reports

078413 PENETRATION FIRESTOPPING

Product Data

Qualification Data

Installer Certificates

092900 GYPSUM BOARD

Product Data

095123 ACOUSTICAL TILE CEILINGS

Product Data

Samples

Samples for Initial Selection

Samples for Verification

Product Test Reports

Maintenance Data

Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents

230523.12 BALL VALVES FOR HVAC PIPING

Product Data

23052313 BUTTERFLY VALVES FOR HVAC PIPING

Product Data

23052314 CHECK VALVES FOR HVAC PIPING

Product Data

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

Qualification Data

D A

TE

R

ET

U

R N

ED

C O

N

TR

A C

TO

R

O W

N

ER

FI

EL

D

FI

LE

N O

T A

P P

'D

SUBMITTAL LOG

PROJECT: Marquette Armory Replace Boiler

OWNER:

PROJECT NO: 19404

CONTRACTOR:

OTHER REVIEWER ACTION COPIES TO

D A

TE

R

EC

'D

SP

EC

IF

A

TI

O

N S

EC

TI

O N

N O

N O

. R

EC

EI

V

ED

N O

. C O

P

IE

S

A P

P R

O V

ED

A P

P R

O V

ED

A

S N

O

TE

D

R

EV

IS

E

R

ES

U

B M

IT

Certified TAB reports

Instrument calibration reports, to include the following

230719 HVAC PIPING INSULATION

Product Data

231123 FACILITY NATURAL-GAS PIPING

Product Data

232113 HYDRONIC PIPING

Product Data

232116 HYDRONIC PIPING SPECIALTIES

Product Data

232123 HYDRONIC PUMPS

Product Data

232300 REFRIGERANT PIPING

Product Data

235216 CONDENSING BOILERS

Product Data

Operation and Maintenance Data

238223 UNIT VENTILATORS

Product Data

Shop Drawings

Operation and Maintenance Data

238239.16 PROPELLER UNIT HEATERS

Product Data

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

Product Data

Product Schedule

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

Product Data

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

Product Data

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Product Data

Welding certificates

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

Product Data

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

Product Data

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

Product Data

Samples

Identification Schedule

260923 LIGHTING CONTROL DEVICES

Product Data

Operation and Maintenance Data

262726 WIRING DEVICES

Product Data

Shop Drawings

262813 FUSES

Product Data

Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Product Data

Shop Drawings

Operation and Maintenance Data

Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents

265119 LED INTERIOR LIGHTING

Product Data

Shop Drawings

Qualification Data

Product Certificates

Operation and Maintenance Data

Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents

265213 EMERGENCY AND EXIT LIGHTING

Product Data

Shop Drawings

Coordination Drawings

Qualification Data

Product Certificates

Operation and Maintenance Data

Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents

DTMB/DMVA

Marquette Armory Replace Boiler DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

SELECTIVE DEMOLITION

02 41 19 - Page 1 of 2

06/17/2022

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

SECTION 02 41 19 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Storage or sale of removed items or materials on-site is not permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

F. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

SELECTIVE DEMOLITION

02 41 19 - Page 2 of 2

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

3.3 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.

Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

5. Dispose of demolished items and materials promptly.

3.4 CLEANING

A. Remove demolition waste materials from Project site and recycle or dispose of them according to Section 01 74 19 "Construction Waste Management and Disposal."

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Comply with requirements specified in Section 01 74 19 "Construction Waste Management and Disposal."

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 02 41 19

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

ASBESTOS ABATEMENT FOR UTILITIES

02 82 13.33 - Page 1 of 3

Do not remove: Copyright © 2022 by Deltek. Warning: This SpecText-based document is protected by U.S. Copyright Law and International Treaties. It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current SpecText license from Deltek.com is required for editing or use of this document for any other project. (19404)

SECTION 02 82 13.33 - ASBESTOS ABATEMENT FOR UTILITIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removal of ACM-contaminated pipeline coatings.

