This is a Price Template Excel file for a Centralized Waste Processing System solicitation (Solicitation Number: 040ADV-25-R-0028) issued by the U.S. Government Publishing Office (GPO). The pricing document details mandatory and optional Contract Line Item Numbers (CLINs) for a comprehensive waste management system, including equipment procurement, design, materials, labor, and installation for the Secure Production Facility at NASA's Stennis Space Center.
The price template breaks down costs across six mandatory CLINs (equipment, design, materials, labor/installation, construction contingency, and tariffs) and eight optional CLINs for maintenance and spare parts services spanning four years. The equipment list includes multiple components like separators, divert valves, disintegrators, fans, dust collection systems, variable frequency drives, and control panels. The estimated quantities and specifications suggest a complex waste processing system designed to handle sensitive document production waste with stringent security requirements. All pricing fields are currently marked as "TBD", indicating vendors will need to complete the detailed pricing template as part of their proposal submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Summary
| Please Complete the Equipment, Design, Materials, Labor, Other, and BOM tabs, then use the data to populate this Price Summary Sheet. | ||
| Mandatory CLINs | ||
| CLIN | Description | TOTAL PRICE |
| CLIN 0001 | All Equipment (include the hurricane tie downs) | $TBD |
| CLIN 0002 | Preliminary and Final Waste System Design | $TBD |
| CLIN 0003 | All Materials | $TBD |
| CLIN 0004 | Labor/installation (including travel) | $TBD |
| CLIN 0005 | Construction Contingency | $TBD |
| CLIN 0006 | Tariffs for equipment (if applicable) | $TBD |
| Sub TOTAL PRICE | $TBD | |
| Optional to propose CLINs | ||
| CLIN | Description | TOTAL PRICE |
| CLIN 1001 | Maintenance Services Year 1 After One Year Warranty | $TBD |
| CLIN 1002 | Spare Parts Replacement Year 1 After One Year Warranty | $TBD |
| CLIN 2001 | Maintenance Services Year 2 After One Year Warranty | $TBD |
| CLIN 2002 | Spare Parts Replacement Year 2 After One Year Warranty | $TBD |
| CLIN 3001 | Maintenance Services Year 3 After One Year Warranty | $TBD |
| CLIN 3002 | Spare Parts Replacement Year 3 After One Year Warranty | $TBD |
| CLIN 4001 | Maintenance Services Year 4 After One Year Warranty | $TBD |
| CLIN 4002 | Spare Parts Replacement Year 4 After One Year Warranty | $TBD |
| Sub TOTAL PRICE | $TBD | |
| Amount of Profit Included in Total Proposed Amount: | $ - 0 |
Equipment
| NAME | VOLTAGE & MOTOR HP | QTY. | Unit Price | Total Price |
| SEPARATOR | 460VAC (7.5HP) | 1 | ||
| DIVERT VALVE | 120VAC (10A) | 1 | ||
| DISINTEGRATOR | 460VAC (60HP) | 2 | ||
| DISINTEGRATOR RELAY FAN | 460VAC (10HP) | 2 | ||
| DUST RELAY FAN | 460VAC (10HP) | 1 | ||
| DUST CYCLONE | 1 | |||
| AIRLOCK | 460VAC (2HP) | 1 | ||
| BRIQUETTER | 460VAC (15HP) | 1 | ||
| MATERIAL HANDLING FAN | 460VAC (25HP) | 10 | ||
| DUCT DIVERT VALVE | 120VAC (10A) | 10 | ||
| FLAME AND SPARK SYSTEM | 120VAC (10A) | 1 | ||
| NO RETURN VALVE (NRV) | 120VAC (10A) | 1 | ||
| DUST COLLECTOR | 120VAC (5A) | 1 | ||
| RETURN AIR FAN | 460VAC (75HP) | 2 | ||
| BULK WASTE SHREDDER | EXISTING | 1 | ||
| BULK WASTE MATERIAL FAN | 460VAC (25HP) | 1 | ||
| VFD 10 HP Heavy Duty | 480 Volt 20 Amp | 3 | ||
| VFD 15 HP Heavy Duty | 480 Volt 20 Amp | 10 | ||
| VFD 75 HP Heavy Duty | 480 Volt 40 Amp | 1 | ||
| Sift Start 480 310 amp | 480 volt 150 Amp | 1 | ||
| PLC Hardware | I/O modules/ Touchscreens | 1 | ||
| Control Panel | 1 | |||
| Total | $ - 0 | |||
| Note: this is projected list of equipment, please add yours as needed |
Design
| NAME | QTY. | Unit Price | Total Price |
| Preliminary and final Design | 1 | ||
| Engineering Support | 1 | ||
| Total | $ - 0 |
Materials
| NAME | DESCRIPTION | Estimated QTY. | Unit Price | Total Price |
| STEEL SUPPORT | STRUCTURAL STEEL | 1 | ||
| DROP CHUTE | 24"X24" | 1 | ||
| FAN SUPPORT STRUCTURE | STRUCTURAL STEEL | 1 | ||
| NRV SUPPORT | STRUCTURAL STEEL | 1 | ||
| DUST COLLECTOR SUPPORT | STRUCTURAL STEEL | 1 | ||
| 12" Ducting (total linear ft) | 12" Spiral Galvanized | 1700 | ||
| 24x24 square ducting (total linear ft) | 24x24 galvanized steel | 40 | ||
| 30" Ducting (total linear ft) | 30" Spiral Galvanized | 250 | ||
| DUCT SUPPORT | TRIM DUCTING (12IN.) | 220 | ||
| DUCT SUPPORT | DUST DUCTING (30IN.) | 5 | ||
| DUCT SUPPORT | RETURN AIR DUCTING (30IN.) | 30 | ||
| Ducting Insulation (linear feet) | Industry Standard for External piping | 2000 | ||
| Electrical Materials | CONDUIT, WIRING, BREAKERS, ETC. | 1 | ||
| Total | $ - 0 | |||
| Note: please provide your quantity calculations if different |
Labor
| NAME | DESCRIPTION | QTY. | Unit Price | Total Price |
| Engineering Support: Support Structures | Fab and Installation | 1 | ||
| Engineering Support: Electrical Labor | Electrical | 1 | ||
| Engineering Support: Mechanical Labor | Mechanical | 1 | ||
| Machine Installation Labor | Installation of Items List in Equipment | 1 | ||
| Training | One Week & Startup | 1 | ||
| Crane and Support | 1 | |||
| Project Manager | Site Manager (duration of project) | 1 | ||
| Total | $ - 0 |
Other
| NAME | DESCRIPTION | QTY. | Unit Price | Total Price |
| Construction Contingency | % | 1 | ||
| Total | $ - 0 | |||
| Optional | ||||
| Maintenance Services Year 1 After One Year Warranty | 1 | |||
| Spare Parts Replacement Year 1 After One Year Warranty | 1 | |||
| Maintenance Services Year 2 After One Year Warranty | 1 | |||
| Spare Parts Replacement Year 2 After One Year Warranty | 1 | |||
| Maintenance Services Year 3 After One Year Warranty | 1 | |||
| Spare Parts Replacement Year 3 After One Year Warranty | 1 | |||
| Maintenance Services Year 4 After One Year Warranty | 1 | |||
| Spare Parts Replacement Year 4 After One Year Warranty | 1 | |||
| Total | $ - 0 |
BOM
| CLIN | NAME | DESCRIPTION / SOURCE | VOLTAGE & MOTOR HP | QTY. | Unit Price | Total Price |
| Equipment 0001 | SEPARATOR | 460VAC (7.5HP) | 1 | |||
| DIVERT VALVE | 120VAC (10A) | 1 | ||||
| DISINTEGRATOR | 460VAC (60HP) | 2 | ||||
| DISINTEGRATOR RELAY FAN | 460VAC (10HP) | 2 | ||||
| DUST RELAY FAN | 460VAC (10HP) | 1 | ||||
| DUST CYCLONE | 1 | |||||
| AIRLOCK | 460VAC (2HP) | 1 | ||||
| BRIQUETTER | 460VAC (15HP) | 1 | ||||
| MATERIAL HANDLING FAN | 460VAC (25HP) | 10 | ||||
| DUCT DIVERT VALVE | 120VAC (10A) | 10 | ||||
| FLAME AND SPARK SYSTEM | 120VAC (10A) | 1 | ||||
| NO RETURN VALVE (NRV) | 120VAC (10A) | 1 | ||||
| DUST COLLECTOR | 120VAC (5A) | 1 | ||||
| RETURN AIR FAN | 460VAC (75HP) | 2 | ||||
| BULK WASTE SHREDDER | EXISTING | 1 | ||||
| BULK WASTE MATERIAL FAN | 460VAC (25HP) | 1 | ||||
| VFD 10 HP Heavy Duty | 480 Volt 20 Amp | 3 | ||||
| VFD 15 HP Heavy Duty | 480 Volt 20 Amp | 10 | ||||
| VFD 75 HP Heavy Duty | 480 Volt 40 Amp | 1 | ||||
| Sift Start 480 310 amp | 480 volt 150 Amp | 1 | ||||
| PLC Hardware | I/O modules/ Touchscreens | 1 | ||||
| Control Panels | 1 | |||||
| Design 0002 | Vendor Contracted preliminary and final Design | 1 | ||||
| Engineering Support | 1 | |||||
| Materials 0003 | STEEL SUPPORT | STRUCTURAL STEEL | 1 | |||
| DROP CHUTE | 24"X24" | 1 | ||||
| FAN SUPPORT STRUCTURE | STRUCTURAL STEEL | 1 | ||||
| NRV SUPPORT | STRUCTURAL STEEL | 1 | ||||
| DUST COLLECTOR SUPPORT | STRUCTURAL STEEL | 1 | ||||
| 12" Ducting (total linear ft) | 12" Spiral Galvanized | estimated quantity | 1700 | |||
| 24x24 square ducting (total linear ft) | 24x24 galvanized steel | estimated quantity | 40 | |||
| 30" Ducting (total linear ft) | 30" Spiral Galvanized | estimated quantity | 250 | |||
| DUCT SUPPORT | TRIM DUCTING (12IN.) | estimated quantity | 220 | |||
| DUCT SUPPORT | DUST DUCTING (30IN.) | estimated quantity | 5 | |||
| DUCT SUPPORT | RETURN AIR DUCTING (30IN.) | estimated quantity | 30 | |||
| Ducting Insulation (linear feet) | Industry Standard for External piping | estimated quantity | 2000 | |||
| Electrical Materials | CONDUIT, WIRING, BREAKERS, ETC. | 1 | ||||
| Labor 0004 | Support Structures | Fab and Installation | 1 | |||
| Electrical Labor | Electrical | 1 | ||||
| Mechanical Labor | Mechancial | 1 | ||||
| Machine Installation Labor | Installation of Items List in Equipment | 1 | ||||
| Training | One Week & Startup | 1 | ||||
| Travel (if applicable) | 1 | |||||
| Engineering Support | 1 | |||||
| Crane and Support | 1 | |||||
| Project Manager | Site Manager (duration of project) | 1 | ||||
| Contingency 0005 | Construction Contingency | 1 | ||||
| Tariffs 0006 | Tariffs for equipment (if applicable) | 1 | ||||
| TOTAL | $ - 0 | |||||
| Optional | ||||||
| Maintenance Services Year 1 After One Year Warranty | 1 | |||||
| Spare Parts Replacement Year 1 After One Year Warranty | 1 | |||||
| Maintenance Services Year 2 After One Year Warranty | 1 | |||||
| Spare Parts Replacement Year 2 After One Year Warranty | 1 | |||||
| Maintenance Services Year 3 After One Year Warranty | 1 | |||||
| Spare Parts Replacement Year 3 After One Year Warranty | 1 | |||||
| Maintenance Services Year 4 After One Year Warranty | 1 | |||||
| Spare Parts Replacement Year 4 After One Year Warranty | 1 | |||||
| Total | $ - 0 |