This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for Solicitation Number 040ADV-25-R-0028. The amendment provides responses to previously submitted questions regarding a Government Printing Office (GPO) space expansion project. The responses include details about installation vendors, project contractors, and waste particle specifications.

The amendment identifies key project stakeholders, including NASA and the United States Army Corps of Engineers as primary oversight entities. Birmingham Industrial Contractors (BIC) is the general contractor, with subcontractors including Carriere-Stumm (roofing), Doleac Electric Company (electrical), and Broussard Mechanical (mechanical). The document also provides detailed specifications for six types of waste particles, including dimensions and weights, with Type A final products trim weighing approximately 5.25 grams and having a folded U-shape of 0.5625" (bottom) x 1.125" (sides) x 0.125" (thick).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT CONTROL NUMBER : 040ADV-25-R-0028

SUMMARY OF CHANGES : The purpose of this amendment is to provide responses to the questions submitted.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

(Signature of person authorized to sign)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

040ADV-25-R-0028-C0002

PAGE OF PAGES

1 2

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Same As Issuing Office

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

040ADV-25-R-0028

9B. DATED (SEE ITEM 11)

11/04/2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER 3. EFFECTIVE DATE

1. CONTRACT ID CODE

X

GPO

732 North Capitol St, NW Washington DC, 20401, USA

PR-26-GPO-1452

Nataliya Holl

11 21 25

X

52.243-1Changes-Fixed-Price

040ADV-25-R-0028-C0002

Summary of Changes

1. Provide a response to the questions submitted. This is a continuation of the previously submitted questions and responses, starting from response to the question 10:

10.

Section C 4.4 Installation

Can you provide a list of preferred vendors to help with installation?

GPO does not have preferred vendors but below is the list of vendors we have worked in the past:

a. General Contractors:

- Double H Contractors, Zac Holliday 601.215.6409

- Cox Parker Contracting, Brian Parker 985.705.3545

b. Electrical Contractor:

- Doleac Electric Company, Chris Saucier (o) 228.831.9777

(c) 228.380.0388

c. Mechanical Contractor:

- Donaghey Mechanical Contractors, Mike Harrub 251.476.6494

11. Section C II. Scope of Work

Who is the contractor and subcontractor working on the expansion project?

The GPO space expansion project is handled by NASA and the United States Army Corps of Engineers, see below information:

a. COR/CM: United States Army Corps of Engineers

b. General Contractor: Birmingham Industrial Contractors (BIC) and there are specific subcontractors that are hired by

BIC:

Roofing Subcontractor: Carriere-Stumm Electrical Subcontractor: Doleac Electric Company Mechanical Subcontractor: Broussard Mechanical

12. Section C

17. Performance Requirements

What is the approximate size and weight of the waste particles?

The approximate size and weight of the waste particles are:

a. Type A: Final products trim

i. ~ Net Shape: Folded U Shape – 0.5625” (bottom) x 1.125” (sides) x 0.125” (thick)

ii. ~Weight: 5.25 grams

iii. Note: additional products printed in smaller quantities.

Sizes approximately the same, but weight and thickness doubles.

b. Type B: Rectangular – single sheet

i. ~ LxW: 1” x 7.5”

c. Type C: Rectangular – single sheet

i. ~ LxW: 0.25” x 7”

d. Type D: Rectangular – single sheet

i. ~ LxW: 0.08” x 16”

e. Type E: Rectangular – single sheet

i. ~ LxW: 35” x 1.25”

f. Type F: Rectangular – single sheet

i. 24” x 0.875”

End of Amendment C0002.