This is a Quantity Tabulation and Summary document for the Reconstruction of Bridge 2904 project in Mercer County, Pennsylvania. The project encompasses comprehensive bridge reconstruction services including mobilization, terminal sections, guiderail installation, reinforcement bar materials, removal of the existing bridge structure, construction of a new bridge structure as-designed, temporary excavation support systems, shop inspection of fabricated structural steel, approach roadway construction, and erosion and sediment pollution controls. Key quantities include 1 lump sum mobilization, 4 terminal sections, 125 linear feet of Type 31-S guiderail, 51,833 pounds of epoxy-coated reinforcement bars, 34 pounds of galvanized reinforcement bars, and 1 lump sum for bridge structure as-designed. Bids are due via PennBid by April 30, 2026, at 10:00 a.m. local time, with public bid opening and announcement to follow immediately at the Mercer County Bridge Department located at 104 Mortensen Road, Greenville, Pennsylvania.
The procurement requires prospective bidders to demonstrate prequalification and adequate work capacity to be considered for award. Contractors must submit complete documentation including certification signature pages, bidder certification of prequalification and work capacity, bid proposal guaranty bonds, subcontractor lists, and joint venture statements if applicable. Detailed technical documentation is available online at no cost through the PennBid platform at https://pennbid.bonfirehub.com/. No specific budget range or set-aside designations are identified in the available documentation. The Mercer County Commissioners reserve the right to reject any and all submissions or portions thereof and to waive any informalities in the bidding process.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABULATION OF QUANTITIES
ITEM QUANTITY UNIT DESCRIPTION 2904
NUMBER
0608-0001 1 LS MOBILIZATION -
0620-0400 4 EA TERMINAL SECTION, SINGLE 4
0620-1600 125 LF TYPE 31-S GUIDERAIL 125
0901-0001 1 LS MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION -
1002-0053 51,833 LB REINFORCEMENT BARS, EPOXY COATED 51,833
1002-0054 34 LB REINFORCEMENT BARS, GALVANIZED 34
1018-0003 1 LS REMOVAL OF EXISTING BRIDGE, BRIDGE 2904 -
8110-0003 1 LS BRIDGE STRUCTURE AS-DESIGNED, BRIDGE 2904 -
OR
8100-0003
9000-0003 1 LS TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, BRIDGE 2904 -
9000-1003 1 LS SHOP INSPECTION OF FABRICATED STRUCTURAL STEEL, BRIDGE BRIDGE 2904 -
9000-2003 1 LS APPROACH ROADWAY, BRIDGE 2904 -
9000-4002 1 LS EROSION AND SEDIMENT POLLUTION CONTROLS -
SUMMARY OF QUANTITIES
LS
STEEL BRIDGE STRUCTURE, BRIDGE 2904 -