FIRE PROTECTION GENERAL NOTES
A. THE FIRE PROTECTION CONTRACTOR SHALL USE NFPA-13 (2019), CHAPTER 8, “PLANS AND CALCULATIONS” AS A
GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.
B. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE 2018 INTERNATIONAL BUILDING CODE. INSTALLATION
SHALL MEET THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
C. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY IFC, NFPA AND AUTHORITY
HAVING JURISDICTION REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
D. THIS BUILDING IS A FULLY SPRINKLERED BUILDING. THE EXISTING FIRE SUPPRESSION SYSTEM IS WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. NEW HEADS AND PIPING SHALL BE AN EXTENSION OF THE EXISTING SYSTEM AND SHALL BE DESIGNED AS REQUIRED BY IFC, NFPA, AND AUTHORITY HAVING
JURISDICTION REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
E. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 STANDARDS AND THE SPECIFICATIONS. EXTENDED COVERAGE DISTRIBUTION IS NOT INDICATED, BUT MAY BE UTILIZED
WHERE SPACE MEETS REQUIREMENTS SET FORTH IN NFPA-13.
F. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE WITH IFC, NFPA AND AUTHORITY HAVING JURISDICTION REQUIREMENTS.
G. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY OR MAKE ARRANGEMENTS TO HAVE A FLOW TEST PERFORMED. FIRE PROTECTION CONTRACTOR SHALL INCLUDE IN THE BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC
CALCULATIONS AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
H. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.
SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES
TO AVOID CONFLICT.
I. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE
PROTECTION SYSTEM.
J. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT
PRIMARY BUILDING STRUCTURAL MEMBERS.
K. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.
L. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER
DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.
M. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL
WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.
N. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
O. INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY UTILITY COMPANIES OR AUTHORITIES HAVING JURISDICTION REQUIRED FOR COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE
INTRODUCED TO OWNER.
P. PROMPTLY INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL UTILITIES, MUNICIPALITIES, STATE OR FEDERAL LAWS AND REGULATIONS. PERFORM WORK
IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER.
Q. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO ALL AUTHORITIES HAVING JURISDICTION FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL
REQUIRED PLUMBING CODES.
R. ALL EXPENSES CARRIED BY THE ARCHITECT/ENGINEER IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE
PART OF A CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.
S. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
T. PRESSURE DROP OF THE EXISTING BACKFLOW PREVENTION DEVICE SHALL INCORPORATE INTO HYDRAULIC
CALCULATIONS.
U. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH
LINES PER NFPA-13.
V. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.
W. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS
OR CEILING TILE.
FIRE PROTECTION CONTRACTOR
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINE FPCFL
TAMPER SWITCH
FLOW SWITCH
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
ORDINARY HAZARD
GROUP 1 OCCUPANCY
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
KEYNOTE
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER CONNECT TO EXISTING
LIMITS OF DEMOLITION
BACKFLOW PREVENTER
FIRE PROTECTION DEMOLITION GENERAL NOTES
A. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE, EQUIPMENT AND SPRINKLER HEADS ARE APPROXIMATE.
THE CONTRACTOR IS TO FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES, AS WELL AS SPRINKLER HEADS PRIOR TO THE START OF WORK.
B. COORDINATE WITH OWNER FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE.
THE CONTRACTOR SHALL GIVE THE OWNER SEVEN (7) DAYS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR
INTERRUPTION.
C. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
D. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN
OFFSITE AND DISPOSED OF.
BUILDING AND OCCUPANT SAFETY -
INTERRUPTION OF FIRE PROTECTION SERVICE
A. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT
PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY.
B. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN
ESTABLISHED AREA.
C. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY
DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.
D. IN ADDITION THE BUILDING OWNER IS REQUIRED TO HAVE AN IMPAIRMENT COORDINATOR. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER 9, SECTION 901.7).
E. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
F. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS
USE.
G. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
H. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACITVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE
SMOKE DAMPERS, AND SHUT DOWN FANS.
I. IF BUILDING OCCUPANTS ASSIST WITH FIRE WATCH DUTIES, THE PROCEDURES FOR CONTACTING EMERGENCY PERSONNEL AND EVACUATING THE BUILDING ARE TO BE DISTRIBUTED TO BUILDING OCCUPANTS. FOR PLANNED
OUTAGES, THE PROCEDURES ARE TO BE SENT TO THE BUILDING OWNER FOR DISTRIBUTION.
T&D
TS
FS
ORDINARY HAZARD
GROUP 2 OCCUPANCY
INFECTION CONTROL MEASURES
A. CONTRACTOR SHALL COMPLY WITH THE OWNER'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND
WRITTEN DUST CONTROL PLAN.
B. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE
MAINTAINED.
C. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
D. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBOURNE OPPORTUNISTIC
PATHOGENS.
E. DOUBLE-BAGGING IS REQUIRED FOR CONSTRUCTION DEBRIS. COMPLY WITH OWNER'S DESIGNATED ROUTE FOR
REMOVAL.
F. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, ESPECIALLY CHAPTERS 6 (TYPES OF CONSTRUCTION) AND CHAPTER 9 (FIRE
PROTECTION SYSTEMS), NFPA 13 (CHAPTER 8), AND THE PROJECT SPECIFICATIONS
FOR OTHER FIRE PROTECTION REQUIREMENTS.
N
RN
47721
E
ENIG
O
NA
TR
F
SEAL
RP
OO ISS OE
H RCA
IL
A N
L
E
P A
U
L L . H O L L O
W A
Y
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
/8
/2
:2
:2
A M
F-001
FIRE PROTECTION GENERAL
INFORMATION
01 05
TAMEKA J. TAYLOR
SM
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
DocuSign Envelope ID: B9D4F131-B263-4860-8434-0C5CADDF2C68
1/8/2020
17'-10" 12'-9" 9'-0" 12'-9" 18'-6" 18'-6" 18'-3" 10'-6" 1'-2" 14'-9" 10'-8" 18'-4" 18'-3" 18'-3" 12'-7" 9'-3" 12'-8" 17'-9"
I RQP0NMLKJI.1HGFEDCBA
3.7
7.5
3.8
6.2
4.5
2.8
3.7
7.5
3.8
6.2
4.5
2.8
102A
123A
104A
117K
117J
117H
114G
117A
117B
117C 117D
117L
117E 117F
138A
STAIRS
126A
127A
127B
126E
126B 126D
128B
128E
128A
128C
128D
128F128G
128H
122121
126C
N
RN
47721
E
ENIG
O
NA
TR
F
SEAL
RP
OO ISS OE
H RCA
IL
A N
L
E
P A
U
L L . H O L L O
W A
Y
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
SCOPE OF WORK
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
S S S S
/8
/2
:2
:3
A M
FD101
FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN
02 05
TAMEKA J. TAYLOR
SM
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
0 4 8 16
N O
R
TH
TRUE
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPRESSION DEMOLITION PLAN
01 DEMOLISH SPRINKLER HEAD.
(TYP.)
17'-10" 12'-9" 9'-0" 12'-9" 18'-6" 18'-6" 18'-3" 10'-6" 1'-2" 14'-9" 10'-8" 18'-4" 18'-3" 18'-3" 12'-7" 9'-3" 12'-8" 17'-9"
I RQP0NMLKJI.1HGFEDCBA
3.7
7.5
3.8
6.2
4.5
2.8
3.7
7.5
3.8
6.2
4.5
2.8
01 (TYP.)
01 (TYP.)
N
RN
47721
E
ENIG
O
NA
TR
F
SEAL
RP
OO ISS OE
H RCA
IL
A N
L
E
P A
U
L L . H O L L O
W A
Y
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
SCOPE OF WORK
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
S S S S
/8
/2
:2
:3
A
M
FD102
ATTIC FIRE PROTECTION DEMOLITION
PLAN
03 05
TAMEKA J. TAYLOR
SM
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
Scale: 1/8" = 1'-0"
ATTIC FIRE PROTECTION DEMOLITION PLAN 0 4 8 16
N O
R
TH
TRUE
01 DEMOLISH SPRINKLER HEAD.
17'-10" 12'-9" 9'-0" 12'-9" 18'-6" 18'-6" 18'-3" 10'-6" 1'-2" 14'-9" 10'-8" 18'-4" 18'-3" 18'-3" 12'-7" 9'-3" 12'-8" 17'-9"
I RQP0NMLKJI.1HGFEDCBA
3.7
7.5
3.8
6.2
4.5
2.8
3.7
7.5
3.8
6.2
4.5
2.8
102A
123A
104A
117K
117J
117H
114G
117A
117B
117C 117D
117L
117E 117F
138A
STAIRS
126A
127A
127B
126E
126B 126D
128B
128E
128A
128C
128D
128F128G
128H
122121
126C
N
RN
47721
E
ENIG
O
NA
TR
F
SEAL
RP
OO ISS OE
H RCA
IL
A N
L
E
P A
U
L L . H O L L O
W A
Y
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
SCOPE OF WORK
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
S S S S
/8
/2
:2
:2
A M
F-101
FIRST FLOOR FIRE PROTECTION PLAN
04 05
TAMEKA J. TAYLOR
SM
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPRESSION PLAN 0 4 8 16
N O
R
TH
TRUE
01 (TYP.)
01 PROVIDE SPRINKLER HEADS, BRANCH
PIPING, AND SUPPORTS.
17'-10" 12'-9" 9'-0" 12'-9" 18'-6" 18'-6" 18'-3" 10'-6" 1'-2" 14'-9" 10'-8" 18'-4" 18'-3" 18'-3" 12'-7" 9'-3" 12'-8" 17'-9"
I RQP0NMLKJI.1HGFEDCBA
3.7
7.5
3.8
6.2
4.5
2.8
3.7
7.5
3.8
6.2
4.5
2.8
01 (TYP.)
(TYP.) 01 02
03 03
04 04
04 04 04
N
RN
47721
E
ENIG
O
NA
TR
F
SEAL
RP
OO ISS OE
H RCA
IL
A N
L
E
P A
U
L L . H O L L O
W A
Y
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
SCOPE OF WORK
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
S S S S
/8
/2
:2
:3
A M
F-102
ATTIC FIRE PROTECTION PLAN
05 05
TAMEKA J. TAYLOR
SM
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
Scale: 1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN 0 4 8 16
N O
R
TH
TRUE
01 PROVIDE SPRINKLER HEADS, BRANCH
PIPING, AND SUPPORTS. HEADS SHALL BE
EXPOSED UPRIGHT PENDENT, HIGH
TEMPERATURE. HEAD SHALL REPLACE
REMOVED HEAD AND CONNECT TO EXISTING
SPRINKLER PIPING. TYPICAL.
02 CONNECT TO EXISTING SPRINKLER LINE
HIGH AT ROOF RIDGE, EXTEND DOWN TO
PROVIDE COVERAGE AT NEW AHU.
03 NEW UPRIGHT PENDANT HIGH
TEMPERATURE SPRINKLER HEAD TO
PROVIDE COVERAGE AT AHU.
04 HEAD HIGH AT UNDERSIDE OF ROOF RIDGE.
OUTLINE OF NEW AHU
| Sheets |
| F-001 - FIRE PROTECTION GENERAL INFORMATION |
| FD101 - FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN |
| FD102 - ATTIC FIRE PROTECTION DEMOLITION PLAN |
| F-101 - FIRST FLOOR FIRE PROTECTION PLAN |
| F-102 - ATTIC FIRE PROTECTION PLAN |
| 2020-01-08T12:52:52-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .