Text version
01Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
# 2
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
PH, Ø
A, AMP
AF
AFF
AFG
AHU
AT
AWG
C cd
DHC
EF
EG
ELEC
EMT
EWH
EXIST.
GND
GRS
HP
KAIC
KVA
KW
MAX.
MCB
MDP
MECH
MIN.
MLO
MS
NC
NEC
NEMA
NFPA
NIC
NTS
NO
NO.
PVC
R, REC
RGS
(SC)
SN
SPD
TYP
UL
UON
V
W
XFMR
PHASE,
AMPERE
AMP FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMP TRIP
AMERICAN WIRE GAUGE
CONDUIT
CANDELA
DIRECT DIGITAL CONTROLS
EXHAUST FAN
EQUIPMENT GROUND
ELECTRIC
ELECTRICAL METALLIC TUBING
ELECTRIC WATER HEATER
EXISTING
GROUND
GALVANIZED RIGID STEEL
HORSEPOWER
THOUSAND AMPS INTERRUPTING CURRENT
KILO-VOLTAMPERES
KILOWATT
MAXIMUM
MAIN CIRCUIT BREAKER
MAIN DISTRIBUTION PANELBOARD
MECHANICAL
MINIMUM
MAIN LUGS ONLY
MOTOR STARTER
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NOT TO SCALE
NORMALLY OPEN
NUMBER
POLYVINYL CHLORIDE
RECEPTACLE
RIGID GALVANIZED STEEL
SHARED CIRCUIT
SOLID NEUTRAL
SURGE PROTECTION DEVICE
TYPICAL
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
VOLTS
WATT, WIRE
TRANSFORMER
ELECTRICAL LEGEND:
GFI = GROUND FAULT CIRCUIT INTERRUPTER
WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT
BRANCH OR FEEDER CIRCUIT HOMERUN TO PANELBOARD,
SWITCHBOARD, MOTOR CONTROL CENTER, ETC. SUBSCRIPT
DENOTES PANELBOARD, SWITCHBOARD, MOTOR CONTROL
CENTER, ETC. AND OVERCURRENT PROTECTION DEVICE
NUMBER.
120V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
MODIFIERS FOR RECEPTACLES:
WP = WEATHERPROOF
EXISTING PANELBOARD 208Y/120V, SEE PANEL SCHEDULE
EQUIPMENT CONNECTION, SEE EQUIPMENT CONNECTION SCHEDULE
ROOM NUMBER
DEMOLITION NOTE SYMBOL
NEW WORK NOTE SYMBOL
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE
INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE
MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLE
LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST
EDITION OF THE NATIONAL ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS
WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE
AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND
ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL
CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES. REFER TO
THE ARCHITECTURAL DRAWINGS AND THE OWNER'S EXISTING AS-BUILT/RECORD
DRAWINGS, VERIFY CONSTRUCTION RATINGS AND PROVIDE PENETRATION
ASSEMBLIES SUITABLE FOR THE PARTICULAR CONSTRUCTION.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL
REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING
CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION
SO AS TO AVOID CONFLICT DURING CONSTRUCTION.
EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM
SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE
PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT
PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND
APPROVED BY THE DESIGNER WILL BE ACCEPTED.
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER,
AND/OR PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE
TERMINATED ON THE DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR
EQUIPMENT UNLESS NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE
NOTED.
15. ALL CONDUIT SHALL BE GRS, IMC OR EMT UNLESS OTHERWISE NOTED.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE
LABEL LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.
8. ALL MODIFIED PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING
GENERAL REQUIREMENTS ABBREVIATIONS:
& SPECIAL NOTES
ABBREVIATIONS, LUMINAIRE SCHEDULE,
GENERAL REQUIREMENTS, LEGEND,
MJJ GDA
E-001
LUMINAIRE SCHEDULE
SYMBOL LABEL TYPE OF LAMP
BALLAST/
DRIVER
WATTS/
FIXTURE
VOLTAGE DESCRIPTION MANUFACTURER/CATALOG NUMBER
NOTES:
1. MANUFACTURER AND CATALOG NUMBERS SHOWN ARE FOR BASIS OF DESIGN, DESCRIPTIVE AND QUALITY STANDARDS ONLY, NOT TO BE USED FOR ORDERING WITHOUT VERIFICATION AND APPROVAL. CONTRACTOR TO PROVIDE PRODUCT OR EQUAL FOR
APPROVAL BY COR, ARCHITECT AND ENGINEER. ENGINEER IS NOT RESPONSIBLE FOR MISMATCHED OR INACCURATE PART NUMBERS.
2. FOR ALL LED LIGHT FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED OR CONTROLLED STATE FOLLOWING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS.
PROVIDE WITH THE FIXTURE SUBMITTALS A LETTER OR STATEMENT OF WARRANTY FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED OR
CONTROLLED STATE AUTOMATICALLY. DEMONSTRATE FIXTURE PERFORMANCE DURING COMMISSIONING. CONTRACTOR SHALL CORRECT ANY DEFICIENCIES AT CONTRACTOR EXPENSE.
3. LIGHT FIXTURES SHALL BE UL LISTED FOR DAMP LOCATIONS.
3922 LUMEN LED
1 ELECTRONIC
DRIVER
30 MVOLT
HALL LED 2X4 LENSED, GRID LAY IN TROFFER
LITHONIA 2GTL-F-4-40L-FW-GZ10-LP835
3922 LUMEN LED
1 ELECTRONIC
DRIVER
30 MVOLT
HALL LED 2X4 LENSED, GRID LAY IN TROFFER WITH EMERGENCY BATTERY BACK
UP
LITHONIA 2GTL-F-4-40L-FW-GZ10-LP835-EL14L
METHOD OF VOLTAGE DROP
CALCULATIONS
USING OHM'S LAW AND THE KNOWN RESISTIVITY CONSTANT OF CONDUCTOR
METAL (CIRCULAR MIL-OHM PER FOOT) FOR COPPER CONDUCTORS, CALCULATE
THE REQUIRED WIRE SIZE NECESSARY SO AS NOT TO EXCEED THE
RECOMMENDED VOLTAGE DROP OF 3% FOR BRANCH CIRCUIT CONDUCTORS.
