About this file

This document is an addendum to a state and local agency contract opportunity for the Marquette Armory Replace Boiler project. The project is being issued by the Michigan Department of Technology, Management and Budget (DTMB) and the Department of Military and Veterans Affairs (DMVA). The scope of work includes the removal and disposal of asbestos-containing materials (ACM) and the replacement of the building's boiler. Key details include the location of the project at 1820 Lincoln Avenue in Marquette, Michigan, a bid due date of July 27, 2022, and contractor requirements related to working hours, asbestos abatement procedures, and coordination with the owner's representatives.

The addendum provides updates to the project manual, drawings, and mechanical schedules, including revisions to the asbestos abatement specification, updated hazardous materials assessment information, and current Davis Bacon prevailing wage rates. The contract includes a base bid for the overall project scope and an alternate bid for providing temporary heating during construction. Contractors are required to follow all applicable state, federal, and industry regulations for worker and environmental protection when handling ACM and lead-containing paint during the renovation activities.

View the file

Other files

File Type Posted
511.22046.JBB_COVER.pdf PDF
511.22046.JBB_MECH.pdf PDF
511.22046.JBB_Advertisement.pdf PDF
511.22046.JBB_ELEC.pdf PDF
511.22046.JBB_Specifications Front End.pdf PDF
511.22046.JBB_Specifications Tech Specs.pdf PDF
511.22046.JBB_ARCH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 Page 1

ADDENDUM NO. 1

DATE: Friday, July 15, 2022

PROJECT: Marquette Armory Replace Boiler

OWNER: DTMB/DMVA

BID DATE: Wednesday, July 27, 2022

The following shall be incorporated into the Contract Documents dated 2022 JUL 27.

GENERAL

Project address: 1820 Lincoln Avenue, Marquette, MI 49855.

Please contact Alvar Maki at 906-485-2531, or makia@michigan.gov to visit the project site.

Working hours for the project are from 8:00am - 4:30pm.

The existing roof warranty is with Bell Roofing 906-226-2224.

Contact information for the controls sub consultant: Jason 231-218-6324.

Attached is the Prebid sign in sheet.

PROJECT MANUAL

1. Alternate #1 language on bid schedule edited to include temporary boiler size and portable heater exhaust locations.

2. Attached updated hazardous materials spec and report.

3. Attached are current Davis Bacon wages.

DRAWINGS

A-101 FIRST FLOOR PLAN

1. Revisions to demolition general note #1.

A-701 REFLECTED CEILING PLAN

1. Sheet keynote #3 removed from demolition plan.

2. Sheet keynote #1 added to 120 Unit Storage on demolition plan.

3. Sheet keynote #4 added to 114 E.M. Toilet on demolition plan.

4. Sheet keynote #3 added and applied to 120 Unit Storage on renovation plan.

M-101 MECHANICAL RENOVATION PLANS

1. Sheet keynote #5 added to CU-1 on roof to note the roof holds asbestos containing materials.

Roof penetrations should be carried out through the correct laws, methods, and regulations.

2. Sheet keynote #6 added to the hydronic piping that is routed down to the basement. This piping is to be installed after the duct is demolished.

M-102 ENLARGED MECHANICAL PLAN

1. Sheet keynote #2 on the enlarged demolition plan edited to include language that the tank insulation contains asbestos and work should be carried out through the correct laws, methods, and regulations.

2. Sheet keynote #11 on the enlarged demolition plan edited to provide insulated metal panels over louver openings. Louver to remain with the openings capped.

3. Sheet keynote #3 on the enlarged renovation plan edited to include language that the roof holds asbestos containing materials. Roof penetrations should be carried out through the correct laws, methods, and regulations.

mailto:makia@michigan.gov

Addendum 1 Page 2

M-601 MECHANICAL SCHEDULES

1. Expansion tank schedule revised to a 44-gallon tank.

EDP101 1ST FLOOR ELECTRICAL DEMOLITION PLAN

1. Added sheet keynote #7 and #8.

2. Added demolition of lights in 120 Unit Storage.

3. Added demolition of Boiler Rm Louver actuator and Abandoned AHU above 110 Unit Storage.

EL101 1ST FLOOR LIGHTING PLAN

1. Added proposed lighting in 120 Unit storage.

2. Added exit sign and light fixture height 124 Boiler Rm.

3. Changed all motion and vacancy sensor symbols to be ceiling mounted.

4. Added callout 112 break rm.

5. Changed callout 114 E.M toilet rm.

E-501 ELECTRICAL DETAILS

1. Added note to one line diagram.

End of Addendum No. 1

Bidding and Contract Document (R 03/22) Marquette Armory Replace Boiler File No. 511/22046.JBB

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid

1 LS Project Scope of Work

ALLOWANCE AMOUNT $10,000.00 $10,000.00

CONTROLS ALLOWANCE $50,000.00 $50,000.00

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________ (use words) (in figures)

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid

Item Bid Price

1 Lump sum Provide temporary heat to the building with a portable boiler and salamanders for the garage area. Temporary boiler shall be sized to provide minimum

1000 MBH. Salamanders in garage area shall be natural gas and provide minimum 200 MBH heat to maintain 50 deg F in all areas. Connect to existing 2-

1/2" gas line in garage area. Vent

NWare Cloud+

NWare

Addendum #1

Bidding and Contract Document (R 03/22) Marquette Armory Replace Boiler File No. 511/22046.JBB through exterior wall. Patch/repair exterior opening when portable heaters are removed. Owner will pay for utility cost.