2. Cutting of pipelines containing or coated with ACM.

3. Monitoring of Work area during cutting and cleaning operations.

1.2 DEFINITIONS

A. ACM: Asbestos-containing material.

1.3 UNIT PRICES

A. Removal of ACM-Contaminated Coatings:

1. Basis of Measurement: By linear foot, measured along piping and including fittings and appurtenances.

2. Basis of Payment: Includes cleaning cutting, packaging, transport, and disposal and monitoring.

B. Removal of Piping with ACM-Contaminated Coatings:

1. Basis of Measurement: By linear foot, measured along piping and including fittings and appurtenances.

2. Basis of Payment: Includes cleaning cutting, packaging, transport, and disposal and monitoring.

1.4 SUBMITTALS

A. Product Data: Manufacturer information on respirators and air monitor.

B. Manufacturer's Certificate: Products meet or exceed specified requirements.

C. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

D. Qualifications Statements:

1. Qualifications for contractor, on-Site representative, and disposal firm.

2. Qualifications for testing laboratory.

1.5 QUALITY ASSURANCE

A. Perform Work according to NESHAPs , OSHA standards.

B. Contractor: Company specializing in repairing, modifying, cleaning, or removing AC pipe or ACM-coated pipe as specified in this Section with three years' experience.

C. On-Site Representative: Person trained in performing Work of this Section with three years' experience.

D. Disposal Firm: Company specializing in packaging and hauling ACM to disposal site.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

ASBESTOS ABATEMENT FOR UTILITIES

02 82 13.33 - Page 2 of 3

Do not remove: Copyright © 2022 by Deltek. Warning: This SpecText-based document is protected by U.S. Copyright Law and International Treaties. It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current SpecText license from Deltek.com is required for editing or use of this document for any other project. (19404)

E. Active Waste Disposal Site: Solid waste disposal site permitted to accept ACM waste.

F. Testing Laboratory: Company participating in National Voluntary Laboratory Accreditation Program for asbestos, administered by National Institutes of Standards and Technology.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Store materials according to manufacturer instructions.

B. Respirators Not in Use:

1. Store in sanitary location that protects respirators from dust, sunlight, heat, extreme cold, excessive moisture, and potentially damaging chemicals.

2. Place in plastic bags or closed containers.

PART 2 - PRODUCTS

2.1 RESPIRATORS

A. Manufacturers:

1. Enviro Safety Products.

B. Substitutions: Permitted .

C. Description:

1. Comply with 42 CFR Part 84, Subpart K.

2. Type: Half-face mask; reusable after washing.

3. Maintenance: Replaceable filters and cartridges only.

4. Single-use respirators are not acceptable.

D. Filters: Top air inlet.

E. Performance and Design Criteria:

1. Application: Asbestos abatement for concentrations up to 10 times permissible exposure limit (PEL).

2. Design: Low profile.

2.2 AIR MONITOR

A. Manufacturers:

1. Applied Physics Inc.

2. Dylos Corporation.

B. Substitutions: Permitted .

C. Description:

1. Type: Laser.

2. Power Source: Batteries.

3. Screen: LCD.

4. Output: Greater than 0.5 micron and 2.5 micron particulates.

http://www.specagent.com/LookUp/?ulid=12399&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457183076&mf=04&src=w http://www.specagent.com/LookUp/?ulid=12400&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457183079&mf=04&src=w http://www.specagent.com/LookUp/?uid=123457183078&mf=04&src=w

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

ASBESTOS ABATEMENT FOR UTILITIES

02 82 13.33 - Page 3 of 3

Do not remove: Copyright © 2022 by Deltek. Warning: This SpecText-based document is protected by U.S. Copyright Law and International Treaties. It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current SpecText license from Deltek.com is required for editing or use of this document for any other project. (19404)

PART 3 - EXECUTION

3.1 PREPARATION

A. Perform ACM removal without damage to or contamination of adjacent Work or existing area.

B. Perform cleaning operations without taking pipeline out of service.

3.2 APPLICATION

A. Removal of Pipe Coating:

1. Use cleaning machines or "line-traveling machines" that move along pipeline while removing exterior pipe coating.

2. Collect coating residue in bags and dispose in a permitted active waste disposal site.

3. Cutting and Disposal:

a. Transport removed piping to a central staging area to cut for transport or disposal.

b. Deposit pipeline pieces in leakproof metal collection box secured with tarpaulin covers.

c. Transport filled boxes to an approved landfill.

d. A licensed and certified asbestos supervisor will accompany transport vehicles to manage transport process.

e. Maintain supply of fresh water near cutting operation to keep freshly cut areas of

ACM damp while cutting piping.

f. Individually wrap each joint of piping and pipe ends prior to loading.

3.3 FIELD QUALITY CONTROL

A. Sample Testing:

1. Test pipe or pipe coating for asbestos prior to repairing, modifying, or removing pipelines.

2. Remove samples of pipe or coating along entire length of piping to be removed and have testing laboratory determine quantity of asbestos that may be present.

END OF SECTION 02 82 13.33

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 1 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

SECTION 02 83 00 - LEAD ABATEMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Related Documents:

1. Drawings and general provisions of the Subcontract apply to this Section.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

B. Section Includes:

1. Lead paint removal intended as an interim control], [Settled leaded dust removal, Welding

/ hot cutting operations on steel where lead paint has been abated as indicated in Drawings and Specifications.

2. Compliance with all applicable Federal, State, and local regulations pertaining to work practices.

3. Protection of workers, visitors to the site, and persons occupying areas adjacent to the site.

4. Provide medical examinations and maintain medical records of personnel as required by the applicable Federal, State, and local regulations.

5. The scope of this work does not include the manifesting, transporting, or disposal of hazardous waste. The University will manifest, transport, and dispose of hazardous waste that has been properly packaged, labeled, and stored by the subcontractor.

C. Related Sections:

1. Division 01 Section "General Requirements."

2. Division 01 Section "Special Procedures."

3. Division 01 Section "Cutting and Patching."

4. Division 01 Section "Selective Demolition."

1.2 DEFINITIONS

A. Lead in paint: The Consumer Product Safety Commission (CPSC) considers any paint or other surface coating as containing lead at concentrations greater than or equal to 600 parts per million (ppm), 0.06% by weight; however, OSHA regulations apply to any detectable amount of lead in construction.

B. Lead-In-Construction Supervisor: One who is capable of identifying existing and predictable lead hazards in the surroundings or working conditions and who has the authorization to take prompt corrective measures to eliminate them.

C. Lead-in-air Action Level (AL): 30 µg/m3.

D. Lead-in-air Permissible Exposure Limit (PEL): 50 µg/m3.

1.3 SUBMITTALS

A. Submit under provisions of Division 01 Section "General Requirements" for review and approval by the University’s Project Manager

B. Product Data: Submit five (5) copies of the following:

1. Material Safety Data Sheets (MSDS) sheets for each product containing hazardous materials as defined by OSHA’s Hazardous Communication Standard; 29 CFR 1910.1200.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 2 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

C. Quality Assurance/Control Submittals: Submit five (5) copies of the following:

1. Lead Compliance Work Plan: Detailed, job-specific plan of the procedures proposed for use in complying with the requirements of this Specification and 29 CFR 1926.62.

a. As a minimum, provide the information required in Attachment A, the Lead

Compliance Work Plan Outline.

b. The plan shall be approved by the University prior to the mobilization of equipment, supplies, or workers to the site.

2. Worker Certification: Current lead worker certifications for personnel to be engaged in the work of this Section. Workers will not be permitted on the project site until the submittal is complete and has been accepted by the Project Manager. Provide legible copies of the following information for each worker:

a. Employee quantitative respirator fit-test records that identify the testing agency, the individual fit test exercise fit factor results, and the overall fit factor result;

b. Employee medical approval to wear respirator protection records;

c. Photo copy of current DHS-certified lead supervisor picture-identification card for the designated lead supervisor only;

d. Photo copy of current DHS-certified lead worker picture-identification card for all workers;

e. Blood lead measurements collected no more than three workdays prior to work commencing;

f. Employee picture identification matching names on records. Picture IDs can be photo copies of training cards; however, pictures of employee faces must be viewable vs. dark images from poor quality photo copying; and

3. Training Program: Proof that training of all personnel engaged in work under this Section is current and in accordance with the provisions of OSHA.

4. Respiratory Protection Program: Submit company’s Respiratory Protection Program for review and approval by the University.

5. All submittals will be provided to LBNL at least three (3) working days prior to mobilization and must be approved prior to work commencing.

D. Closeout / Ongoing Project Submittals:

1. Personal air sampling results collected by the abatement subcontractor for airborne lead within 24 hours of sample collection.

2. Blood lead measurements collected within three workdays following the completion of lead related work and per 29 CFR 1926.62.

3. Per 29 CFR 1926.62, the subcontractor shall notify their employees of exposure monitoring results. LBNL requires written documentation from the subcontractor that demonstrates the subcontractor’s employees were notified of their results within 5 days of receiving the results including both excursion and calculated 8 hour TWA results for all results, not just those results above the PEL or excursion limit.

E. Submittals will be provided to LBNL 3 working days prior to mobilization for each individual site job and must be approved prior to work commencing.

1.4 QUALITY ASSURANCE

A. Qualifications:

1. Qualifications of Subcontractor:

a. Work performed under this Section shall be by a single Subcontractor.

b. The Subcontractor shall have a minimum of five (5) years experience as an approved lead abatement subcontractor. If requested, the Subcontractor shall provide the names and locations of 5 projects of similar size and scope that he has completed within the previous five years.

2. Qualifications of Lead Abatement Personnel:

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 3 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

a. All work shall be completed utilizing fully qualified persons who are trained, experienced, and knowledgeable in the proper techniques and procedures for lead abatement welding activities covered by this Section.

b. Lead Workers: All workers performing lead-based paint removal shall be currently certified as DHS Lead Workers.

c. Lead-in-Construction Supervisor: Currently certified as a DHS Lead Supervisor.

3. Qualifications of Analytical Laboratory:

a. The subcontractor shall submit lead samples to an analytical laboratory that is accredited by the American Industrial Hygiene Association’s (AIHA) Industrial Hygiene Laboratory Accreditation Program (IHLAP) and Environmental Lead Laboratory Accreditation Program (ELLAP) and maintains current accreditation throughout the duration of this project.

B. Regulatory Requirements: All lead paint settled leaded dust removal work shall be performed in accordance with requirements of Federal, state and local, including but not limited to the following:

1. Federal Regulations:

a. U.S. Department of Labor, Occupational Safety and Health Administration (OSHA):

1) Lead Standard: Title 29, Part 1926, Section 62

2) Respiratory Protection: Title 29, Part 1910, Section 134

3) Construction Industry: Title 29, Part 1910, Section 2

4) Hazard Communication: Title 29, Part 1910, Section 1200

b. U.S. Environmental Protection Agency (EPA):

1) Resource Conservation and Recovery Act (RCRA):

2) Title 40, Part 260 to 265

c. U.S. Department of Transportation (DOT):

1) Hazardous Substances: Title 49, Part 171 and 172

a) U.S. Department of Energy (DOE)

2. Worker Protection Rule: Title 10, Part 851

3. State Regulations:

a. California Department of Industrial Relations, Division of Occupational Safety and Health (Cal/OSHA):

1) Lead Standard: Title 8, Section 1532.1, California Code of Regulations

b. Contractors State License Board (CSLB):

1) Licensing: Section 7058.5, California Business and Professions Code

c. California Environmental Protection Agency (Cal/EPA).

1) Disposal Requirements: Title 22 and 23, California Code of Regulations

d. California Department of Health Services (DHS):

1) Accreditation, Certification, and Work Practices in Lead-Related

Construction: Title 17, Article 16, California Administrative Code

4. Local Regulations:

a. Bay Area Air Quality Management District (BAAQMD).

1) Lead: Regulation 11, Rule 1

b. San Francisco Bay Regional Water Quality Control Board.

1) Waste Water: San Francisco Bay Basin Water Quality Control Plan.

C. Pre-Construction Meeting: At least one week before work commences, a pre-construction meeting shall be held at a location designated by the University’s Project Manager. Attendees shall include the University’s Project Manager, Construction Manager, Superintendent, Safety Inspector, Building Inspector, and Industrial Hygienist; the Subcontractor's Project Superintendent and Abatement Superintendent; and others as necessary. The agenda shall include a review of project safety requirements, the Subcontractor's written lead compliance work plan, emergency contacts and notification plan, containment and work area design, facility requirements, submittals, and any other issues pertinent to the safe execution of the lead paint removal settled leaded dust welding / hot cutting work.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 4 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

1. Work shall not commence until all required submittals and plans have been approved by the University.

1.5 PROJECT/SITE CONDITIONS

A. Existing Conditions:

1. Paint that contains lead and / or settled leaded dust is known to be present on surfaces at the Project site. Surfaces which have not been previously tested, that may be affected by the project scope, should be assumed to contain lead and handled according to this section. .

a. If any other materials are found which are suspected of containing lead or other hazardous materials, immediately stop work in the affected area and notify the University’s Project Manager. Handle suspected lead containing material according to this section.

