Construction Documents Summary
These are construction documents for the Jordan Ridge Elementary School roof replacement project issued by the Jordan School District in South Jordan, Utah. The project scope involves complete reroofing of the existing building, including removal of the existing roof membrane and insulation, installation of new insulation to achieve a minimum R-30 rating with a minimum 1/4-inch-per-foot slope, installation of a new single-ply roofing membrane system, and associated flashing work around roof penetrations and mechanical equipment. The construction documents, prepared by GSBS Architects (GSBS Project No. 2026.070.00) and issued November 2, 2026, comprise architectural, structural, mechanical, plumbing, and electrical drawings. The project includes base bid work and three alternates: Alternate 1 addressing mechanical equipment removal and reinstallation, Alternate 2 addressing roof drain replacement, and Alternate 3 addressing parapet cap replacement. The documents specify that existing roof drains, parapet caps, mechanical equipment, and certain structural elements are to remain unless noted otherwise, with temporary removal of components permitted only as necessary for new roof membrane installation.
The construction documents provide detailed specifications for demolition, material requirements, and installation procedures across all building trades. Structural notes reference the 2021 International Building Code with specific loading criteria including 38.45 psf snow load (LRFD), 109 mph basic design wind speed, and seismic design category D. Mechanical work includes provisions for existing HVAC equipment to remain in place with equipment curbs raised as required, existing exhaust fans to be lifted and ductwork extended, and coordination of refrigerant linesets and controls. Plumbing requirements address existing roof drains to remain with clamp bolts re-tightened, existing vents to be re-flashed, and under Alternate 2, provision of new primary and secondary roof drains with all necessary piping connections. Electrical work encompasses roof equipment flashing coordination and various roof penetration details. The documents emphasize contractor responsibility for field verification of existing conditions, maintenance of structural integrity throughout construction, protection of existing elements to remain, and coordination among all trades for complete system installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
AT
UFOET
A
T S
T C
E
TI
HCRADES
N E
C I
L
7298012-0301
CLIO RAYNER
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
181 E 5600 S, SUIT 200
MURRAY, UTAH 84107
801.530.3148
ELECTRICAL ENGINEERING:
RESOLUT CONSULTING
14 EAST 2700 SOUTH
SALT LAKE CITY, UTAH 84115
801.486.4646
MECHANICAL ENGINEERING:
OLSEN & PETERSON CONSULTING ENGINEERS, INC.
675 EAST 500 SOUTH, STE 400
SALT LAKE CITY, UTAH 84102
801.486.3883
STRUCTURAL ENGINEERING:
REAVELEY ENGINEERS + ASSOCIATES
GSBS PROJECT NO.:
ISSUED DATE:
JORDAN RIDGE ELEMENTARY RE-ROOF
CONSTRUCTION DOCUMENTS
11/02/2026
2026.070.00
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
7605 SOUTH REDWOOD ROAD,
WEST JORDAN, UT 84088
11/02/2026
No.
5047489-2203
OLIVER
DALLIN
BURT
STATE OF UTAH
PR
OF
ES
S I
ON
AL STRUCTURAL
ENG
INEER
11/02/2026
OAKESON
JOSHUA
No. 7707671-2202
G
IN
E E R
ONA
O F
E
SS
I
R
UT
AH
TE OF
S T A
P
L EN
10/30/26
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
ABBREVIATIONS
VICINITY MAP DRAWING INDEX
REV
GRAPHIC SYMBOLS MATERIALS/LEGEND
BLOCKING, ROUGH WOOD
METAL (LARGE SCALE)
QUARRY/CERAMIC TILE
GRAVEL
EARTH
CONCRETE MASONRY UNIT
CONCRETE (POURED IN PLACE)
GYPSUM BOARD OR SETTING BEDS
INSULATION (BATT & BLANKET)
INSULATION (RIGID/SEMI-RIGID)
CONTINUOUS ROUGH WOOD
PLYWOOD
FACE BRICK
GRID
GRID
W1
100A
ELEVATION CONTROL POINT
OR DATUM POINT
EXTERIOR ELEVATION SYMBOL
ELEVATION IDENTIFICATION
SHEET WHERE ELEVATION IS DRAWN
WALL SECTION SYMBOL
SECTION REFERENCE/
SHEET WHERE SECTION IS DRAWN
BUILDING SECTION SYMBOL
SECTION REFERENCE/
SHEET WHERE SECTION IS DRAWN
DETAIL SYMBOL
DETAIL NUMBER/
SHEET WHERE DETAIL IS DRAWN
REVISION TAG
GRID LINES
NAME
#SHEET
SHEET
SHEET
SHEET
SHEET
SCALE
VIEW NAME
VIEW TITLE
VIEW NUMBER/
SHEET WHERE VIEW IS LOCATED
VIEW NAME/ VIEW SCALE
INTERIOR ELEVATION SYMBOL
ELEVATION IDENTIFICATION
SHEET WHERE ELEVATION IS DRAWN
#SHEET
ROOM TAG
ROOM NAME
ROOM NUMBER
WINDOW TAG
WINDOW OR STOREFRONT NUMBER
DOOR TAG
DOOR NUMBER
WOOD
COMPACTED FILL
FIREPROOFING
11/02/2026
2026.070.00
G001
DRAWING INDEX,
SYMBOLS AND
ABBREVIATIONS
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
27KP04
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
7605 SOUTH REDWOOD ROAD,
WEST JORDAN, UT 84088
CONSTRUCTION DOCUMENTS
FV
ABV ABOVE
AFF ABOVE FINISH FLOOR
ADJ ADJUSTABLE
ALUM ALUMINUM
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AB ANCHOR BOLT
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL OR ARCHITECT
AHJ AUTHORITY HAVING JURISDICTION (BUILDING
DEPARTMENT)
BP BASE PLATE
BSMT BASEMENT
BRG BEARING
BTWN BETWEEN
BITUM BITUMINOUS
BLKG BLOCKING
BD BOARD
BO BOTTOM OF
BLDG BUILDING
CLG CEILING
CL CENTER LINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CJ CONTROL JOINT
COORD COORDINATE
DEMO DEMOLISH / DEMOLITION
DRAWING INDEX
SHEET NUMBER SHEET NAME
GENERAL
G000 COVER SHEET
G001 DRAWING INDEX, SYMBOLS AND ABBREVIATIONS
ARCHITECTURAL
AD141 DEMOLITION ROOF PLAN
AE141 ROOF PLAN
AE831 ROOF DETAILS
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S002 LEGENDS & ABBREVIATIONS
S101 ROOF FRAMING PLAN & DETAILS
MECHANICAL
MD101 ROOF MECHANICAL DEMOLITION PLAN
M101 ROOF MECHANICAL PLAN
M401 ENLARGED KITCHEN MECHANICAL PLAN (ALT 01)
M501 MECHANICAL SCHEDULES/DETAILS
M601 MECHANICAL DETAILS
PLUMBING
PD101 ROOF PLUMBING DEMOLITION PLAN
P101 ROOF PLUMBING PLAN
P501 PLUMBING SCHEDULES AND DETAILS
ELECTRICAL
EG001 ELECTRICAL SYMBOLS, SCHEDULES, AND NOTES
ED101 OVERALL ELECTRICAL DEMOLITION PLAN
EP101 OVERALL ELECTRICAL PLAN
Grand total: 19
DEPT DEPARTMENT
DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DW DISHWASHER
DBL DOUBLE
DN DOWN
DRWR DRAWER
DWGS DRAWINGS
EA EACH
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
(ROOFING)
EXIST EXISTING
EXP EXPANSION
EJ EXPANSION JOINT
EXT EXTERIOR
FT FEET / FOOT
FV FIELD VERIFY
FIN FINISH
FF FINISH FLOOR
FA FIRE ALARM
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FLR FLOOR
FD FLOOR DRAIN
FTG FOOTING
FDN FOUNDATION
GAL GALLON
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GALV GALVANIZED
GA GAUGE
GC GENERAL CONTRACTOR
GL GLASS / GLAZING
GLB GLUE LAMINATED BEAM
GND GROUND
GYP BD GYPSUM BOARD
HW HARDWARE
HVAC HEATING / VENTILATION / AIR CONDITIONING
H HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HYD HYDRANT
IN. INCHES OR INCH
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JNT JOINT
LAV LAVATORY
LT WT LIGHT WEIGHT
MAINT MAINTENANCE
MFR MANUFACTURER
MO MASONRY OPENING
MAT MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. NUMBER
OC ON CENTER
OPP OPPOSITE
OD OUTSIDE DIAMETER
OH OVERHEAD
OH DR OVERHEAD DOOR
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
PNT PAINTED OR PAINT
PTN PARTITION
PVMT PAVEMENT
PERP PERPENDICULAR
PLAM PLASTIC LAMINATE
PL PLATE
PLUM PLUMBING
PVC POLYVINYL CHLORIDE
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
QTY QUANTITY
RAD RADIUS
RE REFER / REFERENCE
RCP REFLECTED CEILING PLAN
REF REFRIGERATOR
REINF REINFORCED
REQ REQUIRED
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
SPEC SPECIFICATION
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRU STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
THRU THROUGH
T.O. TOP OF
TOA TOP OF ASPHALT
TOC TOP OF CURB
TOF TOP OF FOOTING
TOS TOP OF SLAB OR SIDEWALK
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VEN VENEER
VERT VERTICAL
VEST VESTIBULE
WC WATER CLOSET
WRB WEATHER RESISTIVE BARRIER
W WIDTH
W/ WITH
W/O WITHOUT
WD WOOD
NOTE:
ABBREVIATIONS FOR FINISHED
MATERIALS ARE DESCRIBED IN
THE FINISH LEGEND.
