5-Reconstruction of Bridge 2904 Quantity Tabulation and Summary.pdf

PDF 38 KB Posted

Attached to
Reconstruction of Bridge 2904
Solicitation number
Not on record
Issued by
Mercer County, Pennsylvania

About this file

This is a Quantity Tabulation and Summary document for the Reconstruction of Bridge 2904 project in Mercer County, Pennsylvania. The project encompasses comprehensive bridge reconstruction services including mobilization, terminal sections, guiderail installation, reinforcement bar materials, removal of the existing bridge structure, construction of a new bridge structure as-designed, temporary excavation support systems, shop inspection of fabricated structural steel, approach roadway construction, and erosion and sediment pollution controls. Key quantities include 1 lump sum mobilization, 4 terminal sections, 125 linear feet of Type 31-S guiderail, 51,833 pounds of epoxy-coated reinforcement bars, 34 pounds of galvanized reinforcement bars, and 1 lump sum for bridge structure as-designed. Bids are due via PennBid by April 30, 2026, at 10:00 a.m. local time, with public bid opening and announcement to follow immediately at the Mercer County Bridge Department located at 104 Mortensen Road, Greenville, Pennsylvania.

The procurement requires prospective bidders to demonstrate prequalification and adequate work capacity to be considered for award. Contractors must submit complete documentation including certification signature pages, bidder certification of prequalification and work capacity, bid proposal guaranty bonds, subcontractor lists, and joint venture statements if applicable. Detailed technical documentation is available online at no cost through the PennBid platform at https://pennbid.bonfirehub.com/. No specific budget range or set-aside designations are identified in the available documentation. The Mercer County Commissioners reserve the right to reject any and all submissions or portions thereof and to waive any informalities in the bidding process.

View the file

Other files

File Type Posted
15-Reconstruction of Bridge 2904 Drawings Structure Plans.pdf PDF
10-Reconstruction of Bridge 2904 Bidder Certification of Prequalification and Work Capacity.pdf PDF
2-Reconstruction of Bridge 2904 Instructions to Bidders.pdf PDF
4-Reconstruction of Bridge 2904 Drawings MPT Plans.pdf PDF
1-Reconstruction of Bridge 2904 Forms to submit if applicable - List of Subcontractors and statement of Joint Venture.pdf PDF
14-Reconstruction of Bridge 2904 Drawings Construction Plans.pdf PDF
8-Reconstruction of Bridge 2904 Legal Notice.pdf PDF
3-Reconstruction of Bridge 2904 Proposal Report Attachment Structure Foundation Recommendations.pdf PDF
6-Reconstruction of Bridge 2904 Certification Signature Page.pdf PDF
16-Reconstruction of Bridge 2904 Proposal Report.pdf PDF
13-Reconstruction of Bridge 2904 Existing Structure Plans.pdf PDF
9-Reconstruction of Bridge 2904 Wage Rate Schedule.pdf PDF
7-Reconstruction of Bridge 2904 Bid Proposal Guaranty Bond.pdf PDF
11-Reconstruction of Bridge 2904 Drawings ESC Plans.pdf PDF
12-Reconstruction of Bridge 2904 Proposal Report Attachment GP114306223-014.PDF PDF
6-Reconstruction of Bridge 1111 Bidder Certification of Prequalification and Work Capacity.pdf PDF
14-Reconstruction of Bridge 1111 Drawings ESC Plans.pdf PDF
16-Reconstruction of Bridge 1111 Drawings Structure Plans.pdf PDF
3-Reconstruction of Bridge 1111 Legal Notice.pdf PDF
11-Reconstruction of Bridge 1111 Drawings MPT Plans.pdf PDF
4-Reconstruction of Bridge 1111 Instructions to Bidders.pdf PDF
8-Reconstruction of Bridge 1111 Bid Proposal Guaranty Bond.pdf PDF
12-Reconstruction of Bridge 1111 Drawings Construction Plans.pdf PDF
13-Reconstruction of Bridge 1111 Existing Structure Plans.pdf PDF
7-Reconstruction of Bridge 1111 Forms to submit if applicable - List of Subcontractors and statement of Joint Venture.pdf PDF
5-Reconstruction of Bridge 1111 Proposal Report Attachment GP114306223-008 PAFB Clearance.pdf PDF
15-Reconstruction of Bridge 1111 Proposal Report Attachment GP114306223-008.pdf PDF
2-Reconstruction of Bridge 1111 Quantity Tabulation.pdf PDF
10-Reconstruction of Bridge 1111 Proposal Report.pdf PDF
9-Reconstruction of Bridge 1111 Wage Rate Schedule.pdf PDF
17-Reconstruction of Bridge 1111 Proposal Report Attachment Structure Foundation Recommendations.pdf PDF
1-Reconstruction of Bridge 1111 Certification Signature Page.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABULATION OF QUANTITIES

ITEM QUANTITY UNIT DESCRIPTION 2904

NUMBER

0608-0001 1 LS MOBILIZATION -

0620-0400 4 EA TERMINAL SECTION, SINGLE 4

0620-1600 125 LF TYPE 31-S GUIDERAIL 125

0901-0001 1 LS MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION -

1002-0053 51,833 LB REINFORCEMENT BARS, EPOXY COATED 51,833

1002-0054 34 LB REINFORCEMENT BARS, GALVANIZED 34

1018-0003 1 LS REMOVAL OF EXISTING BRIDGE, BRIDGE 2904 -

8110-0003 1 LS BRIDGE STRUCTURE AS-DESIGNED, BRIDGE 2904 -

OR

8100-0003

9000-0003 1 LS TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, BRIDGE 2904 -

9000-1003 1 LS SHOP INSPECTION OF FABRICATED STRUCTURAL STEEL, BRIDGE BRIDGE 2904 -

9000-2003 1 LS APPROACH ROADWAY, BRIDGE 2904 -

9000-4002 1 LS EROSION AND SEDIMENT POLLUTION CONTROLS -

SUMMARY OF QUANTITIES

LS

STEEL BRIDGE STRUCTURE, BRIDGE 2904 -

File details come from the government source that posted it. Updated .