5 SOW Attachment Asbestos Report - JAHVA ED-203.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24824R0011
About this file
This asbestos survey report documents the results of testing for asbestos-containing materials (ACMs) in areas that will be impacted by the replacement of Air Handling Unit ED-203 at the James A. Haley Veterans Hospital in Tampa, Florida. Samples were collected from the air handling unit and associated ductwork slated for replacement. Laboratory analysis using polarized light microscopy found no ACMs present in the sampled locations. As no ACMs were detected, the materials can be removed and disposed of as construction waste without further abatement procedures.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs for project 673-21-151 to replace Air Handling Unit ED-203 at the James A. Haley VA Hospital in Tampa, Florida.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Limited Asbestos Survey
Performed at:
James A. Haley VA Hospital Tampa
“Replace AHU ED-203”
13000 Bruce C Downs Blvd
Tampa, FL 33612
Report Prepared For:
AESUS Group
1050 E. Southern Ave, Suite #5
Tempe, AZ 85282
Report Prepared By:
OHC Environmental Engineering, Inc.
101 South Hoover Blvd, Suite 101
Tampa, FL 33609
OHC Project #220113-AS
September 7, 2022
JAHVA Replace AHU ED-203
Asbestos NESHAP Survey
OHC Project No. 220113-AS
PROJECT INFORMATION
OHC PROJECT NO. 220113-AS
CLIENT NAME: AESUS Group
CLIENT CONTACT: David Combs
PROJECT LOCATION: 13000 Bruce C Downs Blvd.
Tampa, FL 33612
SERVICES PERFORMED: Asbestos Pre-Renovation Survey
DATES OF SERVICES: August 17, 2022
CONSULTING FIRM: OHC Environmental Engineering, Inc.
101 South Hoover Blvd, Suite 101
Tampa, FL 33609
SURVEYOR: Nick Foster
OHC PROJECT MANAGER:
Cristina Rushing, MPH, CPH
LICENSED CONSULTANT:
James F. Rizk, CIH
FLAC #IA0000022
JAHVA Replace AHU ED-203
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 EXECUTIVE SUMMARY
3.0 PROJECT SCOPE
4.0 ASBESTOS SURVEY
4.1 Asbestos Survey Results
4.2 Asbestos Sampling Methods
4.3 Regulatory Requirements
4.4 Statutory Requirements
5.0 OBSERVATIONS
6.0 CONCLUSIONS
7.0 LIMITATIONS
8.0 DOCUMENT CONTENT
APPENDIX A: Asbestos Sampling Locations
APPENDIX B: Site & Asbestos Sampling Photographs
APPENDIX C: Laboratory Results for Asbestos Samples
APPENDIX D: Consultant & Laboratory Credentials
JAHVA Replace AHU ED-203
1.0 INTRODUCTION
OHC Environmental Engineering, Inc., (OHC), was contracted by AESUS to perform an
Asbestos Survey in compliance with the National Emission Standard for Hazardous Air
Pollutants (NESHAP) regulation for asbestos (40 CFR 61, Subpart M). These services were conducted for the upcoming replacement of the air handler unit (AHU) servicing ED-203.
A representative from OHC and certified AHERA Building Inspector, Mr. Nick Foster, visited the site on August 17th of 2022, to perform these services.
2.0 EXECUTIVE SUMMARY
Based on the results of the Polarized Light Microscopy (PLM) laboratory analysis, asbestos-containing materials (ACM) are not present within the scope of the survey.
3.0 PROJECT SCOPE
The project scope includes the replacement of Air Handler Unit ED-203 and associated ductwork supplying the emergency department in building 1. The A/H unit is located on the roof which was easily accessible from inside the building. Although the roof will be disturbed during this process, the roofing system is a new roof and disturbing may invalidate the warranty of the roof. Therefore, no roofing samples were collected. The ductwork is located in the hallway of the building, in which the sampling events required setting up mini containments in the hallway for infection control following ICRA.
4.0 ASBESTOS SURVEY
The Environmental Protection Agency defines asbestos-containing material (ACM) as any material or product that contains more than one percent (1%) asbestos. Based on the laboratory analysis of the samples collected, ACM does not exist within the scope of this survey.
4.1 Asbestos Survey Results
The table below summarizes the samples of suspect ACM collected from the site and describes the homogenous sampling area (HSA), sample ID, sample location, material description, quantity, condition, friability, and the laboratory analytical result. Please refer to the Appendices at the end of this report for photographs of the materials sampled and official laboratory analytical results.
LEGEND:
▪ NAD = No Asbestos Detected
▪ ### = the material contains asbestos and requires compliance with NESHAP and OSHA
▪ HSA-AC indicates the samples were collected from inside the AHU
▪ HSA-F1 indicates the samples were collected from the 1st floor hallway
JAHVA Replace AHU ED-203
TABLE 1: MATERIALS SAMPLED FOR ASBESTOS
HSA Sample ID Sample Location Material Description
Quantity, Condition, Friability
Lab
Results
AC-1
113-AC1A
AC Unit on exterior roof vibration dampeners E side on floor
Black Mastic on
Vibration Dampers
6 Dampers
Good
Non-Friable
NAD 113-AC1B
AC Unit on exterior roof vibration dampeners E side on floor
113-AC1C
AC Unit on exterior roof vibration dampeners W side on floor
AC-2
113-AC2A
Exterior metal joints of W side of
AC units White Sealant on Exterior
Metal Joints
30 LF
Good
Non-Friable
NAD
113-AC2B
Blower motor, 4th compartment
South
AC-3
113-AC3A
Exterior A/C unit top metal joints
West side Gray Sealant on Metal
Joints
30 LF
Good
Non-Friable
NAD
113-AC3B
Inside unit 4th compartment blower motor
AC-4
113-AC4A
Exterior A/C unit vertical metal joints East Side Course Gray Sealant
Along Vertical Metal
Joints
260 LF
Good
Non-Friable
NAD 113-AC4B
Exterior A/C unit vertical metal joints West Side
113-AC4C
Exterior A/C unit vertical metal joints South Side
AC-5 113-AC5A
Inside A/C Compartment 3rd door
South Black Vibration Damper
20 LF
Good
Non-Friable
NAD
AC-6 113-AC6A
Inside A/C Compartment 3rd door
South
Gray Caulking on Metal
Joints
1 SF
Good
Non-Friable
NAD
AC-7 113-AC7A Inside 5th compartment door South Silver Mastic on Supply
Ducts Below
15 LF
Good
Non-Friable
NAD
F1-1
F1-1A F1 Hall and Nurses Station Area
White Mastic over Silver
Wrap Duct Insulation with Pink Fiberglass
100 LF
Good
Non-Friable
NAD
F1-1B F1 Hall and Nurses Station Area
F1-1C F1 Hall and Nurses Station Area
F1-1D F1 Hall and Nurses Station Area
F1-1E F1 Hall and Nurses Station Area
F1-2
F1-2A F1 Hall and Nurses Station Area
Silver Mastic on Metal
Ducts Underneath
Insulation
100 LF
Good
Non-Friable
NAD
F1-2B F1 Hall and Nurses Station Area
F1-2C F1 Hall and Nurses Station Area
F1-2D F1 Hall and Nurses Station Area
F1-2E F1 Hall and Nurses Station Area
JAHVA Replace AHU ED-203
4.2 Asbestos Sampling Methods
Asbestos sampling was conducted in accordance with NESHAP (40 CFR 61, Subpart
M) protocol for the commencement of demolition/renovation activities. The surveyor conducted a visual inspection of every safe and reasonably accessible room and space of the building. Materials sampled were grouped into Homogenous Sampling Areas
(HSA) based on the texture, color, use, age, condition, and every other visual appearance to identify suspect ACM. Materials containing asbestos are grouped into the following categories:
• Regulated ACM (RACM): Refers to friable manufactured ACM or a
Category I non-friable ACM that has become friable; or a Category I Non-
Friable ACM that will be or has been subjected to sanding, grinding, cutting or abrading; or a Category II Non-Friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
• Category I Non-Friable ACM: Refers to asbestos containing packing, gaskets, resilient floor coverings (including mastics), and asphalt roofing products containing more than 1% asbestos.
• Category II Non-Friable ACM: Refers to any material that is not a
Category I Non-Friable ACM that contains greater than 1% asbestos.
Bulk samples of all friable and non-friable suspect ACM were collected, as well as a representative number of samples from each homogeneous area following the EPA's simplified random sampling method (EPA560/585-030a). Good Industrial Hygiene practices were followed when collecting bulk samples in order to minimize fiber release. Every precaution was taken to prevent asbestos exposure to the surveyor, the building occupants, and the public. All sample locations were logged with an appropriate description and the locations were marked on any available drawings. A unique sequential numbering system was used to identify each area. Each bulk sample was placed in a labeled bag, which was immediately marked with its sample number.
Strict Chain-of-Custody protocols were followed and signed by the receiving laboratory personnel who handled the samples. The samples were analyzed via polarized light microscopy (PLM) by an AIHA and NVLAP accredited laboratory.
4.3 Regulatory Requirements
Demolition: According to NESHAP, 40CFR61 Subpart M, demolition is defined as the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.
The final NESHAP Rule provides classification for regulated asbestos containing material as follows:
• Friable asbestos material;
• Category I non-friable ACM that has become friable;
JAHVA Replace AHU ED-203
• Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or
• Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by forces expected to act upon the material in the course of demolition or renovation operations.
If the total asbestos content is determined to be trace to 10%, the owner must either assume that the material contains greater than 1% asbestos and treat the material as regulated asbestos-containing material (RACM) or have the material verified/quantified by point counting. If after point counting, the material is quantified as 1% or less, it is not regulated by the NESHAP. The Occupational
Safety and Health Administration (OSHA) considers material that contains any amount of asbestos as asbestos-containing and requires compliance with OSHA regulations. The demolition of a structure with materials present that contain any amount of asbestos is considered by OSHA as an asbestos abatement, and all applicable OSHA rules must be complied with during the demolition.
Notification: Notification is required to the local regulatory agency:
1. Ten (10) working days prior to a demolition.
2. Ten (10) working days prior to a renovation operation, if the amount of asbestos material removed or impacted is greater than 160 SF on all building components (i.e. floor tile, mastic, GWBS, etc.) or 260 LF on pipes.
3. One (1) day prior to demolition, if the building has been condemned and is structurally unsound as determined by the appropriate agency.
Notification must be sent by certified mail with return receipt or hand delivered to the Florida Department of Environmental Protection. The demolition contractor must wait ten (10) working days (Monday – Friday) from the postmarked date of mailing or the date of hand delivery to commencement of demolition. Any change to the start date of the demolition requires notification to the agency by phone, followed by a written revision to the Notification Form.
4.4 Statutory Requirements
The regulatory agency responsible for the oversight of the rules pertaining to asbestos-containing building materials (ACBM) is the Environmental Protection Agency
(EPA). The regulations state that prior to demolition or renovation a facility survey must be conducted in accordance to section 40 CFR 61-M National Emission
Standards for Hazardous Air Pollutants; Asbestos NESHAP Revisions, Final Rule.
Enforcement of these rules was passed on to the states. In the State of Florida, they are enforced by the Department of Environmental Protection (DEP). Some counties have developed an enforcement division to carry out the responsibilities of the DEP and have developed environmental and asbestos ordinances with which compliance is required.
JAHVA Replace AHU ED-203
5.0 OBSERVATIONS
• No remarkable observations noted.
6.0 CONCLUSIONS
Based on the results of the PLM analysis, ACM is not present in the future replacement of
Air Handler Unit ED-203 and associated ductwork. Therefore, these materials do not require removal and can be demolished and disposed of as construction waste.
7.0 LIMITATIONS
The materials sampled in this survey were subject to accessibility. This survey is limited to the future renovation scope, as specified by the provided demolition plans. The building was occupied at the time of the assessment, but sampling was performed during non-peak hours. OHC warrants that the investigations and methodology reflect the prevailing standard of work practices in the environmental consulting field. If it is expected that materials outside the scope of this survey are to be disturbed, they must be presumed ACM until the materials can be analyzed by an accredited asbestos building inspector.
8.0 DOCUMENT CONTENT
This document had been made for the exclusive use by AESUS and the Tampa VA. The knowledge of the consultant is based upon current information and research. If local knowledge indicates error, omissions, or inaccuracy, please notify the consultant.
JAHVA Replace AHU ED-203
APPENDIX A
ASBESTOS SAMPLING LOCATIONS
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
APPENDIX B
PHOTOGRAPHS OF MATERIALS
SAMPLED FOR ASBESTOS
JAHVA Replace AHU ED-203
113-AC1A Black Mastic on Vibration Dampers [NAD]
113-AC2A White Sealant on Exterior Metal Joints [NAD]
JAHVA Replace AHU ED-203
113-AC3A Gray Sealant on Metal Joints [NAD]
113-AC4A Course Gray Sealant Along Vertical Metal Joints [NAD]
JAHVA Replace AHU ED-203
113-AC5A Black Vibration Damper [NAD]
113-AC6A Gray Caulking on Metal Joints [NAD]
JAHVA Replace AHU ED-203
113-AC6A Silver Mastic on Supply Ducts Below [NAD]
F1-1A White Mastic over Silver Wrap Duct Insulation with Pink Fiberglass [NAD]
JAHVA Replace AHU ED-203
F1-2A Silver Mastic on Metal Ducts Underneath Insulation [NAD]
JAHVA Replace AHU ED-203
APPENDIX C
LABORATORY RESULTS
FOR ASBESTOS SAMPLES
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
APPENDIX D
CONSULTANT & LABORATORY
CREDENTIALS
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
JAHVA Replace AHU ED-203
----- END OF REPORT -----