SITE LOCATION: 2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
1 2 3 4
E
D
C
B
A
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
BASE BID: REMOVE AND SALVAGE
EXISTING PARAPET CAP FOR TO BE
REINSTALLED IN SAME LOCATION, TYP.
PROTECT WALL SYSTEM FROM
DAMAGE.
ALT#3: REMOVE EXISTING PARAPET
CAPS AND REPLACE WITH NEW.
BASE BID: EXISTING ROOF DRAINS
TO REMAIN. TEMPORARY REMOVAL
OF DEBRIS COLLECTOR MAY BE
REQUIRED FOR REMOVAL AND
PROPER INSTALLATION OF NEW
ROOF MEMBRANE, TYP.
ALT#2: REMOVE EXISTING ROOF
DRAINS AND REPLACE WITH NEW,
RE: MECHANICAL.
REMOVE THE ENTIRE
WALKWAY PAD
REMOVE AND INSTALL NEW ROOF
MEMBRANE FLASHING AROUND
MECHANICAL EQUIPMENT, SUPPORTS
AND PIPING PENETRATIONS. TYP.
MECHANICAL EQUIPMENT AND
SUPPORTS TO REMAIN IN PLACE AND
OPERATIONAL DURING
CONSTRUCTION.
BASE BID: EXISTING ROOF DRAINS
TO REMAIN. TEMPORARY REMOVAL
OF DEBRIS COLLECTOR MAY BE
REQUIRED FOR REMOVAL AND
PROPER INSTALLATION OF NEW
ROOF MEMBRANE, TYP.
ALT#2: REMOVE EXISTING ROOF
DRAINS AND REPLACE WITH NEW,
RE: MECHANICAL.
BASE BID: REMOVE AND SALVAGE
EXISTING PARAPET CAP FOR TO BE
REINSTALLED IN SAME LOCATION, TYP.
PROTECT WALL SYSTEM FROM
DAMAGE.
ALT#3: REMOVE EXISTING PARAPET
CAPS AND REPLACE WITH NEW.
REMOVE THE ENTIRE
WALKWAY PAD
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE AND INSTALL NEW ROOF
MEMBRANE FLASHING AROUND
MECHANICAL EQUIPMENT, SUPPORTS
AND PIPING PENETRATIONS. TYP.
MECHANICAL EQUIPMENT AND
SUPPORTS TO REMAIN IN PLACE AND
OPERATIONAL DURING
CONSTRUCTION.
SEAMLESS METAL ROOF
SYSTEM TO REMAIN, TYP.
SEAMLESS METAL ROOF
SYSTEM TO REMAIN, TYP.
BASE BID: REMOVE AND SALVAGE
EXISTING PARAPET CAP FOR TO BE
REINSTALLED IN SAME LOCATION,
TYP. PROTECT WALL SYSTEM FROM
DAMAGE.
ALT#3: REMOVE EXISTING PARAPET
CAPS AND REPLACE WITH NEW.
BASE BID: EXISTING ROOF DRAINS
TO REMAIN. TEMPORARY REMOVAL
OF DEBRIS COLLECTOR MAY BE
REQUIRED FOR REMOVAL AND
PROPER INSTALLATION OF NEW
ROOF MEMBRANE, TYP.
ALT#2: REMOVE EXISTING ROOF
DRAINS AND REPLACE WITH NEW,
RE: MECHANICAL.
REMOVE THE ENTIRE
WALKWAY PAD
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
BASE BID: REMOVE AND SALVAGE
EXISTING PARAPET CAP FOR TO BE
REINSTALLED IN SAME LOCATION, TYP.
PROTECT WALL SYSTEM FROM
DAMAGE.
ALT#3: REMOVE EXISTING PARAPET
CAPS AND REPLACE WITH NEW.
BASE BID: EXISTING ROOF DRAINS
TO REMAIN. TEMPORARY REMOVAL
OF DEBRIS COLLECTOR MAY BE
REQUIRED FOR REMOVAL AND
PROPER INSTALLATION OF NEW
ROOF MEMBRANE, TYP.
ALT#2: REMOVE EXISTING ROOF
DRAINS AND REPLACE WITH NEW,
RE: MECHANICAL.
SEAMLESS METAL ROOF
SYSTEM TO REMAIN, TYP.
REMOVE EXISTING ROOF
MEMBRANE AND EXISTING
INSULATION COMPLETELY. PROTECT
WOOD SHEATHING TO REMAIN.,
TYP.
REMOVE EXISTING ROOF
MEMBRANE AND EXISTING
INSULATION COMPLETELY. PROTECT
WOOD SHEATHING TO REMAIN.,
TYP.
REMOVE THE ENTIRE
WALKWAY PAD
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
LOWER ROOF LOWER ROOF
LOWER ROOF LOWER ROOF
REMOVE AND SALVAGE
ANTENNA TO BE REINSTALL
IN THE SAME LOCATION ON
THE NEW ROOF SYSTEM.
REMOVE EXISTING ROOF HATCH SEAMLESS METAL ROOF SYSTEM TO
REMAIN, TYP.
SEAMLESS METAL ROOF
SYSTEM TO REMAIN, TYP.
SEAMLESS METAL ROOF SYSTEM TO
REMAIN, TYP.
UPPER ROOF
LOWER ROOF
REMOVE AND INSTALL NEW ROOF
MEMBRANE FLASHING AROUND
MECHANICAL EQUIPMENT, SUPPORTS
AND PIPING PENETRATIONS. TYP.
MECHANICAL EQUIPMENT AND
SUPPORTS TO REMAIN IN PLACE AND
OPERATIONAL DURING
CONSTRUCTION.
REMOVE EXISTING ROOF MEMBRANE
AND EXISTING INSULATION
COMPLETELY. PROTECT WOOD
SHEATHING TO REMAIN., TYP.
REMOVE EXISTING
ROOF HATCH
BASE BID: MECHANICAL UNIT AND
CURB TO REMAIN, RAISE CURB HEIGHT
AS REQUIRED, RE: MECHANICAL.
ALT#1: REMOVE MECHANICAL UNIT
AND CURB, RE: MECHANICAL
BASE BID: MECHANICAL UNIT AND
CURB TO REMAIN, RAISE CURB HEIGHT
AS REQUIRED, RE: MECHANICAL.
ALT#1: REMOVE MECHANICAL UNIT
AND CURB, RE: MECHANICAL
REMOVE EXISTING BUILT-UP CRICKETS
AND THEIR SUPPORT FRAMING. TYP.
CUT LADDER LEGS SHORTER
TO MATCH THE NEW ROOF
ELEVATIONS. TYP.
CUT LADDER LEGS SHORTER
TO MATCH THE NEW ROOF
ELEVATIONS. TYP.
REMOVE EXISTING BUILT-UP CRICKETS
AND THEIR SUPPORT FRAMING. TYP.
REMOVE EXISTING BUILT-UP CRICKETS
AND THEIR SUPPORT FRAMING. TYP.
BUILT-UP CRICKET AND ITS
SUPPORTING FRAMING TO REMAIN.
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
DEMOLITION LEGEND
DEFINITIONS
A. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE
OF THEM OFF-SITE UNLESS INDICATED TO BE SALVAGED OR
REINSTALLED.
B. REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION,
IN A MANNER TO PREVENT DAMAGE, AND STORE.
C. REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING
CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, PREPARE FOR
REUSE, AND REINSTALL WHERE INDICATED.
D. EXISTING TO REMAIN: LEAVE EXISTING ITEMS THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE SALVAGED
OR REINSTALLED.
E. DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM
FROM A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO
PREVENT DAMAGE TO THE ITEM AND SURFACES; DISPOSING OF ITEMS
UNLESS INDICATED TO BE SALVAGED OR REINSTALLED.
1. IF SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT
DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER SEPARATE CONTRACT.
2. SEE ENGINEERING DRAWINGS AND SPECIFICATIONS FOR THE REMOVAL OF
SPECIFIC STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE
ALARM SYSTEMS.
3. REINSTALLED EQUIPMENT AND DEVICES ARE TO BE CLEANED OF ALL
FOREIGN MATERIAL. CONTRACTOR IS RESPONSIBLE TO REPLACE
EQUIPMENT OR DEVICES WHICH ARE DEFECTIVE OR DAMAGED DURING
RELOCATION.
4. WHEREVER MECHANICAL, ELECTRICAL, AND PLUMBING DEVICES ARE
REMOVED, ALL PIPING AND/OR CONDUITS SHALL BE REMOVED TO EXTENT
INDICATED OR REQUIRED TO COMPLETE SCOPE. ITEMS THAT ARE NOTED
TO BE ABANDONED SHALL BE CAPPED OFF BELOW THE ROOF SHEATHING,
EXCEPT WHERE NOTED OTHERWISE. PATCH AND REPAIR FINISHES TO
MATCH SURROUNDING FINISHES.
5. THE CONTRACTOR SHALL MAINTAIN THE EXISTING STRUCTURAL AND
INTEGRITY OF THE ENTIRE BUILDING.
DEMOLITION NOTES
EXISTING BUILDING ELEMENTS TO REMAIN
EXISTING WALKWAY PADS TO BE REMOVED.
EXISTING BUILDING ELEMENTS TO BE REMOVED
DEMOLITION SCOPE
1. SCOPE OF PROJECT IS REROOFING OF ENTIRE BUILDING. REMOVE ROOF
MEMBRANE AND INSULATION. RE: STRUCTURAL, MECHANICAL AND
ELECTRICAL FOR INFROMATION REGARDING REMOVAL OF EQUIPMENT FOR
REINSTALLATION.
2. UNIT PRICE HAS BEEN REQUESTED FOR REPLACEMENT OF DAMAGED
EXISTING ROOF DRAINS. DO NOT REMOVE EXISTING ROOF DRAINS UNTIL
UNIT COST, QUANTITIY AND OVERALL COST IS ACCEPTED BY OWNER.
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
H
AT
UFOET
A
T S
T C
E
TI
HCRADES
N E
C I
L
7298012-0301
CLIO RAYNER
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REV
N O
T E
T
H
IS
S H
E E
T I
S I
N T
E N
D E
D T
O
B
V
IE
W E
D I
N C
O L
O R
RESERVED FOR CONSULTANT LOGO
11/02/2026
2026.070.00
DEMOLITION ROOF PLAN
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
27KP04
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
7605 SOUTH REDWOOD ROAD,
WEST JORDAN, UT 84088
CONSTRUCTION DOCUMENTS
AD141
11/02/2026
1/16" = 1'-0"AD141
1 DEMOLITION ROOF PLAN
0'
GRAPHIC SCALE
8' 16' 24' 32' 48'
1 2 3 4
D
C
B
A
1/4" / 12"
1/2" / 12"
BASE BID: RE-INSTALL SALVAGE
EXISTING PARAPET CAP, TYP.
ALT#3: INSTALL NEW PARAPET CAP
FLASHING TO MATCH EXISTING
PROFILE.
BASE BID: RE-INSTALL SALVAGE
EXISTING PARAPET CAP, TYP.
ALT#3: INSTALL NEW PARAPET CAP
FLASHING TO MATCH EXISTING
PROFILE.
BASE BID: RE-INSTALL SALVAGE
EXISTING PARAPET CAP, TYP.
ALT#3: INSTALL NEW PARAPET CAP
FLASHING TO MATCH EXISTING
PROFILE.
BASE BID: RE-INSTALL SALVAGE
EXISTING PARAPET CAP, TYP.
ALT#3: INSTALL NEW PARAPET CAP
FLASHING TO MATCH EXISTING
PROFILE.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
1/ 2"
2" 1/
2"
2"
1/ 2"
2"
1/ 2"
2"
1/ 2"
2"
1/ 2"
2"
1/ 2"
2" 1/
2"
2"
1/ 2"
2"
AE831
AE831
TYP.
AE831
TYP.
TY
P
3' -0
AE831
TYP.
TYP.
TY
P
3' -0
AE831
AE831
1/4" / 12" 1/4" / 12"
1/4" / 12" 1/4" / 12" 1/4"
/ 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4"
/ 12" 1/4" / 12"
1/ 4"
2"
SLOPE TRANSITION SLOPE TRANSITION
1"
1/4" / 12" 1/4" / 12"
1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12"
1"
1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"
1/ 4"
2" 1/
2"
2"
1/4" / 12" 1/4" / 12"1/4"
/ 12" 1/4" / 12"
1/4" / 12"1/4" / 12"1/4" / 12"1/4"
/ 12"
1/4" / 12" 1/4" / 12"
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
1/ 2"
2"
1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"
1/ 4"
2"
1"
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12" 1/4"
/ 12" 1/4" / 12" 1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12"
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
1"
1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12"1/4" / 12"
1/ 4"
2"
SLOPE TRANSITION
1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12"1/4" / 12"
RIDGE RIDGE
R
ID
G E
R
ID
G E
1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12"1/4" / 12"
1/4" / 12"
1/4" / 12"1/4" / 12" 1/4" / 12"1/4" / 12"
1/4" / 12"
1/4" / 12"1/4" / 12"
SLOPE TRANSITION
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
1/4" / 12"
1/4" / 12"1/4" / 12"
1/4" / 12"
1/4" / 12" 1/4" / 12"
1/ 4"
2"
SL
O
P E
T R
A N
SI
TI
O N
1/4" / 12"
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW AT SAME THICKNESS AS
ORIGINAL CONSTRUCTION. INSTALL
TAPERED INSULATION WITH A SLOPE
OF 1/4" PER 12", UP TO 3"
ADDITIONAL THICKNESS. NEW
INSULATION THICKNESS ON TOP OF
EXISTING INSULATION TO VARY.
1/4" / 12" 1/2" / 12"1/2" / 12"
1/4" / 12" 1/4" / 12" 1/2" / 12"1/2" / 12"
1/4" / 12" 1/4" / 12" 1/2" / 12"1/2" / 12"
22'-0" 10'-0" 10'-0" 22'-0"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/ 4"
2"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12" 1/4" / 12"
EXISTING
CRICKET
AE831
AE831
AE831
AE831
AE831
AE831
SIM
AE831
SIM
AE831
SIM
NEW ROOF HATCH
NEW ROOF HATCH14
AE831
AE831
SIM
SLOPE TRANSITION
SLOPE TRANSITION SLOPE TRANSITION
SLOPE TRANSITION SLOPE TRANSITION
SL
O
P E
T R
A N
SI
TI
O N
BASE BID: EXISTING ROOF
DRAIN TO REMAIN, TYP.
ALT#2: INSTALL NEW ROOF
DRAIN, TYP.
BASE BID: EXISTING ROOF DRAIN TO
REMAIN, TYP.
ALT#2: INSTALL NEW ROOF DRAIN,
TYP.
SL
O
P E
T R
A N
SI
TI
O N
SL
O
P E
T R
A N
SI
TI
O N
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
MECHANICAL EQUIPMENT AND CURB
TO REMAIN, RAISE EQUIPMENT CURB
HEIGHT AS REQUIRED, RE:
MECHANICAL.
BASE BID: MECHANICAL UNIT AND
CURB TO REMAIN, RAISE CURB HEIGHT
AS REQUIRED, RE: MECHANICAL
ALT#1: INFILL OPENING WHERE
MECHANICAL UNIT AND CURB HAVE
BEEN REMOVED. RE: STRUCTURAL
BASE BID: MECHANICAL UNIT AND
CURB TO REMAIN, RAISE CURB HEIGHT
AS REQUIRED, RE: MECHANICAL
ALT#1: NEW MECHANICAL UNIT AND
CURB, RE: STRUCTURAL AND
MECHANICAL FOR REQUIRED
PENETRATIONS, SUPPORT AND
EQUIPMENT COORDINATION.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REPLACE EXISTING INSULATION WITH
NEW. INSTALL ADDITIONAL NEW
INSULATION AS REQUIRED TO REACH
A MINIMUM OF 6" TOTAL. INSTALL
NEW ROOF MEMBRANE COMPLETE
TYP. R-30 MIN FOR FINAL ROOF
CONSTRUCTION, TYP.
REMOVE AND REINSTALL TRANSITION
FLASHING AS NECESSARY TO INSTALL
ADDITIONAL INSULATION THICKNESS
AND NEW ROOF MEMBRANE
REMOVE AND REINSTALL TRANSITION
FLASHING AS NECESSARY TO INSTALL
ADDITIONAL INSULATION THICKNESS
AND NEW ROOF MEMBRANE
REMOVE AND REINSTALL TRANSITION
FLASHING AS NECESSARY TO INSTALL
ADDITIONAL INSULATION THICKNESS
AND NEW ROOF MEMBRANE
REMOVE AND REINSTALL TRANSITION
FLASHING AS NECESSARY TO INSTALL
ADDITIONAL INSULATION THICKNESS
AND NEW ROOF MEMBRANE
GENERAL ROOF NOTES
1. PROVIDE A MINIMUM SLOPE OF 1/4" PER FOOT AT ALL ROOF AREAS.
2. THE ROOF SLOPE SHOWN ON THE PLANS IS DETERMINED BY THE
SLOPE OF THE EXISTING STRUCTURE.
3. ALL SERVICEABLE ROOF EQUIPMENT, SHALL BE LOCATED 10'
MINIMUM FROM A ROOF EDGE.
4. IF SERVICEABLE ROOF EQUIPMENT MUST BE LOCATED AT A DISTANCE
LESS THAN 10' FROM A ROOF EDGE, A GUARDRAIL MUST BE
PROVIDED AT THE ROOF EDGE WHERE THE EQUIPMENT OCCURS.
5. PROVIDE PRESERVATIVE AND FIRE TREATED BLOCKING AS REQUIRED
FOR INSTALLATION OF MECH., PLUMB. & ELEC. EQUIP. AND
SPECIALTIES
6. EXISTING ROOF DECK TO BE REPAIRED AS REQUIRED WHERE
EXISTING ROOF ELEMENTS HAVE BEEN REMOVED.
7. CONTRACTOR IS RESPONSIBLE FOR FLASHING OF ALL ROOF
PENETRATIONS THROUGH ROOF EVEN IF THEY ARE NOT SHOWN IN
PLAN. FIELD VERIFY ALL EXISTING CONDITIONS. SEE DETAILS ON
AE831.
8. CONTRACTOR TO INSTALL CRICKETS AT EQUIPMENT LOCATIONS AS
REQUIRED. INSTALL CRICKETS AS NECESSARY TO ELIMINATE
PONDING WATER.
9. CONTRACTOR IS RESPONSIBLE TO INSPECT ALL UNDER DECK
CONDITIONS TO AVOID DAMAGE TO ANY INTERIOR SYSTEMS.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY
DAMAGE TO EXISTING CONDITIONS TO REMAIN.
TAPERED RIGID INSULATION CRICKETS ON TOP OF 6" MIN
INSULATION THICKNESS
DIRECTION OF ROOF SLOPE
ROOF WALK OFF PADS
TAPERED RIGID INSULATION ON TOP OF INSULATION THICKNESS
MATCHING EXISTING CONDITION, APPROXIMATELY 3"
PRECONSTRUCTION WALK
1. SOME EXISTING PENETRATIONS ARE NO LONGER REQUIRED AND CAN
BE REMOVED. COORDINATE WITH OWNER AND ARCHITECT TO
IDENTIFY THESE PENETRATIONS FOR REMOVAL PRIOR TO
CONSTRUCTION START.
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
H
AT
UFOET
A
T S
T C
E
TI
HCRADES
N E
C I
L
7298012-0301
CLIO RAYNER
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REV
RESERVED FOR CONSULTANT LOGO
11/02/2026
2026.070.00
ROOF PLAN
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
27KP04
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
7605 SOUTH REDWOOD ROAD,
WEST JORDAN, UT 84088
CONSTRUCTION DOCUMENTS
AE141
11/02/2026
1/16" = 1'-0"AE141
1 ROOF PLAN
0'
GRAPHIC SCALE
8' 16' 24' 32' 48'
EXISTING EXTERIOR WALL
ASSEMBLY
EXISTING ROOF SHEATHING
NEW ROOF INSULATION TO
REPLACE EXISTING
SINGLE-PLY ROOFING
MEMBRANE
BASE BID: RE-INSTALL
EXISTING PARAPET CAP
ALT#3: NEW PARAPET CAP
TO MATCH PROFILE OF
EXISTING
ROOF MEMBRANE RUN
OVER ROOF AS SHOWN
CONT. BEAD OF APPROVED
SEALANT
EXISTING PERLITE BOARD
3" NEW ROOF INSULATION
TAPERED CRICKET ROOF
INSULATION BEYOND
EXTEND PLYWOOD TO
COVER THE GAP BEYOND
THE PREVIOUS CRICKET.
ROOF VAPOR BARRIER
EXISTING ROOF SHEATHING
TAPERED CRICKET ROOF
INSULATION BEYOND
NEW ROOF INSULATION TO
REPLACE EXISTING
BASE BID: RE-INSTALL
EXISTING PARAPET CAP
ALT#3: NEW PARAPET CAP
TO MATCH PROFILE OF
EXISTING
ROOF MEMBRANE RUN
OVER ROOF AS SHOWN
CONT. BEAD OF APPROVED
SEALANT
EXISTING EXTERIOR WALL
ASSEMBLY
EXISTING PERLITE BOARD
3" NEW ROOF INSULATION
SINGLE-PLY ROOFING
MEMBRANE
ROOF VAPOR BARRIER
(BASED ON SPACING BEWTEEN DRAIN BOWLS AS INCIATED BELOW)
6'-0" MIN. 10'-0" MAX.
NOTES:
ANY EXISTIG. DRAIN LINES THAT ARE CLOGGED WITH DEBRIS,
BALLAST, LEAVES ETC. SHALL BE CLEANED OUT AND ARE TO BE
VERIFIED TO BE IN GOOD WORKING ORDER.
