5-Attachment B Barnett Road Elevated Storage Tank Inspection Report.pdf
PDF 638 KB Posted
- Attached to
- Elevated Storage Tanks Removal
- Solicitation number
- 2026-PME-06
- Issued by
- Clayton County, Georgia
About this file
This is a Water Tank Inspection Report prepared by Tank Pro, Inc. for the Clayton County Water Authority (CCWA) regarding the Barnett Road Elevated Storage Tank located at 101 Barnett Road, Forest Park, Georgia. The inspection was conducted on December 19, 2024, and documents the condition of the 500,000-gallon elevated steel storage tank constructed in 1963 with a height of 121 feet. The tank features seven welded tubular columns, three torus flex cables, and safety climb systems. The inspection identified multiple areas requiring maintenance and repairs, including issues with the float system (requiring new PVC float and cable), exterior ladder cage, foundation base plates, roof vent, roof hatch, cathodic protection system, and siphon pipe. The report also documented lead testing results, with exterior paint samples showing 9,225 ppm of lead, exceeding safe levels and requiring lead abatement procedures with a 50,000 cfm dust collector during any exterior painting work.
The inspection report provides comprehensive maintenance recommendations scheduled for implementation, with estimated total costs ranging from $435,000 to $475,000, excluding a potential interior overflow pipe replacement project estimated at $60,000 to $70,000. Key recommendations include pressure washing and recoating foundations with Tnemec Series 156, installing new flex cable safety climbs, replacing the interior float system with stainless steel components, welding protection over anchor bolt chairs, and conducting a complete interior renovation using near-white blast preparation with zinc primer and epoxy coatings during the next scheduled renovation cycle. The report notes that coordination with antenna companies and utility providers will be necessary for equipment relocation and power line management during future exterior painting projects, and that tree trimming and site staging planning will be required to accommodate heavy equipment access and containment systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B Barnett Road Elevated Storage Tank Inspection Report
TANK PRO, INC.
WATER TANK INSPECTION REPORT
Mailed: 1-27-25
Phone:770-960-5200
E-mail: brigitte.vonoppenfeld@hdrinc.com Contact: Brigitte von Oppenfeld 602-881-5861
Welded
Seven (7)
Tubular
Three (3)
Torus
Flex cable
Yes
10,000 Estimated
19,600 Estimated
White
Spray
Are Foundations above grade?
Are Foundations cracked? Describe:
Do base plates need grout repair? How Many?
Are the Anchor Bolts tight?
Are there any indications of leaks? No Location(s): N/A
Are the Interior and Exterior ladders safe? Yes
Is the overflow pipe secure? Yes
Is the Exterior Ladder rolling or fixed? All fixed ladders
Are there any buildings with colored metal roofs near the tank? No
Does the Interior have a painter's trolley? No
Does the Exterior have antennas? Yes Location(s): Column ladder (1)
Tank Address/Coordinates: 101 Barnett Road Forest Park, GA 33.6146884-84.3845569
Year Built:
Flag & Clayton Co. Wtr Auth.
Current Inspection Date:
Type Inspection:
Tank Name:
Inspected By:
December 19, 2024
Capacity:
Height to Top
Electricity:
Yes (God Bless America logo)
Yes Are the Anchor Bolts Rusted? Minor spot rust
Water:
Logo: Exterior Color:
Type Disinfection:
Yes
Yes
Yes
Minor hair line cracks
A few areas
TANK OWNER: Clayton County Water Authority
Address: 1600 Battle Creek Road
City, State, Zip Code: Morrow, Georgia 30260
TANK COMPONENTS
FOUNDATION CONDITIONS
Report & Photos Provided:
Washout
Barnett Road
Matthew Sims
Type Construction:
Number of Columns:
Type Columns:
Number Tower Panels:
GENERAL TANK INFORMATION
500,000
121'
Yes
Yes
Type Bottom:
Safety Climb Type:
Ladder Gate:
Interior Square Feet,Wet:
Exterior Square Feet:
Does the Tank have Cathodic Protection? Yes
Does the Over Flow Pipe run to the ground? Yes
Is the Float System Working? No, Need new PVC float and cable
Does tank have a working siphon tube? Yes
Does the Interior have Spider Rods? No
Is the Vent Screen Secure? Yes
Is the Hatch Cover Secure? Yes
Is the Balcony Safe? Yes
Is the Over Flow Pipe located on the Exterior? No
Does the Tank have any Graffiti? No
Are the Roof Seams Lapped or Welded? Welded
How many Roof I-Beams are present? Two (2)
Is the Tank Site fenced? Yes
Date Last Painted: 2002
Surface Preparation Used: Most likely SSPC # 10 near white blast
Coating Type: Induron PE 54 Epoxy
Does the Interior Paint contain lead? Below detection limit
Was the Interior sediment removed during inspection? Yes
Was the Interior Fill Pipe flushed before refilling? Yes
Is the General Adhesion of the Coating Good? Yes
Roof Above High-water Mark: Poor Describe: The coating is peeling exposing the steel plate. Rust present on beams
Interior Tank Shell: Good Describe: Random rust spots mainly on the angle iron stiffener.
Interior Tank Bowl: Fair Describe: Blistering paint with corrosion under the blisters.
Interior Tank Riser Pipe: Fair Describe: Some blistering paint and corrosion
Interior Ladders, Rods, Beams, Pipe Supports: Fair Describe: Spot rust is present
Estimated % of Coatings in Good Condition? 65%
Date Last Painted: # 2002 Color: White
Surface Preparation Used: Pressure wash and power tool clean
Coating Type: Induron 5500 Acrylic Polyurethane
Does the Exterior Paint contain lead? 9225 ppm Lead Abatement is req. 50K cfm dust collector needed
STATE GOOD, FAIR, OR POOR
REPORT CONDITION OF METAL AND PAINT IN THE FOLLOWING AREAS:
EXTERIOR REPORT
REPAIRS MADE BY INSPECTOR:
INTERIOR REPORT
Is the General Adhesion of the Coating Good? No, uniform cracking paint. Over coating is not recommended
Is the Vent Pipe Safe to Rig From? Yes
How Many Man Ways are on the Tank? Two (2) Location(s): One riser, One roof
Tower (Foundation to Catwalk): Poor Describe: Uniform rust and cracking brittle paint
Balcony: Good Describe: Some spot rust on handrail and floor
Exterior Tank Bowl: Good Describe: Very little rust
Exterior Tank Shell: Fair Describe: Some flaking and peeling paint
Exterior Tank Roof: Poor Describe: Cracking and peeling paint. Rust is present
Exterior Ladders: Fair Describe: Spot rust and flaking paint
Estimated % of Coating in Good Condition? 50% Based on the cracking paint overcoating is not recommended.
o Visual Inspection Washout Inspection o Float Adjustment o Graffiti Touch-Up
Reports & Photographs LEAD Testing o Provide Pressure Valves Interior Disinfection o Exterior Spot Painting Describe:
o Interior Spot Painting Describe:
o Foundation Repairs Describe:
o Steel Repairs Describe:
o Miscellaneous Items Describe:
STATE GOOD, FAIR, OR POOR
MAINTENANCE PERFORMED THIS YEAR √ WHAT IS APPLICABLE
REPORT CONDITION OF METAL AND PAINT IN THE FOLLOWING AREAS:
o Visual Inspection o Washout Inspection o Float Adjustment o Graffiti Touch-Up o Reports & Photographs o LEAD Testing o Provide Pressure Valves o Interior Disinfection o Exterior Spot Painting Describe: Install new flex cable safety climbs on exterior and interior ladders o Interior Spot Painting Some of the existing cable and brackets have rust. This rust voids the o Foundation Repairs safety rating o Steel Repairs Describe: Caulk foundation base plates and repair grout as needed
Describe: Drill additional drain holes where water is ponding on catwalk
Describe: Remove the old steel float, install new pvc float, new pulleys, new cables/clamps. All stainless steel.
Describe: Remove nameplate and install two brackets. Use stove bolts to secure name plate when painting is complete.
Describe: Weld 1/4 inch plate over anchor bolt chairs install grease fitting then fill each with grease. Riser pipe only total of (4)
Describe: Remove the exterior ladder cage and dispose to reduce maintenance cost. This is not needed with the flex cable safety system
Describe: Pressure wash all foundations then brush blast and apply Two (2) coats of Tnemec series 156
Describe: Consider removing the interior overflow pipe and installing new on the exterior. Estimated cost is $60,000-$70,000
Describe: If the interior overflow pipe is not removed, remove the steel braces weld padeyes to the roof and overflow pipe then secure with SS cable
Describe: Install new Riser bolts and nuts
Describe: Install new manway Gaskets (Riser)
Describe: Remove the interior riser pipe ladder to provide more room to work
Describe: Remove the interior steel siphon pipe in the bowl, weld brackets as needed then install a new two inch schedule 80 PVC pipe. Secure with galvanized U-bolts
Describe: Install 24 inch aluminum roof vent
Describe: Install new square 24 inch roof hatch.
Describe: Install new cathodic protection hand hole covers. Day light can be seen from the interior which allows contaminates into the water
Describe: Apply an extra coat of Tnemec series 215 to the upper wall angle iron stiffener and the roof beams. (Brush and roll)
Describe: When work is planned for this tank that requires exterior painting
CCWA should notify the Antenna companies so they can temporarily
MAINTENANCE SCHEDULED FOR NEXT YEAR
relocate their coax and antennas somewhere other than the tank site.
Theses companies will also need to relocate or cover their equipment that is on the ground.
Describe: Repaint level indicator marks when exterior is painted
Describe: When tank is painted next have cathodic protection company install new wires, anodes and calibrate the system
Describe: Next Interior renovation SSPC #10 Near White blast, Zinc primer and two (2) Coats of Epoxy
Describe: Next exterior renovation SSPC #6 Commercial blast, Zinc primer, epoxy intermediate and urethane finish. Lead abatement required
Describe: Staging equipment for the project and working around the concrete ready mix plant trucks needs to be planned out so enough room is available to stage equipment. A fueling station is outside fence.
Describe: CCWA will need to have some of the trees trimmed when tank is painted next so containment can go up and down. Trees in the drive up to the tank should be trimmed to allow heavy equipment to the site
Describe: CCWA will need to have power lines moved or covered when the exterior is painted next assuming containment will be needed. A 20 foot clearance is needed around the tank.
Describe: The estimated cost for all work above excluding the new overflow pipe is $435,000- $475,000
Email: tankpro@tankproinc.com OR phillip@tankproinc.com
MAINTENANCE QUESTIONS OR SCHEDULING CONTACT:
Coordinator: Phillip Stearman
5500 Watermelon Road, Northport, AL 35473
Phone: 205-750-0444 Fax: 205-750-0464
Barnett Road Elevated Storage Tank
Lead Testing Results aF ;'
G c- e (r s
,€ j :'1
.'7 G rc
T _ \z v' .9 I't -C ;.= Jv <
/Y -^ :^ ;^ )\ ^E JA
- t r) d a cJ =
47 a a
J 6o a + k
o) A 9€ P a) i-( D rl-lt) u)
_l ::
,J t- 6' :: o a F F 3 c N iD
N A
E
E yU k f-i9
1u t.s ss [3
:ii n
C
)A l-a zs
-s sP i
9a u.
-- ai o zt 2z at
(a a cq A
-l< a F ' '2 i! i -
(a
_a =
-l - a o o
(D - (D P z - o I - 5 -J
IJ !" oo ^ t\.
a a 5 :^ @ u @
Sutherland Environmentsl Company, Inc.
25 l5 5th Avenue South Birmingham, AL 35233 205-581-9-500
Client: Tank Pro, Inc.
Attention: Mr. Shawn Agness Address: 5500 Watermelon Road
Northport, AL 35473
Report Date:
Reference #
P.O. #
Project ID:
December 31,2024 s2966 2024-8t4KY Clayton County Water Works Forest Park/Bametr Rd. 500K ELE
Sample Matrix:
Date Received:
Date Collected:
solid 12t23t24
12t20t24
LM/RG
Analytical Analyst:
Date of Analysis:
Method:
K. Doriety 12130124
EPA Method 60208le Collector:
METALLIC ANALYTES
FIELD ID FIELD ID
Interior Exterior
Analyte, mg/Kg as Total
LAB ID LAB ID Detection
Limit, mg/Kg262296 262297
Lead BDL 9,225 5.0
BDL: Below Detection Limit Detection Limit is Reporting Limit All results expressed as PPM of total analyte
N /QAQC
EPA Laboratory ID ALOl084
Respectfully submitted, k**2,-d Kevin Doriety Analytical Chemist
Quality Environmental Anolyticol Services
Sutherlsnd Environmental Read and Review Checklist
l. Is the client and the sample collector(s) accurately not.o @] lTf,i on report?
l-\6-l t l-6--t t l-^6-t t
I-T6-t t tr6-t t t-6-l t tr6-t t t N6-l t t*6-t t r-T6-t t
I--N6-t t ln.ot t l-o-l t t
K(
2. Do all dates match the COC on the report? t No-l fE]
3. Is the purchase order ID (PO) and project ID accurarely I NO | | yEq I noted on report?
4. Are allmethods and method references correct on r"portz@ lF-l tDF/ latnY ?v0Notes:
6zqvb S ut h erla nd E nviro nme ntal C o,, I n c, f'o-llT] I No 1116-l lTo-l fF-l I No I f?fi-51 fNo llsl fNo llEl I No llEl
Ditution Factors/conversions I No I lfrIl Detection/Reporting/Quant. Limits I No I fFn QC Reviewed: ry Initial*: /nJ*
* MJH = Michael Heard, KD: Kevin Doriety, MSH : Matt Hageman, KH : Kelly Hester
Invoice
5. Do the Field ID(s) and the Lab ID(s) correspond to the
COC?
6. Is the report formatted corectly?
7. Does the following information on report correspond to the printout information from the analytical instrumentation:
Sample Matrix
Analyst
Analysis Date/Time
Analyte concentration
Units
S uth erland Envir nnmental Co mn anv Inc, Sample Check-in Form
Sample Custodian (signed):
Blank Page