5-Part G - Attachment F - Subcontractor List.pdf
PDF 158 KB Posted
- Attached to
- Durant Roof Replacement
- Solicitation number
- 2036
- Issued by
- Alexandria City, Virginia
About this file
This is a Subcontractor List attachment form from the City of Alexandria related to the Durant Roof Replacement project at the Oswald Durant Center located at 1605 Cameron Street, Alexandria, Virginia. The form is designed to document the Prime Contractor and all first-tier subcontractors who will perform work on the project, requiring bidders to identify each subcontractor's name, SWaM/DBE classification status, type of work to be performed, and the approximate percentage of total work to be allocated to each party. The form mandates that the total work percentages across all prime and subcontractor entities equal 100 percent of the bid amount, and requires signature and authorization from an authorized signatory of the bidding entity along with the date of submission.
The document serves as a transparency and accountability mechanism for the City of Alexandria's procurement process, ensuring that bidders clearly identify their project team composition and subcontracting structure. The form includes provisions for tracking Small, Women-owned, and Minority-owned (SWaM) and Disadvantaged Business Enterprise (DBE) participation, with designated fields for selecting and entering SWaM/DBE classifications for both the prime contractor and up to six tiers of first-tier subcontractors. The template allows bidders to itemize the percentage of work performed by each entity, providing the City with visibility into the proposed project team and enabling verification of compliance with any subcontracting or diversity requirements established in the solicitation documents.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Alexandria
Attachment F
Subcontractors List
The following list provides the name of the Prime Contractor and their 1st Tier Sub-Contractors who shall perform the Work in reference to the Solicitation referenced at the top of this page and its resulting Contract. The general type of work to be performed and the approximate percentage of the total work per Prime and 1st Tier Sub-Contractor shall be annotated. (Note: The Prime Contractor may be required to perform a percentage of the total work with their own forces as required in the bid documents).
Vendor Name SWaM/DBE
Select & Enter Number
Type of Work % of Total Work
Prime Contractor
1st Tier Subcontractors
Total % of Bid Amount 100%
Bidder/Offeror Name:_________________________Date: _____________________________
Signature of Authorized Signatory: _________________________________________________
Name & Title of Authorized Signatory: ______________________________________________
No.:
| SWaMDBE Select Enter NumberPrime Contractor: |
| Prime ContractorRow1: |
| SWaMDBE Select Enter NumberRow2: |
| Type of WorkRow2: |
| of Total WorkRow2: |
| 1st Tier SubcontractorsRow1: |
| SWaMDBE Select Enter NumberRow4: |
| Type of WorkRow4: |
| of Total WorkRow4: |
| 1st Tier SubcontractorsRow2: |
| SWaMDBE Select Enter NumberRow5: |
| Type of WorkRow5: |
| of Total WorkRow5: |
| 1st Tier SubcontractorsRow3: |
| SWaMDBE Select Enter NumberRow6: |
| Type of WorkRow6: |
| of Total WorkRow6: |
| 1st Tier SubcontractorsRow4: |
| SWaMDBE Select Enter NumberRow7: |
| Type of WorkRow7: |
| of Total WorkRow7: |
| 1st Tier SubcontractorsRow5: |
| SWaMDBE Select Enter NumberRow8: |
| Type of WorkRow8: |
| of Total WorkRow8: |
| 1st Tier SubcontractorsRow6: |
| SWaMDBE Select Enter NumberRow9: |
| Type of WorkRow9: |
| of Total WorkRow9: |
| BidderOfferor Name: |
| Date: |
| Signature10_es_:signer:signature: |
| Signature11_es_:signer:signature: |
| Text13: |
| Text11: |
| Text15: |
| Text14: |
| Text12: |
File details come from the government source that posted it. Updated .