5-Attachment C - Cost Proposal.xlsx

XLSX spreadsheet 61 KB Posted

Attached to
Digital Asset Management System
Solicitation number
TJ26-12
Issued by
Utah

About this file

This is a Cost Proposal Form (Attachment C) for a Digital Asset Management System RFP (Solicitation # TJ26-12) issued by the State of Utah Division of Purchasing and conducted by the Utah Division of Archives and Records Service. The RFP seeks a single contract award for a Digital Asset Management System, with evaluation occurring across four phases: Minimum Mandatory Requirements (Phase 1), Criteria Evaluation (Phase 2 with 750 points), Demonstration Evaluation (Phase 3 with 200 points), and Cost Evaluation (Phase 4 with 175 points). Vendors must achieve minimum scores of 525 points in Phase 2 and 130 points in Phase 3 to advance. The resulting contract term is five years.

The cost proposal form requires vendors to input all implementation and annual maintenance costs, including initial startup fees and data migration expenses, organized across a five-year contract period. Training costs must be itemized separately with hourly rates for specific positions if applicable. All costs must be entered in designated yellow-highlighted cells, with total proposed costs calculated in cell H43 and evaluated using the formula: Cost Points × (Lowest Proposed Price/Proposed Price), resulting in a maximum of 175 points. The form specifies that any costs not provided on the cost schedule will not be allowed into the resulting contract, and any deviation from the required format may result in proposal disqualification. Zero entries or blank cells are interpreted as services provided at no cost or built into other line items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Form

Attachment D: Cost Proposal Form
System Network
Solicitation # TJ26-12

Offeror Name:

Costing Considerations & Instructions
1. All cells in a yellow highlight allow for a Offeror input. This form will be used to evaluate cost ONLY and may not reflect all the costs associated with the contract or other "optional" services that can be added once awarded. Costs quoted here should be as closely related to the services required as stated in the scope of work.
2. Cost will be evaluated based on the lowest Total Proposed Costs (cell H43 and Highlighted in GREEN) for the purchase and enhancements required to meet the specifications of this RFP. Total Proposed Cost is a combination of cell H29 & D40 (both highlighted in Blue).
3. If zero is entered for any cell or if any cell is left blank, the State will assume that the related services are either provided at no cost or built into another cost item. If a cost category is not applicable, enter N/A.
4. Any cost not provided on this Cost Schedule, will not be allowed into the resulting contract.
5. Any deviation from this format may result in disqualification of Offeror's proposal.
Implementation and Annual Maintenance Costs
Initial Contract Term
ProductYear 1 CostYear 2 CostYear 3 CostYear 4 CostYear 5 Cost
Initial Startup Fee including data migration
All costs as an all inclusive value. Examples include travel costs, user training, costs per hour for installation and Training.. Etc…
ANNUAL TOTALS:$ - 0$ - 0$ - 0$ - 0$ - 0Implementation and Annual Maintenance*
$ - 0
Training Costs
If additional costs will be charged for training, etc., during the life of the 5-year contract, enter the hourly rates associated with such costs below. Insert additional lines as necessary. If zero is entered for any cell or if any cell is left blank, the State will assume that the related services are either provided at no cost or built into another cost item.
Position TitlePosition DutiesCost per Hour
/ hour
/ hour
/ hour
/ hour
/ hour
/ hour
Training Cost0/ hour

Total Proposed Costs* $ - 0

* Total Proposed Costs will be evaluated as outlined in the RFP.

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

File details come from the government source that posted it. Updated .