5-04 Bid Schedule - Required.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Poison Oak Road Realignment Phase II
Solicitation number
Bid #34-03-26
Issued by
Bell County, Texas

About this file

Summary

This is a bid schedule document for the City of Temple, Texas related to the Poison Oak Road Realignment Project Phase 2. The project encompasses approximately 4,200 linear feet of new four-lane roadway construction along with bridge, drainage, water, pedestrian facilities, and lighting infrastructure improvements. The bid schedule is divided into three primary sections: Site Mobilization, New Roadway Construction, and Storm Sewer work, with a separate Water Main Construction section. The roadway construction includes 36 line items covering site preparation, earthwork, pavement installation (including 22,700 square yards of 2.5" HMAC pavement and 31,370 square yards of base preparation), concrete curb and gutter (7,460 linear feet), sidewalk construction (4,980 square yards), a new 64-foot wide vehicular bridge, metal beam guard railing (2,380 linear feet), traffic control, and storm sewer installation. The water main section comprises 19 line items for new water main connections and infrastructure, including 2,860 linear feet of 12" PVC DR18 water main, gate valves, fire hydrant assemblies, and testing requirements. The selected contractor must complete all work within 550 consecutive calendar days from the Notice to Proceed.

The engineer's estimate of probable cost for the entire project is $8,900,000. All bid schedule line items are currently displayed with zero unit prices and zero total amounts, indicating this is a blank bid form awaiting contractor pricing submissions. The document specifies that all work must be completed per project specifications, plans, and details as referenced, with materials, labor, overhead, and profit included in each line item price. Bidders are required to provide unit prices in figures for items with specific quantities and lump sum pricing for items designated as 100% LS (lump sum). No information regarding bid due dates, site visits, pre-bid meetings, award dates, set-asides, or funding sources is contained within this bid schedule document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roadway

EXHIBIT “A”

BID SCHEDULE

CITY OF TEMPLE, TEXAS

2017 Poison Oak Road Realignment Project Phase 2 Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

SITE MOBILIZATION
1)53STAFurnish and install all materials, labor, overhead, and profit required to provide Preparation of Right-of-Way, Haul Off, and Site Clearing, including but not limited to; site demolition; site signage and utility adjustment, removal, and replacement; existing utility and structure bracing, and/or protection; mailbox removal and replacement, landscaping removal and replacement, including tree protection; DVD copies of Video Recording of site pre and post construction; per project specifications and details, complete in place per station.$ - 0$ - 0
2)100%LSFurnish and install all materials, labor, overhead, and profit required to provide Mobilization, Bonds, Permits and Insurance, per project specifications and details, complete in place per lump sum.$ - 0$ - 0
3)100%LSFurnish and install all materials, labor overhead, and profit required to provide and implement a Storm Water Pollution Prevention Plan, including permits, per City of Temple and TCEQ specifications and requirements, complete in place per lump sum.$ - 0$ - 0
4)100%LSFurnish and install all materials, labor, overhead, and profit required to implement a Traffic Control Plan, per project specifications and details, complete in place per lump sum.$ - 0$ - 0
5)100%LSFurnish and install all materials, labor, overhead, and profit required to provide and implement a Trench Safety Plan, signed and sealed by Registered Professional Engineer Licensed in the State of Texas, per project specifications and details, complete in place per lump sum.
$ - 0$ - 0
6)100%LSFurnish and install all materials, labor, overhead, and profit required to Pothole, Excavate and Locate Existing Utilities, at locations shown on plans, per project specifications, notes and details, complete in place per lump sum.$ - 0$ - 0
NEW ROADWAY CONSTRUCTION
7)100%LSFurnish and install all materials, labor overhead, and profit required to provide all Earthwork and Embankment, at locations shown on plans, per project specifications and details, complete in place per lump sum.$ - 0$ - 0
8)100%LSFurnish and install all materials, labor overhead, and profit required to provide Temporary Irrigation, as required, to provide new roadway and utility construction, as shown on plans, per project specifications and details, complete in place per lump sum.
$ - 0$ - 0
9)39,400SYFurnish and install all materials, labor overhead, and profit required to provide 4" Sandy Loam Topsoil and Bermuda Grass Seeding via Hydromulch, as required, to provide new roadway and utility construction, as shown on plans, per project specifications and details, complete in place per square yard.
$ - 0$ - 0
10)7EAFurnish and install all materials, labor, overhead, and profit required to adjust Existing Sanitary Sewer Manhole to new grade, as required, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
Item No.Estimated QuantityUnitDescription of ItemUnit Price in FiguresTotal Amount
11)8EAFurnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Pavement Sections, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
12)80SYFurnish and install all materials, labor overhead, and profit required to provide 7" Reinforced Concrete Pavement Section, at locations shown on plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0
13)22,700SYFurnish and install all materials, labor overhead, and profit required to provide 2.5" HMAC Pavement, at locations shown plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0
14)31,370SYFurnish and install all materials, labor, overhead and profit required to provide, 13.5" Crushed Limestone Base, at locations shown on plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0
15)31,370SYFurnish and install all materials, labor, overhead and profit required to provide, 6" Moisture Conditioned Subgrade, at locations shown on plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0
16)31,370SYFurnish and install all materials, labor, overhead and profit required to provide, Tensar HX5.5 Geogrid between base and subgrade, at locations shown on plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0
17)7,460LFFurnish and install all materials, labor overhead, and profit required to provide Standard 24” Concrete Curb and Gutter, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
18)580LFFurnish and install all materials, labor overhead, and profit required to provide Standard 24” Concrete Edging, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
19)4,980SYFurnish and install all materials, labor, overhead and profit required to provide Reinforced Concrete Sidewalk, including Detectable Warning Pavers, at locations shown on plans, per project specifications, complete in place per square yard.$ - 0$ - 0
20)17EAFurnish and install all materials, labor, overhead, and profit required to provide New ADA Handicap Curb Ramp, at locations shown on plans, per TAS and project specifications and details, complete in place per each.$ - 0$ - 0
21)2,380LFFurnish and install all materials, labor overhead, and profit required to provide New Metal Beam Guard Railing, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot.$ - 0$ - 0

Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

22)100%LSFurnish and install all materials, labor, overhead, and profit required to provide New Pedestrian and Traffic Striping at locations shown on plans, per project specifications and details, complete in place per lump sum.$ - 0$ - 0
23)100%LSFurnish and install all materials, labor, overhead, and profit required to provide New Pedestrian and Traffic Signage, at locations shown on plans, per project specifications and details, complete in place per lump sum.$ - 0$ - 0
24)6EAFurnish and install all materials, labor, overhead, and profit required to provide New Type III Barricades, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
25)1,900LFFurnish and install all materials, labor overhead, and profit required to provide New 5-Strand Barbed Wire Fencing and Gates, to match existing, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot.$ - 0$ - 0
26)100%LSFurnish and install all materials, labor, overhead, and profit required to provide New Street Lighting; including but not limited to light poles, 2" PVC Schedule 40 electrical conduit, wiring, connection boxes, secondary and service boxes, foundations and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum$ - 0$ - 0
27)3,500LFFurnish and install all materials, labor, overhead, and profit required to provide New 4” PVC Schedule 40 Conduit Sleeves, at locations shown on plans, per project specifications and details, complete in place per linear foot.
$ - 0$ - 0
28)100%LSFurnish and install all materials, labor, overhead, and profit required to provide New 64' Wide Vehicular Bridge; including but not limited to reinforced concrete approach slabs, earthwork, backfill, compaction, reinforced concrete abutments, reinforced concrete pier footings, precast reinforced concrete I-girders, reinforced concrete decking, guard rails, utility hangers, pedestrian sidewalk, concrete rip rap, and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum.$ - 0$ - 0
29)1EAFurnish and install all materials, labor overhead, and profit required to Remove and Replace Existing Mailbox, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0

Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

STORM SEWER

30)11EAFurnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Storm Sewer and Existing Junction Boxes, including but not limited to trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
31)740LFFurnish and install all materials, labor, overhead, and profit required to provide New 30” RCP Class III Storm Sewer, at locations shown on plans, including but not limited to, bypass pumping and/or dewatering, backfill, embedment, trenching, per project specifications and details, complete in place per linear foot.
$ - 0$ - 0
32)110LFFurnish and install all materials, labor, overhead, and profit required to provide New 18” RCP Class III Storm Sewer, at locations shown on plans, per project specifications and details, complete in place per linear foot.
$ - 0$ - 0
33)1EAFurnish and install all materials, labor, overhead, and profit required to provide New Precast Concrete Headwall with Energy Dissipators, including but not limited to trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
34)6EAFurnish and install all materials, labor, overhead, and profit required to provide New 15’ Precast Reinforced Concrete Curb Inlet, at locations shown on plans, per project specifications and details, complete in place per each.
$ - 0$ - 0
35)500SYFurnish and install all materials, labor, overhead, and profit required to provide New Stone Rip Rap, 18" avg. dia., at locations shown on plans, per project specifications and details, complete in place per square yard.$ - 0$ - 0$ 1,052,400.00
36)4EAFurnish and install all materials, labor, overhead, and profit required to adjust Existing Concrete Junction Boxes to new grade, as required, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0ERROR:#REF!2ERROR:#REF!
Subtotal City of Temple Poison Oak Road Realignment Project: New Roadway Construction$ - 02.25ERROR:#REF!

4.25 ERROR:#REF!

$ 175,580.00
ERROR:#REF!

Water

EXHIBIT “A”

BID SCHEDULE

CITY OF TEMPLE, TEXAS

2017 Poison Oak Road Realignment Project Phase 2 Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

NEW WATER MAIN CONSTRUCTION

1)3EAFurnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Water Main, including but not limited to; thrust blocking, Mega-Lug Joint Restraint, and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
2)100%LSFurnish and install all materials, labor, overhead, and profit required to Disconnect, Cap, and Abandon Existing Water Main, at locations shown on plans and per City of Temple Requirements, per project specifications, notes and details, complete in place per lump sum.$ - 0$ - 0
3)2,860LFFurnish and install all materials, labor, overhead, and profit required to provide New 12” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
4)410LFFurnish and install all materials, labor, overhead, and profit required to provide New 8” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
5)25LFFurnish and install all materials, labor, overhead, and profit required to provide New 6” PVC DR18 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
6)20LFFurnish and install all materials, labor, overhead, and profit required to provide New 24” Steel Pipe Encasement, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
7)20LFFurnish and install all materials, labor, overhead, and profit required to provide New 16” Steel Pipe Encasement, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot.$ - 0$ - 0
8)1EAFurnish and install all materials, labor overhead, and profit required to provide new 8”x8” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0

Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

9)4EAFurnish and install all materials, labor overhead, and profit required to provide new 12”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
10)1EAFurnish and install all materials, labor overhead, and profit required to provide new 8”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
11)1EAFurnish and install all materials, labor overhead, and profit required to provide new 12”x8” MJ Reducer, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
12)1EAFurnish and install all materials, labor overhead, and profit required to provide new 12” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
13)3EAFurnish and install all materials, labor overhead, and profit required to provide new 8” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
14)4EAFurnish and install all materials, labor overhead, and profit required to provide new 6” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
15)8EAFurnish and install all materials, labor overhead, and profit required to provide new 12” MJ 45 Degree Bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
16)7EAFurnish and install all materials, labor overhead, and profit required to provide new 8” MJ 45 Degree Bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0

Item No. Estimated Quantity Unit Description of Item Unit Price in Figures Total Amount

17)4EAFurnish and install all materials, labor overhead, and profit required to provide new Standard Fire Hydrant Assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, tees, gate valves, piping, trenching, backfill, and embedment, thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equal, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
18)1EAFurnish and install all materials, labor overhead, and profit required to Remove and Salvage Existing Fire Hydrant assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, piping, trenching, backfill, and embedment, at locations shown on plans, per project specifications and details, complete in place per each.$ - 0$ - 0
19)100%LSFurnish and install all materials, labor, overhead, and profit required to provide ALL TESTING per TCEQ and City of Temple Requirements and Contract Documents, complete in place per lump sum.$ - 0$ - 0

Subtotal City of Temple Poison Oak Road Realignment Project: New Water Main $ - 0

Total City of Temple Poison Oak Road Realignment Project: $ - 0

Sheet2

File details come from the government source that posted it. Updated .