This is a Project Manual for a roof replacement project issued by the Jordan School District (JSD) through GSBS Architects for the Jordan Ridge Elementary School located at 2636 W 9800 S, South Jordan, Utah 84095. The project involves the complete replacement of the roof system and associated components including selective demolition, PVC roofing installation, sheet metal flashing and trim, roof accessories, and coordination with existing plumbing, mechanical, and electrical systems. The project is identified as Bid Number 27KP04 with Project Number 2026.070.00, dated November 2, 2026. Bidders are required to submit sealed proposals through either the U3P Bonfire website or in hard copy to the JSD Purchasing Department, addressed to Kurt Prusse. The project timeline specifies a commencement date no later than June 7, 2027, with substantial completion required by August 6, 2027, representing a project duration of approximately two months. The bid documents include 19 sheets of construction documents and comprehensive specifications covering general requirements, existing conditions, metals, wood, thermal and moisture protection, plumbing, mechanical, electrical, and electronic safety systems.
The bid form requires contractors to provide a base bid for the stipulated sum single-prime contract along with pricing for unit prices and three alternates (mechanical, roof drain, and flashing). Bid security in the form of a surety bond equal to 5% of the bid amount is required, with bonds to be written on AIA Document A310 (Bid Bond). The contract documents incorporate AIA Document A201-2017 General Conditions and specify that performance and payment bonds at 100% of the contract sum must be furnished within three days of contract execution. The Owner (Jordan School District) shall provide property insurance through the State of Utah Division of Risk Management with a $5,000 deductible per occurrence, while the Contractor is required to maintain commercial general liability insurance with minimum limits of $1,000,000 per occurrence and $3,000,000 general aggregate, automobile liability at $1,000,000 per accident, workers' compensation at statutory limits, and employers' liability at $1,000,000 each accident. Progress payments will be made monthly with 5% retainage until substantial completion, with final payment due within 30 days of the architect's final certificate for payment. The contract award shall be made to the lowest responsive and responsible bidder in accordance with Utah Code Annotated Chapter 63G-6a and Utah Administrative Rules.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JORDAN RIDGE ELEMENTARY RE -ROOF
PROJECT MANUAL
BID NUMBER 27KP 04
PROJECT NAME: Jordan Ridge Elementary Re -roof
PROJECT ADDRESS: 2636 W 9800 S, South Jordan, UT 84095
PROJECT NUMBER 202 6 .07 0 .00
DATE: November 2, 2026
GSBS CONTACT:
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
P 801.521.8660
TABLE OF CONTENTS TOC - 1
JORDAN RIDGE ELEMENTARY RE-ROOF BID SET
PROJECT # - 27KP04
Table of Contents
Division Section Title Pages
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - GENERAL REQUIREMENTS
AIA A701 2018 INSTRUCTIONS TO BIDDERS 9
AIA A310 2010 BID BOND 3
004113 BID FORM – STIPULATED SUM (SINGLE PRIME CONTRACT) 3
004321 ALLOWANCE FORM 1
004322 UNIT PRICES FORM 2
004323 ALTERNATES FORM 2
AIA A101 2017 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND
CONTRACTOR (STIPULATED SUM) 9
AIA101 2017 EXHIBIT A – INSURANCE AND BONDS 7
AIA A201 2017 GENERAL CONDITIONS OF THE CONTRACT FOR
CONSTRUCTION 49
AIA A312 2010 PAYMENT BOND 6
AIA A312 2010 PERFORMANCE BOND 6
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 5
012100 ALLOWANCES 1
012200 UNIT PRICES 2
012300 ALTERNATES 2
012500 SUBSTITUTION PROCEDURES 4
012600 CONTRACT MODIFICATION PROCEDURES 3
012900 PAYMENT PROCEDURES 5
013100 PROJECT MANAGEMENT AND COORDINATION 11
013200 CONSTRUCTION PROGRESS DOCUMENTATION 8
013300 SUBMITTAL PROCEDURES 10
013300.1 SUBMITTAL FLOW CHART 1
013300.2 SUBMITTAL STAMP SHEET 1
014000 QUALITY REQUIREMENTS 7
014200 REFERENCES 8
TABLE OF CONTENTS TOC - 2
015000 TEMPORARY FACILITIES AND CONTROLS 7
016000 PRODUCT REQUIREMENTS 5
017300 EXECUTION 10
017700 CLOSEOUT PROCEDURES 7
017823 OPERATION AND MAINTENANCE DATA 9
017839 PROJECT RECORD DOCUMENTS 3
017900 DEMONSTRATION AND TRAINING 7
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION 8
DIVISION 05 - METALS
055213 PIPE AND TUBE RAILINGS 9
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061053 MISCELLANEOUS ROUGH CARPENTRY 7
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
075419 POLYVINYL-CHLORIDE (PVC) ROOFING 13
076200 SHEET METAL FLASHING AND TRIM 10
077200 ROOF ACCESSORIES 5
DIVISION 22 - PLUMBING
220000 PLUMBING 3
220700 INSULATION 2
DIVISION 23 - MECHANICAL
230100 GENERAL PROVISIONS 9
230501 TESTING 2
230593 BALANCING 4
230900 BASIC MATERIALS & METHODS 22
233000 AIR DISTRIBUTION 9
251000 AUTOMATIC TEMPERATURE CONTROLS 3
DIVISION 26 - ELECTRICAL
260500 ELECTRICAL GENERAL PROVISIONS 9
260501 MECHANICAL AND ELECTRICAL COORDINATION 5
260502 ELECTRICAL SUBMITTALS AND O&MS 8
260507 ELECTRICAL CONNECTIONS FOR EQUIPMENT 3
260519 CONDUCTORS AND CABLES 3
260526 GROUNDING 3
TABLE OF CONTENTS TOC - 3
260529 SUPPORTING DEVICES 2
260532 CONDUIT RACEWAY 4
260533 ELECTRICAL BOXES AND FITTINGS 2
260553 ELECTRICAL IDENTIFICATION 10
262726 WIRING DEVICES 3
262815 OVERCURRENT PROTECTIVE DEVICES 3
262816 MOTOR AND CIRCUIT DISCONNECTS 2
262913 MOTOR STARTERS 3
264119 DEMOLITION 3
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
283111 FIRE ALARM AND DETECTION SYSTEM 4
END OF TABLE OF CONTENTS
Document A701® – 2018 Instructions to Bidders
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE
REQUIREMENTS ON PUBLIC
PROCUREMENT CONTRACTS.
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIFY
REQUIREMENTS APPLICABLE TO
THIS PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
FEDERAL, STATE, AND LOCAL
LAWS MAY IMPOSE
REQUIREMENTS ON PUBLIC
PROCUREMENT CONTRACTS.
CONSULT LOCAL AUTHORITIES
OR AN ATTORNEY TO VERIFY
REQUIREMENTS APPLICABLE TO
THIS PROCUREMENT BEFORE
COMPLETING THIS FORM.
It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.
for the following Project:
(Name, location, and detailed description)
Jordan Ridge Elementary Re-Roof 2636 W 9800 S, South Jordan, UT 84095
THE OWNER:
(Name, legal status, address, and other information)
Jordan School District 7905 South Redwood Road West Jordan, Utah 84088
THE ARCHITECT:
(Name, legal status, address, and other information)
GSBS Architects 375 West 200 South, Suite 100 Salt Lake City, Utah 84101
TABLE OF ARTICLES
1 DEFINITIONS
2 BIDDER’S REPRESENTATIONS
3 BIDDING DOCUMENTS
4 BIDDING PROCEDURES
5 CONSIDERATION OF BIDS
6 POST-BID INFORMATION
7 PERFORMANCE BOND AND PAYMENT BOND
8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
ARTICLE 1 DEFINITIONS
§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.
