5-8069 StookeyFireESR SOW MAforArch.pdf

PDF 1 MB Posted

Attached to
NC27-106 Stookey Fire ESR Arch Survey (WRI 8069)
Solicitation number
NC27-106
Issued by
Utah

About this file

Summary: Stookey Fire ESR Archaeological Survey Scope of Work

This is a Scope of Work document for an Invitation for Bid (IFB) issued by the State of Utah Division of Purchasing for archaeological survey services related to the Stookey Fire restoration project. The project requires an archaeological survey of BLM and Utah Trust Lands burned during the Stookey Fire. The contract is available only to vendors on the State of Utah's approved vendor list for archaeology. No mandatory site visit is required for this procurement. The IFB anticipates a single contract award to the highest scoring, responsive, and responsible vendor according to the AVL for Archaeology scoring system. Vendors must guarantee pricing for the entire project scope.

The Scope of Work establishes the specific archaeological survey requirements, methodologies, and deliverables necessary to document and assess cultural resources within the fire-affected areas. Vendors are expected to provide comprehensive pricing that covers all aspects of the archaeological survey work from project initiation through final reporting. The procurement is structured as a competitive award process where scoring and evaluation criteria determine the successful vendor, with vendor qualifications and approval status on the archaeology AVL serving as essential prerequisites for bid consideration.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple Award for Archaeology Statement of Work Procurement Authority: State of Utah AS24-114 Project Title: Stookey Fire, ESR Cultural Resources Inventory (WRI 8069)

Solicitation to be conducted by Utah State Purchasing

Cultural Resources Project Type: Intensive and reconnaissance level inventory (mixed 15 and 30 meter transects) and site revisits (outside the survey area).

Project Description: The naturally caused Stookey Fire started on July 10, 2026, on BLM land. It was contained on July 20, 2026, after burning over 12,000 acres in Tooele County. From the WRI proposal: “The overall goal of this project is to restore the BLM and Utah Trust Lands burned in the Stookey Fire. Specific objectives include: (1) Reduce the infestation of noxious weeds into the burn scar (2) Reduce erosion risk and speed up recovery time (3) Restore forage for wildlife and livestock (4) Help protect human life and infrastructure.”

The Project is a federal undertaking; as such, the cultural resources inventory is being completed in compliance with Section 106 of the National Historic Preservation Act and in accordance with State Protocol Agreement between Utah SHPO and BLM. The Project will require ‘rolling consultation’ per Appendix G of the State Protocol to receive preliminary concurrence from Utah State Historic Preservation Office (UtSHPO) and streamline the undertaking implementation (see below).

The Project may include state funding from the Trust Lands Administration (TLA), Utah Division of Forestry, Fire, & State Lands (FFSL), Utah Division of Wildlife Resources (DWR), and/or the Utah Watershed Restoration Initiative (WRI). Such state funding also qualifies this project as an undertaking as defined by Utah Code 9-8a-402. Such an undertaking requires these state agencies to take into account the effect of the undertaking on any historic property (Utah Code 9-8a-404).

The Project includes a cultural resource literature review and site revisits for the full Area of Potential Effect (APE; approximately 3,505 acres) where mechanical treatments (chaining, drill seeding, mastication, etc.) may occur. Within the APE, a cultural resources inventory is required for approximately 1,624.5 acres. Areas of the APE that are not included in the cultural resources inventory (approximately 1,881 acres) were exempted from the new survey through early consultation with the Utah State Historic Preservation Office (UtSHPO), BLM, and partner state agencies. These exempted areas (“Past Adequate Survey Area”) were archaeologically surveyed since the year 2000. Within this area, previously recorded archaeological sites that were recorded between 2000 and 2010 and are NRHP unevaluated or eligible need to be revisited. These various Project activities will be documented in standard BLM and UtSHPO records and data files.

Specifically, the Project includes cultural resources identification and assessment tasks:

a. Completion of a cultural resource literature search, background research, data review, etc. of the entire APE (~3,505 acres;

file: StookeyESR_CRI_APE.zip/kmz) plus a ¼ mile buffer of the APE.

b. Pedestrian cultural resource inventory (archaeological survey) of a portion of the APE defined in consultation with the

UtSHPO (~1,624.5 acres; file: StookeyESR_CRI_SurveyIntensities_20260903.zip). Survey intensity is mixed within this area and defined in the shapefile. Approximately 49.5 acres will require intensive, 15 meter-width transects. The remaining ~1,575 acres will require 30-meter width transects.

Survey “exclusion” areas are not expected, but if areas within the survey area are deemed unsafe or are significantly steep, they may be excluded or surveyed at a reconnaissance level in conversation with the Agency Archaeologists. Such exclusion areas must be documented in the final report and delineated in the associated final project shapefiles. Exclusion areas will be shared with the Agency Archaeologists through shapefile as part of the Project’s rolling consultation requirement.

Transect data shown as tracks in GIS and delivered in a separate shapefile may be required at the discretion of Agency Archaeologists to ensure full coverage of survey areas. If transect data are not required, it will be noted in the kickoff meeting. If requested, survey areas will be field mapped using professional quality GPS units, either through GPS’ing survey lines or GPS’ing the beginning and ending of survey transects.

https://wri.utah.gov/wri/project/title.html?id=8069

c. Revisit and documentation update of previously recorded archaeological sites within the Past Adequate Survey Area, were recorded between 2000 and 2010, and have an NRHP status of eligible or unevaluated. These resources will be recorded in accordance with current UtSHPO and BLM guidance and requirements.

d. Documentation of all previously recorded or newly identified cultural resources within the pedestrian archaeological survey area according to current UtSHPO and BLM guidance and requirements.

e. Complete “rolling consultation” reporting. This task is described below.

WRI Number: 8069

Land Manager: the Project is located on land administered by the BLM-Salt Lake Field Office (SLFO) and Trust Lands Administration lands.

Cultural Lead: Savanna Agardy, BLM West Desert District/US Wildland Fire Service (USWFS) Great Basin Unit 11 Fuels Archaeologist, is the cultural lead and will be consulting with UtSHPO. Lindsay Fenner, TLA Archaeologist will represent TLA lands. If funded by FFSL, Allan Wolfum, FFSL Archaeologist, will represent state funding interests. Arie Leeflang, DWR Archaeologist, will handle invoicing and contracting tasks. These individuals are collectively noted as “Agency Archaeologists” in this document.

Fieldwork Preferences: Do not place physical datums. Site boundaries, artifacts, and features must be GPS’d with submeter accuracy following BLM Utah Fieldwork Guidelines. Follow the 2008 UPAC Linear Sites guidance for the recordation of linear sites.

Clearly justify the recordation of the linear as a site, according to the UPAC guidance, as opposed to an isolated occurrence. Linear sites that are not justified as an archaeological site will be transitioned to an isolated occurrence at the Contractor’s expense.

Utah Archaeological Site Forms will be completed for each newly recorded cultural resource site and each revisited previously documented site. Previously documented sites that are unable to be relocated will be documented using a Utah Archaeological Site Form Part A or appropriate UtSHPO Archaeology Records forms. Previously recorded cultural site forms that are recent (less than 10 years) do not need to be re-documented if they have adequate information and key aspects have not changed since the previous recording, including but not limited to eligibility, condition/impacts, artifact or feature lists, and site boundary, and the existing documentation meets UtSHPO and BLM standards.

Each cultural resource site within the Project area shall be evaluated for inclusion in the National Register of Historic Places (NRHP), as set forth in 36 CFR 60. The Contractor shall make recommendations concerning site eligibility and include a written justification, both on the Utah Archaeological Site Form and in the Project report. This justification shall specify the specific criteria under which eligible sites are found to qualify and a discussion of the seven aspects of integrity specified in 36 CFR 60. Justifications should reference Research Questions from the applicable Class I Report. Final determinations of eligibility will be made by BLM in partnership with TLA, FFSL, and DWR, in consultation with the UtSHPO.

If areas of dense vegetation or steep slopes present an unsafe work environment, document the locations with GPS points or polygons and photographs. Such changes in archaeological survey intensity will be documented and shared with the Agency Archaeologists as part of rolling consultation materials (please see below) unless otherwise directed. These areas must be documented in the final report and spatial data attributes and will be coded as reconnaissance surveys or exempted rather than intensive surveys in the report.

Photos shall be submitted for Isolated Finds (IFs) that are features or consist of diagnostic prehistoric artifacts. IFs that consist of more than one artifact shall list the measurable extent in which the IF occurs to ensure they do not meet the site definition.

Site avoidance flagging is not required.

Reporting Requirements: No paper reporting is required for this project. Rolling consultation reporting is required. A single report and standard BLM and UtSHPO site forms and data files are required to document all the tasks listed. A quarter mile literature review buffer will be used to identify previously conducted archaeological investigations and previously recorded archaeological sites in the area. A standard cultural context or cultural setting for the Project area will be included in the report.

Report format will follow current BLM requirements, including the BLM 8100 summary form. Cultural resource findings and results may be provided in the report in a table or simplified format. Such presentation will include the site type, a site description, and a simplified NRHP discussion.

https://wri.utah.gov/wri/project/title.html?id=8069 https://www.blm.gov/sites/default/files/docs/2024-04/BLM%20Utah%20Cultural%20Fieldwork%20Guidelines%20and%20Standards_2024.pdf https://www.blm.gov/sites/default/files/docs/2024-04/BLM%20Utah%20Cultural%20Fieldwork%20Guidelines%20and%20Standards_2024.pdf https://82f96c66-8d2b-4bed-939b-344cbc2ba706.usrfiles.com/ugd/82f96c_c901a7a7da6d4242ad7083a2392dc393.pdf https://82f96c66-8d2b-4bed-939b-344cbc2ba706.usrfiles.com/ugd/82f96c_c901a7a7da6d4242ad7083a2392dc393.pdf

Deliverables (draft and final) will each include the report, site forms, GIS data, tabular data, and IF data, all according to UtSHPO and BLM guidance, standards, and templates (e.g., Isolated Finds template). If revisions are substantial, additional reviews may be necessary. UtSHPO may also have additional edits that will need to be incorporated.

Follow the 2008 UPAC Linear Sites guidance for the recordation of linear sites. Roads or other linear features that are recorded as linear sites and are not appropriately justified as a linear site in alignment with the UPAC guidance will be asked to transition the site to an isolated occurrence at the Contractor’s expense.

The Utah Archaeology Site Form will be used for recording new sites and updating previously recorded sites. All sites shall be assigned Smithsonian Trinomials prior to draft deliverables submission. Do not submit draft deliverables with temp numbers only.

Include photographs of all diagnostic artifacts and features and a representative sample of complete groundstone tools if found.

Also document onsite deposition depth estimates and your method to determine depth as part of your NRHP discussion and recommendation.

Upon completion of fieldwork, Agency Archaeologists may request the spatial data for transect lines, archaeological sites, as well as preliminary fieldwork results such as a list of sites, total Class II or exclusion acres (if applicable), and preliminary eligibility determinations before approving the fieldwork completion milestone invoice.

UtSHPO Rolling Consultation: Rolling consultation with the UtSHPO is planned and will require reporting to the Agency Archaeologists by the Contractor following each field session. This will include reporting the area of newly completed survey (via shapefile) and initial documentation and updating newly recorded or updated archaeological sites (via spreadsheet). This reporting is required within seven working days of the closing of each archaeological field session. Archaeological site reporting will be via the BLM rolling consultation template spreadsheet (attached) and with the submission of all documented site boundaries and completed-survey areas in a shapefile. This is an extra effort above usual non-ESR project reporting and is time critical as treatments may begin immediately following rolling consultation completion with UtSHPO. Initial rolling consultation is expected within 17 days of fieldwork start (10-day session plus 7 days processing time).

Permitting Requirements: Principal Investigators, Field Directors, and Crew Chiefs must hold a current BLM Cultural Resources Use Permit for the Great Basin and a Public Lands Policy Coordinating Office (PLPCO) Principal Investigator Permit to Conduct Archaeological Surveys. Further, all work shall be performed in accordance with the Secretary of the Interior’s "Standards and Guidelines for Archaeology and Historical Preservation” (Federal Register, Volume 48, Number 190; Thursday, September 29, 1983, page 44716). The Principal Investigator shall be required to hold a valid state permit to conduct archaeological surveys on federal and state property. Field directors must meet the Secretary of the Interior’s Professional Qualification Standards for Archaeology or History. The Contractor shall provide qualified personnel who have knowledge and experience in identifying and evaluating cultural resources found in Utah. All Project staff and crew members must be directly supervised in the field by qualified field directors or the principal investigator.

Fieldwork authorizations from the BLM field office and TLA are required.

MA for Archaeology Region: Central, greater than 300 acres.

WRI Contracting Model: Lump sum. As a lump sum project, cost modifications or change orders based upon unexpected or excessive findings will not be entertained.

In your bid response, provide the lump sum amount and a per-acre amount for the class II and class III areas each. The inclusion of the class II and class III per-acre amounts will help facilitate change orders, increasing the amount of class III acreage if needed.

Such a change order will be completed in agreement between the Contractor, agencies, and State Purchasing.

Please note - funding for the TLA portion of the Project is expected but is yet to be awarded. If this portion of the Project is not funded (decision expected by mid-September), this area may be dropped from the Project area at the discretion of DWR. The removal of the area will be reflected in the Project budget at the appropriate per acre price as provided in your bid response. .

Acres: approximately 3,505 acres*

● BLM = ~3,388 acres

● TLA = ~117 acres

*There are approximately 1,881 acres of previous survey that is considered adequate (Past Adequate Survey Area), and eligible for exclusion from new survey in consultation with Agency Archaeologists and the UtSHPO. As such, the acres requiring full Class II/III Inventory will be ~1,624.5 acres. Revisit of certain sites in the excluded areas may be required (see section below).

Period of Performance:

Required Fieldwork State Date: Within two weeks of project award.

Expected Fieldwork Completion Date: November 10, 2027 Rolling Consultation Due Date: Seven working days following each field session.

Draft Deliverables Due Date: April 1, 2027 Final Deliverables Due Date: June 1, 2027

Revisit of Previously Recorded Sites Outside of the Survey Area, within Past Adequate Survey Area: In consultation with UtSHPO, certain previously recorded sites within the Past Adequate Survey Area require a revisit, re-recording, and NRHP update and assessment. These include sites recorded between 2000 and 2010 that are unevaluated, recommended eligible for, or determined eligible for, the NRHP. Below is a preliminary list of previously recorded sites within the larger project area and their revisit work requirement. If additional sites are identified that qualify under the criteria listed above (e.g., recorded 2000-2010 and NRHP unevaluated or eligible), these newly identified sites will also require revisit and reassessment

List of preliminary of previously recorded sites within the Past Adequate Survey Area and their site revisit requirement:

42TO4465 - revisit not required (not eligible, small historic artifact scatter, 2010 recording) 42TO4468 - revisit not required (not eligible, small historic artifact scatter, 2010 recording) 42TO4467 - revisit required (recommended eligible, lithic scatter, 2010 recording) 42TO4470 - revisit required (recommended eligible, lithic scatter, 2010 recording) 42TO4474 - revisit required (recommended eligible, lithic scatter, 2010 recording) 42TO4475 - revisit required (recommended eligible, lithic scatter, 2010 recording) 42TO4955 - revisit not required (not eligible, historic artifact scatter, 2011 recording) 42TO4958 - revisit not required (not eligible, historic road, 2012 recording) 42TO4962 - revisit not required (not eligible, historic road, 2012 recording)

Access: Access to the Project area will be through established BLM and county roads. A high clearance four-wheel drive, field-going vehicle will be required. As the area is within burn scar, roads may be in poor condition or destroyed. A UTV or deadwalking will be required to reach portions of the Project area. Seasonal weather will make the roads slippery and difficult. Gate keys are not expected as access to the area is through public land.

Inspections: Agency Archaeologists will complete periodic site visits and inspections during fieldwork and as part of the review of draft and final deliverable records.

Payment Schedule: Invoicing for this project will follow the standard Multiple Award for Archaeology contract schedule: 10% invoiced upon completion of pre-field literature review; 50% upon completion of fieldwork, including a preliminary report of fieldwork results as described above; 30% upon delivery of draft deliverables; final 10% upon full acceptance of final deliverables by the Agency Archaeologists. Approval of milestone invoicing must be made by Agency Archaeologists. If more frequent invoicing is required, include your preferred invoice schedule in your bid response for consideration by the Project managers.

Please note – arrival and approval of each milestone require the submission of milestone-reaching documentation:

● Pre-field literature review: submission of a brief Class I document that summarizes the initial literature review and background research effort. While this does not need to be polished, the document should provide evidence of a thorough literature review effort and should include a survey findings expectations paragraph.

● Fieldwork: Cultural leads may request documentation of fieldwork and preliminary fieldwork results. This may include spatial data for fieldwork transect lines, preliminary archaeological site boundaries, and class II or other exclusion areas.

Preliminary site lists and preliminary eligibility determinations may also be requested. Such submissions may be waived by the cultural leads during the Project kickoff meeting.

● Draft deliverables: draft UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

● Final deliverables: final UtSHPO package following BLM and UtSHPO reporting and data standards requirements.

Billing PO: 202643

Attached Files:

● 8069_StookeyESR_GIS.zip: a zip file of the following GIS files:

o StookeyESR_CRI_APE.zip/kmz: a GIS shapefile and KMZ file of the full APE, including the Past Adequate Survey Area. ****Note, the GIS shapefiles, not the map figures, will be used for all contractual project area identification tasks. SOW-included maps are generalized and provided to orient bidders to the general area of the Project.

Further, there were some last minute GIS changes between the Past Adequate Survey Area and the Survey Area that are not reflected on the map below.

o StookeyESR_CRI_SurveyIntensities_20260903.zip/kmz: a GIS shapefile and KMZ file of the archaeological survey area with variable survey intensities delineated o StookeyESR_Previous_Adequate_Survey.zip/kmz: areas of previous survey that, in consultation with UtSHPO, is considered adequate (Past Adequate Survey Area)..

● ESR_Rolling_Consultation_StookeyESR.xlsx – the required BLM template for reporting documented sites for “rolling consultation” with UtSHPO. The Contractor will provide session fieldwork results within seven working days of session’s end. Results will include this spreadsheet (populated), site boundaries in a shapefile, and a shapefile of the completed survey area.

How Projects will be Awarded

The individual SOW project award will be made based upon a cumulative assessment which will take place at each project release.

That assessment will combine the previously outlined Best Value score and a new “SOW Cost Point Award.”

The Best Value score was awarded in RFP AS24-114 and is not changeable. It is a portion of 300 points as assessed in the first three categories (Technical Criteria) of the RFP.

The “SOW Cost Point Award” is figured each time bids are received based upon an individual SOW. The bid responses may be for a “lump sum” bid that would cover all the costs associated with the entire project. Or the bid responses may ask for a “base rate” bid that would cover the basic aspects of an archaeological survey and a “per site” bid that would also ask for the costs to record an archaeological site. 700 cost points are possible. The lowest cost bid will receive the full 700 points. Each higher bid will receive points based upon its percentage higher than the lowest bid.

Cumulative Assessment is calculated by:

(AS24-114 Best Value score out of 300) + (“SOW Cost Point Award” out of 700)

The highest point tally will receive the Project contract at their submitted bid rate.

This approach will assure the State of Utah and the WRI are able to include the point rankings associated with non-cost elements from the RFP, along with the cost ranking associated with each project SOW release (aka the “SOW Cost Point Award”).

All work is contracted and awarded through the State of Utah Division of State Purchasing & General Services Solicitation AS24-114 and Limited Purchasing Delegation #230

Any awarded work is at a fixed rate and is not open to modification except as allowed under State of Utah Division of State Purchasing & General Services rules.

E a s t F a u s t C a n y o nB u r n t C a n y o n

L i t t l e M o u n t a i n

L o o k o u t P a s s

Ro c k C a n y o n

E a s t F a u s t C a n y o n

0 1 Miles No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data.

9/3/2026

Bureau of Land Management, Utah Salt Lake Field Office

491 North John Glenn Road Salt Lake City, UT 84116

Stookey Fire ESR CRI Survey Intensities

UtahN

Survey Intensity Class III (15m transects): 40 acres

Class II (30m transects): 1,583 acres

Previous Adequate Survey: 1,904 acres

Bureau of Land Management (BLM)

Private

State of Utah

8S 5W

7S 7W 7S 5W

8S 7W

7S 6W

8S 6W

8069_StookeyFireESR_SOW_MAforArch
StookeyFireESR_CRI_SurveyIntensities_20260903

File details come from the government source that posted it. Updated .