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid

Item Bid

N/A

NWare

NWare

Addendum #1

DTMB/DMVA ASBESTOS ABATEMENT AND DISPOSAL

Marquette Armory Replace Boiler 02 82 00 - Page 1 of 13 DTMB File #511/22046.JBB Addendum: 07/15/2022

DMVA:260521038

OHM PROJECT # 7136-22-0060

Section 02 82 00 - ASBESTOS ABATEMENT AND DISPOSAL

PART 1. GENERAL

1.01 Summary

This Section includes removal and disposal of asbestos-containing materials (ACM) by enclosure, glove bag, or entire structures methods as applicable. Demolition and debris removal of all ACM identified by provisions of this Section, shown on drawings, or identified at the site, shall be executed under the provisions of this Section, and other applicable sections of these specifications.

A. The extent of asbestos removal work is as surveyed and listed in the bid documents. See

Section 02 26 00 for Hazardous Materials Assessment report.

1. Thermal Systems Insulation (TSI), elbows, and joints are ACM. All elbows, joints and other TSI associated with steam to unit heaters throughout the building shall be abated, as well as other TSI impacted by the project scope.

2. All boiler room TSI, including tank insulation is ACM and shall be properly abated.

3. Roofing materials are assumed to be ACM and shall be handled accordingly unless sampled and confirmed to be non-asbestos.

1.02 References

Asbestos containing material must be managed in accordance with provisions stipulated in

Michigan LEO, Part 602 – Asbestos Standards for Construction, and United States Occupations Safety and Health Organization (US OSHA) Safety and Health Regulations for Construction, Part 29 Code of Federal Regulations 1926.1101.

1.03 Definitions

A. Asbestos Abatement Firm: Firm engaged to perform actual removal and disposal work, either as the CONTRACTOR or SUBCONTRACTOR.

B. Asbestos Containing Material: The term "asbestos containing material" is abbreviated as

ACM.

C. CONSULTANT: Firm engaged by OWNER to identify and measure asbestos containing materials, or to inspect abatement operations, including monitoring of air quality, if applicable.

1.04 Submittals

A. Initial Submittals: Submit the following documents to OWNER/CONSULTANT as required:

1. License from the State of Michigan in accordance with Act 135 1986 (Asbestos Abatement Contractors Licensing Act).

2. Copy of Notification of Intent to Renovate/Demolish sent to appropriate federal, state, and

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 local agencies.

3. Proposed Abatement Work Schedule, including mobilization date, working hours, schedule per week, work locations, length and number of shifts, foreperson's name, and crew size.

4. Proposed Abatement Work Plan, including the work locations, type of work in each location, and proposed abatement methods.

5. Transportation/Disposal Firm Certificate: Letter, signed by CONTRACTOR, certifying that a listed, approved Transportation/Disposal Firm will be used. Include name and address of Transportation/Disposal Firm.

B. Waste Disposition Submittals: Submit to OWNER/CONSULTANT a signed waste shipment record stating that asbestos waste has been properly disposed in a landfill indicated in the "Quality Assurance" section of this specification Section. Submit the following:

1. Receipts (trip tickets) from approved landfill.

2. Asbestos Waste Shipment Record, as follows:

a. Prior to removing ACM from the project site, record quantity and/or volume of ACM and verify with OWNER/CONSULTANT.

b. Ensure that the landfill operator provides a signed copy of the waste shipment record to the OWNER/CONSULTANT within 35 days of the date that ACM is removed from the project site. If waste is not transported directly from the project site to the landfill, the waste shipment record shall reflect each transfer.

c. The OWNER/CONSULTANT will not make final payment prior to receipt of signed waste shipment record.

C. Contract Closeout Submittals: Comply with the following requirements in addition to the requirements elsewhere in the specifications.

1. Statement of Visual Inspection: Upon substantial completion of abatement activities, submit a statement of visual inspection signed by the CONTRACTOR’s competent person/supervisor. Include the following:

a. Name of licensed contractor conducting work.

b. Name, signature, and title of on-site supervisor.

c. Name, location, and start and finish date of abatement work.

d. Current date.

e. Statement that the work was completed according to applicable federal, state, and local laws, and these specifications.

f. Statement that the Asbestos Abatement Firm's field supervisor has visually inspected the work site and has found no dust, debris, or other suspect ACM that were part of the scope of work.

2. Asbestos Removal Report: Submit Asbestos Removal Report to OWNER/CONSULTANT prior to CONTRACTOR’s application for final payment. Include a schedule of items removed, summarizing the types and quantities of ACM removed from the Project Area.

1.05 Quality Assurance

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022

A. Pre-Qualified Disposal Organization: Engage an appropriate Type II Landfill licensed and permitted to accept ACM wastes.

1. Regulatory Requirements: Make all necessary notifications to the appropriate federal, state, and local agencies.

a. The National Emission Standards for Hazardous Air Pollutants (NESHAP), Asbestos regulation 40 CFR 61, Sub-Part M requires that if at least 80 linear meters (260 linear feet) of friable asbestos materials, at least 15 square meters (160 square feet), or 1 cubic meter (35 cubic feet) of friable asbestos materials, or other facility components are stripped or removed while renovating a facility, all the requirements of section

61.145 apply.

b. When applicable, notify the Michigan Department of Environment, Great Lakes, and

Energy (EGLE), the Michigan Department of Labor and Economic Opportunity (LEO), and appropriate state and local regulatory agencies. No work shall be conducted without notification to all regulatory authorities having jurisdiction.

PART 2. PRODUCTS

PART 3. EXECUTION

3.01 Asbestos Abatement, General

A. Conduct asbestos abatement operations in a manner that fully protects CONTRACTOR's and SUBCONTRACTOR's employees, the general public, building occupants, and potential follow-on renovation or demolition contractors and personnel from exposure to asbestos and other safety and health hazards.