2. The University will occupy adjacent areas during the course of the Work. Work under this Subcontract shall not affect the University's operation of adjacent areas.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Plastic Sheeting: Fire retardant polyethylene sheeting conforming to NFPA 701 and ASTM S502- 74T for surface flammability and smoke density. A single polyethylene film in the largest sheet size possible to minimize seams, 6 mils thick, clear, frosted or black as indicated.

B. Duct Tape: Provide duct tape in 2" or 3" widths as indicated, with an adhesive which is formulated to stick aggressively to polyethylene sheeting.

C. Spray Adhesive: Shall not contain methylene chloride, as listed on the product's label and/or Material Safety Data Sheet (MSDS). Provide spray adhesive in aerosol cans that is specifically formulated to stick aggressively to polyethylene sheeting.

D. Disposal Bags: 6-mil polyethylene.

E. Lead-Containing Materials Disposal Containers: Leak-tight drums.

F. Detergent: High-phosphate wash containing at least 5% trisodium phosphate (TSP).

2.2 EQUIPMENT

A. Clothing: Furnish the following for each worker and others as specified.

1. Coveralls:

a. Disposable full-body coveralls with attached head and foot covers conforming to requirements of OSHA Standards 29 CFR 1926.62.

2. Respirators:

3. Full facepiece negative pressure respirators with an assigned protection factor of 50X the

PEL, or equivalent, for the removal of lead paint or settled leaded dust.

4. Powered Air Purifying Respirators (PAPRs) that have been quantitatively fit tested and equipped with HEPA (P-100) filters shall be acceptable substitutes for the respirators specified in 2.02(A)(2)(a).

5. Goggles, safety glasses, face shields: Provide eye and face protection as required by

OSHA.

6. Gloves: Select one or both as needed

a. Leather work gloves for welding / hot cutting.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 5 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

b. Compatible chemical resistant gloves for paint removal products.

7. Boots: Steel toed foot protective work boots with non-skid soles and steel shanks.

8. Hard Hats: Head protection (hard hats) approved by ANSI.

9. Soap and Towels.

B. Industrial Grade Vacuum and Exhaust Equipment: High Efficiency Particulate Air (HEPA) filtered vacuum and exhaust equipment with appropriate HEPA filters for lead contaminated dust / fume aerosols. Household HEPA vacuum cleaners shall not be acceptable.

C. Temporary Shower Facility: A pre-fabricated or site-built temporary shower facility, with hot and cold water to shower head that can be controlled from inside shower, shall be installed and used by all workers when airborne lead levels exceed or are predicted to exceed the PEL without regard to respiratory protection.

D. Temporary Washing Facilities: A sink with hot and cold water supply and soap for washing hands and face prior to breaks, lunch, and leaving the worksite at the end of the shift shall be used by all workers regardless of the airborne lead results.

E. Pressure differential recorders shall be in working condition, calibrated and operated continuously during the operation of the negative pressure enclosure and provide a pressure reading at least every 10 minutes, or more frequent, and provide a written documentation of the pressure readings that will be submitted to LBNL at the end of the project.

PART 3 - EXECUTION

3.1 PROTECTION

A. General:

1. Take appropriate continuous measures as necessary to protect all building occupants from exposure to lead dust and fumes. Such measures shall include the procedures and methods described herein, and shall be in accordance with regulations and guidelines of applicable Federal, State, and local agencies.

2. Securing the Work Area: Secure the work area from access by the public, occupants, staff, or users of the building.

a. Provide and maintain temporary partitions to prevent spread of dust, fumes, odors, and noise to permit continued University occupancy.

b. Demarcate the work by posting warning signs at each locked door and at the entrance to the change room leading to the controlled area as follows:

3. Protect all existing materials, appurtenances and equipment that are not to be abated.

Existing materials, appurtenances and equipment, building exterior and interior, and landscaping altered or damaged during lead related work shall be repaired or replaced by the Subcontractor to match existing undisturbed conditions at no additional cost to the University.

4. Utility shutdowns shall be in accordance with Division 01 Section "Special Procedures".

5. Maintain access and egress to building and all rooms at all times.

6. Do not block or reduce width of egress to exits.

7. Conduct operations with minimum interference to corridors, exits, and public thoroughfares.

8. Use periodic light water mist, temporary enclosures, and other suitable methods to limit the release of airborne lead dust and fumes. Comply with applicable regulations pertaining to environmental protection. Use water outside the work area only if approved by the Project Manager.

9. Path of travel for debris removal shall be maintained dust free and clean at all times.

10. Cover and protect windows, doors, and walls that are adjacent to lead work areas.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 6 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

11. Water used during this project to remove or wet lead paint or lead dust shall be collected and prevented from entering storm water drains.

12. Eating, drinking, smoking, chewing tobacco or gum, or applying cosmetics is prohibited in the work area.

B. Personnel:

1. Lead-in-Construction Supervisor:

a. Provide an on-site, full-time Lead-in-Construction Supervisor (or Supervisors) to ensure that the worker protection program is effective.

b. The Lead-in-Construction Supervisor shall have the authority to shut down the project in accordance with 29 CFR 1926.62.

2. Lead Workers: The Subcontractor shall communicate information concerning lead hazards according to the requirements of the Hazard Communication Standard (29 CFR 1910.1200), including but not limited to the requirements concerning warning signs and labels, material safety data sheets (MSDS), and employee information and training.

3. Training Program: The Subcontractor shall assure that each worker and supervisor holds current training records meeting OSHA requirements. The training shall include the following:

a. The content of the OSHA Lead in Construction Standard (29 CFR 1926.62);

b. The specific nature of the operations that could result in exposure to lead above the action level;

c. The purpose, proper selection, fitting, use, and limitations or respirators;

d. The purpose and a description of the medical surveillance program, and the medical removal protection program, including information concerning the adverse health effects associated with excessive exposure to lead (with particular attention to the adverse reproductive effects on both males and females and hazards to the fetus and additional precautions for workers who are pregnant);

e. The engineering controls and work practices associated with the worker’s job assignment including training of workers to follow relevant good work practices described in 29 CFR 1926.62;

f. The contents of any compliance plan and the location of regulated area in effect;

g. Instructions to workers that chelating agents should not routinely be used to remove lead from their bodies and should not be used at all except under the direction of a licensed physician, and;

h. The worker’s right of access to medical records.

i. In addition to items a-h of this section, workers who perform lead removal work must also be DHS lead trained workers according to 17 CCR Division 1, Chapter 8.

4. Medical Surveillance:

a. Provide medical examinations for all workers performing the removal of lead paint, removal of settled leaded dust, or welding / hot cutting steel where lead paint was removed per 29 CFR 1926.62.

b. Blood testing (blood lead and zinc protoporphyrin) shall be performed for all workers performing the removal of lead paint, removal of settled leaded dust, or welding / hot cutting steel where lead paint was removed, no more than three work days prior to work commencing and within three work days following the completion of lead related work and in accordance with 29 CFR 1926.62.

5. Respiratory Protection Program: Comply with ANSI Z88.2 - 1992 "Practices for Respiratory Protection" and OSHA 29 CFR 1926.62.

a. Require that respiratory protection be used at all times when there is any possibility of disturbance of lead paint, settled leaded dust, or welding / hot cutting on steel where lead paint was removed.

b. Full facepiece negative pressure respirators shall be worn by workers performing lead paint removal. Welders whom will be welding or cutting steel where lead paint

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 7 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404) was removed shall wear Powered Air Purifying Respirators (PAPRs), equipped with HEPA (P-100) filters, that are quantitatively fit tested.

6. Protective Clothing:

a. The following clothing shall be worn by all lead workers in the work area.

1) Disposable Coveralls with head and shoe covers (except for welders):

Provide a sufficient number for all required changes for all workers in the work area. Dispose of coveralls as clothing waste at the end of each day.

2) Gloves: Chemical resistant gloves shall be used when using chemical strippers to remove lead paint. Gloves shall be secured to coveralls using duct tape to protect arms and hands. Do not remove gloves from the work area.

3) Goggles, safety glasses, or face shields: Shall be worn by all workers involved in scraping, spraying, stripping, or any other activity that may potentially cause eye or face injury.

7. Temporary Shower Facilities: Shall be used in accordance with subsection 2.02 (C) of this section.

8. Washing Facilities: Shall be used in accordance with subsection 2.02 (D) of this section.

3.2 GENERAL PROCEDURES

A. Containment Systems:

1. Regardless of the lead content of paints, dust, or coatings being disturbed, Negative

Pressure Enclosure (NPE) containment is not required unless operations such as sanding, abrasive blasting, or any other removal method is used that creates an uncontrollable release of airborne lead aerosols in excess of the Action Level of 30 ug/m3.

2. If measured lead levels from either personal or area air samples exceed the Action Level at any time during the course of the work, or visual emissions are detected, the Subcontractor shall immediately stop work, correct the condition(s) causing the increase, and notify the University’s Project Manager. If the subcontractor’s existing engineering and administrative controls do not reduce concentrations below the Action Level, the Subcontractor shall immediately stop work, notify the University’s Project Manager, and implement additional controls such as the construction of a Negative Pressure Enclosure (NPE) equipped with HEPA filtered Negative Air Machines (NAMs) that have been tested as specified in subsection 3.05 (A)(2). The enclosure shall maintain a negative pressure relative to the surrounding area to adequately prevent the release of unfiltered lead aerosols. NAM exhaust ducting shall be routed to the exterior of buildings.

3. Demarcate the Lead Control Area by providing a roped-off and labeled perimeter area at least 20 feet wide around the work area where lead related work is to be performed. Provide signage per subsection 3.01 (A)(2)(b).

B. In case of inclement weather, such as high winds or rain, which may cause paint chips, dust, or fumes to migrate out of the work area, immediately secure the work area and stop work until weather conditions improve.

3.3 WORK AREA PROCEDURES

A. Entering the Work Area: Each time a work area is entered put on new disposable coverall or (re-use previous coverall if not overly contaminated or torn), new head cover, and a clean respirator with cartridges appropriate for the lead work to be performed. Reinforce coverall seams and secure gloves to coveralls with duct tape.

B. Wearing disposable coveralls: Do not enter occupied building areas while wearing either new or contaminated disposable coveralls or respirators. Provide a visual barrier between lead related work and occupied areas.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 8 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

3.4 LEAD REMOVAL PROCEDURES

A. Lead removal: Remove lead paint or dust as described in the contractor’s lead work plan prior to disturbing the substrate .

1. Prohibited Lead Paint / Dust Removal Methods:

a. Open flame burning

b. Chemical stripping with methylene chloride based paint strippers

c. Uncontained abrasive blasting

d. Uncontained power washing

e. Dry sanding or scraping

f. Power sanding without HEPA attachment

g. Hot cutting or welding prior to removing lead paint

2. Waste Disposal: HEPA vacuum and/or wet wipe to remove all paint chips, dust, and debris generated during the work. Do not allow paint chips, dust, or debris to accumulate. Place all paint chips, dust, and debris in properly labeled plastic disposal bags at the end of each shift.

3.5 FIELD QUALITY CONTROL

A. Site Tests:

1. Respiratory protective equipment shall be quantitatively fit tested, including PAPR units.

Qualitative fit test using irritant smoke tests or other qualitative test methods shall not be acceptable.

2. All HEPA vacuums and negative air machines shall be challenge tested, by emery oil aerosol or equivalent, and certified as in "passing” condition prior to work commencing.

Testing shall be completed in the presence of the University Industrial Hygienist and shall be conducted at the Berkeley Lab outside of buildings in unoccupied areas. If any units fail, no work will be allowed with those units and the units shall be removed from the Berkeley Lab. Maintenance or repair work at the Berkeley Lab shall not be allowed on vacuums or negative air machines that have failed the challenge aerosol testing. Negative air machines and HEPA vacuums shall be tested every three months, and immediately after changing HEPA filters, and remain onsite during the duration of the project. HEPA vacuums and negative air machines shall not be used after changing HEPA filters until they have been tested by a challenge aerosol.

B. Inspection (Lead Air Monitoring):

1. Personal Exposure Monitoring Results: Subcontractor shall provide personal air monitoring of its employees, in accordance with requirements of 29 CFR 1926.62.

a. The personal air monitoring data shall include the employee's name, date of monitoring, task(s) performed, employees represented by the monitoring, analytical result, and time-weighted average exposure reported in units of ug/m3.

b. The analytical lab results shall be submitted to the University’s Project Manager within 24 hours of sample collection.

c. The subcontractor shall submit air samples to an AIHA accredited laboratory per 1.06(A)(3) of this section. The subcontractor shall request NIOSH method 7082 as the analytical method.

2. The University’s Industrial Hygienist may conduct personal lead air monitoring on the subcontractor’s employees at any time to verify Subcontractor's compliance with these Specifications, EPA and OSHA regulations, and applicable State and local government regulations.

3. Monitoring During Lead Decontamination: The University’s Industrial Hygienist, or its representative, may conduct quality control and area monitoring at any time during potential worker exposure to airborne lead. If monitoring outside the control area shows airborne concentrations exceed the OSHA Action Level of 30 ug/m3, the Subcontractor

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 9 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404) shall immediately stop all work, correct the condition(s) causing the increase and notify the Project Manager.

4. If monitoring indicates that lead contamination is occurring outside of controlled areas (i.e., equal to or greater than 30 ug/m3) the Subcontractor shall immediately cease lead disturbance activities. Do not resume work until authorized by the Project Manager.

5. Subcontractor shall calibrate personal air sampling pumps by either using primary calibration devices or properly calibrated rotameters. Rotameters shall be calibrated at least on a semiannual basis. The personal air sampling pumps shall receive a pre- and post-calibration with the flow rates recorded accurately on the analytical lab’s chain of custody and the subcontractor’s field data sheet. Documentation of rotameter calibrations or individual pump calibrations from primary sources shall be made available to LBNL when requested. Pumps shall be calibrated to at least two decimal places.

3.6 CLEANING

A. Daily Cleaning: Thoroughly clean the entire area under active lead disturbance at the end of each workday.

1. At end of work shift remove any paint chips, dust, and debris by using a HEPA vacuum or by spraying with wet wash solution, collect debris with wet paper towels, place in disposal bag while still wet, and clean surface of plastic sheets with wet paper towels.

2. Exterior Cleanup:

a. Undisturbed areas potentially affected by exterior lead disturbance shall be protected by using a drop poly containment system.

b. Because weather can adversely affect the efficacy of exterior drop poly containment, remove surface plastic of the containment system at the end of each workday.

c. Examine immediate area to ensure that no lead debris has escaped containment.

Debris shall be placed in double plastic bags, sealed and stored with other contaminated debris.

3. As determined by EHSS, add this project clearance section as necessary. Project clearance is not always a requirement for LBNL projects; however, it is sometimes useful to include in the specifications especially for interior building projects (i.e., office environments, lunch rooms, etc.) where the space will be re-occupied and it may be prudent to demonstrate lead levels are within acceptable limits. HUD is purposely not referenced here with respect to their clearance criteria to allow the EHSS professional flexibility in determining what is an appropriate clearance level based upon the scope of work. However, the clearance levels listed in this subsection may change accordingly as HUD officially changes their levels.

3.7 PROJECT CLEARANCE

A. Subcontractor Release Criteria: The lead disturbance work area is cleared when the work area is visually clean and wipe samples show lead concentrations have been reduced to the level specified below.

B. Wipe Sampling: Wipe sampling will be used to evaluate the level of lead remaining in the work area. A commercial wipe moistened with a non-alcohol wetting agent will be used. Surface dust sampling will take place no sooner than 24 hours after completion of post-disturbance cleanup activities. This will allow any airborne dust to settle onto the surfaces to be tested.

C. Clearance Criteria:

1. If any of the wipe samples exceed the clearance criteria, the work area must be cleaned again and retested until the criteria are met.

2. If all wipe sample results for the work area meet the clearance criteria, the work area is cleared for re-occupancy.

DTMB File #511/22046.JBB DMVA File #260521038

OHM PROJECT #7136-22-0060

LEAD ABATEMENT

02 83 00 - Page 10 of 10

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Marquette Armory Replace Boiler ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19404)

D. The University will be responsible for all costs of the initial clearance testing. The Subcontractor shall be responsible for additional testing costs if initial clearance test does not pass.

E. After final cleanup and removal of all Subcontractor equipment, materials, and critical barriers are complete, a final post teardown inspection will be conducted. The University or University’s Industrial Hygienist will conduct the final inspection with the Subcontractor.

3.8 STORAGE OF WASTE MATERIALS

A. Waste Evaluation: The materials collected from the cleaning operations must be evaluated to determine if the materials are hazardous and require special handling. The Subcontractor is responsible for segregating waste as it is generated and labeling all waste containers appropriately. Stored waste must be labeled with the accumulation date, type of waste, and area from which it was generated.