USE MANUFACTURER'S TAPERED INSULATION PANELS TO CREATE
PRIMARY DRAIN SUMPS - NO HAND CUT INSULATION WILL BE
ALLOWED.
WHERE EXISTING PLASTIC DRAIN DOMES OCCUR, REPLACED WITH
NEW CAST IRON DOMES.
SLOPE IN SUMP
BETWEEN DRAINS
(8
P
IP
E D
IA
M
E
TE
R S
M
IN
. O R
2"
P
IP
E D
IA
M
ET
E
R S
M A
X
3' -0
AE831
SECONDARY ROOF DRAIN WITH
NON-NOTCHED RETAINING RING AND
CAST IRON DOME - SET 2" HIGHER
THAN PRIMARY DRAIN
PRIMARY ROOF DRAIN W/ NOTCHED
RETAINING RING AND CAST IRON
DOME
2'-0" (HOLD)
2"
BETWEEN DRAIN BOWLS
2'-0" MIN. 6'-0" MAX 2'-0" (HOLD)
6'-0" MIN. 10'-0" MAX. (BASED ON SPACING BEWTEEN DRAIN BOWLS AS INCIATED BELOW)
MANUFACTURERS TAPERED
INSULATION SYSTEM
SECONDARY ROOF DRAIN
WITH NON-NOTCHED
RETAINING RING AND CAST
IRON DOME - SET 2" HIGHER
THAN PRIMARY DRAIN
LINE OF SUMP
(BEYOND)
SLOPE IN SUMP
BETWEEN DRAINS
PRESERVATIVE TREATED
NAILER / SHIM AS REQUIRED
RIGID INSULATION
SINGLE-PLY ROOFING MEMBRANE PRIMARY ROOF DRAIN W/
NOTCHED RETAINING RING
AND CAST IRON DOME
EXISTING ROOF SHEATHING
3'-0" TYP.
SINGLE-PLY ROOFING MEMBRANE
ROOF WALKWAY
SLIP SHEET
COVER BOARD
EXISTING ROOF SHEATHING
VENT PIPE
DRAW BAND
SINGLE PLY MEMBRANE
ROOFING
METAL COLLAR,
3" MINIMUM WIDTH
POLYURETHANE
SEALANT
RIGID ROOF INSULATION
SINGLE PLY
MEMBRANE ROOFING
8" M
IN
EXISTING ROOF
SHEATHING
ROOF VAPOR BARRIER
STAINLESS STEEL
DRAW BAND
MASTIC
VENT PIPE
HOT AIR WELD
PRE-MOLDED FLASHING
SINGLE-PLY ROOFING
MEMBRANE
INSULATION
M
IN
EXISTING ROOF SHEATHING
ROOF VAPOR BARRIER
INSULATION
TREATED WOOD NAILERS
HOT AIR WELDHOT AIR WELD
STAINLESS STEEL DRAW
BAND
MASTIC
VENT PIPE
FLASHING MEMBRANEFLASHING MEMBRANE
SINGLE-PLY ROOFING
MEMBRANE
SEALANT
M
IN
METAL COLLAR
METAL FLASHING AND
CLAMP
METAL FLASHING AND
CLAMP
EXTERIOR SHEATHING
EXISTING ROOF SHEATHING
ROOF VAPOR BARRIER
VENT PIPE
WOOD NAILERS
MATCH INSUL.
THICKNESS
RIGID ROOF
INSULATION
METAL FLASHING
AND CLAMP
METAL HOOD
TURN MEMBRANE
UP 1" MIN.
SINGLE PLY
MEMBRANE ROOF
8" M
IN
FILL W/ FOIL FACED
MINERAL WOOL INSULATION
SEAL TO PIPE, TYP.
EXISTING ROOF SHEATHING
ROOF VAPOR
BARRIER
SUPPORT STRUCTURE, RE:
STRUCTURE
SINGLE-PLY ROOFING
MEMBRANE
CONTINUOUS BEAD OF SEALANT
STAINLESS STEEL CLAMPING RING
FIELD FABRICATED METAL HOOD
PRE-MOLDED PVC PIPE FLASHING
2" MIN. WELDED SPLICE
RIGID INSULATION
EXISTING STRUCTURAL
CONNECTION TO
STRUCTURE/SHEATHING TO
REMAIN.
INSULATION
SINGLE-PLY ROOFING
MEMBRANE
TREATED WOOD NAILERS
SINGLE-PLY ROOFING
MEMBRANE
FLASHING MEMBRANE
ADHERED TO CURB
SEALANT
M A
X
M
IN
2X REQUIRED TREATED
WOOD CURB
PRE-FINISHED METAL TWO PIECE
COUNTERFLASHING WITH DRIP EDGE
EXISTING ROOF SHEATHING
ROOF VAPOR BARRIER
SINGLE PLY MEMBRANE
ROOFING
METAL COLLAR,
3" MINIMUM WIDTHRIGID ROOF
INSULATION
SINGLE PLY
MEMBRANE ROOFING
EXISTING ROOF SHEATHING
EXISTING STEEL TUBE
POLYURETHANE
SEALANT
STAINLESS STEEL DRAW BAND
M
IN
EXISTING FLAGPOLE
SUPPORT ANGLE
PRE-FINISHED METAL TWO PIECE
COUNTERFLASHING WITH DRIP EDGE
SINGLE-PLY ROOFING MEMBRANE
EXISTING EXTERIOR WALL ASSEMBLY
NEW TAPERED INSULATION
NEW ROOF INSULATION TO
REPLACE EXISTING
EXISTING PERLITE BOARD
EXISTING ROOF SHEATHING
ROOF VAPOR BARRIER
EXISTING WINDOW SYSTEM
NEW ROOF INSULATION TO
REPLACE EXISTING
EXISTING PERLITE BOARD
EXISTING ROOF SHEATHING
NEW TAPERED INSULATION
PRE-FINISHED METAL TWO PIECE
COUNTERFLASHING WITH DRIP EDGE
SINGLE-PLY ROOFING MEMBRANE
ROOF VAPOR BARRIER
ROOF HATCH
EXISTING SUPPORT ANGLE AS
REQUIRED
EXISTING ROOF ASSEMBLY
SEALANT
EXISTING WALL ASSEMBLY
EXISTING WALL ASSEMBLY
EXISTING METAL LADDER
ROOF VAPOR BARRIER
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
H
AT
UFOET
A
T S
T C
E
TI
HCRADES
N E
C I
L
7298012-0301
CLIO RAYNER
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REV
RESERVED FOR CONSULTANT LOGO
11/02/2026
2026.070.00
ROOF DETAILS
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
27KP04
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
7605 SOUTH REDWOOD ROAD,
WEST JORDAN, UT 84088
CONSTRUCTION DOCUMENTS
AE831
11/02/2026
1 1/2" = 1'-0"AE831
1 TYP. PARAPET DETAIL
1 1/2" = 1'-0"AE831
2 UPPER ROOF PARAPET DETAIL
1" = 1'-0"AE831
5 ROOF DRAIN PLAN
1" = 1'-0"AE831
6 ROOF DRAIN SECTION
1 1/2" = 1'-0"AE831
7 TYP. ROOF WALKWAY PAD SECTION
3" = 1'-0"AE831
9 TYP. ROOF PENETRATION
3" = 1'-0"AE831
ROOF PIPE PENETRATION -
PRE-MOLDED BOOT
3" = 1'-0"AE831
11 ROOF WARM PIPE PENETRATION
3" = 1'-0"AE831
12 STANDARD-WARM PIPE VENT
3" = 1'-0"AE831
13 ROOF EQUIPMENT SUPPORT
3" = 1'-0"AE831
15 ROOF EQUIPMENT CURB
3" = 1'-0"AE831
ROOF PENETRATION @ EXISTING
FLAGPOLE SUPPOR
1 1/2" = 1'-0"AE831
3 ROOF @ EFIS WALL DETAIL
1 1/2" = 1'-0"AE831
4 ROOF @ WINDOW SILL DETAIL
1" = 1'-0"AE831
14 ROOF HATCH @ LADDER
No.
5047489-2203
OLIVER
DALLIN
BURT
STATE OF UTAH
PR
OF
ES
S I
ON
AL STRUCTURAL
ENG
INEER
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REV
RESERVED FOR CONSULTANT LOGO
11/02/2026
11/02/2026 2026.070.00
GENERAL STRUCTURAL
NOTES
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
2636 WEST 9800 SOUTH,
SOUTH JORDAN, UT 84095
CONSTRUCTION
DOCUMENTS
S001
1. Design Criteria
1.1. Governing Building Code 2021 International Building Code (IBC)
A. Risk Category IVI
1.2. Roof Loading
A. Roof Live Load 20 psf B. Roof Snow Load, pf 38.45 (LRFD) 24 (ASD) psf + Drift per IBC
1. Ground Snow Load, Pg 49 psf
2. Snow Exposure Factor, Ce 1.0
C. Importance Factor, Is 1.0
1. Thermal Factor, Ct 1.0 Roof, D. Slope Factor, Cs 1.0 E. Roof Rain Load Intensity:
1. 15-min duration/100-year return period, i15 4.95inches per hour
2. 60-min duration/100-year return period, i60 2.06inches per hour
1.3. Earthquake
A. Seismic Design Category D B. Spectral Response Accelerations:
SS = 1.37 g SDS = 0.95 g S1 = 0.47 g SD1 = 0.68 g
C. Site Class D D. Importance Factor, Ie 1.25
1.4. Wind
A. Basic Design Wind Speed, V 109 mph B. Allowable Stress Design Wind Speed, Vasd 84.4 mph C. Wind Directionality Factor, Kd 0.85 D. Exposure category C E. Internal Pressure Coefficient, GCpi 0.18 F. Topographic Factor, Kzt 1.0 G. Components and Cladding Design Pressure:
Design Wind Pressure - LRFD (psf)
Location Tributary Area (ft2) < 10 50 200 > 500
Walls Within 6.4 ft of building corner 27.2 23 19.4 17 All other areas 22.1 20 18.2 17
Roof Zone 3: Within 9.6 ft “L” shape at building corner 46.8 39.8 33.8 29.8 Zone 2: Within 9.6 ft of building edge 46.8 39.8 33.8 29.8 Zone 1: All other areas 35.5 30 25.4 22.3
2. Wood
2.1. Fabrication and construction shall comply with the following Codes and Standards:
A.
B.
American Wood Council National Design Specification for Wood Construction 2024 Edition and Supplement (NDS and NDS Supplement) American Wood Council Special Design Provisions for Wind and Seismic 2021 Edition
(SDPWS)
2.2. Materials
A. Sawn Lumber: Members shall be identified by the grade mark and shall conform to the requirements of DOC PS 20. Sawn Lumber shall have a moisture content of less than 19% prior to be enclosed or covered.
1. Dimension Lumber: Members shall be Number 2 Douglas Fir-Larch or better, unless noted otherwise.
B. Wood Sheathing Panels: All sheathing panels shall be rated by the American Plywood
Association (APA). Panels shall bear the stamp of an approved testing and grading agency. Panels shall be grade DOC PS 1 or PS 2 with exterior glue with the following panel span rating or better, unless noted otherwise:
Area to be sheathed Span Rating Minimum Thickness
Roofs 40/20 19/32” Walls 24/0 3/8”
C. Nails as referenced in these documents shall meet the tolerances in ASTM F1667 and have the following properties or better, unless noted otherwise:
Nail Size Length
Minimum Penetratio n
Common Galvanized Box
Shank Diameter
Dowel Bending
Yield Strength (psi)
Shank Diameter
Dowel Bending Yield Strength
(psi)
6d 2” 1.1/8” 0.113” 100,000 0.099” 100,000 8d 2.1/2” 1.3/8” 0.131” 100,000 0.113” 100,000 10d 3” 1.1/2” 0.148” 90,000 0.128” 100,000 16d 3.1/2” 1.5/8” 0.162” 90,000 0.135” 100,000
D. Nails as referenced in these documents shall meet the tolerances in ASTM F1667 and have the following properties or better, unless noted otherwise:
When used to attach sheathing panels, nails shall be common or galvanized box type nails. All other nails shall be common type nails.
E.
F.
Bolts for connections: ASTM A307 with ASTM A563 heavy hex nuts and standard washers unless noted otherwise.
Lag screws for connections: SAE J429 Grade 1 or ASTM A307 Grade A with dimensions per ANSI/ASME B18.2.1. Minimum dowel bending yield strength to be 45,000 psi
2.3. General Framing and Carpentry
A. Minimum Nailing Requirements (See drawings for areas with greater requirements):
1.
2.
3.
Roof: Use two plyclips between each support for spans of 48 inches on center and one plyclip between each support for lesser spans at all unsupported sheathing panel edges. Provide 1/8 inch gap between panels. Typical diaphragm nailing shall be 10d common nails. Nail all diaphragm boundaries at 6 inches on center Nail all supported panel edges to a common framing member at 6 inches on center. At supports away from panel edges nailing shall be at 12 inches on center.
Walls: All sheathing panel edges shall be nailed with 8d common nails at 6 inches on center to common framing members or sheathing panel edge blocking, unless noted otherwise. Sheathing panels shall be nailed at 12 inches on center at all intermediate supports (3/8" or 7/16” panels on studs spaced at 24 inches on center requires 6 inch spacing at all intermediate supports). All abutting sheathing panel edges shall be blocked with panel edge blocking. Where nominal 3 inch members are required at sheathing panel edges, sheathing panel edge blocking shall also be 3 inch nominal thickness if placed perpendicular to sheathing.
All nailing through sheathing panels shall be 3/8 inch minimum from panel edges.
B.
C.
Connect all items as per the “Minimum Nailing Schedule” contained within the contract drawings and IBC Table 2304.10.2, "Fastening Schedule", unless noted otherwise.
All blocking shall be nominally 2 inches thick minimum, unless noted otherwise, and fit tight against adjacent framing members.
1.
2.
3.
Full-depth blocking shall match the depth of adjacent framing member depths. Full-depth blocking shall be shaped to match diaphragm slope. Full-depth blocking cut from I-joist material of the same depth as the I-joists used in floor/roof construction may be used for flat floors or roofs.
Sheathing panel edge blocking and solid blocking may be turned flat against sheathing or other framing, unless noted otherwise.
Where required, squash blocking shall match wall stud nominal thickness, spacing, and shall align with wall studs.
D.
E.
F.
G.
H.
Provide full-depth blocking between all framing members that bear directly on walls.
Full-depth blocking between joists shall be nailed to the wood plate at the top of shear walls with one Simpson “A35” framing anchor per each piece of blocking, unless noted otherwise.
Coordinate size and locations of middle or end notching for roof ventilation with architectural drawings.
Plies of built-up beams, headers, columns, jambs, studs, etc. shall be connected per the “Minimum Nailing Schedule” contained within the contract drawings and IBC Table 2304.10.2, “Fastening Schedule,” unless noted otherwise.
All required bridging and bracing for prefabricated wood I-joists shall be provided by joist manufacturer and installed by Contractor. All penetrations through the joists shall be done per manufacturers’ recommendations and requirements.
2.4. Framing Connections
A.
B.
C.
D.
E.
Simpson Strong Tie Connectors are used as the basis of design. Alternate connectors are permitted with the approval of the Engineer of Record. The Contractor shall submit the proposed product data and code evaluation report demonstrating the connector is equivalent or exceeds the capacity of the specified connector.
Framing connections not indicated shall be connected in a manner similar to the typical details in the drawings and the Engineer of Record shall be notified prior to the procurement of connector materials.
Where framing connection type is specified without reference to a specific model no. the highest capacity model hanger of that type which is compatible with the member to be supported shall be used unless noted otherwise in the drawings.
All framing connectors supporting roof members where additional uplift capacity is available shall be fastened to achieve such.
Fill holes in the framing anchors per manufacturer’s requirements, unless noted otherwise.
3. Miscellaneous
3.1. Post-Installed Anchors in Concrete and Masonry
A.
B.
C.
Anchorage to hardened concrete and grout filled masonry shall include all mechanical and adhesive anchors and epoxy doweled reinforcing bars of size, quantity, spacing, and embedment as shown on the drawings. Additional anchors shall not be used without approval from the Engineer of Record prior to installation.
Special inspection is required during the installation of all post-installed anchors. Refer to applicable code evaluation reports and the Quality Assurance and Statement of Special Inspections sections of the General Structural Notes.
Anchorage to Concrete:
1. All post-installed anchors into hardened concrete shall be selected from the following pre-approved products, unless noted otherwise:
Steel Screw Anchor Evaluation Report Hilti Kwik HUS-EZ ICC ESR-3027
DeWalt Screw-Bolt+ ICC ESR-3889 Simpson Titen HD ICC ESR-2713
Steel Expansion/Wedge Anchor Evaluation Report Hilti Kwik Bolt TZ2 ICC ESR-4266
DeWalt Power-Stud+ SD2 ICC ESR-2502 Simpson Strong-Bolt 2 ICC ESR-3037
Adhesive Anchor System Evaluation Report Hilti HIT-HY 200 V3 ICC ESR-4868
Hilti Kwik-X ICC ESR-5065 Hilti HIT-RE 500 V3 ICC ESR-3814
DeWalt AC200+ ICC ESR-4027 DeWalt Pure 110+ ICC ESR-3298 Simpson SET-3G ICC ESR-4057
2. Adhesive anchors shall be installed into concrete having a minimum age of 21 days.
For installations sooner than 21 days, consult the adhesive manufacturer.
D. Anchorage to Masonry:
1. All post-installed anchors into grout-filled masonry shall be selected from the following pre-approved products, unless noted otherwise:
Steel Screw Anchor Evaluation Report
Hilti Kwik HUS-EZ ICC ESR-3056 DeWalt Screw-Bolt+ ICC ESR-4042 Simpson Titen HD ICC ESR-1056
Steel Expansion/Wedge Anchor Evaluation Report Hilti Kwik Bolt TZ2 ICC ESR-4561
DeWalt Power-Stud+ SD1 ICC ESR-2966 Simpson Strong Bolt 2 ICC ESR-240
Adhesive Anchor System Evaluation Report
Hilti HIT-HY 270 ICC ESR-4143
ICC ESR-4144
DeWalt AC100+ Gold ICC ESR-3200 E.
F.
G.
Alternate anchors or adhesives are permitted with approval of the Engineer of Record.
The Contractor shall submit the proposed anchor product data and code evaluation report demonstrating the anchor is equivalent to or exceeds the capacity of the specified anchor.
Installation of adhesive anchors horizontally or upwardly inclined to support sustained tension loads shall be performed by personnel certified by an applicable certification program. Certification shall include written and performance tests in accordance with the ACI/CRSI Adhesive Anchor Installer Certification program, or equivalent. Proof of current certification shall be submitted to the Engineer of Record for approval prior to commencement of installation.
Anchors shall be installed according to the Manufacturer’s Printed Installation Instructions and applicable code evaluation reports including:
1.
2.
3.
Hole diameter, depth, and cleaning procedure Adhesive mixing, preparation, and placement Installation torque
H.
I.
J.
K.
Locate all existing reinforcement and embedded items prior to drilling into concrete or masonry elements. Do not damage rebar or embeds while drilling or installing anchors.
Grout all defective or abandoned holes with non-shrink grout or an injectable epoxy adhesive matching the surrounding concrete compressive strength. Consult the Architect for additional requirements at architecturally exposed concrete.
Carbon steel anchors are limited to use in dry, interior locations.
Holes for post-installed anchors may not be core drilled unless specifically allowed by the manufacturer’s installation instructions and the code evaluation report. Holes shall not be re-used unless approved by the manufacturer.
4. Special Instructions
4.1. The project specifications are not superseded by the General Structural Notes but are intended to be complementary to them. Consult the specifications for additional requirements in each section. Notes and specific details on the drawings shall take precedence over General Structural Notes and typical details.
4.2. The architectural drawings are the prime contract drawings. Consultant drawings by other disciplines are supplementary to the architectural drawings. All omissions or conflicts, including dimensions, between the various elements of the consultants' drawings and/or specifications shall be brought to the attention of the Architect before proceeding with any work involved. In case of conflict, follow the most stringent requirement as directed by the Architect without additional cost to the Owner. Any work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk.
4.3. The structural drawings shall be used in conjunction with the architectural drawings. Primary structural elements and overall structural layout are indicated within the structural plans and details. Some secondary elements, architectural layouts, alcoves, elevations, slopes, depressions, curbs, mechanical equipment and electrical equipment, are not indicated within the structural drawings. Detailing and shop drawing production for structural elements will require information (including dimensions) contained in the architectural, structural and/or other consultants' drawings.
4.4. Submittals: A copy of all shop drawings that have been submitted for review must be kept at the construction site for reference. These drawings must bear the appropriate review stamps. The shop drawing review shall not relieve the Contractor of the responsibility of completing the project according to the contract documents. The General Contractor shall review and mark all shop drawings prior to submitting them to the Architect for review. Shop drawings made from reproductions of (these) contract drawings will be rejected.
4.5. Project Coordination: It shall be the responsibility of the General Contractor to coordinate with all trades any and all items that are to be integrated into the structural system.
Openings or penetrations through, or attachments to the structural system that are not indicated on these drawings shall be the responsibility of the General Contractor and shall be coordinated with the Architect/Engineers. The order of construction is the responsibility of the General Contractor. It is the Contractor's obligation to provide all items necessary for the chosen procedure.
4.6. Contractor shall field verify all dimensions, and conditions. If the contract drawings do not represent actual conditions, Contractor shall notify Architect/Engineer prior to fabrication or construction within that area.
4.7. Notice of Copyright: The structural drawings, plans, schedules, notes and details are hereby copyrighted by Reaveley Engineers. Submission or distribution of documents to meet official regulatory requirements or for similar purposes in connection with the project is not to be construed as publication in derogation of Reaveley Engineers’ reserved rights. The documents defining the structure are instruments of service prepared by Reaveley Engineers for one use only. Furthermore, these documents shall not be reproduced, or copied, in whole or in part by the Contractor or subcontractors for preparation of shop drawings or other submittals.
5. Quality Assurance
5.1. Quality Assurance Agency Requirements
A. The Owner shall engage a qualified Quality Assurance Agency (QAA) to provide all special inspection and quality assurance testing for the project. The QAA shall provide all information necessary for the building official to determine that the agency meets the applicable requirements.
1.
2.
3.
4.
5.
The QAA shall be objective, competent and independent from the Contractor responsible for the work being inspected. The agency shall disclose to the building official and the registered design professional in responsible charge possible conflicts of interest so that objectivity can be confirmed.
The QAA shall have adequate equipment to perform required tests. The equipment shall be periodically calibrated.
The QAA shall employ experienced personnel educated in conducting, supervising and evaluating tests and special inspections. Experience or training shall be considered relevant where the documented experience or training is related in complexity to the same type of special inspection or testing activities for projects of similar complexity and material qualities.
The QAA shall send copies of all inspection and testing reports to the building official, Owner, Architect, Engineer of Record and Contractor. Reports shall indicate that the work inspected was or was not completed in conformance to the approved construction documents. Discrepancies shall be brought to the immediate attention of the Contractor for correction. If they are not corrected, the discrepancies shall be brought to the attention of the Architect and Engineer of Record.
The QAA shall submit a final report documenting required special inspections and tests, and correction of any discrepancies noted in the inspections or tests. The final report shall be distributed to the building official, Owner, Architect and Engineer of Record in a timely manner prior to the completion of the project.
5.2. Contractor Responsibilities
A.
B.
The Contractor shall submit a written statement of responsibility to the building official and the Owner or the owner’s authorized agent prior to the commencement of work on the systems or components listed in the statement of special inspections. The Contractor’s statement of responsibility shall contain acknowledgement or awareness of the special requirements contained in the statement of special inspections.
Notification of QAA: The Contractor shall notify the QAA in a timely manner so that inspection and testing may be performed as outlined in the statement of special inspections.
5.3. Structural Observations by the Engineer of Record
A.
B.
The Engineer of Record will perform structural observations at critical phases of the project as listed below. Observations will be made on a periodic basis throughout the construction of the structural system. During this timeframe, site visits will be made approximately bi-monthly. Copies of the observation report will be distributed to the Architect, Contractor, Owner, and QAA.
The contractor shall notify the Engineer of Record at least 24 hours in advance before any of the following actions.
1. Placing concrete in any footing.
Observation visits to the site by the Engineer of Record or the Engineer’s field representatives shall not be construed as inspection or approval of construction.
PLAN LEGEND
OPENING
EXISTING OPENING
EXISTING STEEL BEAM OR GIRDER
EXISTING STEEL JOIST OR PURLIN
EXISTING MASONRY WALL
STEEL/WOOD BEAM OR GIRDER
STEEL/WOOD JOIST OR PURLIN
WOOD STUD WALL
WOOD HEADER IN WOOD STUD WALL
NON-BEARING WOOD WALL. SEE ARCH
MINIMUM NAILING SCHEDULE (PER IBC TABLE 2304.10.2)
CEILING JOISTS TO TOP PLATE
FLAT BLOCKING TO TRUSS AND WEB FILLER
ROOF
CEILING JOIST ATTACHED TO PARALLEL RAFTER (HEEL JOINT)
COLLAR TIE TO RAFTER
4.
5.
2.
DESCRIPTION OF BUILDING ELEMENTS SPACING AND LOCATIONNUMBER AND TYPE OF FASTENER
BLOCKING BETWEEN CEILING JOISTS, RAFTERS OR TRUSSES TO
TOP PLATE OR OTHER FRAMING BELOW
BLOCKING BETWEEN RAFTERS OR TRUSS NOT AT THE WALL TOP
PLATE, TO RAFTER OR TRUSS
1.
(3) 8d COMMON OR (3) 10d BOX
(2) 8d COMMON
16d COMMON @ 6" O.C.
EACH END, TOENAIL
EACH END, TOENAIL
FACE NAIL
(3) 8d COMMON OR (3) 10d BOX EACH JOIST, TOENAIL
CEILING JOIST NOT ATTACHED TO PARALLEL RAFTER, LAPS
OVER PARTITIONS (NO THRUST)3. (3) 16d COMMON OR (4) 10d BOX FACE NAIL
PER IBC TABLE 2308.7.3.1 FACE NAIL
(3) 10d COMMON OR (4) 10d BOX FACE NAIL
ROOF RAFTERS TO RIDGE VALLEY OR HIP RAFTERS: OR ROOF
RAFTER TO 2-INCH RIDGE BEAM7.
END NAIL
(3) 10d COMMON OR (4) 10d BOX TOENAIL
(2) 16d COMMON OR (3) 10d BOX
WALL
RAFTER OR ROOF TRUSS TO TOP PLATE6. (3) 10d COMMON OR (4) 10d BOX 2 TOENAILS ON ONE SIDE
AND 1 TOENAIL ON
OPPOSITE SIDE OF
RAFTER OR TRUSS
STUD TO STUD (NOT AT BRACED WALL PANELS)8.
24" O.C. FACE NAIL
10d BOX 16" O.C. FACE NAIL 16d COMMON
STUD TO STUD AND ABUTTING STUDS AT INTERSECTING WALL
CORNERS (AT BRACED WALL PANELS)9.
16" O.C. FACE NAIL
16d BOX 12" O.C. FACE NAIL 16d COMMON
16" O.C. EACH EDGE,
FACE NAIL16d COMMON
BUILT-UP HEADER (2" TO 2" HEADER)10.
16d BOX 12" O.C. EACH EDGE, FACE NAIL
CONTINUOUS HEADER TO STUD11. (4) 8d COMMON OR (4) 10d BOX TOENAIL
TOP PLATE TO TOP PLATE12.
16" O.C. FACE NAIL
10d BOX 12" O.C. FACE NAIL 16d COMMON
TOP PLATE TO TOP PLATE, AT END JOINTS13.
EACH SIDE OF END
JOINT, FACE NAIL
(MINIMUM 24" LAP SPLICE
LENGTH EACH SIDE OF
END JOINT)
(8) 16d COMMON OR (12) 10d BOX
BOTTOM PLATE TO JOIST, RIM JOIST, BAND JOIST OR BLOCKING
(NOT AT BRACED WALL PANELS)14.
16" O.C. FACE NAIL
16d BOX 12" O.C. FACE NAIL 16d COMMON
BOTTOM PLATE TO JOIST, RIM JOIST, BAND JOIST OR BLOCKING
AT BRACED WALL PANELS15. (2) 16d COMMON OR (3) 16d BOX 16" O.C. FACE NAIL
STUD TO TOP OR BOTTOM PLATE16.
TOENAIL
2-16d COMMON OR (3) 10d BOX END NAIL
(4) 8d COMMON OR (4) 10d BOX
TOP PLATES, LAPS AT CORNERS AND INTERSECTIONS17. (2) 16d COMMON OR (3) 10d BOX FACE NAIL 1" BRACE TO EACH STUD AND PLATE18. (2) 8d COMMON OR (2) 10d BOX FACE NAIL 1"x6" SHEATHING TO EACH BEARING19. (2) 8d COMMON OR (2) 10d BOX FACE NAIL 1"x8" AND WIDER SHEATHING TO EACH BEARING20. (3) 8d COMMON OR (3) 10d BOX FACE NAIL
FLOOR
JOIST TO SILL, TOP PLATE, OR GIRDER21. (3) 8d COMMON OR (3) 10d BOX TOENAIL
RIM JOIST, BAND JOIST, OR BLOCKING TO TOP PLATE, SILL OR
OTHER FRAMING BELOW22. 6" O.C. TOENAIL8d COMMON OR 10d BOX
1"x6" SUBFLOOR OR LESS TO EACH JOIST23. (2) 8d COMMON OR (3) 10d BOX FACE NAIL 2" SUBFLOOR TO JOIST OR GIRDER24. (2) 16d COMMON OR (3) 16d BOX BLIND AND FACE NAIL 2" PLANKS (PLANK & BEAM - FLOOR & ROOF)25. (2) 16d COMMON OR (3) 16d BOX EACH BEARINGFACE NAIL
32" O.C. FACE NAIL AT
TOP AND BOTTOM
STAGGERED ON
OPPOSITE SIDES
24" O.C. FACE NAIL AT
TOP AND BOTTOM
STAGGERED ON
OPPOSITE SIDES
BUILT-UP GIRDERS AND BEAMS, 2" LUMBER LAYERS26.
LEDGER STRIP SUPPORTING JOISTS OR RAFTERS27. EACH JOIST OR RAFTER,
FACE NAIL(3) 16d COMMON OR (4) 10d BOX
JOIST TO BAND JOIST OR RIM JOIST28. (3) 16d COMMON OR (4) 10d BOX END NAIL BRIDGING OR BLOCKING TO JOIST, RAFTER OR TRUSS29. (2) 8d COMMON OR (2) 10d BOX EACH END, TOENAIL
20d COMMON
10d BOX
ENDS AND AT EACH
SPLICE, FACE NAIL(2) 20d COMMON OR (3) 10d BOX
No.
5047489-2203
OLIVER
DALLIN
BURT
STATE OF UTAH
PR
OF
ES
S I
ON
AL STRUCTURAL
ENG
INEER
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REV
RESERVED FOR CONSULTANT LOGO
11/02/2026
11/02/2026 2026.070.00
LEGENDS &
ABBREVIATIONS
JORDAN SCHOOL
DISTRICT
JORDAN RIDGE
ELEMENTARY
RE-ROOF
2636 WEST 9800 SOUTH,
SOUTH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .