5 - REV 8-29-2025 BID SHEET - Chipseal-Slurry Seal.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
2025 Street Renovations - Chip Seal and Slurry Seals
Solicitation number
25-6
Issued by
Gilpin County, Colorado

About this file

The document is a bid sheet for the 2025 Street Renovations project issued by the Town of Gypsum, Colorado, focusing on chipseal and slurry seal street maintenance services. The project involves comprehensive road surface treatments across multiple residential areas including Red Hill, Buckhorn, and Gypsum Creek Road, covering approximately 0.4 miles of roadway. Key streets include Knob Lane, Sunset Lane, Strohm Circle, Cedar Drive, Beacon Road, and various streets in the Buckhorn neighborhood. The non-mandatory pre-bid meeting is scheduled for September 4, 2025, with bid opening on September 16, 2025, and Town Council selection anticipated for September 23, 2025. Project completion is mandated by October 24, 2025, with full acceptance and two-year warranty start by October 31, 2025.

The bid sheet provides detailed unit pricing for preparation, sealing, and traffic control, specifying technical requirements such as SRS2P oil for chip seal and CQS-1h oil for slurry seal. Contractors are required to provide public information outreach, protect infrastructure elements, and submit a protection plan. While no specific budget range is detailed, the project includes requirements for bid bonds, performance bonds, and a two-year warranty. Invoicing will be conducted before noon on the 1st and/or 3rd Tuesday of each month, with council approval required. The procurement does not explicitly specify set-aside designations, and bidders must adhere to Gypsum Public Works Manual specifications and current ADA requirements. Contractors will be responsible for comprehensive traffic management and resident notifications one week prior to work commencement.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C&S-Bid (2)

2025 Gypsum Street Renovations Chipseal & SlurrySealREV. 08/29/2025
Bid schedule critical times and dates:
ANon-Mandatory Pre-bid meeting Thursday, September 4, 2025 at 2:00 PM at Community Development Room
BBid Opening = Tuesday, September 16, 2025 at 10 AM at the Community Development Conference Room.
CTown Council (T.C.) selection on September 23, 2025 at a 7 PM public meeting
DNotice to Proceed- as soon as all contract documents are signed and received from the Council selected bidder.
EWork completed and ready for punch list No Later Than (NLT) Octobeer 24, 2025.
F100% completed and accepted for Two-Year Warranty start NLT October 31, 2025.
Standards and Definitions:
GAll construction specifications per the Gypsum Public Works Manual, and current ADA requirements.
HSee attached specifications for Chip Seals, Fog Coat, and Slurry Seals. Seal coats shall follow the requirments of the Fog Coat
IChip Seal shall be Type 1 chip seal with 1/4" Chips. A Fog Coat is required following the chip seal.
JThe contractor shall put out door knockers 1 week ahead of the work notifying residences and businesses and any impacts associated with the work and the duration of the impact.
KThe contractor shall ensure all manholes, inlets, valve boxes, etc. are protected during the work. A plan to protect the manholes, inlets, valve boxes, etc. during the work shall be submitted to the Town for approval prior to starting the work.
LInvoices- Submitted before Noon on the 1st &/or 3rd Tues. of the month will be approved by Council for payment on the following Tues.
2025 Chipseal and Fog Coat
Red Hill
Oil Must be SRS2P and Chip 1/4

DESCRIPTION QNTY Unit Unit Price Total

1Mobilization for all Chipseal and Fog Coat work1LS$ - 0$ - 0
1aPublic Information Outreach (Red Hill Area)1LS$ - 0$ - 0
Knob Ln
2Prep work (Clean Road)15,932SF$ - 0$ - 0
31/4" Chipseal and Fog Coat 470'x25 +fillets & 2 half moons= 11,750+418215,932SF$ - 0$ - 0
4Traffic Control1LS$ - 0$ - 0
Sunset Ln
5Prep work (Clean Road)26,432SF$ - 0$ - 0
61/4"Chipseal and Fog Coat 890'x25' + fillets & 2 half moons = 22,250+4,18226,432SF$ - 0$ - 0
7Traffic Control1LS$ - 0$ - 0
Strohm Cir
8Prep work (Clean Road)84,386SF$ - 0$ - 0
91/4"Chipseal and Fog Coat 3336'x25' + fillets & 2 half moons = 83,400+98684,386SF$ - 0$ - 0
10Traffic Control1LS$ - 0$ - 0
Cedar Dr
11Prep work (Clean Road)82,325SF$ - 0$ - 0
121/4"Chipseal and Fog Coat 2798'x25' 495'x25' + fillets & 2 half moons = 69950+2,81882,325SF$ - 0$ - 0
13Traffic Control1LS$ - 0$ - 0
Beacon Rd
14Prep work (Clean Road)52,374SF$ - 0$ - 0
151/4"Chipseal and Fog Coat 2080'x25' + fillets 52,000+37452,374SF$ - 0$ - 0
16Traffic Control1LS$ - 0$ - 0
TOTAL$ - 0
2025 Slurry Seal
Buckhorn and Gypsum Creek Rd
Slurry Seal Should be Type 1 #200 x 1/8" (3.175mm)
Oil (CQS-1h,)

DESCRIPTION QNTY Unit Unit Price Total

17Mobilization for all work and Slurry seal1LS$ - 0$ - 0
17aPublic Information Outreach (Buckhorn Area)1LS$ - 0$ - 0
Indian Heights Way
18Prep work (Clean Road) 21,400 SF21,400SF$ - 0$ - 0
19Slurry Seal 21,400 SF 856'x 25'21,400SF$ - 0$ - 0
20Traffic Control1LS$ - 0$ - 0
Apache Dr
21Prep work (Clean Road) 41,967 SF41,967SF$ - 0$ - 0
22Slurry Seal 41,967 SF 509'x25' 921'x25'41,967SF$ - 0$ - 0
12,725 + 23,025 + 2 half moons 12,725 + 6,217
23Traffic Control1LS$ - 0$ - 0
Aztec Ct
24Prep work (Clean Road) 12,804 SF12,804SF$ - 0$ - 0
25Slurry Seal 12,804 SF 413'x25' 10,325'+ half moons 2,404'12,804SF$ - 0$ - 0
26Traffic Control1LS$ - 0$ - 0
Cochise Dr
27Prep work (Clean Road) 35,200 SF35,200SF$ - 0$ - 0
28Slurry Seal 35,200 SF 1,408'x25'35,200SF$ - 0$ - 0
29Traffic Control1LS$ - 0$ - 0
Coronado Ct
30Prep work (Clean Road) 6,158 SF6,158SF$ - 0$ - 0
31Slurry Seal 6,158 SF6,158SF$ - 0$ - 0
32Traffic Control1LS$ - 0$ - 0
Cochise Ct
33Prep work (Clean Road) 8,303 SF8,303SF$ - 0$ - 0
34Slurry Seal 8,303 SF8,303SF$ - 0$ - 0
35Traffic Control1LS$ - 0$ - 0
Navajo
36Prep work (Clean Road) 50,875 SF50,875SF$ - 0$ - 0
37Slurry Seal 50,875 SF50,875SF$ - 0$ - 0
38Traffic Control1LS$ - 0$ - 0
Crocket Ct
39Prep work (Clean Road) 13,407 SF13,407SF$ - 0$ - 0
40Slurry Seal 13,407 SF13,407SF$ - 0$ - 0
41Traffic Control1LS$ - 0$ - 0
BlackHawk Rd
42Prep work (Clean Road) 16,500 SF16,500SF$ - 0$ - 0
43Slurry Seal 16,500 SF 660'x25'16,500SF$ - 0$ - 0
44Traffic Control1LS$ - 0$ - 0
Bowie Rd
45Prep work (Clean Road) 16,000 SF16,000SF$ - 0$ - 0
46Slurry Seal 16,000 SF 633'x25'16,000SF$ - 0$ - 0
47Traffic Control1LS$ - 0$ - 0
Arawak Way
48Prep work (Clean Road) 5,825 SF5,825SF$ - 0$ - 0
49Slurry Seal 5,825 SF 233'x25'5,825SF$ - 0$ - 0
50Traffic Control1LS$ - 0$ - 0
Bridger Dr
51Prep work (Clean Road) 32,825 SF32,825SF$ - 0$ - 0
52Slurry Seal 32,825 SF 1313'x25'32,825SF$ - 0$ - 0
53Traffic Control1LS$ - 0$ - 0
Mohawk Ct
54Prep work (Clean Road) 7,162 SF7,162SF$ - 0$ - 0
55Slurry Seal 7,162 SF7,162SF$ - 0$ - 0
56Traffic Control1LS$ - 0$ - 0
Custer Ct
57Prep work (Clean Road) 10,062 SF10,062SF$ - 0$ - 0
58Slurry Seal 10,062 SF10,062SF$ - 0$ - 0
59Traffic Control1LS$ - 0$ - 0
Maverick CT
60Prep work (Clean Road) 11,629 SF11,629SF$ - 0$ - 0
61Slurry Seal 11,629 SF11,629SF$ - 0$ - 0
62Traffic Control1LS$ - 0$ - 0
Powderhorn Dr
63Prep work (Clean Road) 44,864 SF44,864SF$ - 0$ - 0
64Slurry Seal 44,864 SF 41,300'x25' 41,300+ Parking 3,56444,864SF$ - 0$ - 0
65Traffic Control1LS$ - 0$ - 0
Buckhorn Valley TotalTOTAL$ - 0
Gypsum Creek Rd
Type II Slurry Seal
Oil (CQS-1h)
Gypsum Creek Rd
Daggett Ln to Brightwater N Enterance
66Mobilization for all work Gypsum Creek Rd1LS$ - 0$ - 0
67Removal existing stripes1LS$ - 0$ - 0
68Prep work (Clean Road) 5635'x30'169,050SF$ - 0$ - 0
69Slurry Seal 5635'x30'169,050SF$ - 0$ - 0
70Traffic Control1LS$ - 0$ - 0
71Striping with Reflective Beads 5,635 'x 4" Double Yellow5,635LF$ - 0$ - 0
72Striping with Reflective Beads 11,270' x 4" Single white11,270LF$ - 0$ - 0
Gypsum Creek TotalTOTAL$ - 0
SUMMARY of Bids:
Chipseal and Fog Coat Red Hill$0.00
Slurry Seal Buckhorn$ - 0
Slurry Seal Gypsum Creek$0.00
SUB TOTAL$0.00
(formula uses 1.5%, so change if your is different) Performance & Two Year Warranty Bond =$ - 0
TOTAL$0.00
_____________________________________ ___________________________ , 2025
Printed Name of Bidder SignatureDate
_________________________________________________________________
Company Name
Amount to be read at the bid opening =$0.00