About this file

Summary

This document is a 35% conceptual design drawing set for the Selfridge Air National Guard Base Runway Encroachment Project #2, prepared by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division. The project encompasses Task 3 - Taxiway Alpha Extension, issued on October 3, 2025, under Solicitation No. Y24082 and Contract No. 511/23420.JLM. The project work includes construction of Portland Cement Concrete (PCC) or Hot Mix Asphalt (HMA) pavement sections for Taxiway A extension, HMA taxiway shoulders, airfield electrical improvements including taxiway edge lights and signage, miscellaneous utility removals and relocations, grading and drainage improvements, and pavement markings. The overall project is anticipated to occur in three phases over a total construction period of 643 calendar days, with Phase 0 (pre-construction activities) requiring 170 calendar days, Phase 1 requiring 189 calendar days beginning in the spring, a winter shutdown of 113 calendar days, Phase 2 requiring 61 calendar days, and Phase 3 requiring 65 days, followed by 30 calendar days for project closeout. The drawing set contains 66 sheets including title sheets, survey control plans, construction phasing plans, soil boring logs, erosion control plans, demolition plans, grading and drainage plans, pavement details, cross sections, and airfield electrical details.

The contractor must comply with extensive airfield operations requirements including coordination with the control tower, maintenance of ARFF and emergency vehicle access to Runway 01/19 throughout the project, and implementation of Foreign Object Debris (FOD) management procedures. Construction staging areas and haul routes are provided by the government, with access available through designated north or south gates requiring base badging and driver training completion. The contractor is responsible for all disposal of waste materials at off-site locations, obtaining all permits including FAA Form 7460-1 Notice of Proposed Construction, and providing trained gate guards and traffic control personnel. All barricading, signage, temporary lighting, and safety equipment are contractor-furnished and must comply with specified standards. The document establishes three construction phases with varying restrictions on proximity to active runways and taxiways, ranging from 200-foot minimum distances in Phase 1 to work within 200 feet of runway centerlines in Phase 3 with optional temporary runway threshold displacement. Weather considerations include winter shutdown periods, and all work within the airfield operations area requires continuous base escort.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X

X

X

X

XX

X

X

X

X X

G

UY

G

UY

G

UY

G

UYGUY GUYGUY

SB# 12

SB# 11

G U

Y

R /W

R /W

R/W

R/W

R/W

X

X

X X

X

X

X

X X

X

X

X

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

SELFRIDGE ANG BASE - RUNWAY ENCROACHMENT

PROJECT #2 - AIRFIELD IMPROVEMENTS

TASK 3 - TAXIWAY ALPHA EXTENSION

CONCEPTUAL DESIGN (35%) A-2 (DTMB PHASE 300)

511/23420.JLM

Y 24082

OCTOBER 3, 2025

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

O

C

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

RUNWAY 01-19

TAXIWAY B

TA

XI

W

AY

G

TA

XI

W

AY

E

PROJECT

LOCATION

FILE NO.:

M

JR

D

LU

PA

B

D R

P

TI

TL

E

SH

EE

T

GI001

LOCATION MAP

CALL BEFORE YOU DIG

10000 200000

VICINITY MAP

CASS

GENESEE

BAY

GRATIOT

SHIAWASSEE

SAGINAW

SANILAC

ST. CLAIR

LAPEER

MACOMBOAKLAND

WASHTENAW

63 50

LIVINGSTON

MONTMORENCY

CHEBOYGANEMMET

PRESQUE ISLE

CHARLEVOIX ALPENAOTSEGO

ANTRIM

CHIPPEWAMACKINAC

LUCE

SCHOOLCRAFT

ALGER

DELTA

MARQUETTE

DICKINSON

IRON

M

EN

OM

IN

EE

BARAGA

HOUGHTON

KEWEENAW

LEELANAU

BENZIE GRAND

TRAVERSE

KALKASKA CRAWFORD OSCODA ALCONA

ROSCOMMON OGEMAWMISSAUKEE IOSCOWEXFORDMANISTEE

LAKEMASON OSCEOLA CLARE GLADWIN

HURON

TUSCOLA

WAYNE

53 43 67 18

578351

26 6

72 65 35

1682040

5 69 60 4

MIDLANDISABELLAMECOSTANEWAYGOOCEANA

MUSKEGON

OTTAWA

KENT

MONTCALM

CLINTONIONIA

INGHAMEATONBARRY

CALHOUN

BRANCH HILLSDALE LENAWEE

KALAMAZOOVAN BUREN

ALLEGAN

78 12 30 46

80 39 13

83 23

5637546264

BERRIEN

11 14

ARENAC

MONROEST. JOSEPH

JACKSON

ONTONAGON

GOGEBIC

COUNTY MAP

NOT TO SCALE

NOT TO SCALE

PROJECT

LOCATION

I.S.H. 94

JEFFERSON AVE.

W

IL

LI

AM

P R

O

SS

A H

W Y

PROJECT

LOCATION,

MACOMB

COUNTY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

M

JR

D

LU

PA

B

D R

P

IN

D

EX

S H

EE

T

GI002

SHEET LIST TABLE

DWG. NO. SHEET NO. SHEET TITLE

1 GI001 TITLE SHEET

2 GI002 INDEX SHEET

3 GI004 ABBREVIATIONS

4 GC113 PROJECT LAYOUT PLAN - OVERALL LAYOUT

5 GC121 SURVEY CONTROL PLAN

6 GC122 SURVEY CONTROL ALIGNMENTS

7 GC141 STAGING AREA AND HAUL ROUTE PLAN

8 GC142 CONSTRUCTION PHASING PLAN - OVERVIEW

9 GC143 CONSTRUCTION PHASING PLAN - PHASE 1 (TAXIWAY A)

10 GC144 CONSTRUCTION PHASING PLAN - PHASE 2 (TAXIWAY A)

11 GC145 CONSTRUCTION PHASING PLAN - PHASE 3 (TAXIWAY A)

12 GC151 CONSTRUCTION OPERATIONS AND PHASING PLAN - GENERAL NOTES

13 GC152 CONSTRUCTION OPERATIONS AND PHASING PLAN - GENERAL NOTES

14 GC153 CONSTRUCTION OPERATIONS AND PHASING PLAN - DETAILS

15 BB101 PLAN AND LOG OF SOIL BORINGS

16 BB102 PLAN AND LOG OF SOIL BORINGS

17 BB103 PLAN AND LOG OF SOIL BORINGS

18 CS121 EXISTING CONTOURS AND UTILITIES PLAN

19 CS122 EXISTING CONTOURS AND UTILITIES PLAN

20 CS123 EXISTING CONTOURS AND UTILITIES PLAN

21 CG101 EROSION CONTROL PLAN

22 CG102 EROSION CONTROL PLAN

23 CG103 EROSION CONTROL PLAN

24 CG201 EROSION CONTROL WETLAND PLAN

25 CG501 EROSION CONTROL DETAILS

26 CG502 EROSION CONTROL DETAILS

27 CD101 DEMOLITION PLAN

28 CD102 DEMOLITION PLAN

29 CD103 DEMOLITION PLAN

30 CP301 EXISTING TYPICAL SECTIONS

31 CP302 PROPOSED TYPICAL SECTIONS

32 CP501 PAVING DETAILS

33 CP502 PAVING DETAILS

34 CS141 GEOMETRICS PLAN

35 CS142 GEOMETRICS PLAN

36 CS143 GEOMETRICS PLAN

37 CS144 GEOMETRICS PLAN

38 CG111 GRADING AND DRAINAGE PLAN

39 CG112 GRADING AND DRAINAGE PLAN

40 CG113 GRADING AND DRAINAGE PLAN

41 CG121 PLAN AND PROFILE - TAXIWAY A

42 CG122 PLAN AND PROFILE - TAXIWAY A

43 CG123 PLAN AND PROFILE - TAXIWAY A

44 UP501 DRAINAGE DETAILS

45 UP502 DRAINAGE DETAILS

46 CM401 PAVEMENT MARKING PLAN

47 CM402 PAVEMENT MARKING PLAN

48 CM403 PAVEMENT MARKING PLAN

49 CM501 PAVEMENT MARKING DETAILS

50 CX301 CROSS SECTIONS - TAXIWAY A

51 CX302 CROSS SECTIONS - TAXIWAY A

52 CX303 CROSS SECTIONS - TAXIWAY A

53 CX304 CROSS SECTIONS - TAXIWAY A

54 CX305 CROSS SECTIONS - TAXIWAY A

55 CX306 CROSS SECTIONS - TAXIWAY A

56 CX307 CROSS SECTIONS - TAXIWAY A

57 CX308 CROSS SECTIONS - TAXIWAY A

58 CX309 CROSS SECTIONS - TAXIWAY A

59 CX310 CROSS SECTIONS - TAXIWAY A

60 CX311 CROSS SECTIONS - TAXIWAY A

61 CX312 CROSS SECTIONS - TAXIWAY A

62 EA501 AIRFIELD ELECTRICAL DETAILS

63 EA502 AIRFIELD ELECTRICAL DETAILS

64 EA503 AIRFIELD ELECTRICAL DETAILS

65 EA504 AIRFIELD ELECTRICAL DETAILS

66 EA505 AIRFIELD ELECTRICAL DETAILS

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

M

JR

D

LU

PA

B

D R

P

AB

BR

EV

IA

TI

O N

S

GI004

ABBREVIATIONS

L ANGLE

A/C AIR CONDITIONING

ABC AGGREGATE BASE COURSE

AB ANCHOR BOLT

ABV ABOVE

AC ALTERNATING CURRENT

ACC ACCESSIBLE

ACI AMERICAN CONCRETE INSTITUTE

ACR ACRYLIC PLASTIC

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACSR ALUMINUM CABLE STEEL REINFORCED

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

ADDM ADDENDUM

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, ADJUSTABLE

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

AHR ANCHOR

AHU AIR HANDLING UNIT

AI AREA INLET

AIC AMPERE INTERRUPTING CAPACITY

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

A.L. ACTIVE LEAF

ALT ALTERNATE

ALUM ALUMINUM

AMB AMBIENT

AMP AMPERE

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPD APPROVED

APPROX APPROXIMATE

ARCH ARCHITECT

ARI AMERICAN REFRIGERATION INSTITUTE

ASB ASBESTOS

ASC ABOVE SUSPENDED CEILING

ASPH ASPHALT

ATC ACOUSTICAL TILE CEILING

AUTO AUTOMATIC

AVG AVERAGE

AWG AMERICAN WIRE GAUGE

AWT ACOUSTICAL WALL TREATMENT

BB BULLETIN BOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BEJ BRICK EXPANSION JOINT

BEV BEVEL

BITUM BITUMINOUS

BJT BED JOINT

BL BUILDING LINE

BLDG BUILDING

BLW BELOW

BM BENCHMARK

BO BOTTOM OF

BOT BOTTOM

BP BACK PLASTER(ED)

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRG PL BEARING PLATE

BRK BRICK

BRKT BRACKET

BRZ BRONZE

BS BOTH SIDES

BSMT BASEMENT

Btu BRITISH THERMAL UNIT BtuH BTU PER HOUR

BTWN BETWEEN

BUR BUILT-UP ROOFING

BW BOTH WAYS

CAB CABINET

CAP CAPACITY

CB CATCH BASIN

CCT CUBICLE CURTAIN TRACK

CCTV CLOSED CIRCUIT TELEVISION

CE COVER ELEVATION

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CFI CONDUCTIVE FLOORING

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CH BD CHALKBOARD

CHFR CHAMFER

CHIM CHIMNEY

CHK CHECK

CHR PL CHROME PLATED

CI CAST IRON

CI CURB INLET

CIP CAST-IN-PLACE

CIRC CIRCULAR

CJ CONTROL JOINT

CJ CONSTRUCTION JOINT

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLGL CLEAR GLASS

CLL CONTRACT LIMIT LINE

CLO CLOSET

CLOS CLOSURE

CLR CLEAR(ANCE)

CLWG CLEAR WIRED GLASS

cm CENTIMETER(S)

CMP CORRUGATED METAL PIPE

CMPST COMPOSITE

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CNL CONDUCTIVE NEOPRENE LATEX

CNR CORNER

CNTR COUNTER

COA COURSE OF ACTION

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER REPRESENTATIVE

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBUSTION

COMPT COMPARTMENT

CONC CONCRETE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

CORR CORRIDOR

COV COVER

CPRS COMPRESSIBLE

CPT CARPET

CRCMF CIRCUMFERENCE

CRES CORROSIVE RESISTANT STEEL

CRG CROSS GRAIN

CRS COURSE(S)

CS CAST STONE

CSK COUNTERSUNK

CSMT CASEMENT

CT CERAMIC TILE

CT CURRENT TRANSFORMER

C TO C CENTER TO CENTER

CTR CENTER

CU CONDENSING UNIT

Cu COPPER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CU YD CUBIC YARDS

CV CEILING VENT

CVH CONDUCTIVE VINYL HOMOGENEOUS (SHEET

TYPE)

CW COLD WATER

CYL CYLINDER

d PENNY (AS IN NAIL - 10D)

DAT DATUM

DB DRY BULB

DBL DOUBLE

DBL ACT DR DOUBLE ACTING DOOR

DCJ DOWELED CONTROL JOINT

DCJT DUMMY CONTROL JOINT

DEG DEGREE

DEMO DEMOLITION

DEPR DEPRESSION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DH DUCT HEATER

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISC DISCONNECT

DISP DISPENSER

DISTR PNL DISTRIBUTION PANEL

DIV DIVISION

DL DEAD LOAD

DMPF DAMPPROOFING

DMPR DAMPER

DMT DEMOUNTABLE

DN DOWN

DR DOOR

DR DRAIN

DRB DRAINBOARD

DR CL DOOR CLOSER

DS DOUBLE STRENGTH (GLASS)

DS DOWNSPOUT

DT DRAIN TILE

DTMB DEPT. OF TECHNOLOGY, MANAGEMENT & BUDGET

DVTL DOVETAIL

DWG DRAWING

DWLS DOWELS

DWR DRAWER

DWTR DUMBWAITER

DX DIRECT EXPANSION

E EAST

EA EACH

EAT ENTERING AIR TEMPERATURE

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION - GRADE OR BUILDING

ELEC ELECTRIC

EM EXPANDED METAL

EMD ESTIMATED MAXIMUM DEMAND

EMER EMERGENCY

ENCL ENCLOSE(URE)

ENTR ENTRANCE, ENTERING

EP ELECTRICAL PANELBOARD

EPRF EXPLOSION PROOF

EPY EPOXY COATING

EQ EQUAL

EQUIP EQUIPMENT

ESCAL ESCALATOR

EST ESTIMATE(D)

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXC EXCAVATE

EXH EXHAUST

EXH A EXHAUST AIR

EXST EXISTING

EXP EXPANSION

EXP EXPOSED

EXP BT EXPANSION BOLT

EXT EXTERIOR

F FAHRENHEIT

FA FIRE ALARM

FA FRESH AIR

FAC FIRE APPARATUS CLOSET

FAI FRESH AIR INTAKE

F BRK FIRE BRICK

FC FOOT CANDLE

FC BRK FACE BRICK

FCG FACING

FCJ FLOOR CONSTRUCTION JOINT

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDMPR FIRE DAMPER

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

FF FACTORY FINISH

FGL FIBERGLASS

FH FIRE HYDRANT

FH FLAT HEAD

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHR FIRE HOSE RACK

FHS FIRE HOSE STATION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIN FINISH

FIN FLR FINISH FLOOR

FIXT FIXTURE

FJT FLUSH JOINT

FLASH FLASHING

FLR FLOOR

FLEX FLEXIBLE

FLG FLOORING

FLR PL FLOOR PLATE

FLUOR FLUORESCENT

FN FENCE

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FP FIRE PARTITION

FP FIREPROOF

FPM FEET PER MINUTE

FR FIRE RESISTANT

FR FRAME

FRG FORGED

FRMG FRAMING

FRT FIRE-RETARDANT

FS FULL SIZE

FSTNR FASTEN(ER)

FT FEET

FTG FOOTING

FURG FURRING

FUT FUTURE

FW FIRE WATER

FWC FABRIC WALL COVERING

G NATURAL GAS

GA GAGE

GAL GALLON(S)

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GCABC GRADED CRUSHED AGGREGATE BASE COURSE

GEN GENERAL

GF GROUND FACE

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFE GOVERNMENT-FURNISHED EQUIPMENT

GFE/CI GOVERNMENT-FURNISHED EQUIPMENT

CONTRACTOR INSTALLED

GI GALVANIZED IRON

GIP GALVANIZED IRON PIPE

GKT GASKET(ED)

GL GLASS

GL BLK GLASS BLOCK

GLF GLASS FIBER

GLZ GLAZING

GLZ CMU GLAZED CONCRETE MASONRY UNITS

G GROUND

GOVT GOVERNMENT

GPM GALLONS PER MINUTE

GPT GYPSUM TILE

GRAN GRANITE

GR LN GRADE LINE

GRTG GRATING

GST GLAZED STRUCTURAL TILE

GT GROUT

GWT GLAZED WALL TILE

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

HB HOSE BIBB

HC HOLLOW CORE

HCD HALON CONTAINMENT DAMPER

HCP HANDICAPPED

HD HEAD

HD HEAVY DUTY

HDBD HARDBOARD

HD JT HEAD JOINT

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HES HIGH EARLY-STRENGTH CEMENT

HEX HEXAGON

HH HANDHOLE

HK HOOK(S)

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HP HIGH PRESSURE

HP HORSEPOWER

HPT HIGH POINT

HR HOUR

HS HIGH STRENGTH

HSGYP HIGH-STRENGTH GYPSUM PLASTER

HSKPG HOUSEKEEPING

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HYDR HYDRAULIC

Hz HERTZ

IC INTERCOM

ID INSIDE DIAMETER

IESNA ILLUMINATING ENGINEERING SOCIETY OF NORTH

AMERICA

ILK INTERLOCK

IN INCH

INCIN INCINERATOR

INCL INCLUDED

INSF INSULATING FILL

INSUL INSULATION

INT INTERIOR

INTM INTERMEDIATE

INV INVERT

IP IRON PIPE

IPS IRON PIPE SIZE

I.P.S. INSIDE PIPE SIZE

JAN CLO JANITOR’S CLOSET

J-BOX JUNCTION BOX

JCT JUNCTION

JST JOIST

JT JOINT

KIP KILOPOUND (1000 POUNDS)

KIT KITCHEN

KOP KNOCKOUT PANEL

KPL KICKPLATE

kV KILOVOLTS kVA KILOVOLT AMPERES kVAR KILOVOLT AMPERES REACTIVE kW KILOWATT

KWY KEYWAY

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAT LEAVING AIR TEMPERATURE

LAU LAUNDRY

LAV LAVATORY

LB LAG BOLT

LB POUND

LBL LABEL

LBR LUMBER

LC LIGHT CONTROL

LD LOAD

LDG LOADING

LG LENGTH

LH LEFT HAND(ED)

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLD LEAD-LINED DOOR

LM LUMEN

LMST LIMESTONE

LNTL LINTEL

LONG LONGITUDINAL

LP LIGHTPROOF

LPD LIGHTPROOF DOOR

LPL LIGHTPROOF LOUVER

LPT LOW POINT

LR LIVING ROOM

LS LAWN SPRINKLER

LT LIGHT

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWT LEAVING WATER TEMPERATURE

m METER(S)

M&B MATCHED AND BEADED

MACH MACHINE

MAS MASONRY

MATL MATERIAL(S)

MAX MAXIMUM

MB MACHINE BOLTS

MBR MEMBER

MC MEDICINE CABINET

MCJ MASONRY CONTROL JOINT

MCO METAL-CASED OPENING

MDS METAL DIVIDER STRIP

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDIUM

MEMB MEMBRANE

MES METAL EDGE STRIP

MFD METAL FLOOR DECKING

MFG MANUFACTURING

MFR MANUFACTURER

MG MOTOR GENERATOR

MGT MATTE-GLAZED TILE

MH MANHOLE

MI MALLEABLE IRON

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

ML METAL LATH

ML MONOLITHIC

MLDG MOULDING

MLWK MILLWORK

mm MILLIMETER(S)

MNIC MATERIAL NOT IN CONTRACT (INSTALLATION BY

CONTRACTOR)

MO MASONRY OPENING

MOD MODULAR

MOD. MODIFIED

MOT MOTOR

MP MOVABLE PARTITION

MR MOP RECEPTOR

MRB MARBLE BASE

MRD METAL ROOF DECKING

MS MACHINE SCREWS

MT METAL THRESHOLD

MT MOUNT

MTD MOUNTED

MTFR METAL FURRING

MTL METAL

MVBL MOVABLE

MULL MULLION

N NORTH

NAT NATURAL

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

Ni NICKEL

NIC NOT IN CONTRACT

NL NAILABLE

N.L. NEOPRENE LATEX

NM NONMETALLIC

NO NORMALLY OPEN

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

N’’REQD NOT REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OBSC OBSCURE

OBW OBSERVATION WINDOW

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OFC OFFICE

OGL OBSCURE GLASS

OH OVERHEAD

OHMS OVALHEAD MACHINE SCREW

OHWS OVALHEAD WOOD SCREW

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OPS OPERATIONS

OS & Y OUTSIDE SCREW AND YOKE

OWGL OBSCURE WIRED GLASS

P POLE

PA PUBLIC ADDRESS

PAR PARALLEL

PB PANIC BAR

PBD PARTICLE BOARD

PBS PUSH BUTTON STATION

PC PIECE

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCP CEMENT PLASTER (PORTLAND)

PD PAVEMENT DRAIN

PED PEDESTAL

PERF PERFORATE(D)

PERIM PERIMETER

PH PHASE

PHAR PHARMACY

PI POINT OF INTERSECTION

PIPU PREFAB ISOLATION POWER UNIT

PIV POST INDICATING VALVE

PL PLATE

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLAT PLATFORM

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLG PILING

PL GL PLATE GLASS

PLYWD PLYWOOD

PNL PANEL

PT PAINT(ED)

POL POLISHED

PORC PORCELAIN

PORT PORTABLE

PPGL POLISHED PLATE GLASS

PPM PARTS PER MILLION

PR PAIR

PREFAB PREFABRICATE(D)

PREFIN PREFINISHED

PREFMD PREFORMED

PRKG PARKING

PROJ PROJECT

PRV PRESSURE-REGULATING VALVE

PS PIPE SPACE

P.S. PRESSED STEEL

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PNEUMATIC TUBE

PT. POINT

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PV PAVED

PVC POLYVINYL CHLORIDE

PVG PAVING

PW PASS WINDOW

QT QUARRY TILE

QT. QUART

QTR QUARTER

1/4 RND QUARTER ROUND

QTY QUANTITY

R RADIUS

R RANGE

R RISER

RA RETURN AIR

RAB RABBETED

RA GR RETURN AIR GRILLE

RAR RETURN AIR REGISTER

RB RUBBER BASE, RESILIENT BASE

RBL RUBBLE STONE

RBR RUBBER

RC REMOTE CONTROL

RCP REINFORCED CONCRETE PIPE

RCVR RECEIVER

RD ROOF DRAIN

RDG INS RIGID INSULATION

RECPT RECEPTACLE

REC ROOM RECREATION ROOM

RECT RECTIFIER

REF REFERENCE

REFL REFLECT

REFR REFRIGERATION

REG REGISTER

REG REGLET

REINF REINFORCE

REM REMOVE(ABLE)

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RFG ROOFING

RH RELATIVE HUMIDITY

RH RIGHT HAND

RH ROOF HATCH

RK RACK

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RP RETRACTABLE PARTITION

RPM REVOLUTIONS PER MINUTE

RPRT RAISED PATTERN RUBBER TILE

RTF RUBBER TILE FLOOR

RVS REVERSE

RVT RIVET

RWC RAINWATER CONDUCTOR

S SOUTH

SA SUPPLY AIR

SANGB SELFRIDGE AIR NATIONAL GUARD BASE

SB SPLASH BLOCK

S.B. SECURITY BARS

SC SOLID CORE

SCHED SCHEDULE

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SD STORM DRAIN

SDI STEEL DOOR INSTITUTE

SECT SECTION

SEQ SEQUENCE

SFGL SAFETY GLASS

SFTU STRUCTURAL FACING TILE UNIT

SFU STRUCTURAL FACING UNIT

SG SHEET GLASS

SHLDR SHOULDER

SHT SHEET

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SKLT SKYLIGHT

SLNT SEALANT

SLV SLEEVE

SM SHEET METAL

SMS SHEET METAL SCREWS

SOV SHUT OFF VALVE

SPC SPACER

SPCL SPECIAL

SPD SOUNDPROOF DOOR

SPEC SPECIFICATION

SPF SOUNDPROOF

SP FIN SPECIAL FINISH

SPH SPACE HEATER

SPKR SPEAKER

SQ SQUARE

SQHD SQUARE HEAD

S&R SHELF AND ROD

SS SERVICE SINK

SS STANDING SEAM (ROOF)

SST STAINLESS STEEL

STA STATION

STD STANDARD

STG SEATING

STL STEEL

STOR STORAGE

ST PR STATIC PRESSURE

STR STRINGER

STRUCT STRUCTURAL

STWY STAIRWAY

SUB FL SUBFLOOR

SUSP SUSPENDED

SV SHEET VINYL

SW SWITCH

SWBD SWITCHBOARD

SYMM SYMMETRICAL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

TAN TANGENT

TB TOWEL BAR

TC TERRA COTTA

TEL TELEPHONE

TEMP TEMPERATURE

TEMP TEMPORARY

TER TERRAZZO

TERM TERMINAL

T&G TONGUE AND GROOVE

TGL TOGGLE

TH TRUSS HEAD

THK THICK(NESS)

THRES THRESHOLD

TK BD TACKBOARD

TKS TACKSTRIP

TO TOP OF

TOL TOLERANCE

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPTN TOILET PARTITION

TRANS TRANSOM

TRANS TRANSVERSE

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

UC UNIT COOLER

UGND UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS LABORATORIES

UNEX UNEXCAVATED

UNFIN UNFINISHED

UPS UNINTERRUPTABLE POWER SUPPLY

USACE UNITED STATES ARMY CORPS OF ENGINEERS

UR URINAL

UTIL UTILITY

UV UNIT VENTILATOR

V VOLT

VAR VARNISH

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VCT VITRIFIED CLAY TILE

VD VAULT DOOR

VENT VENTILATOR(TION)

VERT VERTICAL

VEST VESTIBULE

VF VINYL FABRIC

VG VERTICAL GRAIN

VH VINYL HOMOGENEOUS

VJ V-JOINT(ED)

VNR VENEER

VOL VOLUME

VR VAPOR RETARDER

VRM VERMICULITE

VS VENT STACK

V.T. VOLTAGE TRANSFORMER

VTR VENT THRU ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

WB WET BULB

WBL WOOD BLOCKING

WC WATER CLOSET

W/C WHEELCHAIR

WCO WOOD-CASED OPENING

WD WOOD

WD WOOD DOOR

WDSP WASTE DISPOSER

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WALL HUNG

WH WATER HEATER

WHB WHEEL BUMPER

WHM WATT-HOUR METER

WI WROUGHT IRON

WKSH WORK SHOP

WM WIRE MESH

W/O WITHOUT

WP WATERPROOF(ING)

WP WEATHERPROOF

WP WORKING POINT

WR WASTE RECEPTACLE

WRB WARDROBE

WS WATERSTOP

W.S. WASTE STACK

WSCT WAINSCOT

WT WEIGHT

WTH WIDTH

W/W WALL TO WALL

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

WWR WELDED WIRE REINFORCEMENT

XFMR TRANSFORMER

YD YARD

YD YARD DRAIN

X

X X

X

X

X X

X X X

X X X X X X X X

X X

X X

X X

X

X

X

X

XXXX

XXXXXXXXX

X

XXXXX

X X

X X

X

XX

X X X X X

X

X

X

X

X

X

X

X

X

X

X

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

PA

B

D R

P

PR

O

JE

C T

LA

YO

U T

PL

AN

O

VE

R

AL

L

LA

YO

U T

GC113

400'0 200'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

KEY MAP

TAXIWAY A EXTENSION

(TASK 3)

EXISTING RUNWAY 19

THRESHOLD

RELOCATED

RUNWAY 19

THRESHOLD

RELOCATED CLEAR ZONE

GRADED AREA (1,000' X 2,000')

RELOCATED RUNWAY 19

CLEAR ZONE (3,000' X 3,000')

RELOCATED PERIMETER ROAD, IRWIN

DRAIN, AND ROSSO HWY CORRIDOR.

(BY OTHERS)

690.26'

RUNWAY 19 EXTENSION

(TASK 1)

R15 0.0

0'

BOUNDARY LINE

30' ESMT FOR

INGRESS/EGRESS

PARCEL 2A

PARCEL 2B

YOUTH

CENTER

BOUNDARY LINE

CTC DEVELOPMENT GROUP

CTC DEVELOPMENT

GROUP

25.00' 25.00'

75.00'

125.00'

R150.00'

R125.00'

GENERAL NOTES:

1. DISPOSAL AREAS FOR REMOVED MATERIALS, RUBBLE, UNSUITABLE EXCESS SOILS, OR OTHER CONSTRUCTION DEBRIS EXCEPT FOR ASPHALT MILLINGS ARE NOT AVAILABLE AT SANGB FOR CONTRACTOR'S USE. DISPOSAL IS THE

RESPONSIBILITY OF THE CONTRACTOR AT SITES OFF GOVERNMENT CONTROLLED LANDS.

2. ALL WASTE MATERIAL GENERATED BY THE PROJECT SHALL BE DISPOSED OF ACCORDING TO THE PROJECT

SPECIFICATIONS AND SANGB AND DTMB DEMOLITION WASTE REQUIREMENTS.

3. BORROW SITES ON BASE ARE NOT AVAILABLE FOR USE BY THE CONTRACTOR EXCEPT FOR STOCKPILES OF ASPHALT MILLINGS. ALL BORROW MATERIALS, TOPSOIL, OR OTHER SOIL MATERIAL SHALL BE OBTAINED BY THE

CONTRACTOR FROM COMMERCIAL SOURCES FROM OFF-SITE LOCATIONS.

4. STAGING AREAS WILL BE PROVIDED BY THE GOVERNMENT. DAMAGE TO EXISTING FENCING AND GATES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO GOVERNMENT EXPENSE. SEE SHEET GC141.

5. ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.

6. CONTRACTOR SHALL CALL THE MICHIGAN ONE CALL CENTER MISS DIG 811, HAVE AN APPROVED AF FORM 103 "DIG

PERMIT", AND ALL UTILITY LOCATES IN PLACE FOR THE PROJECT PRIOR TO BEGINNING CONSTRUCTION.

CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN THROUGHOUT CONSTRUCTION.

GENERAL PROJECT WORK DESCRIPTION SUMMARY:

· CONSTRUCT PCC OR HMA PAVEMENT SECTIONS FOR THE TAXIWAY A EXTENSION.

· CONSTRUCT HMA PAVEMENT SECTION FOR THE TAXIWAY EXTENSION SHOULDERS.

· MISCELLANEOUS AIRFIELD ELECTRICAL IMPROVEMENTS FOR TAXIWAY A EXTENSION.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, RELOCATIONS, AND IMPROVEMENTS.

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

· REMOVE, REPLACE, AND TIE IN TO EXISTING PAVEMENT MARKINGS, AND APPLY NEW MARKINGS

FOR THE NEW PAVEMENTS.

BLAST PAD

(TASK 1)

1000.00'

TAXIWAY B EXTENSION

(TASK 2)

X X

X

X

X X

X X

X

X

X X

X

X

X X

X X X

X X X X X X X X

X X

X X

X X

X

X

X

X

XXXX

X X

X X

X X

X

X X

XXXXXXXXX

X

XXXXXXXXXX

X X

X X

X

XX

X X X X X X X X

X

X

X

X

X

X

X

X

X

X

X

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

SD

A#21

SD

A#22

SD

A#23

SD

A#24

SD

A#25

SD

A#26

SD

A#27

SD

A#28

SD

A#30

SD

A#31

SD

A#32

SD

A#33

SD

A#34

SD

A#35

SD

A#42

SD

A#43

SD

A#20

M O

N M

O N

F.I.

SB# 12

SB# 11

G U

Y

R /W

R /W

R /W

R /W

R /W

R /W

R /W

R /W

R /W

R /W

R /W

R /W

175+00 180+00 185+00 190+00 195+00 200+00 205+00 210+00 215+00 220+00 225+00 230+00

300+51.77 305+00 310+00 315+00 320+00 325+00 330+00

5+

7+

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

PA

B

D R

P

SU

R

VE

Y C

O N

TR

O

L

PL

AN

GC121

400'0 200'

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

A H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

LEGEND:

CONTROL POINT

RUNWAY 01-19

ALIGNMENT

TAXIWAY A

ALIGNMENT

POINT NORTHING EASTING DESCRIPTIONELEV.

CONTROL POINTS

NOTES:

1. THIS TOPOGRAPHICAL MAP IS BASED UPON A FIELD SURVEY PERFORMED BY SPALDING DEDECKER

DURING JUNE OF 2024.

2. THE COORDINATE SYSTEM FOR THIS SURVEY IS THE STATE PLANE COORDINATE SYSTEM, MICHIGAN

SOUTH ZONE (2113), BASED ON NAD83 (NSRS2011). UNITS ARE INTERNATIONAL FEET.

COORDINATES WERE ESTABLISHED USING A DATA LINK TO THE MDOT CONTINUOUSLY OPERATING

REFERENCE STATIONS (CORS).

3. THE VERTICAL DATUM OF THIS SURVEY IS BASED UPON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) AS ESTABLISHED WITH RTK GPS MEASUREMENTS USING A DATA LINK TO THE MDOT

CONTINUOUSLY OPERATING REFERENCE STATIONS (CORS).

4. CONTRACTOR SHALL VERIFY BENCHMARKS AND CONTROL POINTS SHOWN AND PROVIDE TO THE

CONTRACTING OFFICER PRIOR TO START OF WORK.

BM 100

BM 101

BM 102

BM 103

BM 104

BM 105

BM 106

BM 107

BM 108

BM 109

BM 110

BM 111

BM 112

BM 115

BM 116

BM 117

BM 118

BM 119

BM 120

BM 121

BM 122

BM 123

BM 124

BM 125

BM 126

BM 127

BM 128

BM 129

BM 130

BM 131

BM 132

BM 133

BM 134

BM 135

BM 136

BM 137

BM 138

BM 139

BM 243

BM 1010

BM 1013

BM 10910

BM 50400

415607 415617 415653 415664 415803 415826 415751 415858 415869 415964 415954 415998 416279 415511 415557 415522 415614 415650 415404 414767 414370 413667 413219 414812 410966 410173 409171 408173 407173 412171 406173 405421 404159 403672 414466 415236 415452 415474 415733 415330 415340 416425

415670.909

13534197 13534605 13535127 13535441 13536347 13536792 13537253 13537504 13537875 13538268 13538526 13538762 13538973 13533828 13534755 13535872 13536985 13537782 13535402 13535415 13535412 13535407 13535404 13538566 13535230 13535258 13535250 13535243 13535235 13535273 13535228 13535192 13535335 13535067 13533941 13534068 13534566 13534986 13532570 13532927 13538241 13539013

13533290.274

588.826 583.261 581.849 579.937 580.568 579.794 579.837 577.048 577.661 578.952 576.899 579.113 579.375 585.890 584.994 578.069 578.441 578.306 579.085 576.041 576.142 576.112 577.016 578.399 579.654 578.265 578.633 579.055 579.051 578.573 579.308 580.505 578.778 581.823 576.278 587.943 581.843 578.971 604.711 582.584 577.640 576.880 585.667

SET MAG NAIL

SET CUT CROSS

SET CHISELED X

SET CHISELED X

ARROW ON FIRE HYDRANT

SET BENCH TIE

SET CHISELED CROSS, NOT SHOWN

SET CHISELED X, NOT SHOWN

ARROW ON FIRE HYDRANT, NOT SHOWN

SET CHISELED X, NOT SHOWN

SET CHISELED X, NOT SHOWN

ARROW ON FIRE HYDRANT, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE

TOP OF NW BOLT OF LIGHT POLE BASE

SET MAG SPIKE

SET MAG SPIKE

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE

SET MAG SPIKE

SET MAG SPIKE

SET MAG SPIKE

SET MAG SPIKE

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE, NOT SHOWN

SET MAG SPIKE

SET CHISELED X

SET MAG SPIKE

SET MAG SPIKE

FOUND MAG NAIL

FOUND DISK IN CONCRETE MON.

FOUND DISK IN CONCRETE MON., NOT SHOWN

FOUND NGS MONUMENT, NOT SHOWN

FOUND DISK IN CONCRETE MON.

BM 136

BM 137

BM 100

BM 115

BM 50400

BM 101

BM 138

BM 116

BM 139

BM 102

BM 103

BM 120BM 121BM 122BM 123BM 124

BM 117

BM 104

BM 105

BM 118

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

PA

B

D R

P

SU

R

VE

Y C

O N

TR

O

L

AL

IG

N

M

EN

TS

GC122

Alignment: CL_RWY 01-19 Tangent Data

Description PT Station Northing Easting

Start: 70+00.000 402170.74 13535046.4 End: 231+00.000 418270.28 13535167.65

Tangent Data

Parameter Value Parameter Value Length: 16100 Course: N 00° 25' 53.4622" E

Alignment: CL_TWY A Tangent Data

Description PT Station Northing Easting

Start: 300+51.770 412915.24 13535904.22 End: 327+66.097 415629.49 13535924.66

Tangent Data

Parameter Value Parameter Value Length: 2714.327 Course: N 00° 25' 53.4622" E

Curve Point Data Description Station Northing Easting

PC: 327+66.097 415629.49 13535924.66

RP: 415630.9 13535737.17

PT: 330+60.622 415818.39 13535738.58

Circular Curve Data Parameter Value Parameter Value

Delta: 90° 00' 00.0000" Type: LEFT Radius: 187.5 DOC: 30° 33' 27.8976" Length: 294.524 Tangent: 187.5 Mid-Ord: 54.917 External: 77.665

Chord: 265.165 Course: N 44° 34' 06.5378" W

Tangent Data Description PT Station Northing Easting

Start: 330+60.622 415818.39 13535738.58 End: 336+50.003 415822.83 13535149.22

Tangent Data

Parameter Value Parameter Value Length: 589.381 Course: N 89° 34' 06.5378" W

X X

X X X X

X X

X

X

X

XX

X X

X

XXXX

X

XX

X

XX

X X

X

X

X

X

X

G

UY

G

UY

G

UY

G

UY GUY GUYGUY

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

G U

Y

G U

Y

R /W

R /W

R /W

R /W

R/W

R/W

R/W

R/W

R/W

R/W

R /W

300+51.77 305+00 310+00 315+00 320+00 325+00 330+00

5+

7+

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

R G

V

D R

P

ST

AG

IN

G A

R

EA

A N

D H

AU

L

R O

U

TE

P

LA

N

GC141

800'0 400'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

O H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

25 MPH

CONSTRUCTION

VEHICLES

ALL

CONSTRUCTION

VEHICLES

CONSTRUCTION

VEHICLES ONLY

OR=

ALL

CONSTRUCTION

VEHICLES

CONSTRUCTION TRAFFIC

SIGNS. PLACE ALL SIGNS

BEFORE WORK STARTS.

COORDINATE SIGN

LOCATIONS AND

ORIENTATION WITH

AIRPORT AND ENGINEER.

NO

CONSTRUCTION

VEHICLES

LEGEND - CONSTRUCTION SIGNS & BARRICADES

CONSTRUCTION HAUL ROUTES

N . P

ER

IM

ET

ER

R D

W

IL

LI

AM

P R

O

SS

O H

W Y

FALCON RD.

JEFFERSON AVE.

TAXIWAY A WORK

AREA HAUL ROUTE

OPTION

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE

(SEE NOTE 7), GATE GUARD

REQUIRED

CONTRACTOR'S BASE

ACCESS GATE, SEE NOTE 2

CONTRACTOR

STAGING AREA, SEE

NOTE 6

BASE VISITOR'S CENTER

RELOCATED N. PERIMETER RD., ROSSO

HWY, IRWIN DRAIN, AIRFIELD FENCE,

PERIMETER FENCE, AND CLEAR ZONE

FENCE (BY OTHERS IN TASK 1)

DOOLITTLE DR.

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE

FOR TAXIWAY A WORK

ONLY (SEE NOTE 7), GATE

GUARD REQUIRED

NOTES:

1. ONLY ONE GATE AND CORRESPONDING HAUL ROUTE CAN BE USED AT ONE TIME.

2. ALL CONTRACTOR PERSONNEL AND VEHICLES ARE SUBJECT TO INSPECTION UPON ENTRANCE TO THE BASE AT THE GATES SHOWN. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO ENSURE THE TIME IT TAKES FOR INSPECTIONS DOES NOT CONFLICT WITH MATERIAL SPECIFICATION OR PROJECT TIME CONSTRAINTS. NO ADDITIONAL COMPENSATION TO THE CONTRACTOR WILL BE APPROVED FOR OUT OF SPECIFICATION MATERIALS OR

TIME DELAYS DUE TO BASE INSPECTIONS.

3. BASE ACCESS ROADS SHALL BE MAINTAINED BY EITHER A PAVED SURFACE, OR SUFFICIENT THICKNESS OF GRADED CRUSHED AGGREGATE BASE COURSE OR ASPHALT MILLINGS THROUGHOUT THE PROJECT. THIS SHALL INCLUDE ALL MAINTENANCE, TEMPORARY TRANSITIONS, AND DELINEATION OF WORK AREAS BY LINES OF CONTINUOUS BARRICADES TO PREVENT DAMAGE TO VEHICLES ACCESSING THESE AREAS.

4. SEE SHEET GC142 FOR EACH PHASES' AREA OF CONSTRUCTION LIMITS. THE AREA LIMITS SHALL BE DELINEATED IN THE FIELD TO THE APPROVAL OF

THE AIRFIELD MANAGER.

5. CONTRACTOR TO SUBMIT FORM FAA 7460-1 FOR PROPOSED BATCH PLANT(S) IN ADDITION FOR THE CONSTRUCTION LIMITS OF THIS PROJECT.

6. FOR TEMPORARY UTILITY CONNECTIONS NEAR THE DESIGNATED STAGING AREAS, CONTRACTOR TO CONNECT TO EXISTING WATER OR ELECTRICAL

SUPPLIES PER THE PROJECT SPECIFICATIONS AND NATIONAL ELECTRIC CODE / NFPA 70. THIS INCLUDES BACKFLOW PREVENTERS AND ELECTRICAL

EQUIPMENT AS REQUIRED.

7. FOR THE HAUL ROUTE OPTIONS FOR TAXIWAY A WORK, COORDINATE WITH DTMB AND BASE PERSONNEL REGARDING THE N. PERIMETER ROAD, ROSSO HIGHWAY, IRWIN DRAIN, AND FENCING RELOCATION PROJECT PROGRESS TO DETERMINE AVAILABLE OPTIONS TO GAIN ACCESS TO THE STAGING AND WORK AREAS. IF OPTIONS ARE UNAVAILABLE FROM THE BY OTHERS RELOCATION PROJECT, THE CONTRACTOR SHALL PROVIDE TEMPORARY AIRFIELD ACCESS GATES FOR THE WORK AREAS. ALL AIRFIELD ACCESS GATES SHALL HAVE A CONTRACTOR SUPPLIED GATE GUARD.

TAXIWAY A

EXTENSION

PROJECT WORK

AREA

X X

X X X X

X X

X

X

X

XX

X X

X

XXXX

X

XX

X

XX

X X

X

X

X

X

X

G

UY

G

UY

G

UY

G

UY GUY GUYGUY

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

G U

Y

G U

Y

R /W

R /W

R /W

R /W

R/W

R/W

R/W

R/W

R/W

R/W

R /W

300+51.77 305+00 310+00 315+00 320+00 325+00 330+00

5+

7+

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

R G

V

D R

P C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

P

LA

N

O

VE

R

VI

EW

GC142

800'0 400'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

O H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

N . P

ER

IM

ET

ER

R D

W

IL

LI

AM

P R

O

SS

O H

W Y

FALCON RD.

JEFFERSON AVE.

TAXIWAY A WORK

AREA HAUL ROUTE

OPTION

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE 7,

GATE GUARD REQUIRED

CONTRACTOR'S BASE

ACCESS GATE

CONTRACTOR

STAGING AREA

BASE VISITOR'S CENTER

RELOCATED N. PERIMETER RD.,

ROSSO HWY, IRWIN DRAIN, AIRFIELD

FENCE, PERIMETER FENCE, AND

CLEAR ZONE FENCE (BY OTHERS)

DOOLITTLE DR.

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE

FOR TAXIWAY A WORK

ONLY, GATE GUARD

REQUIRED

TAXIWAY A

EXTENSION

PROJECT WORK

AREA, PHASES

1, 2, AND 3

XXXXXXXXXXXXXXXXXXXXXXXXXX

LEGEND

CONSTRUCTION HAUL ROUTES

LOW PROFILE BARRICADES

PHASE 1 WORK AREA (TAXIWAY A)

PHASE 2 WORK AREA (TAXIWAY A)

STAGING, BATCH PLANT, AND/OR STOCKPILE AREA

NOTES:

1. MAINTAIN ARFF AND EMERGENCY VEHICLE ACCESS TO RUNWAY 01/19 THROUGHOUT THE PROJECT.

MAINTAIN ARFF AND EMERGENCY VEHICLE ACCESS TO THE WEST SIDE FACILITIES OF SELFRIDGE ANGB

THROUGHOUT THE PROJECT.

2. ALL BARRICADE PLACEMENT, TAXIWAY CLOSURES, EDGE LIGHT DEACTIVATION/ACTIVATION, SIGNAGE COVERAGE, ETC. MENTIONED ON THE FOLLOWING SHEETS TO BE COORDINATED AND APPROVED BY THE

AIRFIELD OPERATIONS MANAGER AND CONTRACTING OFFICER.

3. WORK WITHIN THE AOA REQUIRES A BASE ESCORT AT ALL TIMES.

4. PHASE 2 AND 3 REQUIRE CLOSURES OF PORTIONS OF TAXIWAYS OR RUNWAY 01/19 NORTH HAMMERHEAD.

COORDINATION WITH THE AIRFIELD OPERATIONS MANAGER AND CONTRACTING OFFICER WILL BE

REQUIRED PRIOR TO EXECUTING WORK WITHIN THOSE AREAS.

5. IF THE GLIDESLOPE IS ACTIVE DURING THIS PROJECT, ANY WORK REQUIRED WITHIN THE GLIDESLOPE CRITICAL AREA WILL REQUIRE THE GLIDESLOPE TO BE DEACTIVATED. THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH AIRFIELD MANAGEMENT PRIOR TO WORKING WITHIN ANY ACTIVE

GLIDESLOPE CRITICAL AREA.

6. PLACE TAXIWAY AND RUNWAY EDGE LIGHT CABLE JUMPER AT BARRICADE LINES. JUMPER TO BE FAA APPROVED 5000V CABLE RUN FROM EDGE LIGHT TO EDGE LIGHT W/ L-823 SPLICES. PROTECT CABLE AND

SECURE W/ SAND BAGS.

PHASE GENERAL DESCRIPTIONS:

PHASE 1 (CONSTRUCTION OF TAXIWAY A; 200-FEET MINIMUM OUTSIDE OF RUNWAY OR TAXIWAY

CENTERLINES)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

PHASE 2 (CONSTRUCTION OF TAXIWAY A; TAXIWAY A CLOSED ADJACENT TO WORK AREAS; WORK WITHIN

200-FEET OF TAXIWAY CENTERLINES)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

PHASE 3 (CONSTRUCTION OF TAXIWAY A; RUNWAY 19 END OPTIONALLY TEMPORARILY DISPLACED; WORK

WITHIN 200-FEET OF RUNWAY CENTERLINE)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

· FINAL PAVEMENT MARKINGS FOR TAXIWAY A EXTENSION.

PHASE 3 WORK AREA (TAXIWAY A)

PHASE 3 (TAXIWAY A)

XX

XX

XX

XX

X

PHASE 2 (TAXIWAY A)

SEE NOTE 6

PHASE 2 (TAXIWAY A)

SEE NOTE 6

XXXX

TA

XI

W

AY

L

TA

XI

W

AY

J

SEE NOTE 4

POTENTIAL RELOCATED

GLIDESLOPE CRITICAL

AREA, SEE NOTE 5

SEE NOTE 4

X X

X X X X

X X

X

X

X

XX

X X

X

XXXX

X

XX

X

XX

X X

X

X

X

X

X

G

UY

G

UY

G

UY

G

UY GUY GUYGUY

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

G U

Y

G U

Y

R /W

R /W

R /W

R /W

R/W

R/W

R/W

R/W

R/W

R/W

R /W

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

R G

V

D R

P C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

P

LA

N

PH

AS

E

(T

AX

IW

AY

A

GC143

800'0 400'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

O H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

N . P

ER

IM

ET

ER

R D

W

IL

LI

AM

P R

O

SS

O H

W Y

FALCON RD.

JEFFERSON AVE.

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE,

GATE GUARD REQUIRED

CONTRACTOR'S BASE

ACCESS GATE

CONTRACTOR

STAGING AREA, SEE

NOTE 1

BASE VISITOR'S CENTER

RELOCATED N. PERIMETER RD.,

ROSSO HWY, IRWIN DRAIN, AIRFIELD

FENCE, PERIMETER FENCE, AND

CLEAR ZONE FENCE (BY OTHERS)

DOOLITTLE DR.

HAUL ROUTE

XXXXXXXXXXXXXXXXXXXXXXXXXX

LEGEND

CONSTRUCTION HAUL ROUTES

LOW PROFILE BARRICADES

PHASE 1 WORK AREA (TAXIWAY A)

STAGING, BATCH PLANT, AND/OR STOCKPILE AREA

NOTES:

1. THERE EXISTS A 0.27 ACRE WETLAND FURTHER TO THE WEST OF THE INDICATED STAGING AREA. PLACE SILT

FENCING AROUND STAGING AREA TO NOT IMPACT WETLAND.

2. WORK WITHIN THE AOA REQUIRES A BASE ESCORT AT ALL TIMES.

3. CONTRACTOR'S OPERATIONS, PERSONNEL, VEHICLES, AND MATERIALS SHALL BE A MINIMUM OF 200-FEET AWAY

FROM ANY TAXIWAY OR RUNWAY CENTERLINE DURING PHASE 1 AT ALL TIMES.

PHASE GENERAL DESCRIPTIONS:

PHASE 1 (CONSTRUCTION OF TAXIWAY A; 200-FEET MINIMUM OUTSIDE OF RUNWAY OR TAXIWAY CENTERLINES)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

TA

XI

W

AY

L

TA

XI

W

AY

J

X X

X X X X

X X

X

X

X

XX

X X

X

XXXX

X

XX

X

XX

X X

X

X

X

X

X

G

UY

G

UY

G

UY

G

UY GUY GUYGUY

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

G U

Y

G U

Y

R /W

R /W

R /W

R /W

R/W

R/W

R/W

R/W

R/W

R/W

R /W

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

R G

V

D R

P C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

P

LA

N

PH

AS

E

(T

AX

IW

AY

A

GC144

800'0 400'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

O H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

N . P

ER

IM

ET

ER

R D

W

IL

LI

AM

P R

O

SS

O H

W Y

FALCON RD.

JEFFERSON AVE.

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE,

GATE GUARD REQUIRED

CONTRACTOR'S BASE

ACCESS GATE

CONTRACTOR

STAGING AREA, SEE

NOTE 1

BASE VISITOR'S CENTER

RELOCATED N. PERIMETER RD.,

ROSSO HWY, IRWIN DRAIN, AIRFIELD

FENCE, PERIMETER FENCE, AND

CLEAR ZONE FENCE (BY OTHERS)

DOOLITTLE DR.

HAUL ROUTE

XXXXXXXXXXXXXXXXXXXXXXXXXX

LEGEND

CONSTRUCTION HAUL ROUTES

LOW PROFILE BARRICADES

PHASE 2 WORK AREA (TAXIWAY A)

STAGING, BATCH PLANT, AND/OR STOCKPILE AREA

NOTES:

1. THERE EXISTS A 0.27 ACRE WETLAND FURTHER TO THE WEST OF THE INDICATED STAGING AREA.PLACE SILT FENCING AROUND STAGING AREA TO NOT

IMPACT WETLAND.

2. WORK WITHIN THE AOA REQUIRES A BASE ESCORT AT ALL TIMES.

3. PHASE 2 WORK IS WITHIN 200-FEET OF PORTIONS OF TAXIWAY A CENTERLINE. COORDINATE REQUIRED TAXIWAY A PHASE 2 CLOSURE A MINIMUM OF 30

DAYS PRIOR TO PLANNED CLOSURE WITH THE CO AND AIRFIELD OPERATIONS MANAGER.

4. CONTRACTOR'S OPERATIONS, PERSONNEL, VEHICLES, AND MATERIALS SHALL BE A MINIMUM OF 200-FEET AWAY FROM RUNWAY CENTERLINE DURING

PHASE 2 AT ALL TIMES.

PHASE GENERAL DESCRIPTIONS:

PHASE 2 (CONSTRUCTION OF TAXIWAY A; TAXIWAY A CLOSED ADJACENT TO PHASE 2 WORK AREA; WORK IS WITHIN 200-FEET OF TAXIWAY CENTERLINES)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

AIRFIELD LIGHTING AND NAVAID DEACTIVATIONS:

· TAXIWAY A EDGE LIGHTS (COVER LIGHTS AND DISCONNECT CIRCUIT OF LIGHTS WITHIN THE PHASE 2 WORK AREA INDICATED; PROVIDE JUMPER AS

REQUIRED TO MAINTAIN OTHER CIRCUITS)

TA

XI

W

AY

L

TA

XI

W

J

X X

X X X X

X X

X

X

X

XX

X X

X

XXXX

X

XX

X

XX

X X

X

X

X

X

X

G

UY

G

UY

G

UY

G

UY GUY GUYGUY

G U

Y

G U

Y G

U Y

G U

Y

G U

Y

G U

Y

G U

Y

G U

Y

R /W

R /W

R /W

R /W

R/W

R/W

R/W

R/W

R/W

R/W

R /W

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

O

PT

IO

N

AL

V

AL

U E

1%

O

PT

IO

N

AL

V

AL

U E

2%

M

JR

D

LU

PA

B

D R

P C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

P

LA

N

PH

AS

E

(T

AX

IW

AY

A

GC145

800'0 400'

TAXIWAY B

TA

XI

W

AY

K

SUGARBUSH RD.

RUNWAY 01-19

TAXIWAY A

W

IL

LI

AM

P R

O

SS

O H

W Y

N . P

ER

IM

ET

ER

R D

KEY MAP

N . P

ER

IM

ET

ER

R D

W

IL

LI

AM

P R

O

SS

O H

W Y

FALCON RD.

JEFFERSON AVE.

HAUL ROUTE

PROVIDE TEMPORARY

AIRFIELD ACCESS GATE,

GATE GUARD REQUIRED

CONTRACTOR'S BASE

ACCESS GATE

CONTRACTOR

STAGING AREA, SEE

NOTE 1

BASE VISITOR'S CENTER

RELOCATED N. PERIMETER RD.,

ROSSO HWY, IRWIN DRAIN, AIRFIELD

FENCE, PERIMETER FENCE, AND

CLEAR ZONE FENCE (BY OTHERS)

DOOLITTLE DR.

HAUL ROUTE

XXXXXXXXXXXXXXXXXXXXXXXXXX

LEGEND

CONSTRUCTION HAUL ROUTES

LOW PROFILE BARRICADES

PHASE 3 WORK AREA (TAXIWAY A)

STAGING, BATCH PLANT, AND/OR STOCKPILE AREA

TA

XI

W

AY

L

TA

XI

W

AY

J

NOTES:

1. THERE EXISTS A 0.27 ACRE WETLAND FURTHER TO THE WEST OF THE INDICATED STAGING AREA.PLACE SILT FENCING AROUND STAGING AREA TO NOT

IMPACT WETLAND.

2. WORK WITHIN THE AOA REQUIRES A BASE ESCORT AT ALL TIMES.

3. PHASE 3 WORK IS WITHIN 200-FEET OF PORTIONS OF RUNWAY 01-19 CENTERLINE. OPTIONAL DISPLACEMENT OF RUNWAY 19 END TO BE INVESTIGATED

AND INCORPORATED INTO SUBSEQUENT B-1 SUBMISSION.

PHASE 3 (CONSTRUCTION OF TAXIWAY A; RUNWAY 19 END OPTIONALLY TEMPORARILY DISPLACED; WORK WITHIN 200-FEET OF RUNWAY CENTERLINE)

· CONSTRUCT PCC OR HMA PAVEMENT SECTION FOR TAXIWAY A EXTENSION.

· CONSTRUCT HMA TAXIWAY SHOULDERS.

· INSTALL AIRFIELD ELECTRICAL TAXIWAY EDGE LIGHTS AND SIGNAGE.

· MISCELLANEOUS UTILITY REMOVALS, REPLACEMENTS, AND RELOCATIONS (STORM, WATER, COMM, ETC.)

· CONSTRUCT GRADING, DRAINAGE, AND UNDERDRAINAGE IMPROVEMENTS.

· FINAL PAVEMENT MARKINGS FOR TAXIWAY A EXTENSION.

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 66

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

TO

BE

R

, 2

AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

TA

XI

W

AY

A

LP

H A

EX

TE

N

SI

O N

Y

M

JR

D

LU

PA

B

D R

P C

O N

ST

R

U C

TI

O

N O

PE

R

AT

IO

N S

AN

D

P H

AS

IN

G P

LA

N

G

EN

ER

AL

N

O

TE

S

GC151

CONSTRUCTION PHASING/ SCHEDULING

1. THIS PROJECT IS ESTIMATED TO BEGIN IN THE SUMMER WITH PHASE 1 STARTING IN THE SPRING OF THE FOLLOWING YEAR AND COMPLETION OF THE PROJECT IN THE SUMMER OF PRECEDING

YEAR FROM THE PHASE 1 START PERIOD. CONTRACTOR SHALL SUBMIT THE REQUIRED PROJECT SCHEDULES FOR COMPLETING THE ENTIRE TAXIWAY PROJECT ALONG WITH REQUIRED PROGRESS UPDATES PER THE STATE OF MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET STATE FACILITIES ADMINISTRATION MICHSPEC DIVISION 0 SPECIFICATIONS.

THIS PROJECT IS ANTICIPATED TO OCCUR IN THREE PHASES. TOTAL CONSTRUCTION TIME FOR PHASES 1, 2, AND 3 FOR THIS PROJECT IS 643 CALENDAR DAYS. SEE SHEETS GC141 - GC145 FOR ADDITIONAL INFORMATION. PHASE 0 OF THE PROJECT WILL START AFTER THE SUMMER AWARD TO THE CONTRACTOR IS GIVEN. THIS PHASE WILL CONSIST OF A 170 CALENDAR DAY PERIOD FOR THE

CONTRACTOR TO:

1. SUBMIT AND GET APPROVAL ON ALL REQUIRED PRE-CONSTRUCTION SUBMITTALS.

2. PERFORM REQUIRED TESTS ON PROPOSED MATERIALS TO BE USED IN THE PROJECT.

3. PERFORM AND GET APPROVAL ON REQUIRED MIX DESIGNS.

4. ISSUE SUBCONTRACTS AND PURCHASE ORDERS.

5. SUBMIT REQUIRED PERMITS FOR APPROVAL.

6. POSSIBLE PLACEMENT OF STAGING AREA AND BATCH PLANTS ON BASE PROPERTY.

7. CONSTRUCTION OF STAGING/ PARKING AREAS WITHIN BASE PROPERTY.

8. POSSIBLE INVESTIGATION AND SURVEYING REQUIRED DURING WEEKEND OR NO FLY DAY CLOSURES.

9. PRODUCTION AND STOCKPILING OF MATERIALS ON-SITE WITHIN DESIGNATED STAGING AREAS FOR THE PROJECT.

PHASE 0 WILL ALLOW TIME FOR ALL OF THE ABOVE ITEMS TO BE COMPLETED, INVESTIGATED, AND HAVE ANY ISSUES WORKED OUT PRIOR TO THE START OF CONSTRUCTION THAT MAY RESULT IN THE SLOWING OR STOPPING OF THE CONSTRUCTION PROGRESS.

PHASE 1, ESTIMATED TO BEGIN IN THE SPRING OF THE FOLLOWING YEAR FROM THE CONTRACT AWARD IS A PERIOD OF 189 CALENDAR DAYS WHICH WILL BE THE ACTUAL START OF CONSTRUCTION.

A WINTER SHUTDOWN PERIOD IS EXPECTED TO BEGIN AFTER PHASE 1 COMPLETION AND PRIOR TO PHASE 2 STARTING. THE WINTER SHUTDOWN IS ESTIMATED TO BEGIN IN THE FALL FOR A PERIOD OF 113

CALENDAR DAYS.

PHASE 2 IS ESTIMATED TO BEGIN IN THE SPRING FOR A PERIOD OF 61 CALENDAR DAYS AND CONSISTS OF CLOSING PORTIONS OF TAXIWAY A.

PHASE 3 IS ESTIMATED TO BEGIN IN THE SPRING FOR A PERIOD OF 65 DAYS AND CONSISTS OF WORK WITHIN 200 FEET OF RUNWAY 01-19 CENTERLINE. AFTER PHASE 3 IS COMPLETE AND ACCEPTED BY THE CO, AN ADDITIONAL 30 CALENDAR DAYS IS ESTIMATED FOR COMPLETING PROJECT CLOSEOUT REQUIREMENTS.

PHASE 1 CANNOT START UNTIL A CONCRETE MIX DESIGN HAS BEEN APPROVED BY THE CONTRACTING OFFICER.

CONTRACTOR SHALL SUBMIT THE PROJECT SCHEDULE FOR THE COMPLETING THE ENTIRE TAXIWAY PROJECT (INCLUDING ALL PHASES) FOR APPROVAL PER THE STATE OF MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET STATE FACILITIES ADMINISTRATION MICHSPEC DIVISION 0 SPECIFICATIONS PRIOR TO THE START OF WORK.

EACH PHASE SHALL BE COMPLETE AND ACCEPTED PRIOR TO STARTING SUBSEQUENT PHASE.

GENERAL CONSIDERATIONS:

COORDINATE THE FOLLOWING AS REQUIRED:

A. CONTRACTORS, QC, QA, SAFETY OFFICERS, FOREMANS, SUPERINTENDENTS, AND PROJECT MANAGEMENT ARE REQUIRED TO ATTEND WEEKLY COORDINATION MEETINGS AT WHICH OPERATIONAL

SAFETY WILL BE A STANDING AGENDA ITEM DURING EVERY PROGRESS MEETING.

B. ALL CONTRACTOR'S PERSONNEL SHALL COMPLETE THE BASE'S BADGING AND DRIVER TRAINING REQUIREMENTS PRIOR TO BEING ALLOWED ACCESS TO THE PROJECT. BASE ACCESS BADGES/ I.D's WILL BE PICKED UP BY CONTRACTOR PERSONNEL AT THE BASE VISITORS CENTER LOCATED AT THE SANGB'S MAIN GATE (NORTH GATE) UPON COMPLETION OF REQUIRED BADGING FORMS AND

PROCESSING TIME.

C. THE CONTRACTOR SHALL NOT INTERFERE WITH THE NORMAL OPERATIONS OF THE BASE FACILITIES THAT ARE DESIGNATED UNDER THIS CONTRACT TO REMAIN OPEN TO AIR TRAFFIC, AND SHALL IMPLEMENT ALL SPECIFIED AND OTHER APPROPRIATE MEASURES TO ENSURE THE SAFETY OF ALL USERS OF THE BASE.

AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY:

A. RUNWAYS AND TAXIWAYS SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. WHEN ANY AREA IS REQUIRED TO BE CLOSED TO AIRCRAFT TRAFFIC, IT SHALL BE BARRICADED AND

MARKED, WITH ANY NAVAIDS AFFECTED BY THE CLOSURE ADDRESSED PER THE REQUIREMENTS STATED ON THIS SHEET, SHEETS GC141 TO GC145 AND GC151 TO GC153, AND THE SPECIFICATIONS

PROVIDED.

B. TAXIWAY CLOSURES:

THE TAXIWAY CLOSURES SHALL BE AS SHOWN ON THE CONSTRUCTION OPERATIONS & PHASING PLAN, SHEETS GC142 - GC145.

C. RUNWAY CLOSURES:

NO RUNWAY CLOSURES ARE ANTICIPATED AS PART OF THIS PROJECT. OPTIONAL DISPLACEMENT OF RUNWAY 19 END TO BE EVALUATED AS PART OF THE SUBSEQUENT B-1 SUBMISSION.

D. APRON CLOSURES:

NOT APPLICABLE TO THIS PROJECT.

CONTRACTOR ACCESS:

A. THE CONTRACTOR SHALL USE THE SOUTH OR NORTH GATE TO GAIN ACCESS ONTO BASE PROPERTY DURING WORK ON THE PROJECT. THE SOUTH GATE WILL REQUIRE THE CONTRACTOR TO PROVIDE

TRAINED AND CERTIFIED SECURITY PERSONNEL WHILE THE GATE IS IN USE. THE CONTRACTOR STAGING AREA AND HAUL ROUTES WILL BE LOCATED PER SHEETS GC141 TO GC145.

B. IF OTHER ACCESS POINTS ARE ALLOWED OTHER THAN THE SOUTH OR NORTH GATES, APPROVAL FROM THE CO IS REQUIRED. THE CONTRACTOR SHALL PROVIDE A GATE GUARD AT ALL POINTS OF ENTRY SHOWN. GATES MUST BE LOCKED WHEN NOT IN USE OR NOT MANNED BY THE GATE GUARD. CONTRACTOR MUST TAKE CARE TO MAINTAIN A HIGH LEVEL OF SAFETY AND SECURITY DURING CONSTRUCTION WHEN ACCESS POINTS ARE CREATED IN THE SECURITY FENCING TO PERMIT THE PASSAGE OF CONSTRUCTION VEHICLES OR PERSONNEL. TEMPORARY GATES SHOULD BE EQUIPPED SO THEY CAN BE SECURELY CLOSED AND LOCKED TO PREVENT ACCESS BY ANIMALS AND PEOPLE. PROCEDURES SHOULD BE IN PLACE TO ENSURE THAT ONLY AUTHORIZED PERSONS AND VEHICLES HAVE ACCESS TO THE AIRFIELD OR PROJECT LIMITS VIA THE AIRFIELD GATES DEPICTED ON SHEETS GC141 TO GC145. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER OPERATION AND PRESERVATION OF ALL AIRFIELD PERIMETER GATES, EITHER MANUAL OR AUTOMATED. A MAXIMUM OF ONE ACCESS POINT/GATE WILL BE ALLOWED OPEN AT ANY ONE TIME. NO GAPS BETWEEN OR BELOW GATE GREATER THAN 2-INCHES WILL BE ALLOWED. ALL TEMPORARY GATES AND FENCING SHALL BE REMOVED AND FENCING RESTORED TO ITS ORIGINAL CONDITION AT THE COMPLETION OF

THE PROJECT.

C. FOR THE PURPOSES OF THIS CONTRACT, ALL FENCING/GATES SHALL BE CONSIDERED PART OF CONTRACTOR HAUL ROUTES. AS SUCH, ANY DAMAGE TO FENCING/GATES AS A RESULT OF CONSTRUCTION TRAFFIC SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. IF ANY CONSTRUCTION GATE IS FOUND OPEN AND UNATTENDED BY THE BASE STAFF, THE CONTRACTOR WILL INCUR A VIOLATION/ PENALTY PER OCCURRENCE TO BE DETERMINED BY THE GOVERNMENT. SEE PARAGRAPH "ENFORCEMENT/ PENALTIES".

D. GATE GUARDS, TRAFFIC GUARDS AND DRIVER TRAINING: THE GATE GUARDS AND TRAFFIC GUARDS SHALL MAINTAIN AND MONITOR A CONTRACTOR SUPPLIED CELL PHONE AT ALL TIMES.

CONTRACTORS KEY PERSONNEL ALONG WITH THE GATE AND TRAFFIC GUARDS SHALL MAINTAIN AND MONITOR A CONTRACTOR SUPPLIED RADIO AT ALL TIMES. TRAINING OF PERSONNEL ON PROPER COMMUNICATION PROCEDURES WITH THE CONTROL TOWER IS ESSENTIAL FOR MAINTAINING OPERATION SAFETY AND WILL BE PROVIDED BY THE GOVERNMENT PRIOR TO THE START OF CONSTRUCTION. ALL GATE AND TRAFFIC GUARDS, FOREMAN AND KEY PERSONNEL WILL BE REQUIRED TO ATTEND. CONTACT NUMBERS IN REGARDS TO FIRE-RESCUE, SECURITY, AND ANY OTHER NUMBER REQUIRED SHALL BE PROVIDED BY THE GOVERNMENT. COST OF PROVIDING THE REQUIRED GATE AND TRAFFIC GUARDS SHALL BE PROVIDED BY THE CONTRACTOR . FOR THE SOUTH BASE ACCESS GATE, THE CONTRACTOR HIRED SECURITY PERSONNEL SHALL BE TRAINED AND CERTIFIED THROUGH THE REQUIREMENTS SET FORTH BY SELFRIDGE ANGB SECURITY FORCES. REQUIRED

TRAINING FOR THE SOUTH BASE ACCESS GATE IS ANTICIPATED TO TAKE 4 HOURS.

KEY CONTRACTOR PERSONNEL MAY BE EXPECTED TO TRAVEL ON OR NEAR ACTIVE AOA'S. THESE INDIVIDUALS MUST COMPLY WITH THE RULES AND REGULATIONS BY PARTICIPATING IN ANY

APPLICABLE AIRFIELD DRIVER'S TRAINING PROCEDURES PROVIDED BY THE BASE.

E. STOCKPILED MATERIALS AND EQUIPMENT STORAGE/PARKING ARE NOT…