1. Asbestos abatement projects shall be directly supervised by a competent person as described in 29 CFR 1926.1101.

2. The supervisor/competent person shall provide a weekly record of abatement activities to the OWNER/CONSULTANT.

B. Protect adjacent areas, materials and surfaces from damage due to demolition operations, including but not necessarily limited to the following:

1. Water damage.

2. Dirt dust and debris.

3. Abrasion.

4. Cuts and scratches.

5. Holes from fasteners for temporary barriers.

C. All asbestos work shall be conducted within a regulated area that complies with the following requirements:

1. Post a sufficient number of signs required by 29 CFR 1926.1101 at the asbestos abatement area and at every work area entrance, so that tenants, OWNER's personnel, and other CONTRACTOR's employees have an opportunity to take protective measures before potentially exposing themselves to asbestos. Place barriers if necessary to secure

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 open areas.

2. Allow only authorized, properly protected personnel to enter the regulated area.

Immediately report unauthorized individuals entering the work area to the

OWNER/CONSULTANT.

D. When required, provide employees and inspectors authorized to enter the regulated area with protective work clothing consisting of disposable Dupont "Tyvek" (or equivalent) full body coveralls, head covers, boots, and other necessary safety gear, including a hard hat and eye protection.

E. Provide respiratory protection to employees as required by current OSHA regulations including 29 CFR 1910.134 and 1926.1101.

1. Provide asbestos abatement workers with appropriate respirators with high efficiency particulate air (HEPA) filters for adequate protection during ACM removal operations.

Respiratory protection may be downgraded if negative exposure assessment indicates that less protection is required.

2. A half-face respirator or appropriate respirator protection must be worn while tearing down and setting up enclosures, while glovebagging, and during pre-cleaning and post-cleaning work.

3. Do not allow respirators to be pulled away from faces while in the work area.

F. Maintain at the job site and post the following documents:

1. Copy of EGLE/LEO notification.

2. Employee respiratory protection program.

3. Michigan Right-To-Know poster.

4. Company standard operating procedure.

5. This Specification Section.

6. Safety Data Sheets for products used on job.

7. 29 CFR 1926.1101.

8. 40 CFR, Part 61 (NESHAP).

9. The foreperson's or supervisor's Contractor/Supervisor Accreditation Certificate.

10.State of Michigan Accreditation Certificates and medical approval for each worker.

G. Use the following engineering controls and work practices for all asbestos abatement operations, regardless of measured exposure levels:

1. Vacuum cleaners equipped with HEPA filters to collect all asbestos-containing dust and debris.

2. Wet methods to control exposures during asbestos removal and clean-up, except where proven to be infeasible.

3. Prompt clean-up and disposal of asbestos-contaminated wastes and debris in leak-proof containers.

4. Establish a decontamination area, adjacent and connected to the regulated area, if the

Project requires the removal of more than 25 linear feet, or 10 square feet of thermal systems insulation or surfacing ACM.

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022

5. Establish an equipment area adjacent to the regulated area if the Project requires the removal of less than 25 linear feet or 10 square feet of thermal systems insulation or surfacing ACM.

H. Do not use any of the following equipment or work practices during asbestos abatement operations, regardless of measured exposure levels.

1. High-speed abrasive disc saws not equipped with point-of-cut HEPA ventilation or HEPA filtered exhaust air enclosures.

2. Blowing with compressed air to remove asbestos-containing materials.

3. Dry sweeping, shoveling, or other dry methods to clean up asbestos-containing dust and debris.

4. Employee rotation as a means of reducing employee exposure to asbestos.

3.02 Asbestos Removal by Full Enclosure Method

A. Preparation of the Work Area: Complete the following preparation work prior to beginning asbestos removal operations:

1. Install critical barriers over each opening into the regulated area. The following requirements are in addition to, not in lieu of, other indicated surface and object protection requirements:

a. Seal each opening between the work area and adjacent areas with not less than 2 layers of 6-mil polyethylene sheeting. Use an expanding poly-urethane foam material or equivalent to seal areas with large numbers of pipes, conduits, and beams.

Openings include, but are not necessarily limited to, windows, skylights, doorways, elevator hoistway openings, corridor entrances, drains, ducts, grills, grates, and diffusers.

b. Seal intake and exhaust vents and duct seams within the regulated area with not less than two layers of 6-mil polyethylene sheeting.

2. HVAC System Shutdown: OWNER's maintenance personnel will shut down heating, cooling, and air conditioning systems when necessary. Coordinate scheduling with OWNER's personnel and provide 72 hours notice to the OWNER prior to planned shut-down.

3. Protection of Surfaces and Objects: The following requirements are in addition to, not in lieu of, indicated work area sealing requirements. Cover the following surfaces and objects as follows:

a. Protect all surfaces beneath all removal activity. Remove moveable objects from the work area and cover fixed objects with impermeable dropcloths or plastic sheeting with edges securely sealed with tape.

b. Cover open tanks with plywood or other solid material.

c. Provide clean, fresh air to mechanical equipment, where required to maintain proper

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 performance of equipment.

d. Fully pre-clean all covered surfaces with amended water and a HEPA vacuum.

e. Cover walls with not less than two layers of 4-mil polyethylene sheeting. Construct free standing enclosure walls of not less than 6-mil polyethylene sheeting, with supports spaced not more than 3 feet on-center.

f. Cover floors with not less than two layers of 6-mil polyethylene sheeting. Avoid seams where possible. If seams are necessary, overlap not less than 12 inches and tape joints. Extend sheeting 12 inches up the sidewalls, leaving no seams at the wall and floor joint. Immediately repair punctures and leaks and clean up seepage.

4. Cleaning: Do not use cleaning methods that raise dust, such as sweeping or using vacuum cleaners not equipped with HEPA filters. Do not disturb asbestos materials during pre-cleaning phases.

a. During abatement activities, treat water removed from the enclosure as asbestos contaminated, either by filtering or disposing as asbestos waste. Fully seal floor drains.