METHOD OF SHORT CIRCUIT
CURRENT CALCULATIONS
SHORT CIRCUIT CURRENT CALCULATIONS SHALL BE PERFORMED ON THE
ELECTRICAL SYSTEM USING A BOLTED THREE PHASE FAULT CONDITION FOR
CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND MECHANICAL STRESS TO
THE SYSTEM FOR CALCULATION PURPOSES. EXISTING SHORT CIRCUIT VALUES
WILL BE USED OUTSIDE THE WORK ARE, FOR THE STARTING POINT OF THE
CALCULATIONS.
ARC-FLASH STUDY &
IDENTIFICATION REQUIREMENTS
PROVIDE ARC FLASH WARNING LABELS ON ALL NEW ELECTRICAL DISTRIBUTION
EQUIPMENT. SEE SPECIFICATION SECTION 26-05-73 OVERCURRENT PROTECTIVE
DEVICE COORDINATION STUDY. LABELING SHALL MEET NFPA-70E
REQUIREMENTS AND INCLUDE CALCULATED CAL/CM^2 VALUES AND LIST
PERSONAL PROTECTIVE EQUIPMENT (PPE) CATEGORY LEVEL REQUIREMENTS
SPECIFIC TO EACH PIECE OF INSTALLED EQUIPMENT. \
AN EXISTING ELECTRICAL SYSTEM ARC FLASH STUDY IS ON RECORD AND SHALL
BE MADE AVAILABLE BY THE VA FOR USE IN PREPARING THE ARC FLASH STUDY
REQUIRED FOR THIS PROJECT. SEE SECTION 26-05-73 PARTS 1.1.C & 1.6.C FOR
REQUIREMENTS REGARDING THE EXTENT OF THE STUDY.
2983 LUMEN LED
1 ELECTRONIC
DRIVER
23 MVOLT
OFFICE LED 2X4 LENSED, GRID LAY IN TROFFER
LITHONIA 2GTL-F-4-30L-FW-EZ1-LP835
2983 LUMEN LED
1 ELECTRONIC
DRIVER
23 MVOLT
OFFICE LED 2X4 LENSED, GRID LAY IN TROFFER WITH EMERGENCY BATTERY
BACK UP
LITHONIA 2GTL-F-4-30L-FW-EZ1-LP835-EL14L
DISCONNECT SWITCH SYMBOL
SMOKE DUCT DETECTOR
MOTORIZED DAMPER
SDT
MOD
16. BRANCH CONDUITS ARE 3/4"C. WITH (3)-#12 AWG, UON.
1500 LUMEN LED
1 ELECTRONIC
DRIVER
18 MVOLT 6" DIAMETER PENDANT MOUNT LED LITHONIA LDN6CYL-35/15-LO6AR-L55-MVOLT-GZ10-PM-DWHG
1500 LUMEN LED
1 ELECTRONIC
DRIVER
18 MVOLT LITHONIA LDN6CYL-35/15-LO6AR-L55-MVOLT-GZ10-FCM-DWHG6" DIAMETER CEILING MOUNT LED
DocuSign Envelope ID: B9D4F131-B263-4860-8434-0C5CADDF2C68
1/8/2020
SERVICE ROOM
TRANSFORMER ROOM
BATTERY ROOM
PIT
ELEV.
CWP 2-2
CWP 2-1
CWP 2-4
CWP 2-3
HWP 2-5, 2-6
CWP 2-5
CWP 2-6
HWP 2-2
HWP 2-1
ELECTRICAL DEMOLITION PLAN - BASEMENT
SCALE: 1/8" = 1'-0"
ELECTRICAL DEMOLITION PLAN - BASEMENT
MJJ GDA
ED101
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
02 11
1. DISCONNECT, REMOVE AND DEMOLISH
CHILLED WATER PUMP, COMPLETE. SEE
MECHANICAL SHEET FOR MORE
INFORMATION.
2. EXISTING PANEL TO REMAIN FOR USE WITH
NEW EQUIPMENT. PANELS SHOWN FOR
CONTRACTORS KNOWLEDGE.
3. DISCONNECT, REMOVE AND DEMOLISH HOT
WATER PUMP, COMPLETE. SEE
PHASING/MECHANICAL PLANS FOR MORE
INFORMATION.
0 4 8 16
N
O
R
T
H
TRUE
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH
OR TERMINATE IN THE AREA OF WORK.
MAINTAIN CIRCUIT CONTINUITY TO ALL
CIRCUITS WHICH ARE NOT COMPLETELY
REMOVED.
B. CONTRACTOR TO DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO HVAC EQUIPMENT
AND OTHER ELECTRICAL DEVICES. REMOVE
CONDUCTORS AND CONDUIT BACK TO
PANELBOARD SERVING EQUIPMENT OR TO THE
POINT WHERE OTHER REMAINING LOADS ARE
CONNECTED. MARK EXISTING OVERCURRENT
PROTECTION DEVICE AS "SPARE (UNUSED)"
AND TURN "OFF" WHERE NOT REUSED BACK TO
POINT OF JUNCTURE WITH SYSTEMS IN USE.
SEAL WATER TIGHT ANY PENETRATIONS THAT
REMAIN AS PART OF DEMOLITION.
C. CONDUIT/BOXES SHALL HAVE ELECTRICAL
WIRING REMOVED COMPLETELY AND NOT JUST
MADE "SAFE". CONDUIT/BOXES SHALL BE
REMOVED WHERE PRACTICAL WITHOUT
CREATING ADDITIONAL DEMOLITION/WORK. NO
EMPTY CONDUITS SHALL REMAIN.
D. WHERE CONDUIT IS REMOVED FROM EXISTING
RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING PENETRATION
SHALL BE PATCHED/REPAIRED TO MAINTAIN
THE RATING OF THE ASSEMBLY.
CORRIDOR
LOBBY
ELEV.
ELEV.
DAV
102A
DAV
OFFICE
OFFICES
123A
STORAGE
CLASSROOM
OFFICE
STAIRS
DVB
F. TOILET
STOR.
SUPPLIES
117K
BREAK ROOM
117J
FIRE ALARM
117H
SPECIALIST
114G
OFFICE
SECRETARY
ASSOC. CHIEF
BIO HAZARD
RMS
M. TOILET
STORAGE
INSTRUCTOR
NURSING
INSTRUCTOR
NURSING
NURSING ED.
LOADING
ELEC.
RMS
117A
OFFICE
117B
OFFICE
117C
TESTING
117D
OFFICE
WAITING
EDUCATION
DOCTOR'S
BIO-FEED
BACK
ENTRY
117L
TECHN'S
RMS
117E
CHIEF'S OFFICE
117F
PSYCHOLOGY
VOC. REHAB
BOARD
DVB
OFFICES
LIBRARY
IT
TOILET
STORAGE
138A
STAIRS
ROOM
126A
STAIR
COPY VALEX
OFFICE VALEX
127A
TELLER/LOBBY
VAULT
127B
OFFICE
126E
CONFERENCE
126B
OFFICE
126D
CORRIDOR
TOILET
COMPUTER
128B
BREAK
LIBRARY
128E
128A
CHECKOUT
128C
128D
TOILET
128F
LIBRARY
LIBRARY
128G
128H
ELECT.
LIBRARY
DOCK
ID.4
OFFICE
F.C.U.
INSTRUCTOR
NURSING
126C
CORRIDOR
CORRIDOR
RECEPTION
116C
116A
OFFICE
UNION
116B
SHOP
ELECT.
TELE.
104A
RM
PHASE 1
PHASE 3
PHASE 2
ELECTRICAL DEMOLITION PLAN - 1ST FLOOR
MJJ GDA
ED102
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
03 11
1. REMOVE AND DEMOLISH MECHANICAL
EQUIPMENT CIRCUIT AND CONTROLS,
COMPLETE. SEE SHEET "MD-102" FOR MORE
INFORMATION.
ELECTRICAL DEMOLITION PLAN - 1ST FLOOR
SCALE: 1/8" = 1'-0"
0 4 8 16
N
O
R
T
H
TRUE
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH
OR TERMINATE IN THE AREA OF WORK.
MAINTAIN CIRCUIT CONTINUITY TO ALL
CIRCUITS WHICH ARE NOT COMPLETELY
REMOVED.
B. CONTRACTOR TO DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO HVAC EQUIPMENT
AND OTHER ELECTRICAL DEVICES. REMOVE
CONDUCTORS AND CONDUIT BACK TO
PANELBOARD SERVING EQUIPMENT OR TO THE
POINT WHERE OTHER REMAINING LOADS ARE
CONNECTED. MARK EXISTING OVERCURRENT
PROTECTION DEVICE AS "SPARE (UNUSED)"
AND TURN "OFF" WHERE NOT REUSED BACK TO
POINT OF JUNCTURE WITH SYSTEMS IN USE.
SEAL WATER TIGHT ANY PENETRATIONS THAT
REMAIN AS PART OF DEMOLITION.
C. CONDUIT/BOXES SHALL HAVE ELECTRICAL
WIRING REMOVED COMPLETELY AND NOT JUST
MADE "SAFE". CONDUIT/BOXES SHALL BE
REMOVED WHERE PRACTICAL WITHOUT
CREATING ADDITIONAL DEMOLITION/WORK. NO
EMPTY CONDUITS SHALL REMAIN.
D. WHERE CONDUIT IS REMOVED FROM EXISTING
RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING PENETRATION
SHALL BE PATCHED/REPAIRED TO MAINTAIN
THE RATING OF THE ASSEMBLY.
PHASE 1
PHASE 3
PHASE 2
CORRIDOR
LOBBY
ELEV.
ELEV.
DAV
102A
DAV
OFFICE
OFFICES
123A
STORAGE
CLASSROOM
OFFICE
STAIRS
DVB
F. TOILET
STOR.
SUPPLIES
117K
BREAK ROOM
117J
FIRE ALARM
117H
SPECIALIST
114G
OFFICE
SECRETARY
ASSOC. CHIEF
111BIO HAZARD
RMS
M. TOILET
STORAGE
INSTRUCTOR
NURSING
INSTRUCTOR
NURSING
NURSING ED.
LOADING
ELEC.
RMS
117A
OFFICE
117B
OFFICE
117C
TESTING
117D
OFFICE
WAITING
EDUCATION
DOCTOR'S
BIO-FEED
BACK
ENTRY
117L
TECHN'S
RMS
117E
CHIEF'S OFFICE
117F
PSYCHOLOGY
VOC. REHAB
BOARD
DVB
OFFICES
LIBRARY
IT
TOILET
STORAGE
138A
STAIRS
ROOM
126A
STAIR
COPY VALEX
OFFICE VALEX
127A
TELLER/LOBBY
VAULT
127B
OFFICE
126E
CONFERENCE
126B
OFFICE
126D
CORRIDOR
TOILET
COMPUTER
128B
BREAK
LIBRARY
128E
128A
CHECKOUT
128C
128D
TOILET
128F
LIBRARY
LIBRARY
128G
128H
ELECT.
LIBRARY
DOCK
ID.4
OFFICE
F.C.U.
INSTRUCTOR
NURSING
126C
CORRIDOR
CORRIDOR
RECEPTION
116C
116A
OFFICE
UNION
116B
SHOP
ELECT.
TELE.
104A
RM
ELECTRICAL CEILING DEMOLITION PLAN - 1ST FLOOR
SCALE: 1/8" = 1'-0"
- 1ST FLOOR
ELECTRICAL CEILING DEMOLITION PLAN
MJJ GDA
ED103
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
04 11
1. BASE BID: REMOVAL OF ALL EXISTING LIGHT
FIXTURES AND RE-USE EXISTING LIGHT
FIXTURES AFTER RENOVATION WORK IN
CEILING IS COMPLETE.
2. DEDUCT ALTERNATIVE: INCLUDES REMOVAL
OF ALL EXISTING LIGHT FIXTURES AND
REPLACING WITH NEW, ON FIRST FLOOR.
0 4 8 16
N
O
R
T
H
TRUE
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH
OR TERMINATE IN THE AREA OF WORK.
MAINTAIN CIRCUIT CONTINUITY TO ALL
CONNECTIONS WHICH ARE NOT COMPLETELY
REMOVED.
B. CONTRACTOR TO DISCONNECT AND REMOVE
ELECTRICAL CONNECTIONS TO AS NEW CEILING
WORK REQUIRES EQUIPMENT LIGHTING &
CEILING MOUNTED DEVICES. REMOVE
CONDUCTORS AND CONDUIT BACK TO
PANELBOARD SERVING EQUIPMENT OR TO THE
POINT OF JUNCTURE WHERE OTHER LOADS
REMAIN CONNECTED. MARK EXISTING
OVERCURRENT PROTECTION DEVICE AS
"SPARE (UNUSED)" AND TURN "OFF" WHERE NOT
REUSED. SEAL WATER TIGHT ANY
PENETRATIONS THAT REMAIN AS PART OF
DEMOLITION.
C. CONDUIT/BOXES SHALL HAVE ELECTRICAL
WIRING REMOVED COMPLETELY AND NOT JUST
MADE "SAFE". CONDUIT/BOXES SHALL BE
REMOVED WHERE PRACTICAL WITHOUT
CREATING ADDITIONAL DEMOLITION/WORK. NO
EMPTY CONDUITS SHALL REMAIN.
D. WHERE CONDUIT IS REMOVED FROM EXISTING
RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING PENETRATION
SHALL BE PATCHED/REPAIRED TO MAINTAIN
THE RATING OF THE ASSEMBLY.
E. TIE-UP AND PROTECT AUXILIARY SYSTEM
COMPONENTS TO BE RE-INSTALLED AT
EXISTING LOCATIONS IN CONJUNCTION WITH
NEW CEILING AND EXISTING ASSOCIATED
ELECTRICAL CONNECTIONS. WIRING AND
CONNECTIONS SHALL REMAIN FOR USE WITH
DEVICES IN CONJUNCTION WITH NEW CEILING.
EXISTING COMPONENTS TO REMAIN
FUNCTIONAL DURING CONSTRUCTION.
COMPONENTS EXPECTED TO BE ENCOUNTERED
INCLUDE:
1. FIRE/LIFE SAFETY: SMOKE
ALARMS,STROBES, HEAT SENSORS, ETC.
2. WIRELESS ACCESS POINTS (DATA,
CELLULAR)
3. PUBLIC ADDRESS AND PAGING SYSTEM
SPEAKERS
4. SURVEILLANCE CAMERAS AND INTRUSION
DETECTION
5. EMERGENCY/EGRESS LIGHTING AND
SIGNS
6. OTHER ELECTRICALLY CONENCTED
DEVICES ENCOUNTERED NOT LISTED
HERE
F. EXISTING LIGHTING CONTROLS ARE TO REMAIN.
CONTRACTOR SHALL DISCONNECT AND
REMOVE LUMIAIRES AND ACCESSORIES,
COMPLETE. AFTER CEILING RENOVATION WORK
IS COMPLETE, CONTRACTOR SHALL RE-INSTALL
LIGHTING WITH ALL COMPONENTS AND
ACCESSORIES FOR FULLY FUNCTIONING
SYSTEM.
PANEL '4-NX'
MCC-AC
ELECTRICAL DEMOLITION PLAN - ATTIC AND ROOF
SCALE: 1/8" = 1'-0"
ROOF
ELECTRICAL DEMOLITION PLAN - ATTIC &
MJJ GDA
ED104
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
05 11
1. EXISTING AHU-1 TO BE DEMOLISHED.
DISCONNECT AND REMOVE, COMPLETE. SEE
SHEET 'MD-105' FOR MORE INFORMATION.
2. EXISTING EXHAUST FAN TO BE DEMOLISHED.
DISCONNECT AND REMOVE, COMPLETE. SEE
SHEET 'MD-105' FOR MORE INFORMATION.
3. REMOVE EXISTING STARTER COMPONENTS
TO BE REPLACED WITH NEW CIRCUIT
BREAKERS FOR NEW AHU'S.
4. EXISTING AIR HANDLING UNIT TO BE
DEMOLISHED. DISCONNECT AND REMOVE,
COMPLETE. SEE SHEET 'MD-105' FOR MORE
INFORMATION.
5. EXISTING UTILITY RETURN FAN TO BE
DEMOLISHED. DISCONNECT AND REMOVE,
COMPLETE. SEE SHEET 'MD-105' FOR MORE
INFORMATION.
0 4 8 16
N
O
R
T
H
TRUE
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH
OR TERMINATE IN THE AREA OF WORK.
MAINTAIN CIRCUIT CONTINUITY TO ALL
CIRCUITS WHICH ARE NOT COMPLETELY
REMOVED.
B. CONTRACTOR TO DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO HVAC EQUIPMENT
AND OTHER ELECTRICAL DEVICES. REMOVE
CONDUCTORS AND CONDUIT BACK TO
PANELBOARD SERVING EQUIPMENT OR TO THE
POINT WHERE OTHER REMAINING LOADS ARE
CONNECTED. MARK EXISTING OVERCURRENT
PROTECTION DEVICE AS "SPARE (UNUSED)"
AND TURN "OFF" WHERE NOT REUSED BACK TO
POINT OF JUNCTURE WITH SYSTEMS IN USE.
SEAL WATER TIGHT ANY PENETRATIONS THAT
REMAIN AS PART OF DEMOLITION.
C. CONDUIT/BOXES SHALL HAVE ELECTRICAL
WIRING REMOVED COMPLETELY AND NOT JUST
MADE "SAFE". CONDUIT/BOXES SHALL BE
REMOVED WHERE PRACTICAL WITHOUT
CREATING ADDITIONAL DEMOLITION/WORK. NO
EMPTY CONDUITS SHALL REMAIN.
D. WHERE CONDUIT IS REMOVED FROM EXISTING
RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING PENETRATION
SHALL BE PATCHED/REPAIRED TO MAINTAIN
THE RATING OF THE ASSEMBLY.
SM
G/SX-22
G/SX-41
G/SX-33
N2GS1-1
N2GS1-3
N2GS1-31
N2GS1-28
N2GS1-16
N2GS1-18
N2GS1-43
G/SX-44
G/SX-42
PHASE 3
PHASE 2
LOBBY
ELEV.
ELEV.
DAV
OFFICE
OFFICES
123A
STORAGE
CLASSROOM
OFFICE
DVB
F. TOILET
STOR.
SUPPLIES
117K
BREAK ROOM
117J
FIRE ALARM
117H
SPECIALIST
114G
SECRETARY
ASSOC. CHIEF
BIO HAZARD
RMS
M. TOILET
STORAGE
INSTRUCTOR
NURSING
INSTRUCTOR
NURSING
NURSING ED.
LOADING
ELEC.
RMS
117A
OFFICE
117B
OFFICE
TESTING
117D
OFFICE
WAITING
EDUCATION
DOCTOR'S
BIO-FEED
ENTRY
117L
TECHN'S
RMS
117E
CHIEF'S OFFICE
117F
PSYCHOLOGY
VOC. REHAB
BOARD
DVB
OFFICES
LIBRARY
IT
TOILET
STORAGE
138A
STAIRS
ROOM
126A
STAIR
COPY VALEX
OFFICE VALEX
127A
TELLER/LOBBY
VAULT
127B
OFFICE
126E
CONFERENCE
126B
OFFICE
126D
TOILET
COMPUTER
128B
BREAK
LIBRARY
128E
128A
CHECKOUT
128C
128D
TOILET
128F
LIBRARY
LIBRARY
128G
128H
ELECT.
LIBRARY
DOCK
ID.4
OFFICE
F.C.U.
INSTRUCTOR
NURSING
126C
CORRIDOR
CORRIDOR
RECEPTION
116C
116A
OFFICE
UNION
116B
SHOP
G/SX-19
117C
TESTING
BIO-FEED
BACK
ELECTRICAL CEILING PLAN - 1ST FLOOR
SCALE: 1/8" = 1'-0"
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
1. NEW LUMINAIRES TO UTILIZE EXISTING
CIRCUITS, LIGHTING CONTROLS, AND
DEVICES. SEE ARCHITECTURAL SHEETS FOR
REFLECTED CEILIING PLAN. SEE SHEET E-001
FOR LUMINAIRE SCHEDULE.
- 1ST FLOOR
ELECTRICAL CEILING INSTALLATION PLAN
MJJ GDA
EL101
06 11
A. EXISTING CIRCUIT AND LIGHTING CONTROLS SHALL BE
REUSED WITH NEW CONDITIONS. SALVAGE EXISTING LED
TYPE LUMINAIRES TO OWNER.
B. ALTERNATE DEDUCT-1: RE-INSTALL EXISTING LUMINAIRES
IN EXISTING LOCATIONS AND OMIT NEW LUMINARES.
C. LUMINAIRE SCHEDULE IS FOUND ON SHEET E-001.
D. RE-INSTALL EXISTING AUXILLIARY COMPONENTS IN
PREVIOUSLY INSTALLED LOCATIONS, IN CONJUNCTIONS
WITH NEW CEILING.
0 4 8 16
N
O
R
T
H
TRUE
SERVICE ROOM
TRANSFORMER ROOM
BATTERY ROOM
PIT
ELEV.
N-2-B-S-3-7, 9, 11
N-2-B-S-3-8, 10, 12
N-2-B-N-3-13, 15, 17
N-2-B-N-3-2, 4, 6
2-CWP-1
2-CWP-2
2-CWP-3
2-CWP-4
N-2-B-S-3-21
N-2-B-S-3-21
BOX FAN
BOX FAN
N-2-B-N-3-21
N-2-B-N-3-21
BOX FAN
BOX FAN
SM
SM
SM
SM
ELECTRICAL POWER PLAN - BASEMENT
SCALE: 1/8" = 1'-0"
1. NEW CHILLED WATER PUMPS SHALL UTILIZE
EXISTING CIRCUITS FROM DEMOLISHED
CHILLED WATER PUMPS.
2. NEW BOX FAN EQUIPMENT LOCATION. 120V, 1
PHASE, 9.8A, TYPICAL. SEE SHEET E-601 FOR
PANEL CIRCUIT INFORMATION.
ELECTRICAL POWER PLAN - BASEMENT
MJJ GDA
E-101
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
07 11
0 4 8 16
N
O
R
T
H
TRUE
A. SEE EQUIPMENT CONNECTION SCHEDULE
ON E-601 FOR ADDITIONAL INSTALLATION
DETAILS.
B. INSTALL MOTOR CONTROLLERS AS
REQUIRED FOR MECHANICAL INSTALLATION.
SEE MECHANICAL SCHEDULES ON SHEET
M-501 FOR DETAILS.
2-FCU-13A
2-FCU-02
2-FCU-04
2-FCU-05
2-FCU-06
2-FCU-08
2-FCU-01
2-FCU-03
2-FCU-07B
2-FCU-07A
2-FCU-09
2-FCU-10B
2-FCU-10C
2-FCU-11B
2-FCU-11C
2-FCU-11D
2-FCU-11E
2-FCU-11F
2-FCU-11G
2-FCU-11A
2-FCU-13B
2-FCU-14
2-FCU-15
2-FCU-17
2-FCU-18
2-FCU-16
DAC-1
2-FCU-19
ACCU-1
2-FCU-21
2-FCU-22
2-FCU-23
2-FCU-25
2-FCU-24
2-FCU-26
2-FCU-28
2-FCU-27
2-FCU-30
2-FCU-31
ACCU-2
DAC-2
DAC-3
ACCU-3
2-FCU-36
2-FCU-34
2-FCU-38
2-FCU-33
2-FCU-32
2-FCU-39
2-FCU-35
2-FCU-29
2-FCU-37
2-FCU-42
2-FCU-44
2-FCU-41
2-FCU-40
2-FCU-43
2-FCU-45
2-FCU-10A
2-FCU-46
SM
SM
SM
2-FCU-47
PHASE 3
PHASE 2
LOBBY
ELEV.
ELEV.
DAV
OFFICE
OFFICES
123A
STORAGE
CLASSROOM
OFFICE
DVB
F. TOILET
STOR.
SUPPLIES
117K
BREAK ROOM
117J
FIRE ALARM
117H
SPECIALIST
114G
SECRETARY
ASSOC. CHIEF
BIO HAZARD
RMS
M. TOILET
STORAGE
INSTRUCTOR
NURSING
INSTRUCTOR
NURSING
NURSING ED.
LOADING
ELEC.
RMS
117A
OFFICE
117B
OFFICE
117C
TESTING 117D
OFFICE
WAITING
EDUCATION
DOCTOR'S
BIO-FEED
BACK
ENTRY
117L
TECHN'S
RMS
117E
CHIEF'S OFFICE
117F
PSYCHOLOGY
VOC. REHAB
BOARD
DVB
OFFICES
LIBRARY
IT
TOILET
STORAGE
138A
STAIRS
ROOM
126A
STAIR
COPY VALEX
OFFICE VALEX
127A
TELLER/LOBBY
VAULT
127B
OFFICE
126E
CONFERENCE
126B
OFFICE
126D
CORRIDOR
TOILET
COMPUTER
128B
BREAK
LIBRARY
128E
128A
CHECKOUT
128C
128D
TOILET
128F
LIBRARY
LIBRARY
128G
128H
ELECT.
LIBRARY
DOCK
ID.4
OFFICE
F.C.U.
INSTRUCTOR
NURSING
126C
CORRIDOR
CORRIDOR
RECEPTION
116C
116A
OFFICE
UNION
116B
SHOP
PHASE 1
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
S
M
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
S
M
SMSM
S
M
SM
S
MSMS
M
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
S
M
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
S
M
2-FCU-48
2-FCU-11H
SM
2-FCU-11
2-FCU-20
SM
2-FCU-49
2-EF-ELEC
2-EF-BIO
SM
SM
ELECTRICAL POWER PLAN - 1ST FLOOR
SCALE: 1/8" = 1'-0"
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
1. INSTALL NEW 100A/3P CIRCUIT BREAKER INTO
DISTRIBUTION BOARD '2-MDPN-A' (LOCATED IN
ELECTRICAL ROOM 110) FOR NEW PANEL
'N-2-G-S-2'. SEE SHEET E-601 FOR ONE LINE
DIAGRAM.
2. CONNECT NEW PANEL TO EXISTING
PANELBOARD WITH (4)#2 & #8 GND IN 1.5"C.
ROUTE CONDUIT ABOVE CEILING AS SHOWN
ON DRAWING.
3. NEW ELECTRICAL POWER CONNECTION FOR
DDC CONTROLS AS SHOWN ON THIS SHEET.
ELECTRICAL POWER PLAN - 1ST FLOOR
MJJ GDA
E-102
08 11
0 4 8 16
N
O
R
T
H
TRUE
A. NEW FAN COIL UNIT CONNECTION.
ELECTRICAL POWER CONNECTION SHALL BE
INSTALL NEW 120V CIRCUITS TO NEW
MECHANICAL UNITS, UNO.
EQUIPMENT
DISH
ANTENNA
2-ERV-01
2-AH-1
2-AH-2
2-ERV-02
GFCI
GFCI
GFCI
2-4/NX-13
2-4/NX-13
2-4/NX-13
2-4/NX-13
MCC-AC-9
MCC-AC-3
MCC-AC-7
MCC-AC-8
PANEL '2-4/NX'
(IN ATTIC SPACE)
MCC-AC
2-4/NX-14
2-EF-SLEEP
2-EF-ATTIC
SM
SM
ELECTRICAL POWER PLAN - ROOF
SCALE: 1/8" = 1'-0"
WALL RATING LEGEND
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
AREA OF WORK
KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
# 2
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
S S S S
1. NEW AIR HANDLING UNIT ELECTRICAL POWER
CONNECTION. SEE MECHANICAL SHEETS FOR
MORE INFORMATION.
2. NEW ENERGY RECOVERY VENTILATOR
ELECTRICAL POWER CONNECTION. SEE
MECHANICAL SHEETS FOR MORE
INFORMATION
3. NEW SERVICE RECEPTACLE ON STUB
PEDESTAL.
4. INSTALL NEW MECHANICAL EQUIPMENT
CIRCUIT BREAKERS IN EXISTING MCC.
PROVIDE COMPATIBLE EQUIPMENT FOR
EXISTING CUTLER-HAMMER 'UNITROL' MCC
5. CONNECT NEW SMOKE DUCT DETECTOR WITH
EXISTING FACP CONNECTION FROM EXISTING
MECHANICAL EQUIPMENT LOCATIONS.
6. NEW CIRCUIT FOR CHILLED WATER SUPPLY
HEAT TRACE. APPROX 75 LINEAR FEET. SEE
MECHANICAL SHEETS FOR MORE
INFORMATION.
ELECTRICAL POWER PLAN - ROOF
MJJ GDA
E-103
09 11
0 4 8 16
N
O
R
T
H
TRUE
A. SEE MECHANICAL EQUIPMENT CONNECTION
SCHEDULE ON SHEET E-601 FOR DETAILS.
System No.W-L-1001
June 15, 2005
F Ratings - 1, 2, 3 and 4 Hr (See Items 2 and 3)
T Ratings - 0, 1, 2, 3, and 4 Hr (See Item 3)
L Rating At Ambient - less than 1 CFM/sq ft
L Rating At 400 F - less than 1 CFM/sq ft
1. Wall Assembly
A. Studs
B. Gypsum Board*
2. Through Penetrant
A. Steel Pipe
B. Iron Pipe
C. Conduit
D. Copper Tubing
E. Copper Pipe
F. Through Penetrating Product* - Flexible Metal Piping
OMEGA FLEX INC
TITEFLEX CORP
A BUNDY CO
WARD MFG INC
3. Fill,Void or Cavity Material* - Caulk or Sealant
HILTI
1. Floor or Wall Assembly
Concrete Blocks*
Concrete Blocks
1A. Steel Sleeve
2. Through Penetrant
A. Steel Pipe
A1. Iron Pipe
B. Conduit
C. Conduit
3. Packing Material
4. Fill,Void or Cavity Materials* - Caulk or Sealant
HILTL
System No. C-AJ-1001
June 15, 2005
F Rating - 3 Hr
T Rating - 0 Hr
W Rating - Class I (See Item 4)
PROVIDE NEW 100A BREAKER IN
2MDP-A/B SECTION 3, IN SPARE AS
SHOWN.
2MDPN-A/B
1600A, 65 KAIC
120/208 3Ø 4W
SECTION 1
2MDPN-A/B
1600A, 65 KAIC
120/208 3Ø 4W
SECTION 2
2MDPN-A/B
1600A, 65 KAIC
120/208 3Ø 4W
SECTION 3
NEW PANEL
N-2-G-S-2
100A
4-2 AWG AND 1-8
EG GND IN 1"C.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
# 2
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
ELECTRICAL DIAGRAMS & DETAILS
MJJ GDA
E-501
10 11
WALL CONDUIT PENETRATION DETAIL
NO SCALE
CEILING/FLOOR CONDUIT PENETRATION DETAIL
NO SCALE
ELECTRICAL DISTRIBUTION INSTALLATION DIAGRAM
NO SCALE
LUMINAIRE MOUNTING - LAY-IN CEILING
NO SCALE
EXIT SIGN MOUNTING - LAY-IN CEILING
NO SCALE
CONDUIT ROOF PENETRATION DETAIL
NO SCALE
ROOF CONDUIT SUPPORT DETAIL
NO SCALE
RECEPTACLE ROOF MOUTING DETAIL
NO SCALE
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
# 2
502-16-104
TAMEKA J. TAYLOR
1-9-2020
100% CONSTRUCTION DOCUMENTS
17-108
2495 SHREVEPORT HWY. PINEVILLE, LA 71360
REPLACE HVAC SYSTEM
& PANEL SCHEDULES
MECHANICAL EQUIPMENT CONNECTION
MJJ GDA
E-601
11 11
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
TAG DESCRIPTION VOLTS PHASE LOAD MOCP
2-FCU-01
CONDUCTORS NEUTRAL GROUND CONDUIT DISCONNECT TYPE
2- FAN COIL UNIT-01 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-02 2- FAN COIL UNIT-02 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-03 2- FAN COIL UNIT-03 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-04 2- FAN COIL UNIT-04 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-05 2- FAN COIL UNIT-05 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-06 2- FAN COIL UNIT-06 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-07A 2- FAN COIL UNIT-07A 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-07B 2- FAN COIL UNIT-07B 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-08 2- FAN COIL UNIT-08 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-09 2- FAN COIL UNIT-09 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-10A 2- FAN COIL UNIT-10A 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-10B 2- FAN COIL UNIT-10B 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-10C 2- FAN COIL UNIT-10C 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11 2- FAN COIL UNIT-11 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11A 2- FAN COIL UNIT-11A 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11B 2- FAN COIL UNIT-11B 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11C 2- FAN COIL UNIT-11C 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11D 2- FAN COIL UNIT-11D 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11E 2- FAN COIL UNIT-11E 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11F 2- FAN COIL UNIT-11F 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11G 2- FAN COIL UNIT-11G 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-11H 2- FAN COIL UNIT-11H 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-13A 2- FAN COIL UNIT-13A 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-13B 2- FAN COIL UNIT-13B 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-14 2- FAN COIL UNIT-14 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-15 2- FAN COIL UNIT-15 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-16 2- FAN COIL UNIT-16 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-17 2- FAN COIL UNIT-17 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-18 2- FAN COIL UNIT-18 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-19 2- FAN COIL UNIT-19 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-20 2- FAN COIL UNIT-20 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-21 2- FAN COIL UNIT-21 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-22 2- FAN COIL UNIT-22 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-23 2- FAN COIL UNIT-23 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-24 2- FAN COIL UNIT-24 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-25 2- FAN COIL UNIT-25 120 1 0.51 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-26 2- FAN COIL UNIT-26 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-27 2- FAN COIL UNIT-27 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-28 2- FAN COIL UNIT-28 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-29 2- FAN COIL UNIT-29 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-30 2- FAN COIL UNIT-30 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-31 2- FAN COIL UNIT-31 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-32 2- FAN COIL UNIT-32 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-33 2- FAN COIL UNIT-33 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-34 2- FAN COIL UNIT-34 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-35 2- FAN COIL UNIT-35 120 1 0.29 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-36 2- FAN COIL UNIT-36 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-37 2- FAN COIL UNIT-37 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-38 2- FAN COIL UNIT-38 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-39 2- FAN COIL UNIT-39 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-40 2- FAN COIL UNIT-40 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-41 2- FAN COIL UNIT-41 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-42 2- FAN COIL UNIT-42 120 1 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-43 2- FAN COIL UNIT-43 120 1 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-44 2- FAN COIL UNIT-44 120 1 0.51 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-45 2- FAN COIL UNIT-45 120 1 0.22 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-46 2- FAN COIL UNIT-46 120 1 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-47 2- FAN COIL UNIT-47 120 1 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-FCU-48 2- FAN COIL UNIT-48 120 1 0.46 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-CWP-1 208 3 6 AWG3 1"
2-CWP-2 208 3 6 AWG3 1"
2-CWP-3 208 3 6 AWG3 1"
2-CWP-4 2-COLD WATER PUMP-4 208 3 17.4 kVA 6 AWG3 1"
2-ERV-1 208 3 8 AWG3 3/4"
2-ERV-2
2-ENERGY RECOVERY
UNIT-2
208 3 13.5 kVA 8 AWG3 3/4"
2-AH-2 208 3 3P-70A 6 AWG3 1"
2-AH-2(UV)
120 1 1P-15A 12 AWG1 12 AWG 12 AWG 3/4"
2-AH-2(REC)
120 1 1P-15A 12 AWG1 12 AWG 12 AWG 3/4"
2-AH-1 2-AIR HANDLER-1 208 3 18.9 kVA 3P-70A 6 AWG3 1" 100F/70A/3P 250V N1 SAFETY DISCONNECT SWITCH
2-AH-1(UV)
2-UV LIGHTS-1 120 1 0.19 kVA 1P-15A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
2-AH-1(REC)
2-RECEPTACLE-1 120 1 0.96 kVA 1P-15A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
3P-50A
3P-50A
3P-60A
3P-60A
3P-60A
3P-60A
2-AIR HANDLER-2
2-UV LIGHTS-2
2-RECEPTACLE-2
2-ENERGY RECOVERY
UNIT-1
2-COLD WATER PUMP-3
2-COLD WATER PUMP-2
2-COLD WATER PUMP-1
100F/70A/3P 250V N3R SAFETY DISCONNECT SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
30F/15A/1P 250V N3R SAFETY DISCONNECT SWITCH
30F/15A/1P 250V N3R SAFETY DISCONNECT SWITCH
8 AWG
8 AWG
8 AWG
8 AWG
8 AWG
8 AWG
10 AWG
10 AWG
18.9 kVA
0.19 kVA
0.96 kVA
13.5 kVA
17.4 kVA
17.4 kVA
17.4 kVA
0.46 kVA
0.46 kVA
0.51 kVA
0.46 kVA
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
NO SCALE
2-FCU-49 2- FAN COIL UNIT-49 120 1 0.46 kVA 1P-20A 12 AWG1 12 AWG 12 AWG 3/4" 1P-20A 125V MOTOR RATED SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
60F/50A/3P 250V N3R SAFETY DISCONNECT SWITCH
| E-001-GENERAL NOTES LEGEND AND ABBREVIATIONS |
| Sheets and Views |
| GENERAL NOTES LEGEND AND ABBREVIATIONS |
| ED101-ELECTRICAL DEMOLITION PLAN - BASEMENT |
| Sheets and Views |
| ELECTRICAL DEMOLITION PLAN - BASEMENT |
| ED102-ELECTRICAL DEMOLITION PLAN - 1ST FLOOR |
| Sheets and Views |
| ELECTRICAL DEMOLITION PLAN - 1ST FLOOR |
| ED103-ELECTRICAL DEMOLITION PLAN - ATTIC AND ROOF |
| Sheets and Views |
| ELECTRICAL DEMOLITION PLAN - ATTIC AND ROOF |
| ED104-ELECTRICAL DEMOLITION PLAN - ATTIC AND ROOF |
| Sheets and Views |
| ELECTRICAL DEMOLITION PLAN - ATTIC AND ROOF |
| EL-101-ELECTRICAL NEW WORK PLAN - 1ST FLOOR |
| Sheets and Views |
| ELECTRICAL NEW WORK PLAN - 1ST FLOOR |
| E-101-ELECTRICAL NEW WORK PLAN - BASEMENT |
| Sheets and Views |
| ELECTRICAL NEW WORK PLAN - BASEMENT |
| E-102-ELECTRICAL NEW WORK PLAN - 1ST FLOOR |
| Sheets and Views |
| ELECTRICAL NEW WORK PLAN - 1ST FLOOR |
| E-103-ELECTRICAL NEW WORK PLAN - ROOF |
| Sheets and Views |
| ELECTRICAL NEW WORK PLAN - ROOF |
| E-501-ELECTRICAL DETAILS |
| Sheets and Views |
| ELECTRICAL DETAILS |
| E-601-ELECTRICAL DETAILS |
| Sheets and Views |
| ELECTRICAL DETAILS |
| 2020-01-08T12:52:55-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .