3-Figure 2 Barnett Road Demolition Plan.pdf
PDF 350 KB Posted
- Attached to
- Elevated Storage Tanks Removal
- Solicitation number
- 2026-PME-06
- Issued by
- Clayton County, Georgia
About this file
This is a demolition plan document for the Clayton County Water Authority (CCWA) related to the removal of an elevated storage tank located at 101 Barnett Road, Forest Park, Georgia. The plan provides detailed site specifications for the demolition of a 0.5 million gallon elevated steel storage tank, including property boundaries, utility easements, equipment laydown areas, and access routes. The demolition work requires removal of the water tower to its foundation, with fill, drain, and overflow piping to be removed to the first mechanical joint situated in the ground vault below the riser. Concrete openings must be covered with half-inch thick aluminum diamond plate secured by stainless steel wedge anchors and sealed with exterior-grade silicone sealant. The contractor is required to remove fencing as needed for access, demolish any antenna or appurtenances on the tank, and ensure the roadway remains clear for CEMEX access outside active demolition hours. Equipment laydown and crane operations are restricted to designated hatched areas on the site plan.
The document specifies that the contractor must field verify tank dimensions and comply with specification sections 01 11 00 (Summary of Work) and 02 41 00 (Demolition) for all demolition requirements. The site is subject to permanent easements for CEMEX Southeast LLC and CCWA access, as well as temporary easements for construction activities. The plan was prepared by HDR Engineering, Inc., with project manager Kristina Yanosek, dated November 13, 2025, and assigned project number 10413963. No pricing information, set-asides, incumbent data, or funding sources are addressed in this technical demolition plan document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X
X X
XXX
X X
BARNETT ROAD (R/W VARIES)
EP
EP
EP
EP
(PER DB 10560 - PG 178)
490'± FROM C/L INT
BARNETT RD
OL
D
DI
XI
E
RD
N/F
GEORGIA POWER CO
PARCEL# 13077A
A005
N/F
ALBERT WEIR
PARCEL# 13077A
A007
DB 1119 - PG 153
N/F
CEMEX SOUTHEAST LLC
PARCEL# 13077A A008
DB 8253 - PG 673
WATER TOWER LEG, TYP.
OHE
OHE
OHE OHE
S00°02'07"E 92.81'
TEXACO
PARCEL# 13077A
A003
LOADING SILOS
TE
TE
TE
TE
TE
EXISTING PERMANENT
EASEMENT FOR CEMEX
AND CCWA ACCESS
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
N89°00'34"W 100.00'
IPF
IPF
POB:
IPF
1/2'' RB
IPS
EQUIPMENT LAYDOWN AND
CRANE BASE TO BE LIMITED TO
HATCHED AREA.
ROADWAY TO BE UTILIZED BY
CONTRACTOR FOR HAULING DURING
DEMOLITION ACTIVITY. ROADWAY TO
REMAIN CLEAR FOR USAGE BY CEMEX
OUTSIDE THE HOURS OF ACTIVE
DEMOLITION.
DEMOLISH WATER TOWER
TO FOUNDATION
SEE NOTE 3
S88°53'59"E 100.13'
S00°34'03"W 207.02'
FENCE
SHED TO REMAIN
N00°06'47"W 93.00'
SHEET TITLE
PROJECT TITLE
PROJECT MANAGER
DATE
PROJECT NUMBER
REFERENCE DOCUMENT
EXHIBIT NUMBER
REFERENCE SHEET
HDR Engineering, Inc.
1100 Peachtree Street NE Suite 400 Atlanta, GA 30309-4053 404.601.8600
KRISTINA YANOSEK
11-13-2025
10413963
0 1" 2"
1" = 70'
CCWA ELEVATED STORAGE TANK DEMOLITION
ABBREVIATIONS & LEGEND
PROPERTY BOUNDARY
DEMOLITION
PE
OHE
PERMANENT EASEMENT
OVERHEAD ELECTRIC
TE TEMPORARY EASEMENT
POINT OF BEGINNING
IRON POST FOUND
IRON POST SET
REBAR
POB
IPF
IPS
RB
PHOTO OF BARNETT ROAD
ELEVATED STORAGE TANK SITE
DETAIL 2
1. REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OF WORK AND SPECIFICATION
SECTION 02 41 00 - DEMOLITION FOR DEMOLITION REQUIREMENTS.
2. SEE DETAIL 1 FOR TANK DIMENSIONS. CONTRACTOR TO FIELD VERIFY.
3. CONTRACTOR TO REMOVE FENCE AS NEEDED FOR ACCESS.
4. FILL, DRAIN AND OVERFLOW PIPING THAT EXIST IN THE CENTER RISER SHALL BE REMOVED
TO THE FIRST MECHANICAL JOINT SITUATED ON PIPE IN THE GROUND VAULT BELOW RISE.
CONCRETE OPENINGS SHALL BE COVERED WITH ¼-INCH THICK ALUMINUM DIAMOND PLATE
SECURED BY 3/8-INCH STAINLESS STEEL WEDGE ANCHORS WITH WASHERS. ALUMINUM COVER
SHALL BE SEALED TO CONCRETE USING EXTERIOR GRADE SILICONE SEALANT.
5. THERE IS NOT ANY ACTIVE COMMUNICATION EQUIPMENT ON TANK, CONTRACTOR TO
DEMOLISH ANY ANTENNA OR APPURTENANCES AS NEEDED.
EDGE OF PAVEMENT
NOTES
UTILITY POLE
EP
BARNETT ROAD DEMOLITION PLAN
TANK ELEVATION (N.T.S)
DETAIL 1
EL. 984'
OV
ER
AL
L H
EI
GH
T, P
IE
R
TO
O
VE
RF
LO
W
2.0 0'
BO
W
L H
EI
GH
T
.00
FIGURE 2
File details come from the government source that posted it. Updated .