5. Deactivate or install ground-fault circuit interrupters on each electrical circuit within the enclosure.

6. Construct a three-chambered decontamination facility that is adjacent to and connected to the regulated area, and that consists of an equipment room, a shower room, and a clean room in series. If decontamination facilities are exposed to weather, construct with lumber and exterior grade plywood. Secure the facility when not in use.

a. Supply the equipment room with properly labeled impermeable bags and containers for the containment and disposal of contaminated protective equipment.

b. Construct showers that comply with the requirements of 29 CFR 1910.141 (d) (3), with the shower room adjacent to both the equipment room and the clean room. Filter water waste and shower water through a 5-micron filter or remove water from site as asbestos waste.

c. Equip the clean room with a locker or appropriate storage container for each employee.

7. Employee Decontamination Facilities: Comply with the following requirements:

a. Access the work area only through an approved decontamination system. Lock or block other entrances. Seal emergency exits (for use during a fire or accident) with polyethylene sheeting and tape.

b. Seal the waste pass-out, except during the removal of asbestos waste from the enclosure.

c. Entrance To the Regulated Area: Employees shall enter the decontamination area through the clean room, remove and store clothing, and put on protective clothing and respiratory protection before passing through to the equipment room.

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022

d. Exit From the Regulated Area: Employees shall exit the regulated area by removing gross contamination and debris from their protective clothing. The clothing shall be removed and disposed of in the equipment room into labeled impermeable bags or containers. Employees shall then shower and enter the clean room before changing into street clothes.

8. Local Exhaust Ventilation: Maintain portable air filtration units with a HEPA filter in use during asbestos abatement operations requiring enclosures. Units shall conform to OSHA Standard 1926.1101, Appendix F, and shall be designed in accordance with 40 CFR 61, Subpart M Sections 61.152 and 61.153.

a. Exhaust directly to building exterior. Provide backup ventilation units in adequate number at each removal enclosure. Start up ventilation units prior to initiating asbestos removal operations and run until the OWNER has approved their shut-down, after cleaning, visual inspection, sampling, and tear-down.

b. Direct air movement within the enclosure away from the employees' work area and toward the air filtration device.

c. Provide not less than 4 air changes per hour within the enclosure.

d. Within the enclosure, through the period of its use, maintain the minimum pressure differential of not less than minus 0.02 water gage with respect to ambient conditions outside the enclosure. OWNER/CONSULTANT has authority to stop work if negative pressure deviates from the minus 0.02. In this case, work should not resume until negative pressure is re-established in accordance with requirements.

9. Visually inspect the enclosure for breaches and smoke-test for leaks periodically. Make all modifications to the enclosure prior to starting removal work.

B. Asbestos Removal Operations: Comply with the following requirements for asbestos removal operations:

1. Immediately preceding asbestos removal, apply a fine mist of amended water (water and wetting agent) to the ACM and the surrounding area. Keep surrounding areas wet by spraying periodically with amended water. Maintain a high humidity environment to assist in fiber settling.

2. Remove asbestos material using two-person teams, on staging platforms if necessary.

3. Remove wet asbestos material as intact sections or components. Carefully lower material to the floor or place directly into container. Never drop or throw asbestos material on the floor.

4. At working heights between 15 and 50 feet above the floor, place removed ACM in containers at the elevated levels and lower to floor, or place onto inclined chutes or scaffolding for subsequent collection and placement into containers. Clean all debris at the completion of each workday or work shift.

5. Once the ACM is at ground level, pack in labeled 6-mil polyethylene bags, wet and, if appropriate, hold in drums prior to starting the next section.

6. Use double layer (two sealed and labeled 6-mil thick bags) for storage and transportation

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 of asbestos waste. Standing water shall be present in package.

7. Wrap large components removed intact in two layers of 6-mil polyethylene sheeting, label, and secure with tape for transport to the landfill. Comply with all wetting requirements.

8. Treat wires, hangers, steel bands, nails, screws, metal lath, tin sheeting, and similar sharp objects as items that pose puncture risk. They should be removed with asbestos material as asbestos waste. Place in drums or similar waste packaging for disposal.

9. Label containerized asbestos waste in accordance with OSHA, EPA, and Department of

Transportation regulations, as follows:

a. Label each container with OSHA label that contains the following information:

DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

CANCER AND LUNG

DISEASE HAZARD

b. Label each container with OWNER's and Asbestos Abatement Firm's names and addresses as required by NESHAP. OWNER's address is 1820 Lincoln Ave, Marquette, MI 49855.

c. Label each container with Class 9 Label required by DOT and identify waste as "RQ, Asbestos, Class 9, NA 2212, III."

10. Prepare a complete and accurate NESHAP Waste Shipment Record (special manifest).

Ensure all information required by the U.S. Department of Transportation regulations is included. Under "special handling instructions" provide the required DOT identification information: RQ Asbestos 9, NA 2212, PG III.

11. Remove containerized asbestos waste daily from site, or store on site in a locked or secured location until ready for final disposal. Obtain approval of OWNER/CONSULTANT for the location of disposal containers. Outdoor waste containers shall be fully enclosed and locked. Mark vehicles used to transport waste during the loading and unloading of asbestos waste with a visible sign, as required by

NESHAP.

12. The asbestos waste in each container must be thoroughly wet.

C. Post-Removal Operation Requirements: After completion of asbestos removal and clean-up operations, comply with the following requirements:

1. Provide minimum 48-hour notice to OWNER/CONSULTANT in advance of expected project completion in order to schedule the final inspection and aggressive air sampling, unless otherwise directed by OWNER/CONSULTANT. Work activities must be complete and the work areas completely dry to proceed with visual inspection and aggressive air sampling.

2. The Asbestos Abatement Firm representative, in presence of OWNER/CONSULTANT, Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 shall inspect the entire work area, including work areas, decontamination unit, all plastic sheeting, seals over doorways, windows, and all other openings, for the presence of asbestos containing material.

a. If any suspect asbestos is found, CONTRACTOR shall repeat final cleaning operation, until the visual inspection is satisfactory to the OWNER/CONSULTANT and the Asbestos Abatement Firm. Asbestos not scheduled to be removed as part of the project is exempt.

3. When results of aggressive air sampling exceed 0.01 fiber/cubic centimeter (cc) or background level, repeat cleanup operation until the area is below either 0.01 fibers/cc or background level.

4. After successful completion of the aggressive air sampling, lock down encapsulate may be applied to all walls, floors, ceilings, other exposed surfaces, and decontamination facilities.

a. Remove the inner polyethylene barrier that is not integral to maintaining negative pressure in the enclosure at this time, and post-abatement air samples will be collected and reviewed by OWNER/CONSULTANT. Immediately clean any asbestos-containing materials observed behind these secondary barriers.

5. When the post-abatement samples are in compliance and the OWNER/CONSULTANT has completed the visual inspection, the enclosure shall be removed.

a. Turn off HEPA filter exhaust units only after all barriers have been removed.

b. A final visual inspection will be conducted by the OWNER/CONSULTANT before the

CONTRACTOR is released from the removal site. The final inspection will include tape, polyethylene sheet, debris, and equipment.

3.03 Removal by Negative Pressure Glove Bag Systems

A. Equipment and Materials: Use the following equipment and materials for each glovebag procedure:

1. Glovebags fabricated of 6-mil thick plastic without seams at the bottom.

2. HEPA vacuum system attached to the glovebag and run continuously during operation.

3. Protective suits and respirators.

4. Plastic sheeting.

5. Wetting agent.

6. Encapsulant.

B. Procedures: Comply with the following glovebag method requirements:

1. Wrap loose and friable material adjacent to the removal area in two layers of 6-mil thick plastic, or otherwise render intact.

2. Place plastic sheeting on the floor and equipment beneath each glovebag.

3. Wet-wipe or HEPA vacuum dust and dirt from insulation to be removed.

4. Install glovebags to completely cover the circumference of pipe or other structure where

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 work is to be done.

5. Smoke-test glovebags for leaks. Seal leaks prior to use.

6. Insert and seal equipment that penetrates the bag (spray wands, vacuum nozzles) before insulation is disturbed.

7. Wet the insulation to be removed before, during, and after the removal.

8. Provide only bags capable of withstanding constant wetting and evacuation through a

HEPA filtered device.

9. During the performance of glovebag operations removing thermal system insulation, or surfacing materials, employ not less than two persons, working simultaneously, for each task.

10. Wipe insulation residue from the pipe prior to application of an encapsulant.

11. Spray the pipe and glovebag with an encapsulant before the bag is removed from the pipe.

12. Seal exposed insulation ends with a heavy grade mastic.

13. Follow glovebag manufacturer's instructions.

14. Comply with requirements for asbestos waste disposal indicated in 'Removal by Full

Enclosure Method' of this Section.

C. Unacceptable Conditions and Procedures: In general, do not use the glovebag method in conditions that prevent safe completion of the removal process. The following procedures are not allowed during glovebag removal:

1. Removing severely damaged insulation.

2. Overloading glovebag.

3. Sliding or moving insulation or glovebag along pipe.

4. Squeezing bags to remove air.

5. Placing glovebags on pipes or other surfaces that exceed 150 degrees Fahrenheit.

6. Using a glovebag more than once.

3.04 Removal by Entire Structures Method

A. The removal of entire structures without disturbing the asbestos is encouraged. An example is removal of asbestos covered pipe fittings by cutting out the entire pipe section scheduled for demolition.

1. Obtain OWNER/CONSULTANT approval of removal by entire structures method prior to starting the project.

B. Required Procedures: Comply with the following requirements applicable to removal of entire structures:

1. Properly wet all asbestos materials before starting procedure. Ensure that material stays adequately wet throughout the entire procedure by continuing application of water as

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 needed.

2. Properly and fully wrap and label the structure before it is moved or cut out.

3. Provide the equipment necessary for asbestos debris cleaning on site during the procedure.

4. Comply with requirements for asbestos waste disposal indicated in "Removal by

Enclosure Full Method" of this Section.

3.05 Field Quality Control

A. Pre-Notification of OWNER/CONSULTANT: To permit adequate time to coordinate activities at the project site, notify the OWNER/CONSULTANT not less than 48 hours prior to planned start of all removal operations, unless otherwise directed by the OWNER/CONSULTANT.

B. Air Monitoring: The CONTRACTOR will collect air samples to ensure compliance with applicable codes, regulations, and ordinances, including 29 CFR 1926. 1101, NESHAP, and Michigan Public Act 135. The CONTRACTOR is required to provide personal air monitoring of its employees to ensure compliance with all regulatory requirements pertaining to worker protection.

1. Air monitoring will be performed within the containment and also as perimeter monitoring outside the containment.

2. If continuous sampling indicates airborne fiber concentrations above 0.01 fibers/cc or background level, work will be stopped unless otherwise approved by OWNER/CONSULTANT. Work may resume when the source of contamination has been corrected and the contamination has been cleaned to the satisfaction of the

OWNER/CONSULTANT.

3. A post-abatement clearance air monitoring check must be performed by a neutral party at all sites that utilize a negative pressure enclosure or involve more than 10 LF or 15 SF of friable ACM. The neutral party must be completely independent of the asbestos abatement contractor.

4. Glove bag, entire structures, and full enclosure clearance sampling will be by the aggressive PCM method when feasible. Enclosures must be fully dry before sampling.

C. Inspection: If during the project the OWNER/CONSULTANT determines that work practices either violate applicable rules and regulations or endanger employees, the CONTRACTOR's on-site representative shall stop operations immediately and take corrective action.

3.06 Removal of Non-Friable Asbestos-Containing Materials

A. Removal of Non-Friable Materials, General: For each type of non-friable ACM indicated, comply with the following requirements:

1. Engineering controls and work practices for Class II asbestos work involving the removal of nonfriable ACM shall conform with OSHA 29 CFR 1926.1101(g)(7) and (8) and all other applicable requirements for Class II asbestos work.

2. Critical barriers, other barrier or isolation methods, impermeable drop cloths, and intact

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022 removal are required in each work area. Remove and dispose of all Class II ACM without damaging or otherwise rendering the ACM friable.

3. No visible emissions are permitted. If the material does not remain substantially intact, comply with the requirements for friable asbestos removal specified herein (except roofing removal).

4. The use of a negatively-pressurized containment is not required for the removal of nonfriable ACMs (Class II Asbestos Work) provided the ACMs are not rendered friable during removal.

5. Do not conduct asbestos removal unless the OWNER/CONSULTANT is present at the site or has provided approval to proceed in their absence.

6. Labeling Containerized Waste: Comply with the requirements specified herein.

B. Removal of Resilient Flooring Materials

1. Prior to removal, clean floors of dirt and debris with vacuums equipped with HEPA filter, disposable dust bag, and floor tool (no brush). Control odors and fumes with engineering controls.

2. Sanding the floor or related backing is not permitted.

3. Mechanical chipping of vinyl floor tile is prohibited, except when performed in a negative pressure enclosure.

4. Thoroughly wet vinyl floor with amended water. Use a slip scraper or equivalent to loosen the floor tile from the floor. Remove the floor tile in a substantially intact state. Removal of floor tile in a not substantially intact state must be completed within a negative pressure enclosure. Keep the floor tile wet throughout the removal and cleanup. Removal of floor tile using an infrared heat machine eliminates the wetting requirement.

5. Remove vinyl sheet flooring by cutting while wetting the snip-point. Wet sheet flooring during delamination. Rip-up of resilient flooring material is not permitted.

6. Clean resilient flooring of all debris using a HEPA vacuum, wet sweeping, mopping or equivalent and allow time to dry. Dry sweeping is prohibited.

7. Place the resilient flooring material and debris in an asbestos disposal bag. Seal the bag and place it in a properly labeled container. Comply with the disposal and labeling requirements as specified herein.

C. Other Non-Friable ACM: Remove non-friable ACM using the following technique:

1. Cutting, abrading, or breaking material is not permitted.

2. Wet material with amended water prior to and during removal.

3. Carefully disassemble material in such a manner as to prevent breakage. ACM must stay in intact state unless CONTRACTOR demonstrates that intact removal is not possible.

Marquette Armory Replace Boiler 02 82 00 - Page DTMB File #511/22046.JBB Addendum: 07/15/2022

4. Wrap and seal material in two layers of 6-mil thick polyethylene, asbestos disposal bags, or equivalent packages and properly label them with appropriate asbestos warning signs as indicated herein.

5. Immediately lower to the ground unwrapped or unbagged materials via covered dust-tight chute, crane, or hoist; or place in an impervious waste bag or wrap in plastic sheet and lower to the ground no later than the end of the work shift.

6. ACM must be kept wetted if not immediately bagged or wrapped and must be transferred to a closed receptacle by the end of the work shift.

7. Clean the floor of all debris using a HEPA vacuum, wet sweeping, mopping or equivalent and allow time to dry.

8. Dispose of asbestos waste in accordance requirements of this Section.

D. Abatement of Non-Friable Roofing Material: In addition to other requirements regarding removal of non-friable ACM, the following requirements apply to non-friable roofing material:

compare with 29 CFR 1926.1101(g)(8)

1. Contractor shall remove all existing ACM roof materials without causing visible emissions or rendering asbestos materials friable. Acceptable manual methods which maintain materials as non-friable include, but are not limited to, the use of spud, spade, flat-blade or slicing tools, such as axes, mattocks, pry bars, crow bars, shovels, flat-blade knives, and utility knives, to slice, cut, strip-off, shear-under, or pry up the material. Work activities must include the use of water misting to prevent dust.

2. Contractor shall remove roofing in a non-friable manner to the extent feasible. Do not sand, mechanical cut, abrade, or grind ACM.

3. If Contractor utilizes single edge/blade cutting machines, they should be continuously water misted during use.

4. Powered roof cutters are considered to render the roofing material into a friable state and should not be on the roof at any time. Powered cutters with integral HEPA vacuums may be utilized, as long as roofing material is wetted and no visible emissions occur.

END OF SECTION

SECTION 02 26 00

HAZARDOUS MATERIAL ASSESSMENTS

830 W. Washington Street

Marquette, MI 49855

906.228.5125

906.228.5126 Fax

www.trimediaee.com

June 7, 2022

Sent Via Electronic Mail Tracie Williams, PE, LEED AP OHM Advisors 424 Hancock Street Hancock, Michigan 49930

Re: Summary Report – Limited Hazardous Materials Assessment at the National Guard Armory in

Marquette, Michigan TriMedia Project Number 2022-1270

Dear Ms. Williams:

TriMedia Environmental & Engineering Services, Inc. (TriMedia) has prepared this correspondence to summarize results of the limited Hazardous Materials Assessment (HMA) at the Marquette Armory.

