About this file
This file contains environmental permitting documentation and engineering plans for the Mercer County Bridge 2904 reconstruction project in Wilmington Township, Pennsylvania, involving the Pennsylvania Department of Environmental Protection (DEP), the U.S. Army Corps of Engineers, and Mercer County. The project involves the replacement of an existing single-span steel beam bridge carrying Bend Road (T-546) over the West Branch of Little Neshannock Creek. The bridge replacement will modify the structure from rolled steel beams with open grid steel deck (existing 26'-0" width, 64'-0" length) to a new 60-foot clear span steel plate girder bridge. The project scope includes bridge rehabilitation, scour protection, and grading activities affecting approximately 0.46 acres of disturbance. The site investigation, conducted December 1, 2021, identified two stream features (one perennial and one intermittent) but no wetland resources within the project area. Engineering drawings dated May 2023 and associated hydraulic data for design and 100-year flood events are included. The general permit registration was received by DEP on June 2, 2023, and acknowledged on October 20, 2023, with federal authorization verified under the Pennsylvania State Programmatic General Permit 6 (PASPGP-6) as of June 11, 2021. The bid submission deadline is April 30, 2026, at 10:00 a.m. local time via PennBid, with bids to be opened publicly by the Mercer County Bridge Engineer at 104 Mortensen Road, Greenville, Pennsylvania.
The environmental permitting indicates no wetland impacts requiring compensatory mitigation and compliance with Pennsylvania Chapter 105 water obstruction and encroachment regulations under General Permit 11 (GP-11) for bridge replacement. The project must comply with all PASPGP-6 conditions, including erosion and sediment control measures, spawning area time-of-year restrictions (October 1 through April 1 for Class A wild trout waters), threatened and endangered species avoidance measures, and aquatic life movement protections. The West Branch Little Neshannock Creek holds a Chapter 93 Trout Stocked Fishery (TSF) designation. The permitting documentation specifies that the applicant, Mercer County, through consultant HRG, Inc., must obtain all necessary state and federal authorizations prior to construction. No specific project budget or funding sources are stated in the provided documentation, though the extensive engineering and environmental requirements suggest a substantial infrastructure investment. The County Commissioners reserve the right to reject any or all bid submissions and may waive informalities in the bidding process.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3150-PM-BWEW0500 Rev. 4/2021 COMMONWEALTH OF PENNSYLVANIA Form DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WATERWAYS ENGINEERING AND WETLANDS
- 1 -
CHAPTER 105 WATER OBSTRUCTIONS AND ENCROACHMENT
GENERAL PERMIT REGISTRATION
SECTION A. APPLICANT INFORMATION
FERC Natural Gas Activity Docket Number Type of Facility Has a Water Quality Certification (WQC) request been sent to DEP? Yes No
Activity Subject to FERC approval and/or Oil & Gas Exploration, Production, Storage or Transmission if the activity is regulated by FERC and provide the FERC docket number.
Applicant’s Name / Client Mercer County
DEP Client ID# (if known) Employer ID# (EIN) 25-6001038
Client Information - Please select Client Type / Code from drop down box under the correct entity shown below. (or may be written in) ↓
Government Non-Government Individual CNTY County
Mailing Address 104 Mortenson Road
City Greenville
State
PA
ZIP + 4
16125
Contact Person – Last Name First MI Suffix Elder Bradley D P.E.
Telephone
(724) 662-4977
Email Address belder@mercercountypa.gov
SECTION B. CONSULTANT INFORMATION (If applicable) N/A Contact Person – Last Name First MI Suffix
Minor Ryan P Consultants Title Project Manager
Consulting Firm HRG, Inc.
Mailing Address 220 West Kensinger Drive, Suite 100
City Cranberry Township
State
PA
ZIP + 4
16066
Telephone
(724) 779-4777
Fax
(724) 779-4711
Employer ID# (EIN) 23-160-9730
Email rminor@hrg-inc.com
SECTION C. PROJECT INFORMATION
Project / Site Name Mercer County Bridge #2904 Replacement
DEP Site ID# (if known or leave blank)
Client Relationship - Please select Site-to-Client Relationship / Code from drop down box to the right. (or may be written in) →
Double-click on shaded area below to select correct Site-to-Client Relationship / Code ↓ AGENT Agent for Owner or Operator
County Mercer
Municipality City Borough Township Wilmington
Note: Municipal & County Notification is Required
Site Location / Address Bend Road (T-546) over a branch of the Little Neshannock Creek
City State
PA
ZIP + 4
16142
Collection Method: EMAP HGIS GISDR* ITPMP GPS WAAS LORAN
Check the horizontal reference datum (or projection datum) employed in the collection method.
EMAP and HGIS (PNDI) have known datum and do not require checking here. NAD27 NAD83 WGS84
(GEO84) LAT.: 41.139882 LONG.: -80.341241
NOTE: A Submerged Lands License Agreement (SLLA) with an annual fee, if applicable, may also be required for your project. You will be notified if an SLLA is required.
The Aquatic Resources Impact Table (SECTION E. PROPOSED IMPACTS) must be completed or equivalent submitted for this registration to be complete.
DEP Rec'd 6/2/2023
GP114306223-014
3150-PM-BWEW0500 Rev. 4/2021 Form
- 2 -
SECTION D. REGISTRATION CHECKLIST AND REQUIREMENTS
Please place an “X” next to each item (1-9) to ensure it is completed and/or provided.
Unless otherwise specified, all items are required to ensure a complete Registration package.
**Provide ONE (1) ORIGINAL and ONE (1) COPY of the Registration package**
Please provide a copy of the Registration form to the Municipality & County in which the work will be performed. Proof of receipt is not required to be provided to DEP.
1. REGISTERING A GENERAL PERMIT (GP) check all that apply Federal, State, county or municipal agencies or municipal authorities: EXEMPT from fees
GP-1 Fish Habitat Enhancement Structures ........................................................... Per Project $ 50 = $
GP-2 Small Docks and Boat Launching Ramps .......................... Per Dock / Ramp (#) x $ 175 = $
GP-3 Bank Rehabilitation, Bank Protection and Gravel Bar Removal ................................................................. Per Project (#) x
$ 250 = $
GP-4 Intake and Outfall Structures ................................................. Per Structure (#) x $ 200 = $
GP-5 Utility Line Stream Crossings .................... Per Individual Utility (#) x (#) x $ 250 = $
GP-6 Agricultural Crossings and Ramps .............................. Per Crossing / Ramp (#) x $ 50 = $
GP-7 Minor Road Crossings2 ..........................................................Per Crossing (#) x $ 350 = $
GP-8 Temporary Road Crossings2 ..................................................Per Crossing (#) x $ 175 = $
GP-9 Agricultural Activities ................................................................................... Per Project $ 50 = $
GP-10 Abandoned Mine Reclamation .....................................................................Per Project $ 500 = $
GP-11 Maintenance, Testing, Repair, Rehabilitation, or Replacement of Water Obstructions and Encroachments1
$ 750 +
Temporary Disturbance ($400/0.1ac) ....................... . acres x $4,000 = $ +
Permanent Disturbance ($800/0.1ac) ....................... . acres x $8,000 = $ = $
GP-15 Private Residential Construction in Wetlands1 .................................................................. $ 750 +
Temporary Disturbance ($400/0.1ac) ....................... . acres x $4,000 = $ +
Permanent Disturbance ($800/0.1ac) ....................... . acres x $8,000 = $ = $ GP(s) FEE subtotal (b) $
3150-PM-BWEW0500 Rev. 4/2021
- 3 -
Applicant
Entry DEP Use
Only
2. Location Map (USGS quad map) with project site marked:
3. Color Photographs with dates, locations, and descriptions: GP-3 GP-11 N/A
4. Project Description: (Example: Linear pipeline project using multiple GP-5’s and GP-8’s; One GP-7 for an access road to my property) Project includes a replacement of Mercer County Bridge #2904 along Bend Road (T-546).
5. Site Specific and/or Standard Drawings are (required for all) project’s GP activities.
For Activities that qualify for GP-7 or GP-11
Plans, specifications, and reports for bridges and culverts across a stream which are to be used by the general public such as an access to an industrial, commercial or residential development, etc., shall be prepared by a registered professional engineer and shall be affixed with their seal and certification which shall read as follows on the drawings:
If the project includes a bridge or culvert replacement or the proposed work will change the waterway opening, please complete and provide the Bridge and/or Culvert Replacement Projects or Projects That Change the Waterway Opening (3150-PM-BWEW0552B) worksheet. If the project consists of similar work (replacement or change in waterway opening) on more than one structure, provide the data requested for each structure included in this Registration package.
“I (name) do hereby certify pursuant to the penalties of 18 Pa. C.S.A. Sec. 4904 to the best of my knowledge, information and belief, that the information contained in the accompanying plans, specifications, and reports has been prepared in accordance with accepted engineering practice, is true and correct, and is in conformance with Chapter 105 of the rules and regulations of the Department of Environmental Protection.”
6. Proposed Project Purpose depicting the site of the projects GP activities and impacts. Briefly discuss the need for the authorization.
7. Erosion & Sediment Control Plan (E&S Plan) (Required for all GP’s but specifically required with submission with a registration of GP-11 or GP’s for oil and gas related activities submitted to DEP.)
8. Pennsylvania Natural Diversity Inventory (PNDI): PNDI Search Receipt and clearance letters, if available. See additional requirements for submission with Avoidance Measures and/or Potential Impacts.
9. Activities which impact wetlands: (For State Regulated Impacts) Please place an “X” next to the appropriate box indicating the information provided:
N/A because no wetland impacts are proposed or no compensatory mitigation is necessary.
A wetland delineation with complete data sheets in accordance with the 1987 Corps of Engineers Wetland Delineation Manual AND the appropriate Regional Supplements to the Corps of Engineers Wetland Delineation Manual for use in Pennsylvania
If direct or indirect wetland impacts are greater than 0.05 acre, a compensatory mitigation plan in accordance with the Department’s Replacement criteria which provides compensation for both affected acreage, and functions at a minimum of one to one ratio.
If compensatory mitigation onsite is determined not feasible:
A check, number , in the amount of $ payable to the National Fish and Wildlife Foundation, N.A. 1237, as compensatory mitigation for acres of impact in wetlands, in accordance with the Pennsylvania Wetland Replacement Project
(Additional Mitigation May Be Required by U.S. Army Corps)
NOTE: If the Pennsylvania Wetland Replacement Fund is proposed to be used as compensatory mitigation for waters of the Commonwealth the U.S. Army Corps of Engineers may also require additional mitigation if the proposed activity impacts waters of the United States.
3150-PM-BWEW0557 Rev 6/2021 COMMONWEALTH OF PENNSYLVANIA Application DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WATERWAYS ENGINEERING AND WETLANDS
Applicant’s Name / Client Mercer County
AQUATIC RESOURCE IMPACT TABLE
FOR PENNSYLVANIA CHAPTER 105 WATER OBSTRUCTION AND ENCROACHMENT APPLICATION / REGISTRATION
Project / Site Name: Mercer County Bridge #2904 Date: April 2023
DEP
USE
ONLY Project Information PA DEP / 105
Enter Only If Different from
DEP Impacts Army Corps Impacts:
PADEP
Permit
Number
Structure / Activity unique identifier
Aquatic Resource
Type Latitude dd nad83
Longitude dd nad83 Waters Name
PA Code Chapter 93
Designation Work
Proposed
DEP
Impact Type temp / perm
ACOE
Impact Type temp / perm
Watercourse Impact
Top of Bank to Top of
Bank
Floodway Impact Top of Bank Landward
Wetland Impact
Dimensions Watercourse
Impact Wetland Impact
Length and Width in feet
Length and Width in feet
Length and Width in feet
Length and Width in feet
Length and Width in feet
2904 Perennial 41.139882 -80.341241 West Branch Little Neshannock Creek TSF Bridge
Rehabilitation Temp N/A 110'L - 45'W 110'L - 20'W N/A N/A N/A
2904 Perennial 41.139882 -80.341241 West Branch Little Neshannock Creek TSF Bridge
Rehabilitation Perm N/A 28'L - 45'W N/A N/A N/A N/A
2904 Perennial 41.139882 -80.341241 West Branch Little Neshannock Creek TSF Scour
Protection Perm N/A 65'L - 26'W N/A N/A N/A N/A
2904 Perennial 41.139882 -80.341241 West Branch Little Neshannock Creek TSF Grading Perm N/A N/A 80'L - 120'W N/A N/A N/A
PADEP Impact Type: temporary or permanent.
Permanent Impacts are those areas affected by a water obstruction or encroachment that consist of both direct and indirect impacts that result from the placement or construction of a water obstruction or encroachment and include areas necessary for the operation and maintenance of the water obstruction or encroachment located in, along or across, or projecting into a watercourse, floodway or body of water.
Temporary Impacts are those areas affected during the construction of a water obstruction or encroachment that consists of both direct and indirect impacts located in, along or across, or projecting into a watercourse, floodway or body of water that are restored upon completion of construction. This does not include areas that will be maintained as a result of the operation and maintenance of the water obstruction or encroachment located in, along or across, or projecting into a watercourse, floodway or body of water (these are considered permanent impacts).
3150-PM-BWEW0552B 11/2012
Please complete and provide this chart as part of the General Permit Registration (3150-PM-BWEW0500) for GP-11 (3150-PM-BWEW0511)
BRIDGE AND/OR CULVERT REPLACEMENT PROJECTS OR PROJECTS THAT CHANGE THE WATERWAY OPENING* Bridge/Culvert Existing Bridge/Culvert Proposed
Activity Number**
Waterway Opening (sq. ft.)
(cross section/area)
Span (ft.)
Underclearance (ft.)
Length (ft.)
(upstream to downstream)
Material Type
(RCP,
CMP,
etc.)
Waterway Opening (sq. ft.)
(cross section/area)
Span (ft.)
Underclearance (ft.)
Length (ft.)
(upstream to downstream)
Material Type
(RCP,
CMP,
etc.)
1 464.4 60 7.74 25.5 I-Beam Stringer 636 60 10.6 27.54
Steel Plate Girder
*For multiple structures attach additional sheets that provide the same information requested in the chart.
**The number used for a particular water obstruction from 3150-PM-BWEW0552A should match the number in 3150-PM-BWEW0552B for the same water obstruction.
http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-11232 http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-9530
3150-PM-BWEWO500 Rev. 412021
SECTION F. CERTIFICATION
I certify under penalty of law that the information provided in this permit registration is true and correct to the best of my knowledge and information and that I possess the authority to undertake the proposed action. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. (If any of the information and/or plans is found to be in error, falsified, and/or incomplete, this authorization/verification may be subject to modification, suspension, or revocation in that this project complies with all the conditions of the general permit.
Signature of Applicant / Owner Date
0 AkcLo’J’JECC Typed / Printed Name
T’ped / Printed Title
This General Permit shall not be effective until the owner has had their E&S Plan reviewed by the appropriate Regional Office or District, and, where required, obtained an SLLA from DEP.
THIS ACKNOWLEDGED COPY OF THIS GENERAL PERMIT REGISTRATION PACKAGE AND THE E&S PLAN MUST BE
AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION.
SECTION G. DECISION / DISPOSITION — COMPLETED BY DEP
Decision Review:
GP
DEP / District Reviewer Signature
GP
Reviewers Typed I Printed Name
NOTE: See Aquatic Resource Impact Table for any additional authorizations.
Disposition Status Comments fl ACKNOWLEDGED Date
SLLA Required LI Yes Attached LI No o INCOMPLETE / DEFICIENCY Date
LI EXTENSION REQUEST Date
U WITHDRAWN Date
NOTE: If the GP registration information is incomplete a copy of this registration form and requested additional information will be sent to the applicant. A copy of the returned registration form and additional information must be re-submitted within 60 calendar days unless extended by the extension date listed above.
fl FEDERAL AUTHORIZATION Non-reporting PASPGP verification / authorization attached.
LI Reporting — A copy of this General Permit registration package has been sent to the U.S. Army Corps of Engineers. Separate federal authorization may be required
NOTE: Please be advised that if the reporting box is checked you do not have Federal authorization for this project and such authorization may be required prior to starting your project. In accordance with Section 404 of the Clean Water Act, a Department of the Army authorization is required for the discharge of dredged and/or fill material into waters of the United States, including jurisdictional wetlands. Section 10 of the Rivers and Harbors Act also requires Department of the Army authorization for any work in, over, or under a navigable water of the United States. In accordance with procedures established with the U.S. Army Corps of Engineers, you will be contacted directly by the Corps regarding Federal Authorization.
-5- DEP Rec'd 6/2/2023
114306223-014
Karl M. Gross, P.E.
DEP Reviewer: Nicole Peterson10/20/2023x x x x
June 11, 2021
PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT 6
(PASPGP-6)
July 1, 2021
Please note: the full text of the PASPGP-6 may be viewed on the Baltimore District web site at http://www.nab.usace.army.mil/Missions/Regulatory/PermitTypesandProcess.aspx or by calling the Corps at 814-235-0570
Permittee:
Date of PASPGP-6 Verification:
State Authorization(s):
Corps District:
Baltimore District U.S. Army Corps of Engineers State College Field Office 1631 South Atherton Street Suite 101 State College, Pennsylvania 16801-6260 Email: NAB-Regulatory@usace.army.mil
Philadelphia District U.S. Army Corps of Engineers Wanamaker Building 100 Penn Square East Regulatory Branch Philadelphia, Pennsylvania 19107-3390 Email: PhiladelphiaDistrictRegulatory@usace.army.mil
Pittsburgh District U.S. Army Corps of Engineers, Regulatory Branch William S. Moorhead Federal Building, 20th floor 1000 Liberty Avenue Pittsburgh, Pennsylvania 15222-4186 Email: Regulatory.Permits@usace.army.mil
It has been determined that your proposed project, which includes the discharge of dredged and/or fill material and/or the placement of structures into waters of the United States, including wetlands, qualifies for federal authorization under the provisions of Section 404 of the Clean Water Act and /or Section 10 of the River and Harbor Act of 1899, under the terms and conditions of the PASPGP-6.
All activities authorized under PASPGP-6 must comply with all conditions of the authorization, including General, Procedural, and Special Conditions. Failure to comply with all the conditions of the authorization, including project special conditions, will constitute a permit violation and may be subject to criminal, civil, or administrative penalties, and /or restoration.
The authorized activity must be performed in compliance with the following General Conditions to be authorized under PASPGP-6:
General Conditions:
1. Permit Conditions: The permittee shall conduct all work and activities in waters of the United States, including jurisdictional wetlands, in strict compliance with the approved authorization/verification including all final maps, plans, profiles, and design specifications.
2. 401 State Water Quality Certification (SWQC) Conditions: The permittee shall comply with the following conditions unless a project specific SWQC is required as identified below:
a. Prior to beginning any activity authorized by the Corps under PASPGP-6, the applicant shall obtain from the Department all necessary environmental permits, authorizations or approvals, and submit to the Department environmental assessments and other information necessary to obtain the permits and approvals, as required under state law, including The Clean Streams Law (35 P.S. §§ 691.1 691.1001), the Dam Safety and Encroachments Act (32 P.S. §§ 693.1 693.27), the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.1 1396.19b), the Noncoal Surface Mining Conservation and Reclamation Act (52 P.S. §§ 3301 3326), the Bituminous Mine Subsidence and Land Conservation Act (52 P.S. §§ 1406.1 1406.21), the Coal Refuse Disposal Control Act (52 P.S. §§ 30.51 30.66), the Solid Waste Management Act (35 P.S. §§ 6018.101 6018.1003), the Hazardous Sites Cleanup Act (35 P.S. §§ 6020.101 6020.1305), the Land Recycling and Environmental Remediation Standards Act (35 P.S.
§§ 6026.101 6026.908), 58 Pa.C.S. §§ 3201 3274 (related to development), the Air Pollution Control Act (35 P.S. §§ 4001 4015), the Storage Tank and Spill Prevention Act (35 P.S. §§ 6021.101 6021.2104) and the regulations promulgated thereunder, including 25 Pa. Code Chapters 16, 71, 77, 78, 78a, 86 91, 92a, 93, 95, 96, 102, 105, 106, 127, 245 and 260a 299.
b. Fill material may not contain any wastes as defined in the Solid Waste Management Act.
c. Applicants and projects eligible for the PASPGP-6 must obtain all state permits or approvals, or both, necessary to ensure that the project meets the state's applicable water quality standards, including a project-specific SWQC.
-6 on February 12, 2021, the following was included to clarify the meaning of this condition:
This 401 SWQC is only available for projects that do not require any federal authorization other than authorization from the Corps under Section 404 of the Act or Section 10 of the Rivers and Harbors Act of 1899. Applicants seeking authorization for activities not eligible for coverage under PASPGP-6, or for activities that require another federal authorization (such as an interstate natural gas pipeline, a gas storage field or a nuclear or hydroelectric project requiring authorization by another federal agency), must submit a request to the Department for a project-specific SWQC. The scope of the issuance of this SWQC is related only to the scope and applicability of the proposed PASPGP-6. Any activity or project requiring the Department to issue 401 SWQC that is beyond the scope of the proposed PASPGP-6 or other programmatically issued SWQC (e.g. Nationwide Permits) will require the applicant to obtain a project-specific SWQC from the Department. This would include any activity or project requiring a SWQC associated with an authorization, permit or license issued by a federal agency, such as Federal Energy Regulatory Commission or Nuclear Regulatory Commission. Such activities or projects include, but are not limited to, an interstate natural gas pipeline, a gas storage field or a nuclear or hydroelectric project.
3. Terms and Conditions Related to Coastal Zone Management Act (CZMA) Certification: For -Reporting Activities have
General CZMA consistency determination and Reporting Activities must obtain individual CZMA consistency determination (see General Condition 30(b)).
4. Aquatic Life Movements: No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless crossing cannot be used, then culverts should be designed, constructed, and appropriately depressed, if possible, below the stream invert to minimize adverse effects to aquatic life movements.
5. Threatened and Endangered Species: By signing the Pennsylvania Natural Diversity Inventory (PNDI) receipt, the permittee has agreed to comply with all avoidance measures identified by the PNDI receipt. The applicant may also agree in writing to comply with all avoidance measures identified in U.S. Fish and Wildlife Service (USFWS) correspondence, including IPaC, as part of the application. To ensure compliance with the Endangered Species Act (ESA), those avoidance measures associated with federally listed, threatened, or endangered species are a condition of the PASPGP-6 verification, unless modified by the Corps.
If an activity is verified under the PASPGP-6, and a federally listed, threatened, or endangered species, or proposed species, is subsequently found to be present, all work must cease, and the Corps and USFWS (or National Marine Fisheries Service (NMFS)) must be notified by telephone immediately (contact information below). The PASPGP-6 verification is automatically suspended without additional notification to the permittee and will not be re-issued until consultation pursuant to Section 7 of the ESA is concluded and adverse effects to federally listed, threatened, endangered, and proposed species are avoided, or incidental take authorization issued.
Furthermore, persons have an independent responsibility under Section 9 of the ESA to avoid
USFWS:
Pennsylvania Field Office 110 Radnor Rd; Suite 101 State College, PA 16801 office phone: 814 234-4090 fax: 814-234-0748 or 814 206-7452
NMFS:
Ms. Jennifer Anderson Assistant Regional Administrator Protected Resources Division NOAA Fisheries 55 Greater Republic Drive Gloucester, Massachusetts 01930
6. Spawning Areas: The permittee shall comply with all time-of-year-restrictions (see below) associated with spawning areas as set forth by the Pennsylvania Fish and Boat Commission (PFBC) or other designated agency. Discharges or structures in spawning or nursery areas shall not occur during spawning seasons unless written approval is obtained from the PFBC or another designated agency. In addition, work in areas used for other time sensitive life span activities of fish and wildlife (such as hibernation or migration) may necessitate the use of seasonal restrictions for avoidance of adverse impacts to vulnerable species. Impacts to these areas shall be avoided or minimized to the maximum extent practicable during all other times of the year.
Wild Trout October 1 - December 31 Class A Wild Trout October 1 - April 1
List of Trout Streams found at:
https://www.fishandboat.com/Fish/PennsylvaniaFishes/Trout/Pages/TroutWaterClassificatio ns.aspx.
7. Shellfish Production: No discharge of dredged and/or fill material and/or the placement of structures may occur in areas of concentrated shellfish production, unless the discharge is directly related to an authorized shellfish harvesting activity.
8. Adverse Effects From Impoundment: If the regulated activity creates an impoundment of water, the adverse effects on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow, including impacts to wetlands, shall be minimized to the maximum extent practicable.
9. Management of High Flows: To the maximum extent practicable, the preconstruction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).
10. Erosion and Sediment Controls: Appropriate soil erosion and sediment controls, in accordance with state regulations, must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States, including jurisdictional wetlands, during periods of low-flow or no-flow, or during low tides.
11. Suitable Material: No activities, including discharges of dredged and/or fill material or the placement of structures, may consist of unsuitable material (i.e., asphalt, trash, debris, car bodies, etc.). No material discharged shall contain toxic pollutants in amounts that would violate the effluent limitation standards of § 307 of the Clean Water Act (CWA).
12. Temporary Fill and Structures: Temporary fill (i.e., access roads and cofferdams) and structures in waters and/or wetlands authorized by PASPGP-6 shall be properly constructed and stabilized during use to prevent erosion and accretion. Temporary fill in wetlands shall be placed on geotextile fabric laid on existing wetland grade, unless such requirement is specifically waived by the Corps. Whenever possible, rubber or wooden mats should be used for equipment access through wetlands to the project area. Temporary fills and structures shall be removed, in their entirety, to an upland site, and suitably contained to prevent erosion and transport to a waterway or wetland. Temporarily impacted areas shall be restored to their preconstruction contours, elevations, and hydrology, and revegetated with a wetland seed mix that contains non-invasive, native species, to the maximum extent practicable.
Unless approved by the Corps, the restoration work must be completed within 30 days of the date the temporary fill/structure is no longer needed.
13. Equipment Working in Wetlands: Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
14. Installation and Maintenance: Any regulated structure or fill authorized by PASPGP-6 shall be properly installed and maintained to ensure public safety.
15. PASPGP-6 Authorization:
a. PASPGP-6 expires June 30, 2026, unless suspended or revoked.
b. Verifications of PASPGP-6 expire June 30, 2026, unless the PASPGP-6 permit is suspended, revoked, or the PADEP authorization expires, whichever date occurs sooner.
Activities authorized under PASPGP-6 that have commenced construction or are under contract to commence construction will remain authorized provided the activity is completed within 12 month of the date of the PASPGP-6 expiration, modification, or revocation; or until the expiration date of the project specific verification, whichever is sooner.
16. One-Time Use: A PASPGP-6 verification is valid to construct the project, or perform the activity, one time only, except for PASPGP-6 verifications specifically issued for reoccurring maintenance activities.
17. Water Supply Intakes: No regulated activity may occur in the proximity of a public water supply intake and adversely impact the public water supply. In order to minimize the effects of intakes on anadromous fish eggs and larvae, and oyster larvae, intake structures should be equipped with screening (with mesh size no larger than 2 mm) of wedge wire or another material of equal or better performance. Where feasible, intakes should be located away from spawning or nursery grounds, or to minimize the impingement on, or entrainment of, eggs or larvae. In addition, intake velocities should not exceed 0.5 ft/sec.
18. Historic Properties: For all activities verified under a PASPGP-6, upon the unanticipated discovery of any previously unknown historic properties (historic or archeological), all work must cease immediately, and the permittee must notify the State Historic Preservation Officer (SHPO) and the Corps. The Corps will contact the tribes with whom they routinely consult, -6 may be re-verified, and special conditions added if necessary, after an determination on historic properties and/or tribal resources is made, in consultation with the SHPO, the tribes and other interested parties. The PASPGP-6 verification may be modified and/or rescinded for the specific activity if an adverse effect on the historic property cannot be avoided, minimized, or mitigated.
19. Tribal Rights: No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.
20. Corps Civil Works Projects: The PASPGP-6 does not authorize any work which will interfere with an existing or proposed Corps Civil Works project, or any Corps-owned or managed property or easement (i.e., flood control projects, dams, reservoirs, and navigation projects), unless specifically approved by the Corps in writing. Pursuant to 33 U.S.C 408, a review by, or permission from the Corps is required for activities that will alter or temporarily or permanently occupy or use a Corps federally authorized Civil Works project.
Any activity that requires Section 408 permission and/or review is not authorized by PASPGP-6 until the appropriate Corps office issues the Section 408 permission or completes its review to alter, occupy, or use the Corps Civil Works project, and Corps issues a written PASPGP-6 verification.
21. Navigation: No activity verified under PASPGP-6 may cause more than minimal adverse effect on navigation. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the activity authorized herein. In addition, activities that require temporary causeways that prohibit continued navigational use of a waterway (i.e., temporary causeways extending greater than ¾ the width across the waterway) shall be removed in their entirety upon completion of their use. Any safety lights and signals prescribed by the U.S. Coast Guard (USCG), through regulation or otherwise, navigable waters of the United States. The permittee understands and agrees that, if further operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or an authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
22. Inspections: The permittee shall allow a District Engineer or an authorized representative(s) to make periodic inspections at any time deemed necessary in order to ensure that the work is being performed in accordance with all the terms and conditions of PASPGP-6. The District Engineer may also require post-construction engineering drawings (as-built plans) for completed work.
23. Modifications of Prior Verifications: Any proposed modification of a previously verified Single and Complete project that results in a change in the verified impact to, or use of waters of the United States, including jurisdictional wetlands, must be approved by PADEP, or the Corps if applicable. Corps written approval is required if the prior verification was reviewed by the Corps, or if the proposed modification is a Reporting Activity under PASPGP-6. Project modifications that cause a Single and Complete Project to exceed 0.5 acre of loss of waters of the United States, including jurisdictional wetlands (except those identified in Part II A.2. a. and b.), or greater than 1,000 linear feet of permanent jurisdictional stream loss (except those identified in Part II A.2. a and b.), are not eligible for PASPGP-6 and will be forwarded to the Corps for review under an alternative permit review procedure.
24. Recorded Conservation Instruments: As per Part III.D.27 and Part III.E.8 of this permit, proposed Draft Conservation Instruments may be submitted by the applicant as part of the permit application package for review and approval. When such proposed Conservation Instruments are submitted by the applicant, proof of the recorded deed restriction, conservation easement, or deed restricted open space area shall be forwarded to the appropriate Corps District and appropriate PADEP offices, prior to the initiation of any permitted work, unless specifically waived by the Corps in writing. Conservation Instrument templates can be found at:
http://www.nab.usace.army.mil/Missions/Regulatory/PermitTypesandProcess.aspx
25. Property Rights: PASPGP-6 does not obviate the need to obtain other federal, state, or local authorizations required by law, nor does the permit grant any property rights or exclusive privileges or authorize any injury to the property or rights of others.
26. Navigable Waters of the United States (Section 10 Waters):
In addition to the other general conditions, the following conditions are applicable for activities in the eligible navigable waters of the United States identified in Appendix B:
a. For aerial transmission lines, the following minimum clearances are required for aerial electric power transmission lines crossing navigable waters of the United States. These clearances are related to the clearances over the navigable channel provided by the existing fixed bridges, or the clearances which would be required by the USCG for new fixed bridges, in the vicinity of the proposed aerial transmission line. These clearances are based on the low point of the line under conditions producing the greatest sag, taking into consideration temperature, load, wind, length of span, and type of supports as outlined in the National Electric Safety Code:
Nominal System Voltage (kV) Minimum Additional Clearance (ft.) Above Clearance Required for Bridges
115 and below 20 138 22 161 24 230 26 350 30 500 35 700 42 750-765 45
i. Clearances for communication lines, stream gauging cables, ferry cables, and other aerial crossings must be a minimum of ten feet above clearances required for bridges, unless specifically authorized otherwise by the District Engineer.
ii. Corps regulation ER 1110-2-4401 prescribes minimum vertical clearances for power communication lines over Corps lake projects. In instances where both regulation and ER 1110-2-4401 apply, the greater minimum clearance is required.
b. Encasement: The top of any cable, encasement, or pipeline shall be located a minimum of three feet below the existing bottom elevation of the streambed and shall be backfilled with suitable heavy material to the preconstruction bottom elevation. Where the cable, encasement, or pipeline is placed in rock, a minimum depth of one foot from the lowest point in the natural contour of the streambed shall be maintained. When crossing a maintained navigation channel, the requirements are a minimum of eight feet between the top of the cable, encasement, or pipeline and the authorized depth of the navigation channel. For maintained navigational channels, where the utility line is placed in rock, a minimum depth of two feet from the authorized depth of the navigation channel shall be maintained.
c. As-Built Drawings: Within 60 days of completing an activity that involves an aerial transmission line, submerged cable, or submerged pipeline across a navigable water of the United States (i.e., Section 10 waters), the permittee shall furnish the Corps and National Oceanic and Atmospheric Administration, Nautical Data Branch, N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, Maryland, 20910 with professional, certified as-built drawings, to scale, with control (i.e., latitude/longitude, state plane coordinates), depicting the alignment and minimum clearance of the aerial wires above the mean high water line at the time of survey or depicting the elevations and alignment of the buried cable or pipeline across the navigable waterway.
d.Aids to Navigation: The permittee must prepare and provide for USCG approval, a Private Aids to Navigation Application (CG-2554). The application can be found at:
https://media.defense.gov/2017/Nov/20/2001846135/-1/- 1/0/CG_2554.pdf. The completed application must be sent to the appropriate USCG office as indicated below:
i. Baltimore/Philadelphia Districts: Commander Fifth Coast Guard District, 431 Crawford Street, Room 100, Portsmouth, VA 23704-5504, Attn: Mr. Matthew Creelman; by email to Matthew.K.Creelman2@uscg.mil; or by FAX to (757) 398-6303.
ii. Pittsburgh District: Eighth Coast Guard District, Sector Ohio Valley, USCGC Osage, 300 McKown Ln, Sewickley, PA 15143; phone (412) 741-1180
Within 30 days of the date of receipt of the USCG approval, the permittee must provide a copy to the appropriate Corps district office.
27. PADEP Waiver: If the Corps determines a specific activity, which is eligible for a PADEP Non-reporting Waiver, has a significant adverse impact on life, property or important aquatic resources, the Corps may require the owner to modify the activity to eliminate the adverse
District Engineer may reevaluate the circumstances and conditions of any permit, including regional permits, either on his own motion, at the request of the permittee, or a third party, or as the result of periodic progress inspections, and initiate action to modify, suspend, or revoke a permit as may be made necessary by considerations of the public interest. In the case of regional permits, this reevaluation may cover individual activities, categories of
28. Corps Water Releases: For projects located downstream of a Corps dam, the permittee should contact the appropriate Corps, Area Engineer Office, to obtain information on potential water releases and to provide contact information for notification of unscheduled water releases. It is recommended that no in-water work be performed during periods of high-water flow
29. State Authorization: The activity must receive state authorization. For the purpose of this requirement, any one of the following is considered as a state authorization:
a. A PADEP Chapter 105 Water Obstruction and Encroachment Permit, including PADEP approved Environmental Assessment pursuant to 25 Pa. Code § 105.15; or
b. A PADEP GP issued pursuant to 25 Pa. Code § §105.441-105.449; or
c. A PADEP approved Environmental Assessment for activities not otherwise requiring a PADEP permit pursuant to 25 Pa. Code § 105.12; or
d. A PADEP Dam Permit, including maintenance or repairs of existing authorized dams, including maintenance dredging; or
e. A PADEP Emergency Permit issued pursuant to 25 Pa. Code § 105.64; or
f. A PADEP permit for the construction of a bridge or culvert which allows for maintenance activities of bridges and culverts; or
g. A PADEP Chapter 105 Dam Safety and Encroachment Enforcement Action.
30. Other Authorizations: Additional federal, state, and/or local authorizations or approvals may be required and where applicable must be secured by the applicant, prior to initiating any discharge of dredged and/or fill material, and/or the placement of structures into waters of the United States, including jurisdictional wetlands. These approvals include, but are not limited to:
a. A project specific 401 SWQC issued by PADEP or considered waived, consistent with Section 401 of the CWA.
PADEP has issued 401 SWQC for activities authorized by PASPGP-6 with conditions.
See General Condition 2 for conditions and for identification when a project specific 401 SWQC or a waiver thereof is required. If the permittee cannot comply with all of the conditions of the 401 SWQC previously issued for PASPGP-6, then the permittee must obtain a project specific 401 SWQC or waiver for the proposed discharge in order for the activity to be authorized by PASPGP-6. The Corps or certifying authority may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality; and
b. Reporting Activities located within the designated CZM Areas. Require a CZMA consistency determination issued by PADEP or a presumption of concurrence pursuant to Section 307 of the Federal Coastal Zone Management Act.
The District Engineer or PADEP may require additional measures to ensure that the authorized activity is consistent with state CAM requirements; and
c. Fills within the 100-year floodplains. This activity must comply with applicable Federal Emergency Management Agency approved state or local floodplain management requirements.
31. Federal Liability: In issuing this permit and any subsequent activity verification, the federal government does not assume any liability, including but not limited to the following:
a. Damages to permitted project or users, thereof, as a result of other permitted or unpermitted activities or from natural causes;
b. Damages to the permitted project or uses, thereof, as a result of current or future activities undertaken by or on behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; and
e. Damage claims associated with any future modification, suspension, or revocation of the
PASPGP-6.
32. False and Incomplete Information: The Corps may modify or rescind a previously issued project specific verification, if it determines that the original verification was issued based on false, incomplete and/or inaccurate information; or other information becomes available whereby such action is necessary to ensure compliance with other federal laws and regulations.
33. Anadromous Fish Waters: To protect anadromous fish during their migration and spawning, no work can take place in the following anadromous fish waterways listed in the table below from March 15 to June 30 unless approved in writing by the Corps. Questions on the applicability of this condition should be directed to the Corps, Philadelphia District.
Waterway Downstream extent Upstream extent Upstream Latitude (N)
Upstream Longitude (E)
Delaware River in Pennsylvania (including W.
Branch)
Rte. 220 Bridge PA/NY Border 41.999448 -75.359573
Lehigh River and adjacent canals confluence with Delaware River
500 feet upstream of the Cementon Dam
40.690275 -75.503800
Little Lehigh Creek confluence with Lehigh River
500 feet upstream of the lowermost dam
40.596318 -75.475570
Hokendauqua Creek confluence with Lehigh River
State Route 4014 (West Scenic Drive)
40.793273 -75.439262
Bushkill Creek confluence with Delaware River
500 feet upstream of the lowermost dam
40.694859 -75.212406
Waterway Downstream extent Upstream extent Upstream Latitude (N)
Upstream Longitude (E)
Brodhead Creek confluence with Delaware River
500 feet upstream of the Stroudsburg Water Co.
Dam
41.018667 -75.201063
Bush Kill confluence with Delaware River
500 feet upstream of Resica Falls
41.111235 -75.095824
Lackawaxen River confluence with Delaware River
500 feet upstream of the Woolen Mill Dam
40.984304 -75.191569
Dyberry Creek confluence with Lackawaxen River
Jadwin Dam 41.612088 -75.263391
Darby Creek Confluence with Delaware River
500 feet upstream of the confluence of Cobbs Creek and Darby Creek
39.907278 -75.255432
Schuylkill River Fairmount Dam 500 feet upstream of the Bingaman St. Bridge in Reading, Pennsylvania
40.326411 -75.934417
Neshaminy Creek Confluence with Delaware River
500 feet upstream of the lowermost dam
40.143369 -74.915828
34. Compliance Certification: Each permittee who receives a written PASPGP-6 verification letter from the Corps must provide a signed certification documenting completion of the authorized activity and implementation of any required compensatory mitigation. This certification should indicate if the success of any required permittee-responsible mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(l)(3) to confirm that the permittee secured the appropriate number and resource type of credits. The signature of the permittee is also required to certify the completion of the activity and mitigation. The completed certification document must be submitted to the District Engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later.
35. Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring that an action authorized by PASPGP-6 complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting the appropriate local office of the USFWS to determine what measures, if any, are necessary or appropriate to reduce adverse effects to migratory birds or eagles, including whether "incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. The permittee should contact the appropriate local office of the USFWS to determine if such authorizations are required for a particular activity. Information on the conservation of migratory birds and Bald and Golden Eagles can be found at the following USFWS web site:
http://www.fws.gov/northeast/pafo/
36. Migratory Bird Breeding Areas: Activities in waters of the United States, including jurisdictional wetlands, that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. Recommendations pertaining to the conservation of migratory birds can be found at the following USFWS web site:
http://www.fws.gov/northeast/pafo/
By Authority of the Secretary of the Army:
John T. Litz Colonel, U.S. Army Commander and District Engineer Baltimore District
David C. Park Lieutenant Colonel, Corps of Engineers District Commander Philadelphia District
PROFESSIONAL ENGINEER CERTIFICATION
FOR
MERCER COUNTY BRIDGE REPLACEMENT PROJECT
COUNTY BRIDGE NO. 2904
MERCER COUNTY, PENNSYLVANIA
I, Ryan P. Minor P.E., do hereby certify pursuant to the penalties of 18 Pa C.S.A. Section 4904 to the best of my knowledge, information, and belief, that the information contained in the accompanying plans, specifications, and reports has been prepared in accordance with accepted engineering practice, is true and correct, and is in conformance with Chapter 105 of the rules and regulations of the Department of Environmental Protection.
SIGNED:
DATE:
Ryan P. Minor
05/09/2023
BRIDGE 2904
LOCATION
EXISTING LEGEND
Existing Stream (Flow)
Existing Edge of Road
Existing Wetland
PHOTO NUMBER & LOCATION
Existing Bridge Structure
SCALE: 1" = 25'
JOB#: 3366.0442
WILMINGTON TOWNSHIP, MERCER COUNTY, PENNSYLVANIA
BRIDGE 2904 REPLACEMENT
PHOTO LOCATIONS
SHEET NO: 1 OF 1
DATE: APRIL 2023
SCALE
25 25 0 FEET
S-01
S-01
S-01
S-02
S-02
TP-01
TP-02
N E
S H
A N
N O
C K
R
E E
K B
R A
N
H
O F
T H
E
L I
T T
O W
BEND ROAD (T-545)
REVISIONS
Mark Description By Chk'd Recm'd. Date
RECOMMENDED
SHEET OF
DEPARTMENT OF BRIDGES
MERCER COUNTY, PENNSYLVANIA
DES: DWG: CKD:
-M
A Y
-2
:0
P
L O
T T
E D
BRIDGE NO. 2904
WILMINGTON TOWNSHIP
T-546 (BEND RD)
OVER BRANCH OF LITTLE NESHANNOCK CREEK
SINGLE SPAN STEEL PLATE GIRDER BRIDGE
N00°49'00"E r p a le
O P
E R
A T
O R
F
IL
E N
A M
E
BMS STR ID: 43 7229 0546 2904 BRKEY: 26295
BRIDGE ENGINEER
26\\ .1
.0
.3 \P ro je c t\
\0
\M ic ro s ta ti o n \B
R
ID
G E
B e n d R o a d \B
R
ID
G E
\F D
\B G
P E
.d g n
GENERAL PLAN AND ELEVATION
� BRG TO � BRG
61'-6"
CLEAR SPAN
60'-0"
ABUT 1
STA 52+37.25
BRG�
ABUT 2
STA 52+98.75
BRG�
B A
R R
IE
R
T
Y P
C R
E E
K N
E S
H A
N N
O
K
IT
T
B R
A N
C H
O
GUIDE RAIL BARRIER
PA STRUCTURE MOUNTED
STA AHEAD
� BRG TO � BRG
61'-6"
CLEAR SPAN
60'-0" (FIX)
ELEV 1011.02
ABUT 2
� BRG
(EXP)
ELEV 1012.07
ABUT 1
� BRG
GUIDE RAIL BARRIER
PA STRUCTURE MOUNTED
-1.7%
ELEV 1007.31
LOW CHORD
PROPOSED STREAMBED
EXISTING AND
DATUM 985
W33X118
PLAN
ELEVATION
4 0 4 8 FEET
4 0 4 8 FEET
DAM DAM -
TANGENT AT BRIDGE
VERTICAL CURVE DATA
HLSD 194'
MO 0.45'
VC 97'
ELEV 1012.94
PVI STA 51+85.72
HLSD 481'
MO 0.18'
VC 61'
ELEV 1010.37
PVI STA 53+37.17
ROADWAY SURFACE
PENNSYLVANIA 16066
CRANBERRY TOWNSHIP,
220 WEST KENSINGER DRIVE, SUITE 100
HERBERT, ROWLAND AND GRUBIC INC.
PREPARED BY
NOV. 30, 2021RC-51MTYPE 31 STRONG POST GUIDE RAIL
FEB. 08, 2019RC-12MBACKFILL AT STRUCTURES
JUN. 01, 2010RC-11MCLASSIFICATION OF EARTHWORK FOR STRUCTURES
JAN. 31, 2019BC-788MTYPICAL WATERPROOFING AND EXPANSION DETAILS
JAN. 31,…