ASI_1Drawings_ 6732115_Replace AHU ED203.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24824R0011
About this file
This document describes a federal contract solicitation for replacement of an air handling unit. The James A. Haley Veterans Hospital requires a contractor to completely prepare the site, demolish existing structures, and furnish all labor and materials to replace Air Handling Unit ED-203. The work must be performed according to the drawings and specifications in the acquisition package. Interested contractors must visit the site on November 15th and submit any questions by November 22nd. Responses are due under solicitation number 36C24824R0011. The magnitude of construction is between $1-2 million and the NAICS code is 238220. The wage determination is FL2015-4571 Revision 21. The requirement is set aside for Service-Disabled Veteran Owned Small Businesses. The Department of Veterans Affairs Veterans Health Administration is the contracting agency.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATORNO.
0.1 0.2 0.3 0.4 0.5 0.7
E.3
D.1
B.6
EXISTING
STAIRS
EXISTING BUILDINGEXISTING ROOF
AREA OF WORK
EXISTING ROOF
PARAPET
EXISTING ROOF
PARAPET
EXISTING ROOF BELOW
EXISTING EQUIPMENT
ROOF ACCESS
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE
TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING
ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
GENERAL NOTES
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
A. 1 DAY MAXIMUM - PLASTIC
B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC
C. GREATER THAN 1 WEEK - SEE NOTE B AND C.
B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
C. TEMPORARY CONSTRUCTION BARRIERS AT ANTE ROOMSHALL BE 3
5/8" METAL STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH
SIDE. BARRIERS ARE TO EXTEND TO THE BOTTOM OF EXISTING
ROOF DECK. TAPE ALL SEAMS AND PENETRATION OPENINGS TO
PREVENT CONTAMINATION FROM PASSING OVER THE TOP OR
UNDERNEATH THE WALL FROM CONSTRUCTION AREAS TO ACHIEVE
1 HR FIRE/SMOKE RATING.
D. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
E. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE
NEEDS TO BE POSTED FOR THE MODIFICATIONS.
F. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
G. CONTRACTOR TO INSTALL TEMPORARY UPRIGHT SPRINKLERS IN
THE WORK AREA TO MAINTAIN SPRINKLER PROTECTION.
TEMPORARY CONSTRUCTION
FLOOR PLAN LEGEND
INCLUDED IN SCOPE OF WORK
1 HR BARRIER
2 HR BARRIER
1 HR FIRE/SMOKE BARRIER
2 HR FIRE/SMOKE BARRIER
SMOKE BARRIER
GENERAL HVAC PHASING:
PRIOR TO REMOVING THE EXISTING AND/OR ORDERING
THE NEW AHU, THE CONTRACTOR SHALL TAKE THE
FOLLOWING STEPS TO ENSURE SHUT DOWN TIMES ARE
KEEP TO A MINIMUM.
CONDUCT A PRE-CON MEETING TO ENSURE THE
APPROPRIATE COORDINATION IS COMPLETE TO
SUCCESSFULLY REMOVE AND REPLACE THE EXISTING
AHU IN 5 DAYS OR LESS.
THE CONTRACTOR SHALL WALK THE SITE WITH VA
CONTRACTING & FACILITIES PERSONNEL AND ALL
ASSOCIATED SUBCONTRACTORS TO REVIEW THE
DESIGN INTENT.
THE CONTRACTOR SHALL PROVIDE A WORK/PHASING
PLAN TO IDENTIFY WHAT STEPS ARE NECESSARY TO
MINIMIZE THE SHUT DOWN TIME. NOTE: THE
CONTRACTOR WILL BE ALLOTTED 5 DAYS TO REMOVE
AND REINSTALL THE AHU. PROVIDE TEMPORARY
HEATING AND COOLING FOR THE EMERGENCY
DEPARTMENT PHARMACY AREA DURING CONSTRUCTION.
THE CONTRACTOR SHALL PRODUCE COORDINATION
DRAWING TO IDENTIFY THE INSTIUATION AND
PLACEMENT OF THE NEW EQUIPMENT AND ALL
ASSOCIATED UTILITY ROUTES. THIS SHALL INCLUDE BLJT
NOT BE LIMITED TO MECHANICAL, PLUMBING,
ELECTRICAL, CONTROLS, AND ASSOCIATED
ARCHITECTURAL AND STRUCTURAL COMPONENTS.
A "FINAL" PRE-CON MEETING SHALL BE CONDUCTED TO
ENSURE ALL TRADES ARE COORDINATED AND THE
PLANNED AHU REMOVAL AND INSTAUATION FITS WITHIN
THE PARAMETERS AS DESCRIBED ABOVE.
PHASE 1:
1. CONTRACTOR SHALL PROVIDE AN INVESTIGATIVE SITE VISIT TO DETERMINE THE EXTENT OF:
A. DEMOLITION OF THE SUPPLY AND RETURN AIR DUCTWORK LOCATED IN THE CORRIDOR OF
THE EMERGENCY DEPARTMENT LOCATED ON THE 1ST FLOOR (REFER TO SHEET MD101).
B. DEMOLITION OF THE CHILLED/HEATING HOT WATER SYSTEMS LOCATED ON THE GROUND
FLOOR. (REFER TO SHEET MD100)
2. PRIOR TO DEMOLITION OF THE DUCTWORK AND PUMPS THE CONTRACTOR SHALL:
A. MANUFACTURER THE NEW DUCTWORK. THIS WILL MINIMIZE THE DOWNTIME OF THE
EMERGENCY DEPARTMENT DURING INSTALLATION.
B. PROVIDE A PLAN TO COOL THE EXISTING SPACE UTILIZING TEMPORARY HVAC DURING THE
DEMOLITION AND INSTALLATION OF THE NEW DUCTWORK. THE CONTRACTOR WILL
BERESPONSIBLE TO PROVIDE A MEANS AND METHODS TO THIS PORTION OF THE PHASING
AND THIS SHALL BE INCLUDED IN THE INITIAL BID. THIS PLAN SHALL BE REVIEWED AND
APPROVED BY THE AE.
C. PROVIDE TEMPORARY HVAC UNITS IN APPROVED LOCATIONS. TEMPORARY HVAC SHALL BE
ON STAND-BY AND READY TO BE ACTIVATED AS SOON AS THE DEMOLITION OF THE
DUCTWORK IS STARTED.
D. MANUFACTURE ALL PIPE FITTING NECESSARY TO SEAMLESSLY INSTALL THE NEW
CHILLED/HEATING WATER PUMPS.
3. CONTRACTOR SHALL START-UP TEMPORARY HVAC UNITS AND VERIFY THEY ARE OPERATIONAL.
4. THE CONTRACTOR SHALL DEMOLISH:
A. EXISTING DUCTWORK AND ALL ASSOCIATED SUPPORTS.
B. CHILLED/HEATING WATER PUMPS AND ASSOCIATED PIPING AND SUPPORT.
5. THE CONTRACTOR SHALL INSTALL:
A. NEW PREFABRICATED SUPPLY AND RETURN DUCTWORK.
B. NEW CHILLED/HEATING WATER PUMPS AND ASSOCIATED PIPES.
6. THE CONTRACTOR SHALL TEST ALL NEW CONSTRUCTION AS SPECIFIED.
7. THE TEMPORARY HVAC UNITS SHALL BE LEFT IN PLACE FOR FUTURE USE.
PHASE 2:
1. SIMULTANEOUSLY:
A. DEMOLISH AHU ED-203
1. SHUT DOWN AND DISCONNECT EXISTING UTILITIES FROM AHU.
2. REMOVE EXISTING LIGHTING PROTECTION AND RETAIN FOR RE-USE.
3. REMOVE EXISTING AHU AND ASSOCIATED DUCTWORK. MECHANICAL AND
ELECTRICAL EQUIPMENT SHALL BE STRATEGICALLY DISCONNECTED AND
RECONNECTED TO ALLOW FOR NORMAL OPERATION TO OCCUR.
TEMPORARY UNITS MAY BE NECESSARY TO MINIMIZE SHUT DOWNS.
4. THE CONTRACTOR SHALL VERIFY ALL ABANDON AND NEW PENETRATIONS
UNDER THE AHU ARE SEALED WITH THE APPROPRIATE RATING AND ARE
WATER TIGHT.
5. REMOVE THE EXISTING AHU CONCRETE PAD, ROOF CURB, AND ASSOCIATED
ROOFING AS REQUIRED FOR THE NEW AHU. THE BASIS OF DESIGN IS TO
BUILD A NEWA STEEL STRUCTURE TO SUPPORT THE NEW AHU
CONFIGURATION. NOTE, THE CONTRACTOR WILL BE REQUIRED TO UTILIZE
THE MECHANICAL SCHEDULES AND SPECIFICATIONS FOR THE NEW AHU
CONFIGURATION. SEE STRUCTURAL NOTES FOR ADDITIONAL INFORMATION.
2. ACTIVATE TEMPORARY HVAC UNITS
3. WITHIN 5-DAYS OF DEMOLISHING THE EXISTING AHU, THE CONTRACTOR SHALL HAVE THE NEW
AHU INSTALLED AND ALL CONNECTIONS COMPLETED. THESE INCLUDE
A. INSTALL NEW FLASHING FOR THE EXISTING DECK PENETRATIONS. VERIFY EXACT SIZE
AND DIMENSIONS WITH UNIT MANUFACTURES PRIOR TO ORDERING AND/OR
INSTALLATION. PATCH AND REPAIR EXISTING ROOFING AS REQUIRED TO MAINTAIN A
WARRANTABLE ROOF. THE CONTRACTOR SHALL VERIFY ANY EXISTING ROOF
WARRANTIES PRIOR TO ANY ROOF TOP WORK TO MAKE SURE HE/SHE WILL NOT BE
VOIDING ANY WARRANTIES IN PLAY.
B. INSTALL NEW AHU AND ASSOCIATED DUCTWORK. THIS SHALL INCLUDE BUT NOT BE
LIMITED TO INCREASING THE SIZE OF THE SUPPLY AND RETURN DUCTS BELOW THE
SLAB. SEE PLANS FOR ADDITIONAL INFO.
C. CONNECT ALL UTILITIES TO THE NEW AHU EQUIPMENT.
D. COORDINATE AND ADJUST THE SEQUENCE OF OPERATIONS AND CONTROLS.
4. AFTER ALL PREVIOUS WORK HAS BEEN TESTED AND APPROVED, THE CONTRACTOR SHALL
PROCEED WITH CONNECTING THE CONTROLS FOR THE NEW AHU.
5. CONTRACTOR SHALL REMOVE ALL TEMPORARY HVAC UNITS.
THE CONTRACTOR SHALL. REVIEW AND EXPAND THE ABOVE LIST AS HE/SHE FEELS FIT AS THE
0.1 0.2 0.3 0.4 0.5 0.7
E.3
D.1
B.6
TEMPORARY WALL
LOCATION, SEE
TEMPORARY
CONSTRUCTION
NOTES, THIS SHEET.
REMOVE AND REPLACE
EXISTING DOOR WITH 4' X 7'
DOOR AND FRAME GC TO
REPLACE AUTO OPENER AND
ACCESS CONTROL AS REQ'D.
EXISTING DOOR TO
REMAIN CLOSED AND
SEALED FOR THE
DURATION OF PHASE 1.
TEMPORARY ANTE-ROOM FOR
CONTRACTOR ACCESS. SEE
TEMPORARY CONSTRUCTION
NOTE C, THIS SHEET.
EXISTING DOOR TO
REMAIN CLOSED AND
SEALED FOR THE
DURATION OF PHASE 1.
AREA OF WORK
TEMPORARY
EGRESS/ACCESS
DURING CONSTRUCTION
REMOVE EXISTING
WALL FRAMING AND
HEADER AS REQ'D
FOR NEW DOOR AND
FRAME.
ASI#1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C A
E S
U S
\O n e D ri v e
A e s u s D e s ig n G ro u p L
L C
\D o c u m e n ts
\6
-2
-1
R e p la c e
A ir H a n d lin g U n it
E D
A
R C
H
N
E W jd o rn a n D
S R
W .r v t
/2
/2
:5
:2
P
M
AS100
PHASING PLAN
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
1/8" = 1'-0"2 PHASE 2 - ROOF PLAN
1/8" = 1'-0"1 PHASE 1 - FLOOR PLAN
Revisions: Date:
ASI#1 REVISED AHU DIMENSIONS 02/21/24
STAMPSTAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I O E NG
I N
EE
R
0.4 0.5 0.7
E.3
D.1
B.6
EXISTING
STAIRS
+/-40' - 0"
AE500
4' - 0" 3' - 6"
/8
8' - 4" 22' - 8"
LANDING
AE500
NOTE: ALL AHU CURB
DIMENSIONS TO BE VERIFIED
WITH SHOP DRAWINGS.
37' - 8" 1' - 2"
ASI#1
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE
REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17
TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL
PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY
WORK.
6. ASBESTOS REMEDIATION IS PART OF THE SCOPE. ALL AREAS OF WORK SHALL
BE CLEARED PRIOR TO THE START OF CONSTRUCTION.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL
EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED
8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR
EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.
10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.
11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE
SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND
NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING
SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.
12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN
ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF
DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE
ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.
13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED
DURING CONSTRUCTION. MATCH EXISTING 1 HR FIRE RATING PER TYPE II
CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.
14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW
CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION
AND RATING.
15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR
AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY
ROOF TOP WORK.
17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C A
E S
U S
\O n e D ri v e
A e s u s D e s ig n G ro u p L
L C
\D o c u m e n ts
\6
-2
-1
R e p la c e
A ir H a n d lin g U n it
E D
A
R C
H
N
E W jd o rn a n D
S R
W .r v t
/2
/2
:5
:2
P
M
A301
ROOF PLAN
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
FLOOR PLAN KEYNOTES
1 EXTENT OF ROOF REMOVAL AND REPAIR, TYPICAL.
2 NEW EXTERIOR AHU MOUNTED ON A PREBABRICATED STRUCTURAL CURB. VERIFY
EXACT SIZE AND CONFIGURATION WITH SHOP DRAWING SUBMITTAL(S). THE GC
SHALL VERIFY EXISTING AND NEW ROOF PENETRATIONS ARE SEALED, PERFORM A
LEAK TEST TO VERIFY. SEE MECHANICAL FOR ADDITIONAL INFO.
3 PREFABRICATED STRUCTURAL CURB FOR AHU, SEE MECHANICAL AND
STRUCTURAL FOR ADDITIONAL INFO. THE GC SHALL VERIFY THE ACTUAL AHU
EQUIPMENT SIZE PRIOR TO ORDERING THE CURB. PROVIDE COORDINATION
DRAWINGS FOR REVIEW.
4 EXISTING ROOF TO REMAIN, TYPICAL. PATCH AND REPAIR ROOF AS A RESULT OF
CONSTRUCTION ACTIVITY.
5 PREFABRICATED STAIR, LANDING, AND GUARDRAILS ATTACHED TO THE
STRUCTURAL CURB.
6 EXISTING WALK PADS, TYPICAL.
7 EXISTING ROOF PENETRATION, SEE MECHANICAL FOR ADDTIONAL INFO, TYPICAL.
8 NEW WALK PADS, TYPICAL.
9 PROVIDE A MIN. 10" CONTINUOUS HIGH DENSITY RIGID INSULATION. TAPE AND
SEAL ALL SEAMS, TYPICAL.
3/16" = 1'-0"1 ROOF NEW WORK
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
FLOOR PLAN SYMBOLS
PROPOSED
EQUIPMENT
Revisions: Date:
ASI#1 REVISED AHU DIMENSIONS 02/21/24
STAMPSTAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I O E NG
I N
TOILET/SHOWER
RN MGR
ON CALL
BEREAV/COUNSEL
CONF/TRAINING
TLT TLT
ENTRY
WAITING
PRE-TRIAGE
TRIAGE 1 TRIAGE 2 TRIAGE 3
STAFF LOCKER/BREAK
EKG
HAC
MON EXAM 1
CL LINEN
WHEELCHAIR STOR.
CLEAN UTIL/EQUIP
SECURE EXAM
UNIT CLERK
PACS/CONSULT
MEDS
NURSE STATION
VESTIBULE
MON EXAM 2
SOIL UTILITY
PAT TLT./
SHOWER
MON EXAM 13
MON EXAM 12
MON EXAM 11
MON EXAM 10
MON EXAM 9
PROCEDURE/CAST
CL LINEN
MON EXAM 6
MON EXAM 5 MON EXAM 4
RADIOGRAPHY
MON EXAM 3
MON EXAM 14
(ISOLATION)
MON EXAM 15
(ISOLATION)
MON EXAM 14
(ISOLATION)
MON EXAM 15
(ISOLATION)
1E-110A
1E-109
1E-110
1E-115
1E-108
1E-106 1E-107 V1-04-1
1E-101
1E-102 1E-103 1E-104 1E-105
1E-113
1E-116
1E-118
1E-119
1A-222
1A-202
1E-138
1E-143
1E-145
1E-148
1E-147
1E-146
V1-05-1
1E-120
1E-136
1E-134
1E-140
1E-139
1E-137
1E-135
1E-133
1E-132
1E-130
1E-128 1E-127 1E-126
1E-125
1E-124
1E-141 1E-142
1E-131 1E-129
RCP GENERAL NOTES
1. IN THE CASE OF MINOR DISCREPANCIES BETWEEN MEP AND
ARCHITECTURAL DOCUMENTS IN THE LOCATION OF CEILING MOUNTED
COMPONENTS, THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL
GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT SHALL
BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR TO
PROCEEDING WITH THE WORK.
2. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR MOUNTING
LOCATIONS OF ITEMS WHERE NO CEILING IS REQUIRED OR INDICATED
3. LIGHTS, DIFFUSERS, EXIT SIGNS, SMOKE DETECTORS, SPEAKERS, STROBES
AND MISCELLANEOUS DEVICES SHALL BE CENTERED IN THE CEILING TILE IN
WHICH THEY OCCUR, UNLESS NOTED OTHERWISE
4. ALL CORRIDOR SPRINKLER HEADS SHALL BE ALIGNED IN THE SAME
LOCATION PARALLEL TO THE WALL WITHIN EACH SPECIFIC CEILING
CONSTRUCTION. ARCHITECTURALLY SIGNIFICANT SPRINKLER HEAD
LOCATIONS MAY BE SHOWN ON REFLECTED CEILING PLAN FOR DESIGN
INTENT ONLY.
5. ACCESS DOOR LOCATIONS ARE INDICATED ON RCP'S ONLY WHERE
ARCHITECTURALLY SIGNIFICANT. REFERENCE SPECIFICATIONS AND MEP
DRAWINGS FOR OTHER ACCESS DOOR LOCATIONS. ACCESS PANELS ARE
REQUIRED IN GYP BD CEILINGS ADJACENT TO BUT NOT LIMITED TO VAV
BOXES AND CEILING MOUNTED BOOMS.
6. EXIT SIGNS ARE SHOWN ON REFLECTED CEILING PLAN ONLY WHERE
LOCATION IS ARCHITECTURAL SIGNIFICANT. CONTRACTOR TO VERIFY IN
FIELD THAT ALL EXIT SIGNS ARE VISIBLE AND NOTIFY COR IF ADDITIONAL
EXIT SIGNS NOT SHOWN ON PLAN ARE NEEDED.
7. THE GC SHALL REMOVE AND REINSTALL THE EXISTING CEILING AND
COMPONENTS TO IT'S ORIGINAL CONDITION AND LOCATION. ANY ITEMS LOST
AND/OR BROKEN DURING CONSTRUCTION WILL BE THE GC RESPONSIBILITY
TO REPLACE OR FIX. IT IS RECOMMENDED THAT THE GC VISIT THE SITE
PRIOR TO CONSTRUCTION TO SURVEY THE EXISTING CONDITIONS AND
IDENTIFY ANY DELINQUENT ITEMS.
0.1 0.3 0.4 0.5 0.7
E.3
D.1
B.6
LIMITS OF WORK
LIMITS OF WORK
CEILING SYMBOLS
SUPPLY AIR
FLUORESCENT LIGHT
2X4 ACOUSTIC CEILING
TILE
SPRINKLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C A
E S
U S
\O n e D ri v e
A e s u s D e s ig n G ro u p L
L C
\D o c u m e n ts
\6
-2
-1
R e p la c e
A ir H a n d lin g U n it
E D
A
R C
H
N
E W jd o rn a n D
S R
W .r v t
/2
/2
:5
:2
P
M
AE302
REFLECTED CEILING PLAN - LEVEL 01
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
RCP KEYNOTES
1 REMOVE AND REINSTALL THE EXISTING CEILING AND ASSOCIATED COMPONENTS
AS REQUIRED FOR THE HVAC UPGRADES.
2 REMOVED AND REINSTALL THE EXISTING MECHANICAL DIFFUSER, TYPICAL AS
REQUIRED FOR THE HVAC UPGRADES.
3 REMOVED AND REINSTALL THE EXISTING LIGHTS, TYPICAL AS REQUIRED FOR THE
HVAC UPGRADES.
4 EXISTING SPRINKLER HEADS, GC TO PROVIDE TEMPORARY UPRIGHT SPRINKLER
HEADS DURING CONSTRUCTION AS REQ'D FOR CEILING REMOVAL AND REINSTALL
NEW SPRINKLER HEADS AT THE TIME OF CEILING REINSTALLATION. GC TO
PROVIDE NEW SPRINKLER HEADS WITH THE SAME PERFORMANCE ATTRIBUTES,
MATCH THE EXISTING APPEARANCE.
3/16" = 1'-0"1 _LEVEL 01 RCP OVERALL NEW
Revisions: Date:
ASI#1 REVISED AHU DIMENSIONS 02/21/24
ASI#1
STAMPSTAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I O E NG
I N
General Notes:
1. BASE REFERENCE ELEVATION FROM FINISHED FIRST FLOOR
EL. 100.00' = (+/- 0'-0").
2. SEE SHEET S100 AND S101 FOR GENERAL STRUCTURAL NOTES AND SPECIAL
INSPECTION REQUIREMENTS.
3. SEE ARCHITECTURAL PLANS FOR LAYOUT AND DIMENSIONS NOT
SHOWN ON THIS PLAN. WHERE DISCREPANCIES OCCUR, VERIFY WITH
ARCHITECT THE CORRECT DIMENSION.
4. SEE ARCHITECTURAL SHEETS FOR DEMOLITION PLANS
5. SEE SHEET S500 FOR TYPICAL DETAILS & SECTIONS.
B.6 B.6
D.1 D.1
0.5
0.5
0.7
0.7
0.3
0.3
(E )W
X2
(E) W18X35(E) W21X44(E) W18X40
W24X55(E) W21X44(E) W18X35 (E) W16X31
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X4
(E )W
X4
(E )W
X4
(E )W
X4
(E )W
X4
(E )W
X4
(E )W
X4
(E )W
X4
0 (E )W
X2
(E )W
X2
(E )W
X1
(E
)W
X1
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X3
(E )W
X3
(E )W
X3
(E )W
X3
(E )W
X3
(E )W
X3
(E )W
X3
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X2
(E )W
X1
(E )W
X1
(E )W
X1
(E )W
X1
(E )W
X1
(E )W
X1
(E )W
X1
14' - 0"
T.O. STL.
27' - 4" 29' - 0"
1' - 10" = 13' - 6"
(3) SPACES @ 4'-6"
= 12' - 0"
(2) SPACES @ 6'-0" (4) SPACES @ 6'-0" = 24' - 0" 5' - 0"
8"
2' - 6"
(6) SPACES @ 4'-0" = 24' - 0"
2' - 6"
1' - 0"
A
D S100
C S100
D S100
A S100
C S100
SIM
TYP
MECHANICAL EQUIPMENT WEIGHTS
VERIFY ALL WEIGHTS AND LOCATIONS OF MECHANICAL
EQUIPMENT WITH MECHANICAL ENGINEER AND ARCHITECT
MARK EQUIPMENT WEIGHT REMARKS
A 24,000 LBS MAXIMUM ALLOWABLE WITH CURB
A
SECTION
3/8" SHEAR PLATE -
5/8" SHEAR PLATE WHERE
"D" = 27" OR GREATER
BEAM DEPTH (LESSER OF 2
BEAM DEPTHS WHERE APPLICABLE)
FOR SIZE, TYPE AND NUMBER OF
BOLTS, SEE TYPICAL BOLT SCHEDULE
AT ONE SIDED CONNECTIONS,
SUPPLY 3/8" STIFFENER PLATE
OPPOSITE SHEAR PLATE
(TYPICAL).
STEEL BEAM PER PLAN
TYP
2" MAX
TYP
3 1/2" MIN
1/2" MAX
"K "D
IS
TA
NC
E
/2
"T
YP
"D
"D
"D
A
3"
TY
P.
3/16"
TYP.
3/16"
3 SIDES - TYP.
NOMINAL BEAM
DEPTH "D"
IN INCHES
NUMBER OF
BOLTS IN A ROW
UP TO 7 1
8 - 11 2
12 - 14 3
15 - 17 4
18 - 20 5
3/4"Ø A35N BOLTS U.N.O.
FABRICATOR SHALL TAKE
NECESSARY PRECAUTIONS
AGAINST BOLT SHANK OUT
FABRICATOR'S OPTION:
A. PROVIDE THICKER
SHEAR PLATE
B. PROVIDE MULTIPLE
WASHERS AT EITHER END
OF BOLT (2 MAXIMUM PER
END)
2 "
MINIMUM
21 - 23
24 - 29
30 - 32
33 - 35
STEEL BEAM
3/8" STEEL SHEAR PLATE
(2) 3/4" DIA. BOLTS
EXISTING STEEL BEAM
EXISTING STEEL DECK
STEEL DECK
3/16"
EXISTING STEEL DECK
STEEL DECK
3/16"
STEEL ANGLE DECK
SUPPORT
X
PROVIDE 16GA STEEL PLATE WITH
WIDTH ADEQUATE TO SUPPORT 1"
MINIMUM BEARING OF EXISTING
STEEL DECK BOTTOM FLUTE. PLUG
WELD TO ANGLE AT 16"O.C.
SECTIONX
STEEL DECKEXISTING STEEL DECK
FRAMING SPACING PER PLAN
SECTIONX
X
3/16
TYP
3/16
TYP
CENTERLINE OF
FRAMING MEMBER
CENTERLINE OF
FRAMING MEMBER
L4X3X1/4 (LLV)
L4X3X1/4 (LLV)
L4 X3
X1 /4
(L
LV
L4 X3
X1 /4
(L
LV
) COPE VERTICAL LEG
OF ANGLE - TYPICAL
AT FRAMING
MEMBER
EDGE OF FRAMING
MEMBER
1/4"±
3/16 2
TYP 4'
-0 "M
AX
TYPICAL ROOF OPENING FRAME
AT WALL
L4X3X1/4 (LLV)
L4X3X1/4 (LLV)
4' -0
"M
AX
TYPICAL ROOF OPENING FRAME
AT FRAMING MEMBERS
WALL
STEEL LEDGER
1/4"±
COPE VERTICAL LEG
OF ANGLE - TYPICAL
AT LEDGER
3/16 2
TYP
ALTERNATE
TYPICAL
A
WELD NOTES:
A. PUDDLE WELD OR FASTENER PER
GENERAL STRUCTURAL NOTES
MINIMUM 1/8"
THICK HSS X
LENGTH OF
OPENING -
DEPTH TO
MATCH DECK
DEPTH
A
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup Architecture, Engineering, and Sustainable DesignAESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities ManagementLocation:
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. ofAESUS
REPLACE AIR HANDLING UNIT ED-203
100% CD Submittal
04/13/2023
673-21-151
JAMES A. HALEY VA HOSPITAL
BUILDING #1
KEY PLAN NTS NORTH
BLDG 1
AESUS
S100
EXISTING ROOF FRAMING / PLATFORM
FRAMING PLANS
1/8" = 1'-0"2 PARTIAL ROOF FRAMING PLAN
KEYED NOTES
Key Value Keynote Text
101 C8X11.5, PERIMETER OF MECHANICAL UNIT FOR CURB
SUPPORT. COORDINATE EXACT LOCATION WITH CURB
MANUFACTURER.
102 1-1/2" X 20 GAGE GALVANIZED STEEL ROOF DECK TO
REPLACE EXISTING CONCRETE ON STEEL DECK.
104 EXISTING MECHANICAL UNIT CONCRETE PAD TO BE
REMOVED. REMOVE DECK TO CENTERLINE OF EXISTING
STEEL BEAMS.
106 EXISTING METAL DECK.
108 EXISTING STEEL COLUMN.
3/4" = 1'-0"A TYPICAL WIDE FLANGE BEAM TO BEAM CONNECTIONS
3/4" = 1'-0"B TYPICAL BOLT TABLE FOR STEEL CONNECTIONS
3/4" = 1'-0"C STEEL BEAM CONNECTION AT EXISTING STEEL BEAM
3/4" = 1'-0"D STEEL DECK SUPPORT ANGLE CONNECTION TO EXISTING STEEL BEAM
1" = 1'-0"E
TYPICAL DETAIL -
ROOF OPENING FRAME
1 ASI#1 02/21/2024
2/21/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
100% CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
ED-203
JAMES A. HALEY VA HOSPITAL
673-21-151
BUILDING #1
Revisions: Date:
design
AESUS
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282,
(480) 454-2861 group
Office of Construction and Facilities ManagementArchitecture, Engineering, & Sustainable Design
APRIL 17, 2023
OR
LA
NDO ER I K GONZALES
PRO F E S S I O NA L E NG I NEE
R
DEMOLITION GENERAL NOTES:
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE
MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY
INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING
WHICH ARE TO REMAIN IN OPERATION.
2. ALL UTILITY OR SYSTEM SHUTDOWNS SHALL BE COORDINATED WITH
THE OWNER AND ENGINEER. NO SHUTDOWNS CAN OCCUR WITHOUT
PRIOR PERMISSION FROM THE OWNER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND FIELD
CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK. ANY
DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER FOR
RESOLUTION.
4. THE EXISTING CONDITIONS ARE BASED ON "AS-BUILT" DRAWINGS AND
LIMITED FIELD VERIFICATIONS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE
PROJECT. NO ADDITION COMPENSATION WILL BE PROVIDED FOR ANY
EXTRAS DUE TO THE CONTRACTOR'S FAILURE TO VISIT THE PROJECT
SITE OR PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO
SUBMITTING THE BID. ANY DISCREPANCIES SHALL BE IMMEDIATELY
REPORTED TO THE ARCHITECT/ENGINEER FOR RESOLUTION.
5. ALL WORK SHALL CONFORM TO THE LOCAL AND STATE BUILDING CODE
AND ORDINANCES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR
PORTION OF THE WORK WITH OTHER PORTIONS OF WORK BY OTHER
TRADES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS,
METHODS, TECHNIQUES, AND SAFETY TO THE PUBLIC AND TO
PROPERTY BOTH PRIVATE AND PUBLIC.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE REMOVAL
OF ALL EXISTING EQUIPMENT, PIPING, AND DEVICES NOT REQUIRED
FOR THE WORK AND NOT SHOWN AS EXISTING TO REMAIN AS
INDICATED ON DRAWINGS. DRAWINGS ARE SCHEMATIC IN NATURE AND
INDICATE MAJOR ITEMS OF EXISTING EQUIPMENT AND SYSTEMS. THE
CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE EXTENT OF
EXISTING EQUIPMENT, PIPING, AND DEVICES TO BE REMOVED.
9. ALL SHUT DOWNS AND DEMOLITION SHALL BE PHASED AND
COORDINATED WITH NEW WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION SHUT DOWNS AND REMOVAL OF
ITEMS WITH THE OWNER'S REPRESENTATIVE AND THE OWNER'S
PHASING REQUIREMENTS.
10. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A RESULT OF
REMOVED PIPING, DUCTWORK, FLUES, EQUIPMENT, FIXTURES, ETC
SHALL BE PATCHED TO MATCH EXISTING BUILDING CONSTRUCTION.
WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR
RESPECTIVE TRADES.
11. THE INTENT OF THE DEMOLITION IS TO REMOVE THE ITEMS IN THEIR
ENTIRETY TO INCLUDE ALL ASSOCIATED SUPPORT BASES,
ANCHORAGE, HANGERS, CONTROLS, PIPING, ETC. AND CAP EXISTING
SYSTEM TO REMAIN AT MAINS OR OTHER ACTIVE BRANCH LINES.
MINIMIZE DEAD-END LENGTHS.
12. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN
NW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED.
13. ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF OFF THE SITE;
COORDINATE WITH OWNER, ARCHITECT, AND DIVISION 1
REQUIREMENTS, LIMITS, ETC. ON ON-SITE DUMPSTERS. USE OF
OWNER'S TRASH DUMPSTERS FOR DISPOSAL OF DEMOLISHED WILL
NOT BE PERMITTED.
KEYED NOTES:
1. NEW AHU LOCATION ON PRE-MANUFACTURED CUSTOM CURB. REFER
TO SHEET M-501 FOR PLAN VIEW DETAIL AND SECTION VIEW.
2. ROUTE NEW 1-1/2" CONDENSATE DRAIN TO ROOF DRAIN.
3. CONNECT (N) 4" CHWS&R TO (N) AHU-ED-203 COOLING COIL.
4. CONNECT (N) 1" HWS&R TO (N) AHU-ED-203 PRE-HEAT COIL.
5. CONNECT (N) 1-1/2" LPS AND 3/4" GC TO (N) AHU-ED-203 STEAM COIL.
6. (N) 60"X18" SUPPLY AIR DUCT. ROUTE TO EXISTING SA DUCT AND
CONNECT BELOW THE ROOF.
7. (N) 44"X18" RETURN AIR DUCT. ROUTE TO EXISTING RA DUCT AND
CONNECT BELOW THE ROOF.
8. CONDENSATE DRAIN CLEAN OUT.
9. ROUTE ALL PIPING THROUGH FLOOR OF THE VESTIBULE. PROVIDE COIL
CONTROL VALVE AND ALL ACCESSORIES WITHIN THE VESTIBULE.
10. CONTRACTOR SHALL INSTALL RELIEF DUCTWORK ON THE TOP OF THE
UNIT. CONNECT TO EXISTING AHU RELIEF DAMPER.
SCALE:1 ROOF NEW WORK PLAN
3/16" = 1'-0"
M501
(E) EF-203A
(E) EF-203B
(E) EF-203C
(N) AHU-ED-203 1
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. 82497
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text Expires 02/28/2025
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
NEW WORK PLAN
AutoCAD SHX Text
MH102
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
ASI#1 REVISED AHU DIMENSIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ASI#1
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
100% CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
ED-203
JAMES A. HALEY VA HOSPITAL
673-21-151
BUILDING #1
Revisions: Date:
design
AESUS
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282,
(480) 454-2861 group
Office of Construction and Facilities ManagementArchitecture, Engineering, & Sustainable Design
APRIL 17, 2023
OR
LA
NDO ER I K GONZALES
PRO F E S S I O NA L E NG I NE E
R
SCALE: 3/8" = 1'- 0"
#KEYED NOTES:
1. 60"X18" SUPPLY AIR DUCT. ROUTE TO
EXISTING SA DUCT AND CONNECT BELOW
THE ROOF.
2. 44"X18" RETURN AIR DUCT. ROUTE TO
EXISTING RA DUCT AND CONNECT BELOW
THE ROOF.
3. NEW MANUFACTURED CURB.
4. EXISTING ROOF TOP.
5. EXISTING SA PENETRATION
6. EXISTING RA PENETRATION.
5 6
SCALE: 3/8" = 1'- 0"
SCALE: NTS
CONTRACTOR PROVIDED RELIEF AIR DUCT
INSECT SCREEN
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. 82497
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text Expires 02/28/2025
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
MECHANICAL DETAILS
AutoCAD SHX Text M501
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
ASI#1 REVISED AHU DIMENSIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AHU ED-203 DUCT ROUTING (SECTION VIEW)
AutoCAD SHX Text
AHU ED-203 DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AHU ED-203 MANUFACTURED CURB DETAIL
AutoCAD SHX Text
ASI#1
AutoCAD SHX Text
ASI#1
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
100% CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEERS STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
ED-203
JAMES A. HALEY VA HOSPITAL
673-21-151
BUILDING #1
Revisions: Date:
design
AESUS
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282,
(480) 454-2861 group
Office of Construction and Facilities ManagementArchitecture, Engineering, & Sustainable Design
APRIL 17, 2023
OR
LA
NDO ER I K GONZALES
PRO F E S S I O NA L E NG I NEE
R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NO. 82497
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text Expires 02/28/2025
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M600
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AESUS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02/21/24
AutoCAD SHX Text
ASI#1 REVISED AHU DIMENSIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ASI#1
| Arch - ASI#1 |
| AS100 - PHASING PLAN |
| A301 - ROOF PLAN |
| AE302 - REFLECTED CEILING PLAN - LEVEL 01 |
| Struc - ASI#1 |
| MH102 |
| MH102 |
| M501 |
| M501 |
| M601 |
| M601 |