The HMA was limited to the interior of the building as planned renovations are not set to impact exterior building materials. The intent of this information and data is to assist OHM Advisors in identifying hazardous materials related to proposed renovation activities. This correspondence also includes a summary of analytical laboratory results.

TriMedia was on-site on May 23, 2022 to conduct sampling to identify the presence of Asbestos- Containing Materials (ACM), metals-containing paint, and other hazardous materials within the identified building. The assessment is intended to identify building contaminants that, if mismanaged during renovation activities, could pose an environmental or health and safety concern. During the assessment, TriMedia identified suspect asbestos and lead-containing building materials.

ASBESTOS SURVEY

TriMedia collected a total of 23 interior samples (29 including sample layers) of suspect asbestos-containing materials to be submitted for laboratory analysis. Each suspect asbestos-containing material sampled was containerized in a laboratory-supplied sealable bag; labeled with a material description, sample location, and a unique sample number; and, shipped under chain of custody to EMSL Analytical, Inc., (EMSL) in Indianapolis, Indiana for analysis under EPA Method 600/R-93/116 utilizing polarized light microscopy techniques.

ASBESTOS RESULTS

Asbestos was detected at concentrations above the regulatory limit for asbestos-containing material in the following sampled materials:

OHM Advisors

Sample # Location Material Concentration Estimated Quantity*

Asb-001 Boiler Room Tank Insulation 15% Amosite 30% Chrysotile

130 SF

Asb-003 Boiler Room Steam Return TSI 50% Chrysotile

Approximately 350 LF of TSI and 65 elbows/fittings.

Asb-004 Boiler Room Elbow, Cold Water

35% Amosite

Asb-005 Boiler Room Fitting, Domestic Cold

25% Amosite 25% Chrysotile

Asb-006 Boiler Room Heat Return TSI 35% Chrysotile

Asb-007 Boiler Room Hot Water Heating Supply

10% Amosite

5% Chrysotile

Asb-008 Boiler Room Domestic Hot TSI 45% Chrysotile

Asb-009 Classroom

Brown Floor Tile & Black Mastic

5% Chrysotile & 3% Chrysotile

1000 SF including Classroom

Asb-011 Classroom

TSI 35% Chrysotile Estimated 250 LF and 20 Elbows between Classroom 125 & 126

Asb-015 Maintenance Bay

TSI 60% Chrysotile Appx 1500 LF

Asb-016 Facilities Office

TSI 55% Chrysotile Appx 120 LF & 20 elbows

Asb-021 Men’s Room TSI 55% Chrysotile Appx 20 LF

Asb-022 Men’s Shower TSI 25% Amosite Appx 50 LF

Asb-023 Entry Corridor Floor Mastic 2% Chrysotile Appx 1400 SF

*Estimated quantities are field estimates and are not meant for bidding purposes.

Complete analytical laboratory results have been enclosed for your records. Sampled materials, locations, and analytical results have been summarized in Table 1: Materials Sampled and Found to Not Contain Asbestos and Table 2: Materials Sampled and Found to Contain Asbestos.

Concrete Masonry Unit (CMU block) construction may contain vermiculite as insulating material.

TriMedia did not identify any vermiculite during the inspection. If vermiculite is found during renovations activities, it must be treated as an assumed ACM Per EGLE regulation. Vermiculite, as an assumed ACM by EGLE must be managed in accordance with provisions stipulated in Environmental Protection Agency (EPA) National Emissions Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61, Subpart M; and AHERA regulations promulgated in 40 CFR Part 763, Subpart E. In addition, OSHA and MIOSHA regulations regarding materials containing <1% asbestos may be applicable to vermiculite.

Roofing and exterior building materials were not sampled as part of the assessment. If renovation plans change and the exterior or roof will be impacted as part of the renovations, they must be sampled or treated as ACM.

METALS CONTAINING PAINT SURVEY

TriMedia collected 8 paint samples throughout the facility and included all layers of paint to the substrate. Samples were collected in laboratory supplied packages, given a unique sample identification number, and shipped under appropriate chain of custody to EMSL Analytical, Inc., (EMSL) in Indianapolis, Indiana. Paint samples were analyzed for lead content through EPA Method SW 846 7000B Flame Atomic Absorption Spectrophotometry.

METALS CONTAINING PAINT RESULTS

Analytical results detected the presence of lead in 3 paint samples ranging from 0.034% to 0.11%.

A summary of sampled materials and locations are provided in Table 3: Metals Containing Paint.

Complete analytical laboratory results of paint samples collected for lead have been enclosed for your records.

OTHER HAZARDOUS MATERIALS

Fluorescent Light bulbs: Approximately 480 fluorescent light bulbs and 40 halogen bulbs were identified in the building. Fluorescent light bulbs typically contain mercury and other trace hazardous materials. If lights are impacted/removed during the renovation activities, unbroken fluorescent light bulbs may be collected and disposed as universal waste.

Light Ballasts: Approximately 120 fluorescent light fixtures/ballasts and 40 halogen light ballasts were identified within the building. Light ballasts manufactured prior to January 1, 1979 may utilize oils containing PCBs. Light ballasts manufactured after January 1, 1979 are generally labelled as “non-PCB”. While TriMedia did not catalog each light fixture for non-PCB markings, all light ballasts that are not clearly marked as “Non-PCB” are must be assumed to contain PCBs and should be disposed of as PCB waste. Non-PCB light ballasts must be disposed of as electronics waste.

Smoke Detectors and Exit Signs and Thermostats: TriMedia identified 0 smoke detectors and 8 exit signs that potentially contain special waste (low activity radioactive material). Eight (8) thermostats which potentially contain mercury were observed throughout the building.

SUMMARY OF FINDINGS AND RECOMMENDATIONS

▪ TriMedia did not sample exterior building materials as part of this assessment.

▪ Asbestos was detected at regulated levels (> 1%) in the 14 of the 23 samples taken in the Marquette Armory. If planned renovations impact ACM they must be removed by a licensed asbestos abatement contractor prior to renovation.

▪ The presence of lead was detected in 3 paint samples.

▪ TriMedia estimates the presence of approximately 4,380 – 5,480 linear feet of asbestos containing thermal systems insulation in the Marquette Armory.

▪ TriMedia identified approximately 1,200 SF of 9x9 ACM floor tile found in classrooms 125 & 126.

▪ TriMedia identified approximately 2,500 SF of ACM floor mastic in classrooms 125 & 126 and the main corridor in the entrance of the Armory.

▪ Applicable state, federal and industry regulations for worker and environmental protection must be met when impacting metal-containing paint during building remodeling or demolition.

Specifically, MIOSHA Part 603 – Lead Exposure in Construction.

▪ Information regarding painted surfaces may be provided to contractors who may potentially impact the materials and to other entities who may take possession of the materials. Applicable state, federal and industry regulations for worker and environmental protection must be met when impacting metal-containing paint during building demolition. The State of Michigan has not established a numerical threshold defining “lead-containing paint”. All paint with detection of lead is considered “lead-containing” and there is no provision for recycling usage of concrete products coated with lead-containing paint. Metal bearing lead-containing paint may be recycled. All other materials coated with lead-containing paint, including CMU block, must be deposited in a landfill.

▪ This assessment does not constitute a waste characterization for disposal of demolished building materials. A waste characterization will need to be coordinated with the selected contractor prior to securing landfill disposal acceptance.

▪ All light fixture ballasts, bulbs, thermostats, and exit signs that are impacted by the building renovation should be removed prior to commencement of the renovation and recycled or properly disposed.

TriMedia made every reasonable attempt to access all areas of the building that are planned to be impacted by renovations. However, as with all hazardous material assessments, there exists the potential for discovering additional suspect materials not addressed by this report during renovation activities. In the event suspect materials are identified during on-site activities, they must be sampled before being disturbed or treated as ACM.

TriMedia can assist OHM with project planning, specification development, contractor selection, abatement oversight and air monitoring related to the renovation project. We look forward to the opportunity to assist as the project progresses.

It is hoped this Summary Report meets your needs and expectations. Should you have any questions regarding this correspondence, or the project in general, please do not hesitate to contact the undersigned at (906) 228-5125 or via email at tsorensen@trimedia.com. On behalf of the professional staff at TriMedia, thank you for the opportunity to be of continued service to OHM Advisors.

Sincerely, TriMedia Environmental & Engineering Services, LLC

Andrew Tripp Tim Sorensen Staff Industrial Hygienist Project Manager Asbestos Inspector A48290

AMT/trs/jet mailto:tsorensen@trimedia.com

Enclosures: Table 1: Materials Sampled and Found to Not Contain Asbestos Table 2: Materials Sampled and Found to Contain Asbestos Table 3: Metals-Containing Paint Photo Log EMSL Analytical Report – Asbestos EMSL Analytical Report – Metals Containing Paint cc: TriMedia Project File 2022-1270

Limitations: Information presented in this Summary Report was prepared for OHM Advisors and its authorized parties only.

Any use a third party makes of this report, or any reliance on or decisions to be made based upon, are the responsibility of such third party.

Table 1 Materials Sampled and Found to Not Contain Asbestos

Marquette Armory

TriMedia 2022-1270

Sample #

(Layers)* Material/Description

Asb-002 Boiler Elbow Large hard pack elbow

Asb-005 (1 of 2) Boiler Fitting Domestic cold wrap layer

Asb-010 Classroom 125 Wall Brown covebase and mastic

Asb-012 Corridor Wall Tan covebase and glue

Asb-013 Gym Floor underlayment Gym floor underlay

Asb-014 Maintenance bay Ceiling Ceiling insulation

Asb-017 Facilities office Drop ceiling tile

Asb-018 Bar/club Floor 12x12 off white floor tile

Asb-019 Range/locker room Ceiling Ceiling tile

Asb-020 Men’s room Ceiling Plaster

Asb-023 (1 of 2) Entry corridor Khaki floor tile layer

Sample #

(Layers)* Material/Description

ASB-001 Room 116 Coated Fiberglass

ASB-002 Room 116 Coated Fiberglass

ASB-003 Room 116 Tar under Roof

ASB-004 Room 112 Insulation Tar Mastic

ASB-005 Room 115 Concrete/Plaster Coating

ASB-006 (2) Room 115 Concrete/Plaster Coating

ASB-007 Room 115 Concrete/Plaster Coating

ASB-008 Room 115 Tar

ASB-009 (2) Boiler Room Concrete/Plaster Coating

Location Details

*Material layers separated in lab - not able to be separated in field.

Location Details

Samples Collected May 23, 2022

Samples Collected June 26, 2022

Table 2 Materials Sampled and Found to Contain Asbestos

Marquette Armory

TriMedia 2022-1270

Sample #

(Layers)* Material/Description

Asbestos

Concentration

Estimated

Quantity***

Asb-001 Boiler room Tank insulation

15% Amosite

30% Chrysotile 130 SF

Asb-003 Boiler Steam return TSI air cell 50% Chrysotile

Asb-004 Boiler Elbow Small elbow cold water pipe 35% Chrysotile

Asb-005 (1 of 2) Boiler Fitting Domestic cold

25% Amosite

5% Chrysotile

Asb-006 Boiler Heat return TSI air cell 35% Chrysotile

Asb-007 Boiler Hot water heating supply TSI

10% Amosite

25%…