This document package includes specifications and drawings for replacing an air handling unit at the James A. Haley Veterans Hospital, along with details of the related federal contract opportunity. The specifications and drawings provide preliminary plans for removing an existing air handling unit and installing a new unit, including sections and layouts of the vestibule and tunnel areas. The federal contract opportunity is a set-aside for Service-Disabled Veteran-Owned Small Businesses seeking to furnish all labor, materials, and work to replace Air Handling Unit ED-203 at the James A. Haley VA Hospital in Tampa, Florida. Interested contractors must attend a mandatory site visit on November 15, 2023 and submit any requests for information by November 22, 2023. The magnitude of construction is estimated between $1 million to $2 million. The wage determination applicable to this project is General Decision Number FL2015-4571 Revision 21 from August 4, 2023.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORKING VESTIBULE
z w Ul l9 z
Ul
AIR TUNNEL
PRELIMINARY - SUBJECT TO CHANGE
1IT
C! <P <P lbs) !::,Hll'l'lNl;i !::,1:l.. I lUN 1 l::>,J�U I0SJ
VESTIBULE - SECTION 1
FIELD MOUNTED1
,ov1,0
SINGLEPOIN
OWERPANE
24" Door Width {Typ.)
t:/1::=;:.. � t:f:::;:__
H� l ckdra [ amper, [X � (Typ.)
<( QJ
I= ] Cl
QTY.3
Return Air
Fans
I I
,,b ��
,,b
J => ro m c<c:,.,a
�r
I-ci
�rr
J ,7 7, ] Cl I'"" I g_7, I ,Rn I 1"_7, I ,nn /
I
CONDITIONED AIR - S "cm, 1/ Front Load
Future Filters By Owner
Backdraft
Dampers I (Typ.) I
I
Cl
QTY.3
Return Air Fans mJ m
I
C"7 "7C I'"" I AQ 7, /
co,, 11" 7S ,n n/
1?11
Front Load __J Future Filters By Owner
I<
I< k
1-t-
JAMES A. HALEY V.A. HOSPITAL
REPLACE AIR HANDLING UNIT ED-203
ROOF MOUNTED ON CUSTOM CURB
lbs) !::,Hll'l'lNl;i !::,1:l.. I lUN L lJ,ll::> I0SJ lbs) !::,Hll'l'lNl;i !::,1:l.. I lUN j lf,::>L4 I0SJ lbs) !::,Hll'l'lNl;i !::,1:l.. I lUN 4 l::>,4Jb I0SJ
VESTIBULE - SECTION 2
--a= �
I ,/ "'- ,/ "'- I
1,I 24 I I 30 I Exhaust ,n QA Damper Damoer RR I
I
DA,R-S7
Side Load
MERV-8 / MERV-11
Pre-Filters
PLAN VIEW
NOT TO SCALE
1Q
I e5.. 24 JO_._ 30 _,.____19___.
I �XH Dampejr I QA Damper I I
I,? �,� I
IJ
RA Damper I�
IJ �
Side Load __j
MERV-8 / MERV-11
Pre-Filters
VESTIBULE - SECTION 3
� t:::i::;._ f--
Steam Hot Water Humidifier Coil f--n7 A<:'-
.466.
Ir;::-;, 0 Steam Hot Water I= Humidifier Coil
1, n �
ELEVATION VIEW
NOT TO SCALE
VESTIBULE - SECTION 4
CTLBOX �
Backdraft
] Cl Dampers QTY. 6
Supply {Typ.) Air Fans Cooling
Coil
] Cl
I 1,1,II '"" II
11A 1"1 1a <:a I
I :7NDITI I
Front Load MERV-17 Final Filters
Backdraft
� Cl
QTY. 6
Dampers Supply (Typ.) Air Fans
Cooling mJ Coil
I 1" 7-I I 1 <: C 11 11A 1cl 1a,;a I
/ !la 7, I "" "' rn t--
7 0'17S ' 00, 1"
Front Load __J MERV-17 Final Filters
II'
f----
I
I
J t
'3, <O
NOTES:
1 . OUTSIDE AIR HOODS QTY. (2) NOT SHOWN PROVIDED
BY DAIKIN APPLIED FOR FIELD INSTALLATION BY
CONTRACTOR.
2. EXHAUST AIR DISCHARGE AIR DUCT WORK BY
CONTRACTOR IN FIELD.
3. TOTAL OF EIGHT (8) SECTIONS WILL BE SHIPPED FOR
FIELD INSTALLATION BY CONTRACTOR.
4. CUSTOM CURB NOT SHOWN ON THIS DRAWING.
DAMPER TO BLEED AIR INTO VESTIBULE TO CONDITION VESTIBULE