§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.
§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.
§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.
§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.
§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.
§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.
ARTICLE 2 BIDDER’S REPRESENTATIONS
§ 2.1 By submitting a Bid, the Bidder represents that:
.1 the Bidder has read and understands the Bidding Documents;
.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;
.3 the Bid complies with the Bidding Documents;
.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;
.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and
.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.
ARTICLE 3 BIDDING DOCUMENTS
§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)
Host site/platform
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.
§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.
§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.
§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.
§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.
§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)
Host site/platform
§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.2.4 The drawings and specifications that comprise the Bidding Documents are complementary and what is required by one shall be as binding as if required by all. Should a discrepancy be discovered in the Bidding Documents beyond the date indicated in Section 3.2.2, the Bidder shall provide a price for the more restrictive of the requirements.
§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.
§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.
§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.
§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3) including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.
§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.
§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.
§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.
§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.
(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)
Host site/platform
§ 3.4.2 Addenda will be available where Bidding Documents are on file.
§ 3.4.3 Addenda will be issued no later than four days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.
§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.
ARTICLE 4 BIDDING PROCEDURES
§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.
§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.
§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.
§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.
§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter “No Change” or as required by the bid form.
§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.
§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.
§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:
(Insert the form and amount of bid security.)
Surety bond in an amount equal to 5%of the bid amount
§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.
§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginningdays after the opening of Bids, withdraw its Bid and request the return of its bid security.
§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:
(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)
Host site/platform
§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation “SEALED BID ENCLOSED” on the face thereof.
§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the invitation to bid. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.
§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.
§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.
§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:
(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)
If the Bidder is the apparent or second-low bid for the Project, the Owner reserves the right to retain the bid security. For other Bidders, the bid security wil l be returned.
ARTICLE 5 CONSIDERATION OF BIDS
§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.
§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.
§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.
§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.
ARTICLE 6 POST-BID INFORMATION
§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.
§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.
§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:
.1 a designation of the Work to be performed with the Bidder's own forces;
.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.
§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.
§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.
ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND
§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.
§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid.
If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.
§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.
§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.
(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)
§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.
§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.
§ 7.2.3 The bonds shall be dated on or after the date of the Contract.
§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.
ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS
§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.
(Insert the complete AIA Document number, including year, and Document title.)
AIA Document A201-2017, as amended by the Jordan School District
.5 Drawings
Number Title Date 19 sheets Jordan Ridge Elementary Re-roof Construction Documents November 2, 2026
.6 Specifications
Section Title Date Pages See Index Jordan Ridge Elementary Re-roof Project Manual November 2, .7 Addenda:
Number Date Pages
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017.)
[ ] The Sustainability Plan:
Title Date Pages
AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 14:02:47 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f7d6f11768e6656016e3)
[ ] Supplementary and other Conditions of the Contract:
Document Title Date Pages
.9 Other documents listed below:
(List here any additional documents that are intended to form part of the Proposed Contract Documents.)
Document A310TM – 2010 Bid Bond
AIA Document A310 – 2010. Copyright © 1963, 1970 and 2010. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 13:58:40 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f6d3f11768e66560060b)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
AIA Document A310 – 2010. Copyright © 1963, 1970 and 2010. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 13:58:40 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f6d3f11768e66560060b)
CONTRACTOR:
(Name, legal status and address)
SURETY:
(Name, legal status and principal place of business)
OWNER:
(Name, legal status and address) Jordan School District 7905 South Redwood Road West Jordan, Utah 84088
BOND AMOUNT: $
PROJECT:
(Name, location or address, and Project number, if any) Jordan Ridge Elementary Re-Roof 2636 W 9800 S, South Jordan, UT 84095
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety’s consent for an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor’s bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this day of , Click here to enter text.\s1\
CONTRACTOR AS PRINCIPAL (Signature)
BY:
(Printed name and title)
Click here to enter text.\s2\
SURETY (Signature)
BY:
(Printed name and title)
AIA Document A310 – 2010. Copyright © 1963, 1970 and 2010. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 13:58:40 MDT on 10/30/2026 under Subscription No.20240072321 which expires on 10/24/2027, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (6ae4f6d3f11768e66560060b)
Witness Signature
(Witness)
Witness Signature
(Witness)
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113 - 1
DOCUMENT 004113 - BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT)
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Jordan Ridge Elementary Re-roof.
C. Project Location: 2636 W 9800 S, South Jordan, UT 84095
D. Owner: Jordan School District.
E. Owner Project Number: 27KP04.
F. Architect: GSBS Architects.
G. Architect Project Number: 2026.070.00.
1.2 CERTIFICATIONS AND BASE BID
A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by GSBS Architects and
Architect's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services, including all scheduled allowances, necessary to complete the construction of the above-named project, according to the requirements of the Procurement and Contracting Documents, for the stipulated sum of:
1. ________________________________________________ Dollars ($______________).
2. The above amount may be modified by amounts indicated by the Bidder on the attached
Document 004322 "Unit Prices Form" and Document 004323 "Alternates Form."
1.3 BID GUARANTEE
A. The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within 10 days after a written Notice of Award, if offered within 60 days after receipt of bids, and on failure to do so agrees to forfeit to Owner the attached cash, cashier's check, certified check, U.S. money order, or bid bond, as liquidated damages for such failure, in the following amount constituting five percent (5%) of the Base Bid amount above:
1. ________________________________________________ Dollars ($______________).
B. In the event Owner does not offer Notice of Award within the time limits stated above, Owner will return to the undersigned the cash, cashier's check, certified check, U.S. money order, or bid bond.
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113 - 2
1.4 SUBCONTRACTORS AND SUPPLIERS
A. The following companies shall execute subcontracts for the portions of the Work indicated:
1. Demolition Work: ________________________________________________________.
2. Steel Work: ________________________________________________________.
3. Wood Work: ________________________________________________________.
4. Roof Work: ________________________________________________________.
5. Finish Work: ________________________________________________________.
6. Plumbing Work: ________________________________________________________.
7. HVAC Work: __________________________________________________________.
8. Electrical Work: _________________________________________________________.
1.5 TIME OF COMPLETION
A. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract
Documents no later than June 7, 2027 and shall fully complete the Work by August 6, 2027.
1.6 ACKNOWLEDGEMENT OF ADDENDA
A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:
1. Addendum No. 1, dated ____________________.
2. Addendum No. 2, dated ____________________.
3. Addendum No. 3, dated ____________________.
4. Addendum No. 4, dated ____________________.
1.7 BID SUPPLEMENTS
A. The following supplements are a part of this Bid Form and are attached hereto.
1. Bid Form Supplement - Unit Prices.
2. Bid Form Supplement - Allowances.
3. Bid Form Supplement - Bid Bond Form (AIA Document A310-2010).
1.8 CONTRACTOR'S LICENSE
A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in Riverton, Utah, and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.
BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113 - 3
1.9 SUBMISSION OF BID
A. Respectfully submitted this ____ day of ____________, 2026.
B. Submitted By:_______________________________________(Name of bidding firm or corporation).
C. Authorized Signature:___________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
E. Title:__________________________________(Owner/Partner/President/Vice President).
F. Witnessed By:___________________________________________(Handwritten signature).
G. Attest:_______________________________________________(Handwritten signature).
H. By:___________________________________________________(Type or print name).
I. Title:________________________________(Corporate Secretary or Assistant Secretary).
J. Street Address:___________________________________________________________.
K. City, State, Zip:__________________________________________________________.
L. Phone:_________________________________________________________________.
M. License No.:____________________________________________________________.
N. Federal ID No.:____________________________________(Affix Corporate Seal Here).
END OF DOCUMENT 004113
ALLOWANCE FORM 004321 - 1
DOCUMENT 004321 - ALLOWANCE FORM
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Jordan Ridge Elementary Re-roof.
C. Project Location: 2636 W 9800 S, South Jordan, UT 84095
D. Owner: Jordan School District.
E. Owner Project Number: 27KP04.
F. Architect: GSBS Architects.
G. Architect Project Number: 2026.070.00.
1.2 BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
B. The undersigned Bidder certifies that Base Bid submission to which this Bid Supplement is attached includes those allowances described in the Contract Documents and scheduled in
Section 012100 "Allowances."
1.3 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this ____ day of ____________, 2026.
B. Submitted By:_______________________________(Insert name of bidding firm or corporation).
C. Authorized Signature:_______________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
E. Title:___________________________________(Owner/Partner/President/Vice President).
END OF DOCUMENT 004321
UNIT PRICES FORM 004322 - 1
DOCUMENT 004322 - UNIT PRICES FORM
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Jordan Ridge Elementary Re-roof.
C. Project Location: 2636 W 9800 S, South Jordan, UT 84095
D. Owner: Jordan School District.
E. Owner Project Number: 27KP04.
F. Architect: GSBS Architects.
G. Architect Project Number: 2026.070.00.
1.2 BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
B. The undersigned Bidder proposes the amounts below be added to or deducted from the Contract
Sum on performance and measurement of the individual items of Work and for adjustment of the quantity given in the Unit-Price Allowance for the actual measurement of individual items of the Work.
C. If the unit price does not affect the Work of this Contract, the Bidder shall indicate "NOT
APPLICABLE."
1.3 UNIT PRICES
A. Unit-Price No. 1: Roof Drain.
1. _______________________________________ dollars ($_____________) per unit.
1.4 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this ____ day of ____________, 2026.
B. Submitted By:___________________________________(Insert name of bidding firm or corporation).
UNIT PRICES FORM 004322 - 2
C. Authorized Signature:___________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
END OF DOCUMENT 004322
ALTERNATES FORM 004323 - 1
DOCUMENT 004323 - ALTERNATES FORM
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Jordan Ridge Elementary Re-roof.
C. Project Location: 2636 W 9800 S, South Jordan, UT 84095
D. Owner: Jordan School District.
E. Owner Project Number: 27KP04.
F. Architect: GSBS Architects.
G. Architect Project Number: 2026.070.00.
1.2 BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
B. The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid if particular alternates are accepted by Owner. Amounts listed for each alternate include costs of related coordination, modification, or adjustment.
C. If the alternate does not affect the Contract Sum, the Bidder shall indicate "NO CHANGE."
D. If the alternate does not affect the Work of this Contract, the Bidder shall indicate "NOT
APPLICABLE."
E. The Bidder shall be responsible for determining from the Contract Documents the affects of each alternate on the Contract Time and the Contract Sum.
F. Owner reserves the right to accept or reject any alternate, in any order, and to award or amend the Contract accordingly within 60 days of the Notice of Award unless otherwise indicated in the Contract Documents.
G. Acceptance or non-acceptance of any alternates by the Owner shall have no affect on the
Contract Time unless the "Schedule of Alternates" Article below provides a formatted space for the adjustment of the Contract Time.
1.3 SCHEDULE OF ALTERNATES
A. Alternate No. 1: Mechanical Alternate:
ALTERNATES FORM 004323 - 2
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. ________________________________________________ Dollars ($______________).
3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.
B. Alternate No. 2: Roof Drain Alternate:
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. ________________________________________________ Dollars ($______________).
3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.
C. Alternate No. 3: Flashing Alternate:
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. ________________________________________________ Dollars ($______________).
3. ADD____ DEDUCT____ calendar days to adjust the Contract Time for this alternate.
1.4 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this ____ day of ____________, 2026.
B. Submitted By:_______________________________(Insert name of bidding firm or corporation).
C. Authorized Signature:_______________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
END OF DOCUMENT 004323
Document A101® – 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .