4a-Runway -100% Drawings_Part 14.pdf

PDF 10 MB Posted

Attached to
511/23420. JLM; Selfridge ANGB - Airfield Improvements
Solicitation number
RFP 171 260000002245 4
Issued by
Macomb County, Michigan

About this file

This is a 100% final submittal electrical plan drawing (Sheet EA129) prepared by Mead & Hunt, Inc. for the State of Michigan Department of Technology, State Facilities Administration, Design and Construction Division, in support of the Selfridge Air National Guard Base Runway Encroachment Solution – Project #2 Airfield Improvements Task 1. The project addresses runway encroachment mitigation at Selfridge ANGB in Michigan and involves comprehensive electrical infrastructure installation and relocation work. The drawings detail proposed electrical plans for runway 01-19, including installation of elevated and in-pavement runway lights, approach lighting systems (ALS), precision approach path indicator (PAPI) systems, runway end identifier lights (REIL), and associated electrical conduit systems. Specific electrical components include multiple 5kV, L-824C cables for runway circuits, PAPI circuits, taxiway circuits, and threshold lighting circuits, along with grounding systems utilizing #6 solid copper counterpoise installed halfway between runway edges and light lines, with all connections to ground rods made using exothermic welds.

The electrical work encompasses installation of new L-862(L) elevated high-intensity runway lights on L867 bases, L-867 junction cans with blank covers, and various PVC conduit systems (both direct burial and concrete-encased). The project requires significant coordination with existing infrastructure, including connection to the Airfield Electrical Vault and integration with existing duct banks and communication systems. Additional work includes relocation of runway 01 and 19 glide slope equipment shelters, standby generators, service transformers, antenna arrays, and weather monitoring equipment to new locations, with extension of electrical service and fiber optic communication cables to support relocated facilities. The work also involves installation of specialized lighting systems including approach lights with flasher units, taxiway edge lights, and in-pavement threshold lighting, requiring custom cable installations in both new and existing duct systems. The contract represents a Type B-3 final submittal issued June 5, 2026, as part of a larger airfield improvement initiative containing 467 total sheets of design documentation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E E E E E E E E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEE

E E E

E E E

E E

E E

E E E E E E E E E E

E E E E E E E E E E E E E E E E E E E

EEEEEEEEE

E E E E E E E E E E E E E E EE E E E E E E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

D

D D

D

D D

C B

C B

C B

FR

FRFR

UD

C B

144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00

W W W W W W W W

W WW WW WW W

RDR

RDR

CP

CP

R

R

R

R19

R19

R19

R19

R19

R19

R19

R19

R19

R19

CP

CP

CP

CP

CP

CP

CP

C P

C P

C P

CP

CP

CP

CP

CP

CP

CP

R1

R1

STA: 144+97.30

85.01' L

EL: 579.50

STA: 146+94.12

84.99' L

EL: 579.58

STA: 148+91.07

85.00' L

EL: 579.50

STA: 150+88.04

85.00' L

EL: 579.44

STA: 150+88.04

85.00' R

EL: 579.48

STA: 148+91.07

85.00' R

EL: 579.54

STA: 146+94.10

85.00' R

EL: 579.51

STA: 144+97.13

85.00' R

EL: 579.45

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

JU

N E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA129

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

RUNWAY 01-19

TAXIW

AY M

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

1-2" SCH. 40 PVC WITH:1-1/C #6,

5kV, L-824C CABLE (RWY R1. CKT.)

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

1-2" SCH. 40 PVC WITH:1-1/C #6, 5kV, L-824C CABLE (RWY R19. CKT.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R1 CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY R19. CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

INSTALL: 1-1/C #6, 5kV, L-824C CABLE (RWY R1 CKT.)

1-1/C #6, 5kV, L-824C CABLE (RWY R19 CKT.)

IN EX. DUCT BANK

INSTALL: 1-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

SYSTEM

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

1-2" SCH. 40 PVC CONCRETE ENCASED

1/C #6, 5KV, L-824C CABLE

RWY R1 CKT.) (ABI 001) 1-2" SCH. 40 PVC CONCRETE ENCASED

1/C #6, 5KV, L-824C CABLE

RWY R19 CKT.) (ABI 001)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

EXISTING RDR SIGN

REMOVED, BASE CAN AND

FOUNDATION REMAIN

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

AutoCAD SHX Text 14000.00'

EEEEEEEEEEEEEEEEEEEEEEEE

E E E E E E

EEEEEE

E E E

E

E E

E E E E E E

E E E E E

E E E E E E

E E E E E

E

E

E E E E E

E

E

E

EEEEEEE

E E E E E E E E E E E E E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

EE

E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

D

D

C B

C B

C B

C B

FR

UD

FRFR

153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00

W WW W W W W W W W

W WW WW WW WW W

RDR

RDR

CP

CP

JC

-6

P P

P P

TE

M

P

PA

PIC

P

C P

CP CP

TEMP PAPI

STA 153+36.98

R 149.51

STA 153+44.98

L -145.00

STA 153+45.03

R 145.00

STA: 152+85.01

85.00' L

EL: 579.50

STA: 152+85.01

85.00' R

EL: 579.32

STA: 154+81.98

85.00' L

EL: 579.37

STA: 154+81.98

85.00' R

EL: 579.38

STA: 156+78.95

85.00' L

EL: 579.49

STA: 156+78.95

85.00' R

EL: 579.32

STA: 158+75.92

85.00' R

EL: 579.49

STA: 158+75.92

85.00' L

EL: 579.48

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA130

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

RUNWAY 01-19

TA

XI

W

AY

J

TA

XI

W

AY

L

NEW RDR SIGN

NEW RDR SIGN

NEW 2" ELECTRICAL

CONDUIT, TYP.

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

INSTALL: 1-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

SYSTEM

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

INTERCEPT EX. CONDUIT

AND INSTALL AN L-867

JUNCTION CAN WITH 3/8"

BLANK COVER (TYP.)

THRESHOLD CROSSING

CRITICAL OBJECT

CRITICAL OBJECT

ELEVATION

STATION

PAPI APERTURE

ELEVATION

CRITICAL OBJECT

RUNWAY REFERENCE

PAPI LOCATION

HEIGHT

STATION

RUNWAY REFERENCE

POINT ELEVATION

POINT STATION

RUNWAY THRESHOLD

RUNWAY THRESHOLD

ELEVATION

STATION

UNIT 3

UNIT 4

N/A

N/A

N/A

NOTE: UNIT 1

UNIT 1

TO THE RWY.

IS CLOSEST

UNIT 2

RWY END

19 TEMP

EDGE

ABOVE GRD.

APPROX.HT

ANGLE

AIMING

RWY END

ELEVATION

GROUND

19 TEMP

581.40'

52'

160+49

160+49

580.60'

580.44'

170+37.86

3°30'

3°10'

PAPI DESIGN

LOCATION DATA

2°50'

2°30'

578.55'

578.86'

577.89

577.53'

2.85'

3.54'

3.51'

3.87'

PAPI SITING AND AIMING CHART

AutoCAD SHX Text N00°26'17"E

EEEEEEEEEEEEEEEEEEEEEEE

E E E E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E E E E E E E E

E E E

E

EEEEEEEEEEEEEEEEEEE

E E E E

E E E E E E E E E E E E E E E E E E E E E E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILSD

D

D

D

UD

UD

161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00

W W W W W W W W

W WW WW WW W

R D

R C

P

JC

-7

CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CPTEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI

STA 163+44.85

R 145.00

STA 163+44.98

L -145.00

STA 163+36.68

R 145.00

STA: 162+69.86

85.00' L

EL: 579.68

STA: 162+69.86

85.00' R

EL: 579.42

STA: 164+66.83

85.00' L

EL: 579.58

STA: 164+66.83

85.00' R

EL: 579.29

STA: 166+63.81

85.00' L

EL: 579.55

STA: 166+63.80

85.00' R

EL: 579.48

STA: 168+60.75

85.00' R

EL: 579.51

STA: 168+60.77

85.00' L

EL: 579.57

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA131

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

RUNWAY 01-19

NEW RDR SIGN

NEW RDR SIGN

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

NEW 2" ELECTRICAL

CONDUIT, TYP.

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

INTERCEPT EX. CONDUIT

AND INSTALL AN L-867

JUNCTION CAN WITH 3/8"

BLANK COVER (TYP.)

INSTALL 2-1/C #6, 5KV,

L-824, DIRECT BURIED.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E E E E E E E E E E E E E E E

E

E E

E E

E E

E

EEEEEE

E

E

E

E

E

E E E

E E E

E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E EEEE

E E E E

E E E E E E E E E E E E E E E E E E E E E E E

EEEEEE

E

E

E E

E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

FO

C-ILS

D

FR

FR

UD

C

BC

B

FR

170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00

W W W W W W

W W

W W

W WW WW W

R D

R C

P

JC

-8

CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CPTEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI

STA 173+36.47

R 145.00

STA 173+44.98

L -145.00

STA 173+44.63

R 145.00

STA: 170+57.74

85.00' L

EL: 579.56

STA: 170+57.74

85.00' R

EL: 579.61

STA: 172+54.71

85.00' L

EL: 579.66

STA: 172+54.71

85.00' R

EL: 579.72

STA: 174+51.68

85.00' L

EL: 579.71

STA: 174+51.68

85.00' R

EL: 579.71

STA: 176+48.65

85.00' L

EL: 579.77

STA: 176+48.65

85.00' R

EL: 579.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA132

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

RUNWAY 01-19

NEW RDR SIGN

NEW RDR SIGN

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

NEW 2" ELECTRICAL

CONDUIT, TYP.

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

INSTALL: 1-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

SYSTEM

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

INTERCEPT EX. CONDUIT

AND INSTALL AN L-867

JUNCTION CAN WITH 3/8"

BLANK COVER (TYP.)

INSTALL 2-1/C #6, 5KV,

L-824, DIRECT BURIED.

EXISTING RDR SIGN

REMOVED, BASE CAN AND

FOUNDATION REMAIN

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E E E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E

EEEEE E E

E

E E

E E E

E

E

EE

E E

E

E

E

E

E

E

E E

E E E E E E E E E E E E E

E E

E E

E E

E

E E E E E E E E E

E E

EEEEEEEEEE

E E E E

E E

E E E E E E E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

FOC-ILS

FR

C B

178+00 179+00 180+00 181+00 182+00 183+00

Y W

Y W Y W Y W

Y WY W

JC

-9

R D

R R

D R

R D

R R

D R

C P

C P

C P

C P

DUCT-C

E

DUCT-C

E

R D

R C

P

CP CP CP CP CP CP

TEMP PAPI TEMP PAPI TEMP PAPI TEMP PAPI

TEM

P PAPI

D

SDSDSDSDSDSD

STA: 178+45.62

85.00' L

EL: 579.83

STA: 178+45.62

85.00' R

EL: 579.84 STA: 180+42.59

85.00' R

EL: 579.73

STA: 182+39.56

85.00' L

EL: 579.63

STA: 180+42.59

85.00' L

EL: 579.71

STA: 182+39.56

85.00' R

EL: 579.79

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA133

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

RUNWAY 01-19

TA

XI

W

AY

A

NOTES:

1. SEE NOTES ON EA121.

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

TIE NEW DUCT TO

EX. CONDUITTERMINATE CP ON A 3 4" X 10'

COPPER CLAD GROUND ROD

(TYP. FOR BOTH SIDES OF

TWY A INTERSECTION)

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

MATCH LINE - SEE EA145

INSTALL:1-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

INTERCEPT EX. CONDUIT

AND INSTALL AN L-867

JUNCTION CAN WITH 3/8"

BLANK COVER (TYP.)

INSTALL 2-1/C #6, 5KV,

L-824, DIRECT BURIED.

SPLICE TEMPORARY PAPI POWER CABLES

TO EX. PAPI CIRCUIT USING L-823

CONNECTORSINSTALL: 1-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

SYSTEM

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E

E

E

E

E

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EEEEEE

E E

E E

E E

E E

E E

E

E E E

E E E E E E E E E E E E

E E

E E

EEEEEEEEEE

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E E E E

E

EEEEEE

E

E

E

E

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

D

D

FR

UD

UD

183+00 184+00 185+00 186+00 187+00 188+00 189+00

P P

P P

PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19 PAPI 19

PA

PI

CPCPCPCPCPCPCPCPCPCPCPCP

C P

C P

R

R

C P

C P

C P

Y W

Y WY WY W

Y W Y W

R D

R C

P R

D R

C P

DUCT-C

E

DUCT-CE DUCT-CE DUCT-CE DUCT-CE DUCT-CE DUCT-CE

DUCT-CE DUCT-CE DUCT-CE DUCT-CE DUCT-CE DUCT-CE

STA 185+46.00

R 215.00

STA 183+44.79

R 145.00

STA 183+44.98

L -145.00

DD

D

SDSDSDSDSDSDSDSDSDSDSDSD

SD

STA: 188+30.47

85.00' L

EL: 579.79

STA: 186+33.50

85.00' L

EL: 579.75

STA: 188+30.47

85.00' R

EL: 579.67

STA: 186+33.50

85.00' R

EL: 579.71STA: 184+36.53

85.00' R

EL: 579.69

STA: 184+36.53

85.00' L

EL: 579.69

FR

UD

UD

UD

UD

UD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA134

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

NEW RDR SIGN

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

MATCH LINE - SHEET EA145

SEE SHEET EA145 FOR NEW GLIDE SLOPE

LOCATION

NEW RDR SIGN

EX. ELECTRICAL

MANHOLE

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

.0

50.0'

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (PAPI 19 CKT.)

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

EX. 2W-4" COMM

DUCT BANK W:

1-12 STRAND,

SINGLE MODE F/O

CABLE

EX. 4W-4"-INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19. CKT.)

1-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES

L-880 (L) PAPI

SYSTEM (TYP.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

THRESHOLD CROSSING

CRITICAL OBJECT

CRITICAL OBJECT

ELEVATION

STATION

PAPI APERTURE

ELEVATION

CRITICAL OBJECT

RUNWAY REFERENCE

PAPI LOCATION

HEIGHT

STATION

RUNWAY REFERENCE

POINT ELEVATION

POINT STATION

RUNWAY THRESHOLD

RUNWAY THRESHOLD

ELEVATION

STATION

UNIT 3

UNIT 4

N/A

N/A

N/A

NOTE: UNIT 1

UNIT 1

TO THE RWY.

IS CLOSEST

UNIT 2

RWY END

EDGE

ABOVE GRD.

APPROX.HT

ANGLE

AIMING

RWY END

ELEVATION

GROUND

581.70'

60.00'

185+46

185+46

580.79'

580.74'

196+90

3°30'

3°10'

PAPI DESIGN

LOCATION DATA

2°50'

2°30'

579.02'

578.54'

578.08

577.59'

2.68'

3.16'

3.62'

4.11'

PAPI SITING AND AIMING CHART

INSTALL: 2-1/C #6, 5kV, L-824C

CABLE (RDR CKT.) IN EX. DUCT

SYSTEM

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

1-1/C #6, 5kV, L-824C CABLE IN EX. 2"

DUCT (RWY R19. CKT.)

CONNECT EX. DUCT TO

LIGHT BASE

1-2" SCH. 40 PVC WITH: 1-1/C #6, 5KV,

L-824C CABLE (RWY R19. CKT.)

INSTALL NEW INSET HIRL ON NEW

L868 BASES, COLORS AS SHOWN

TO ACCOMMODATE FUTURE

AIRCRAFT ARRESTING SYSTEM

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E

E E

E E

E E

E E E E E E

E E

EE E

E

E E

E E

E E

E E

E E

E E E E E E E E E

E

E

E

E

E

E

E E E E E E E E E E E E E

E E E E E E E E E E E E E E E

E

E

E E E E E E E E E E E E E E

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

D

D

D

D

D

FR

FR

UD

FRUD

190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00

CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP

CP

PA

PI

PA

PI

PA

PI

PA

PI

PA

PI

PA

PI

PA

PI

PAPI 1

PAPI 1

CP

CP

C P

C P

C P

C P

C P

C P

C P

C P

C P

JC

-10

ALS-1N

ALS-1N

E E

E E

E E

E E

E

THLD-N

THLD-N

THLD-N

CP

CP

CP

CP

O G

O G

O G

O G

Y G

O G

O G

Y G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

R R

R RY W

Y W

Y W

Y W

RDR

RDR RDR RDR RDR RDR

CP

CP CP CP CP CP

RDR RDR RDR RDR RDR

CP CP CP CP CP CP

R19

FO

C-ILS

FOC-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

DUCT-CE DUCT-CE

DUCT-CE DUCT-CE DUCT-CE

C P

C P

Y W

Y W

Y W

YW

R19R19R19R19

R19

STA 193+44.98

R 145.00

STA 193+44.98

L -145.00

STA 196+91.50

L -131.65

FR

FR

UD

UD

C B

C B

D

SD SD SD SD SD SD SD SDSDSDSDSDSDSDSD

SD

SD

SD

SD

STA: 192+24.41

85.00' L

EL: 579.63

STA: 194+21.38

85.00' L

EL: 579.62

STA: 194+21.38

85.00' R

EL: 579.72

STA: 192+24.41

85.00' R

EL: 579.68

STA: 190+27.44

85.00' R

EL: 579.70

STA 196+91.48

L -150.00

STA 196+91.48

R 150.00

STA: 190+27.44

85.00' L

EL: 579.72

STA: 196+18.35

85.00' L

EL: 579.64

STA: 196+18.35

85.00' R

EL: 579.72

STA: 198+15.32

85.00' L

EL: 579.63

STA: 198+15.32

85.00' R

EL: 579.67

STA 196+91.50

L 0.00

STA: 197+89.98

0.00'

EL: 580.71

STA: 198+89.98

FRFR

U D

UD

UD

UD

UD

UD

UD

UD

U D

U D

U D

U D

U D

U D

U D

U D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA135

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

TA

XI

W

AY

K

REMOVED LIGHT BAR

ASPHALT PAVEMENT REPAIR,

SEE DETAIL 1/ CP304, TYP.

REMOVED LIGHT BAR

PCC PAVEMENT REPAIR,

SEE DETAIL 2/ CP304, TYP.

NEW FULL DEPTH PCC

REPAIR FOR APPROACH

LIGHT BAR DUCT BANK

SEE DETAIL 3/ CP502, TYP.

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

NEW RDR SIGN

NEW RDR SIGN

ELECTRICAL MANHOLE

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

2-1/C #6, 5kV, L-824C CABLE IN EX.

DUCT SYSTEM (RDR CKT.)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (TWY B CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER)

1-#2 INSULATED GROUND, 600V

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

IN EXISTING DUCT BANK AND STRUCTURES TO

AIRFIELD ELECTRICALVAULT

INSTALL 5-IN-PAVEMENT

RWY END/THRESHOLD

LIGHTS ON NEW BASES,

COMPLETE WITH ALL

COMPONENTS AND

WIRING (RWY R19 CKT.)

SEE SHEET EA510 FOR

THRESHOLD BAR DETAIL.

INSTALL 5-IN-PAVEMENT RWY

END/THRESHOLD LIGHTS ON

NEW BASES, COMPLETE WITH

ALL COMPONENTS AND

WIRING (RWY R19 CKT.) SEE

SHEET EA510 FOR

THRESHOLD BAR DETAIL.

1-2" SCH. 40 PVC WITH:2-1/C #6,

5kV, L-824C CABLE (RDR CKT.)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

(TYP. FOR STATIONS 90-114)

1-2" SCH. 40

PVC WITH: 2-1/C

#6, 5kV, L-824C

CABLE (ALS 1 N.

CKT.)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

(TYP. FOR STATIONS 90-114)

1-2" SCH 40 PVC-PCC ENCASED WITH:

1-24 STRAND, SINGLE MODE FIBER

OPTIC CABLE TO NEW GLIDE SLOPE

LOCATION

1-4" PVC, PCC ENCASED WITH:

2-#2, 5 kV, 133% EPR INSULATION

1-#8, 600V GROUND TO

RELOCATED GLIDE SLOPESITE

1-2" SCH. 40 PVC PCC ENCASED WITH"

2-1/C, #6, 5kV, L-824C (PAPI 19 CKT.)

INSTALL NEW

REIL (SLAVE).

CONNECT TO

RWY R19 CKT.

INSTALL NEW IN-PAVEMENT THRESHOLD

BAR LIGHTS (41 EACH) ON NEW BASE CANS,

COMPLETE WITH ALL COMPONENTS AND

WIRING (THRSHLD S CKT.). SEE SHEET

EA510 FOR INSTALLATION DETAIL

NEW REIL (MASTER).

L-849, STYLE E, 20/6.6A

SERIES CONNECTION.

(RWY R1 CKT.) INSTALL

INTERCONNECT SHIELDED

WIRE IN SEPARATE

CONDUIT

INSTALL REIL

INERCONNECT WIRING IN

SEPARATE 2" SCH. 40 PCC

ENCASED CONDUIT

1-2" SCH. 40 PVC

WITH: 2-1/C #6,

5kV, L-824C CABLE

(THLD N CKT.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862(L)

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN (TYP.)

CONNECT EX. 2"

DUCT TO LIGHT

BASE

CONNECT EX. 2" DUCT TO

LIGHT BASE

1-1/C #6, 5kV, L-824C CABLE

IN EX. DUCT (RWY R19. CKT.)

1-1/C #6, 5kV, L-824C CABLE IN EX. 2"

DUCT (RWY R19. CKT.)

CONNECT EX. 2"

DUCT TO LIGHT BASE

CONNECT EX. 2"

DUCT TO LIGHT BASE

SPLICE PROPOSED HAMMERHEAD

(FUTURE TAXIWAY B) CIRCUIT TO

EXISTING TAXIWAY K CIRCUIT IN

EXISTING STRUCTURE

SPLICE TO EXISTING TAXIWAY K

CIRCUIT IN EXISTING STRUCTURE

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E E E E

E E E

FOC-ILS FOC-ILS FOC-ILS

D

FR

UD

199+00 200+00 201+00 202+00 203+00 204+00 205+00 206+00

CP CP CP CP CP CP CP CP CP CP CP CP CP

CP

CP

CP

CP

CP

CP

CP

CP CP CP

CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP

R RB

B B B

ALS-1N

ALS-1N

ALS-1N

ALS-1N

ALS-1N

ALS-1N

ALS-1N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

E

ALS-1N

ALS-1N

B

B

R R

R RR R

R R R R

R R R R R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19 R19

R19 R19 R19 R19 R19 R19 R19

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

ALS-2N ALS-2N

ALS-2N

ALS-2N

ALS-1N

ALS-1N

ALS-1N

ALS-3N ALS-3N

ALS-3N

ALS-3N

LOC01 LOC01

LO

C

LO

C

SFL-5kV SFL-5kV

SFL-5kV SFL-5kV

FOC-SFL FOC-SFL

FO

C

-SFL

ALS-1N

ALS-2N

ALS-3N

LOC01

SFL-5kV

FOC-SFL

ALS-2N

ALS

-2N

ALS

-2N

ALS

-2N

ALS

-2N

ALS

-2N

ALS

-2N

ALS-2N

ALS-3N

ALS

-3N

ALS

-3N

ALS

-3N

ALS

-3N

ALS

-3N

ALS

-3N

ALS-3N

SFL-5

kV

SFL-5

kV

SFL-5

kV

SFL-5

kV

SFL-5

kV

SFL-5

kV

SFL-5kV

FOC-S

FL

FOC-S

FL

FOC-S

FL

FOC-S

FL

FOC-S

FL

FOC-SFL

ALS-3N

TWY B TWY B

TW

Y B

TW

Y B

TW

Y B

CP

C P

C P

C P

CP CP CP CP CP CP CP

CP

CP

CP

CP

CP

CP

CP

CP CP CP

TWY B TWY B TWY B

TW

Y B

TWY B

TWY B

TWY B

TWY B

TWY B

TWY B

TWY B

TWY B

TWY B

TWY B TWY B TWY B

ALS-1N

ALS-2N

ALS-3N

SFL-5kV

FOC-SFL

TWY B TWY B

ALS-2N

ICC-C

ICC-E

R19R19R19R19R19R19R19R19R19R19R19R19

U D

U D

U D

U D

U D

UD UD UDUDUDUDUDUDUDUDUDUDUDUD UDUDUDUDUDUD

U D

U D

U D

U D

U D

U D

U D

U D

UDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUD

UDUDUD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

UD

U D

U D

U D

U D

C B

C B

SD

SD

SD

SD

SD

SD SD SD SD SD SD SD SD SD

STA: 200+12.29

85.00' R

EL: 579.63

STA: 200+12.29

85.00' L

EL: 579.63

STA: 202+09.26

85.00' L

EL: 579.70

STA: 202+09.26

85.00' R

EL: 579.70

STA: 204+06.23

85.00' R

EL: 580.13

STA: 206+03.17

85.00' R

EL: 580.95

STA: 206+03.20

85.00' L

EL: 581.02

STA: 204+06.23

85.00' L

EL: 580.21

STA 205+89.64

L -340.00

STA: 205+38.33

291.25' L

EL: 578.03

STA: 204+35.21

188.13' L

EL: 578.91

STA: 203+32.08

85.00' L

EL: 579.94

STA: 198+15.32

STA: 198+89.98

0.00'

EL: 580.77

STA: 199+89.98

0.00'

EL: 580.77

STA: 200+89.98

0.00'

EL: 580.77

STA: 201+89.98

0.00'

EL: 580.82

STA: 202+89.98

0.00'

EL: 580.97

STA: 203+89.98

0.00'

EL: 581.22

STA: 204+89.98

0.00'

EL: 581.57

STA: 205+89.98

0.00'

EL: 582.02

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA136

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

PROPOSED TAXIWAY

EDGE LIGHTS, TYP. SEE

NOTES 13 AND 14 ON

SHEET EA121

PROPOSED

RUNWAY IN-PAVEMENT

EDGE LIGHT, L-850C, R/R (TYP.)

SEE NOTES 13 AND 14 ON

SHEET EA121

INSTALL TAXIWAY EDGE

LIGHT BASE CANS WITH 3/8"

BLANK COVERS UNDER

TASK 1 FOR FUTURE TASK 3

(BASE BID)

INSTALL L-867 BASE CANS WITH

3/8" BLANK COVERS UNDER

THIS CONTRACT FOR FUTURE

TAXIWAY A (TASK 2) WORK

PROVIDE 5' OF SCH. 40 PVC AND CAP

OUTSIDE PAVEMENTLIMITS FOR

FUTURE TAXIWAY A (TASK 2) WORK

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

INSTALL 2-1/C #6, 5000V, L-824C,

IN EXISTING CONDUIT AND

ELECTRICAL STRUCTURES, TO

AIRFIELD ELECTRICAL VAULT,

TYP. (ALS-1 N CKT.)

1-2" SCH. 40 PVC, PCC ENCASED

WITH: 2-1/C #6, 5kV, L-824C, (ALS-1N CKT.)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

(TYP. FOR STATIONS198-206)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (3 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

1-2" SCH. 40 PVC WITH: 1-1/C #6,

5kV, L-824C CABLE (RWY R19 CKT, BASE BID)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

(TYP. FOR STATIONS198-206)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (3 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

1-2" SCH. 40 PVC WITH:

1-1/C #6, 5kV, L-824C

CABLE (RWY R19 CKT.,

BASE BID)

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE. ALL

CONNECTION TO GROUND RODS

MUST BE DONE USING EXOTHERMIC

WELDS, TYP. (BASE BID)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING

ON NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

(TYP. FOR STATIONS198-206)

1-2" SCH. 40 PVC, PCC ENCASED

WITH: 2-1/C #6, 5kV, L-824C, (ALS-1N CKT.)

1-2" SCH. 40 PVC, PCC ENCASED

WITH: 2-1/C #6, 5kV, L-824C, (ALS-2N CKT.)

#6 SOLID COPPER. COUNTERPOISE

INSTALLED HALF WAY BETWEEN

EDGE OR RWY AND LIGHT LINE.

ALL CONNECTION TO GROUND

RODS MUST BE DONE USING

EXOTHERMIC WELDS (TYP.)

INSTALL NEW SFL-19 MASTER

CONTROL RACK, ADB 400VDC.

SYSTEM. SEE INSTALLATION

DETAILS ON SHEET EA505

2" SCH 40 PVC WITH:

1- 12-STRAND, SINGLE MODE

OUTDOOR FIBER CABLE, OS2, FROM

SFL MASTER CONTROL CABINET TO

AIRFIELD ELECTRICAL VAULT, FOR

CONTROL AND MONITORING OF THE

SFL SYSTEM.

4" SCH 40 PVC WITH:

2- #2, 5kV, 133% EPR INSULATION 1-#6, 600v GND

1-2" SCH. 40 PVC WITH:

2-1/C #6, 5kV, L-824C

CABLE (TWY B CKT.,

BASE BID)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (TWY K CKT.)

EACH IN 2" SCH. 40 PVC

ALS-1N ALS-2N

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

INSTALL NEW L-862

ELEVATED HIRL ON NEW

L867 BASES, COLORS AS

SHOWN. SEE NOTE 13

ON SHEET EA121 (TYP.)

(BASE BID)

(BASE BID)

(BASE BID)

(BASE BID)

(BASE BID) (BASE BID)(BASE BID)

(BASE BID)

(BASE BID)

(BASE BID)(BASE BID)

(BASE BID)

INSTALL 1-4" SCH. 40 PVC WITH

2-#2, 15 kV, 133% EPR CABLES

1-#2, 600V GROUND

SEE SHEET EA524

FOR LOCALIZER

MARKER DETAILS

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00

CP CP CP CP

C P

C P

C P

C P

C P

C P

C P

C P

C P

CP CP CP CP

TW

Y B

TW

Y B

TW

Y B

TW

Y B

B E

E

E E

B

B B B

R R

R R

R R

R R

R R

R R

R R

R R

R R

R R

R19 R19 R19

R19 R19 R19 R19

R

R

R

PLZ

PLZ

CP

TWY B TWY B TWY B TWY B TWY B

SFL-N

SFL-N

SFL-N

SFL-N

SFL-N

SFL-N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-2N

PLZ

ALS-2N

ALS-2N

PLZ

ALS-2N

ALS-2N

ALS-2N

ALS-2N

ALS-3N

ALS-3N

ALS-3N

ALS-3N

SFL-N

SFL-N

ALS-2N

ALS-2N

IC

C

-E

IC

C -E

IC

C

-E

IC

C -C

IC

C

-C

IC

C -C

SFL-N

SFL-N

ALS-2N

ALS-3N

ALS-2N

ALS-2N

PLZ

SFL-N

SFL-N

ALS-2N

ALS-3N

ICC-C ICC-C ICC-C

ICC-E ICC-E ICC-E

PLZ

PLZ

PLZ

PLZ

ALS-3N

ALS-3N

ALS-3N ALS-3N ALS-3N

ALS-3N ALS-3N ALS-3N ALS-3N

AL

S-

3N

AL

S- 3N

AL

S-

3N

ALS-3N ALS-3N

ALS-3N

ALS-3N

ALS-3N

ICC-C

ICC-C

ICC-C

ICC-C ICC-C ICC-C ICC-C ICC-C ICC-C

ICC-E

ICC-E

ICC-E

ICC-E ICC-E ICC-E ICC-E ICC-E ICC-E

PLZ

SF

L-

N

ALS-2NALS-2NALS-2N

ALS

-2N

ALS

-2N

IC

C

-E

IC

C -E

ICC-E ICC-E

IC

C

-E

IC

C -E

IC

C

-E

IC

C

-C

IC

C -C

ICC-C ICC-C

IC

C

-C

IC

C -C

IC

C

-C

CP CP CP

C P

C P

C P

C P

C P

CP CP CP CP CP

CP

CP

C P

CP CP CP CP CP CP CP CP

C P

C P

C P

CP CP

C P

C P

C P

C P

E

C P

C P

C P

C P

CP CP CP CP

CP

CP

CP

CP CP CP CP CP CP CP CP

C P

CP

CP CP CP

LO

C

LO

C01

LO

C01

LO

C01

LO

C

01C

LO

C01C

LO

C01C

LO

C01C

DUCT-CE DUCT-CE DUCT-CE

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

FR

FR

U D

FR

UDUDUD

UDUDUD

UD

U D

U D

U D

U D

U D

SD

SD

D

D

D

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

STA: 207+99.98

85.00' R

EL: 582.06

STA: 207+99.98

75.00' R

EL: 582.25

STA: 207+99.98

65.00' R

EL: 582.43

STA: 207+99.98

55.00' R

EL: 582.60

STA: 207+99.98

45.00' R

EL: 582.73

STA: 207+99.98

85.00' L

EL: 582.10

STA: 207+99.98

75.00' L

EL: 582.26

STA: 207+99.98

65.00' L

EL: 582.43

STA: 207+99.98

55.00' L

EL: 582.60

STA: 207+99.98

45.00' L

EL: 582.73

STA: 208+00.57

162.50' L

EL: 581.54

STA: 207+99.97

226.88' L

EL: 581.44

STA: 207+99.98

291.25' L

EL: 581.35

STA: 206+69.16

291.25' L

EL: 579.57

STA: 207+99.98

95.00' R

EL: 581.86

STA 206+74.61

L -339.88

STA 208+36.25

L -137.49

STA 208+89.24

L -137.49 STA 209+89.68

L -137.49

STA 210+84.71

L -47.75

STA 211+89.71

L -47.75

STA 213+84.52

L -47.56

STA 214+73.74

R 10.27

STA 212+89.71

L -47.75

STA: 206+89.98

0.00'

EL: 582.57

STA: 207+91.48

0.00'

EL: 583.23

SD

SD

SD

SD

SD

SD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA137

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

MATCH LINE - SHEET EA146

PROPOSED TAXIWAY

EDGE LIGHTS, SEE NOTES

13 AND 14 ON SHEET

EA121, TYP. (BASE BID)

INSTALL 1-2" SCH.40 PVC FOR

TAXIWAY A (TASK 2) FUTURE

WORK (BASE BID)

INSTALL L-867 BASE CA WITH 3/8"

BLANK COVERS UNDER THIS

CONTRACT FOR FUTURE TAXIWAY

A (TASK 2)WORK (BASE BID)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (5 EACH),

AND (1 EACH) IN-PAVEMENT

FLASHER, COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS M

AT

C

H L

IN

E

- N

EX

T

SH

EE

T

(S) LOC CHECKPOINT

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

6W-2" PPC ENCASED DUCT BANK

1-2" SCH. 40 PVC WITH:

2-1/C #6, 5kV, L-824C

CABLE (RWY R19 CKT.)

1-2" SCH. 40 PVC, PCC ENCASED

WITH: 2-1/C #6, 5kV, L-824C, (ALS-2N CKT.)

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (8 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

INSTALL NEW IN-PAVEMENT

APPROACH LIGHTS (8 EACH),

COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS

INSTALL 1-2" SCH. 40 PVC

FOR FUTURE TAXIWAY B

(TASK 3) WORK

INSTALL ELEVATED RUNWAY END

(THRESHOLD) LIGHTS ON NEW L-867

BASES, COMPLETE WITH ISOLATION

TRANSFORMERS AND 360 RED LENSES.

SEE NOTES 13 AND 14 ON SHEET EA121

(BASE BID)

INSTALL ELEVATED RUNWAY END

(THRESHOLD) LIGHTS ON NEW L-867

BASES, COMPLETE WITH ISOLATION

TRANSFORMERS AND 360 RED

LENSES. SEE NOTES 13 AND 14 ON

SHEET EA121, TYP. (BASE BID)

INSTALL 1 -2" SCH. 40 PVC FOR POWER WITH:

3-1/C #8 THWN-2

1-#8 GREEN EQUIP. GROUND

FROM MAIN SFL CONTROL PANEL TO JUNCTION

BOX AT EACH FLASHER STATION. POWER WIRES

ARE CONNECTED IN PARALLEL FROM STATION TO

STATION (TYP.).

INSTALL 1- 2" SCH. 40 PVC FROM MAIN SFL CONTROL

PANEL TO EACH FLASHER STATION WITH:

1-MANHATTAN WIRE M8628010, #18 AWG , TRIAD

SHIELDED, 600V CABLE FOR COMMUNICATION BUS.

DAISY CHAIN FROM MASTER P1 TO FIRST ICC P1 AND

FROM ICC P3 TO NEXT ICC P1 (TYP.). SEE

CONNECTION DIAGRAM ON SHEET EA520

2" SCH. 40 PVC WITH:

2-1/C #6, 5kV, L-824C (ALS-2N CKT.)

2-1/C #6, 5kV, L-824C (ALS-3N CKT.)

INSTALL NEW ELEVATED

APPROACH LIGHTS (5 EACH),

AND (1 EACH) ELEVATED

FLASHER, COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS (TYP.

FROM STA. 208+90 TO STA.

226+65). SEE ALSF STATIONING

ON SHEET EA152

JET BLAST FEN

C

E

ALS-2N ALS-3N

INSTALL NEW ELEVATED

APPROACH LIGHTS (5 EACH),

AND (1 EACH) ELEVATED

FLASHER, COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS (TYP.

STA. 208+90 TO STA. 226+65).

SEE ALSF STATIONING ON

SHEET EA152

1-2" SCH. 40 PVC CONDUIT

FROM ICC CABINET TO LIGHT

BAR WITH:

1- MANUFACTURER-SUPPLIED 5

CONDUCTOR, SHIELDED CABLE

(TYP.) SEE SHEET EA520 FOR

CONNECTION DIAGRAM (TYP.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

(BASE BID) (BASE BID)

(BASE BID)

(BASE BID)

1-2" SH. 40 PVC CONCRETE

ENCASED 24-STRAND

SINGLE-MOD FIBER OPTIC CABLE.

INSTALL 1-4" SCH. 40 PVC WITH

2-#2, 15 kV, 133% EPR CABLES

1-#2, 600V GROUND

MATCH LINE - SHEET EA149

AutoCAD SHX Text N00°26'17"E

C O

M M

COMM

COMM

COMM

COMM

C O

M M

C O

M M

C O

M M

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E D

D

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00

PLZ

IC

C

-E

IC

C -C

IC

C

-C

IC

C -C

PLZALS-3N

ICC-C

ICC-E

PLZDUCT-CE DUCT-CE

PLZ

PLZ

PLZ

PLZ

PLZ

PLZALS-3N ALS-3N ALS-3N ALS-3N ALS-3N

ICC-C ICC-C

CP CP CP CP CP CP CP CP CP CP CP CP

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP

C P

C P

C P

C P

CP CP

DUCT-CE

BH

#05

BH

#06

STA 215+84.71

R 10.35

STA 216+55.00

R 10.01 STA 217+68.67

R 10.01

STA 218+68.67

R 10.01

STA 219+68.67

R 10.01 STA 220+68.67

R 10.01

STA 221+68.67

R 10.01

STA 222+68.67

R 10.01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA138

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

INSTALL NEW ASPHALT

MILLING/AGGREGATE SURFACED

MAINTENANCE ROAD, TYP.

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

4W-2" PCC ENCASED

DUCT BANK (BY OTHERS)

1-2" SCH. 40 PVC, WITH: 2-1/C #6,

5kV, L-824C, (ALS-3N CKT.)

INSTALL 1 -2" SCH. 40 PVC FOR POWER WITH:

3-1/C #8 THWN-2

1-#8 GREEN EQUIP. GROUND

FROM MAIN SFL CONTROL PANEL TO JUNCTION

BOX AT EACH FLASHER STATION. POWER WIRES

ARE CONNECTED IN PARALLEL FROM STATION TO

STATION (TYP.).

INSTALL 1- 2" SCH. 40 PVC FROM MAIN SFL CONTROL

PANEL TO EACH FLASHER STATION WITH:

1-MANHATTAN WIRE M8628010, #18 AWG , TRIAD

SHIELDED, 600V CABLE FOR COMMUNICATION BUS.

DAISY CHAIN FROM MASTER P1 TO FIRST ICC P1 AND

FROM ICC P3 TO NEXT ICC P1 (TYP.). SEE

CONNECTION DIAGRAM ON SHEET EA520

INSTALL NEW ELEVATED

APPROACH LIGHTS (5 EACH),

AND (1 EACH) ELEVATED

FLASHER, COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS (TYP.

STA. 208+90 TO STA. 226+65).

SEE ALSF STATIONING ON

SHEET EA152

4-4" SCH. 40 PVC, PCC ENCASED

WITH: (ALS-3N CKT.)

(ICC-C)

(ICC-E)

(SPARE)

1-2" SCH. 40 PVC CONDUIT

FROM ICC CABINET TO LIGHT

BAR WITH:

1- MANUFACTURER-SUPPLIED 5

CONDUCTOR, SHIELDED CABLE

(TYP.) SEE SHEET EA520 FOR

CONNECTION DIAGRAM (TYP.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

AutoCAD SHX Text N00°26'17"E

XXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 231+00

PLZ

PLZ

PLZ

PLZALS-3N ALS-3N ALS-3N ALS-3N

CP CP CP CP CP CP CP CP CP CP

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

ICC-C ICC-C

ICC-E ICC-E

CP CP CP CP CP CP CP CP CP CP

STA 223+68.67

R 10.01

STA 224+68.67

R 10.01

STA 225+68.67

R 10.01

STA 226+68.67

R 10.01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA139

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

BASE PROPERTY LINE

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

INSTALL NEW ASPHALT

MILLING/AGGREGATE SURFACED

MAINTENANCE ROAD, TYP.

1-2" SCH. 40 PVC, PCC ENCASED

WITH: 2-1/C #6, 5kV, L-824C, (ALS-3N CKT.)

INSTALL 1 -2" SCH. 40 PVC FOR POWER WITH:

3-1/C #8 THWN-2

1-#8 GREEN EQUIP. GROUND

FROM MAIN SFL CONTROL PANEL TO JUNCTION

BOX AT EACH FLASHER STATION. POWER WIRES

ARE CONNECTED IN PARALLEL FROM STATION TO

STATION (TYP.).

INSTALL 1- 2" SCH. 40 PVC FROM MAIN SFL CONTROL

PANEL TO EACH FLASHER STATION WITH:

1-MANHATTAN WIRE M8628010, #18 AWG , TRIAD

SHIELDED, 600V CABLE FOR COMMUNICATION BUS.

DAISY CHAIN FROM MASTER P1 TO FIRST ICC P1 AND

FROM ICC P3 TO NEXT ICC P1 (TYP.). SEE

CONNECTION DIAGRAM ON SHEET EA520

INSTALL NEW ELEVATED

APPROACH LIGHTS (5 EACH),

AND (1 EACH) ELEVATED

FLASHER, COMPLETE WITH ALL

COMPONENTS AND WIRING ON

NEW LIGHT BASES AND

CONCRETE FOUNDATIONS (TYP.

FROM STA. 208+90 TO STA.

226+65). SEE ALSF STATIONING

ON SHEET EA152

1-2" SCH. 40 PVC CONDUIT

FROM ICC CABINET TO LIGHT

BAR WITH:

1- MANUFACTURER-SUPPLIED 5

CONDUCTOR, SHIELDED CABLE

(TYP.) SEE SHEET EA520 FOR

CONNECTION DIAGRAM (TYP.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

AutoCAD SHX Text N00°26'17"E

E E E E E E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

EEE

EE

FOC

FOC

FOC

FO

C

FO

C

COMM

COMM

COMM

COMM

COMM COMM

COMM

COMM

COMM

COMM

COMM

E

C O

M M

C O

M M

FO

C

FO

C

E E

M H

M H

FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FOC-ILS FOC-ILS FOC-ILS FOC-ILS

FO

C

-IL

S

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC

FOC

FOC

FOC

FOC

FOC

COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM

FOC FOC FOC FOC

COMM COMM COMM COMM COMM COMM COMM

COMM COMM COMM COMM COMM COMM COMM T

T

FO

C

FO

C

C O

M M

C O

M M

T

FOC

FOC

FOC

COMM

COMM

COMM

FOC FOC FOC FOC FOC

FOC FOC FOC FOC FOC FOC

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

CO

M

M

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

W W

W W

W W

W W

W W

W

W W W W W W W

W

W

W

W

CB

CB

CB

CB

CB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA140

KEY MAP

TR

U

E N

PLAN

NORTH

00 50 100

TAXIW

AY M

(E

XISTIN

G ASPHALT

MIDFIELD ACCESS ROAD

(EXISTING ASPHALT)

EXISTING ELECTRICAL VAULT BUILDING.

SEE SHEETS ES101 AND ES102 FOR

DETAILED VAULT UPGRADES

EXISTING 12W-4"

ELECTRICAL DUCT

BANK (HOMERUN), TYP.

PMH(1)

14W-4" DB

HH(1C)

4W-4" CONCRETE ENCASED

ELEC DUCTBANK

TRANSFORMERS

2W-4" CONCRETE ENCASED

COMM DUCTBANK

GENERATOR

COMM MH (64C)

ELEC MH (E3)

2W-4" CONCRETE

ENCASED COMM DUCTBANK

500KVA TRANSFORMER

ELEC MH (E2)

COMM MH (64B)

2W-4" CONCRETE

ENCASED COMM DUCTBANK

12W-4" DB

PMH(2)

2W-4" DB2W-4" DB

HH(2C)

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 1 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY 19 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY 1 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 1 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (THRSLD S. CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER) 2-1/C #2, 5kV, 133% EPR INSULATION (SFL 1 POWER)

2-#2 INSULATED GROUND, 600V

IN EXISTING DUCT BANK AND STRUCTURES

INSTALL:

2- 12-STRAND, SINGLE MODE OUTDOOR

FIBER CABLE, OS2, TO SFL-N AND SFL-S

MASTER CONTROL CABINETS IN EXISTING

COMMUNICATION DUCT SYSTEM. SEE

SHEET EA505 AND EA520 FOR DETAILS

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

E E

E

E E E

E

E

E E E

E E

E E

E E

E E

E

E

E

E E

E

E E E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E

EE

E E

EE

E

EEEEEE

EE

E E E E

EEE

E E

E

E

E

E

E

E E E E E E E E E E E E E E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E E

E E

E E

E E

E

E

E E

E E

E E

E E

E E

E E

E

E

E E

E E

E E

E

E

E E E E E E E E E

E E E E E E E E E E

E

E

E

E

E

E E E E E E E E E E

E

E

E E

E E

E E

E

COMM COMM COMM

E E E E E E E E E E E E E E

E

E

E

E

E E E

EEE

E E

E

E

E E

E E

E E

E

EEEEEEEEEEEEEEE

EEEEEEE

E E

E

EEEEEEEEEEE

EEEEEEEEEEEEEEEEE

EEEEEEEEE

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

E

E E

E

E E

FOC FOC FOC

FOC FOC FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

FOC-ILS

FOC-ILS

FOC-ILS

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

FO

C

-IL

S

E E

E E

E E

E E

E

D

D

D

D

D

D

D

CB

CB

CB

U D

U D

U D

U D

FR

FR

D

CBCB

FR

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W

W W W W W W WWWW

W W W W W W W W W WW W W W W W W W W W W

CB

CB

CB

CB

CB

CB

CB

CB

CB

2+

3+

4+

5+

6+

7+

8+

9+

0+

1+

2+

C P

C P

C P

C P

C P

PPPP PAPI 1CP

R

R

R

R

R

R1

R1

R1

CP

CP

CP

W W

W W

W W

W W

W W

RD

R

RD

R

CP

CP

STA 123+45.00

L -145.00

STA 126+50.00

L -215.00

UD

FR

U D

U D

U D

U D

D SDSD

STA: 131+18.34

85.00' R

EL: 579.67

STA: 131+18.34

85.00' L

EL: 579.73

STA: 129+21.37

85.00' L

EL: 579.67

STA: 125+27.43

85.00' L

EL: 579.60

STA: 123+30.46

85.00' L

EL: 579.75

STA 124+99.98

L -400.00

STA: 127+24.40

85.00' L

EL: 579.72

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA141

KEY MAP

TR

U

E N

PLAN

NORTH

00 50 100

INSTALL:

2-1/C #6, 5kV, L-824C CABLE (ALS 1 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 N CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 1 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 2 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (ALS 3 S CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY 19 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY 1 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 19 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RWY PAPI 1 CKT.)

2-1/C #6, 5kV, L-824C CABLE (RDR CKT.)

2-1/C #6, 5kV, L-824C CABLE (THRSLD N. CKT.)

2-1/C #6, 5kV, L-824C CABLE (THRSLD S. CKT.)

2-1/C #2, 5kV, 133% EPR INSULATION (SFL 19 POWER) 2-1/C #2, 5kV, 133% EPR INSULATION (SFL 1 POWER)

2-#2 INSULATED GROUND, 600V

IN EXISTING DUCT BANK AND STRUCTURES

INSTALL:

2- 12-STRAND, SINGLE MODE OUTDOOR

FIBER CABLE, OS2, TO SFL-N AND SFL-S

MASTER CONTROL CABINETS IN EXISTING

COMMUNICATION DUCT SYSTEM. SEE

SHEET EA505 AND EA520 FOR DETAILS

INSTALL NEW L-806(L) SUPPLEMENTAL

WIND CONE WITH L-810 OBSTRUCTION

LIGHT WITH IR EMITTER . CONNECT TO R1

RUNWAY CIRCUIT. USE 20/6.6 A INLINE

TRANSFORMER AS REQUIRED BY

MANUFACTURER

L-880 (L) PAPI

SYSTEM (TYP.)

NOTE: SEE GENERAL CONSTRUCTION

NOTES ON SHEET EA121.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

EEEEEEEEEEEEEEEE

E

E

E E

E E

E E

E E

E E E E E E E E

E E E E E E E E

E E E

E E

E E

E E

E E

E E E E E E E E E E E E E E E

EEEEEEEEEEEE

E E E E E E E E E E

EEEEEE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E

E

E

E

E

E

4800V

4800V

4800V

4800V

4800V

4800V

4800V

4800V

4800V

4800V

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

FO

C

-ILS

T

50 kVA

E E E E E E E E E E E

D

D

C

BC

BC

B

C B

UD UD UD UD UD UD UD UD UD UD UD UD UD

UD UD UD UD UD UD UD UD UD

FR

FR

UD

FR

C B

C B

106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00

CP CP CP CP CP CP CP CP CP CP

CP CP CP CP CP CP CP CP

ALS-2S

ALS-2S

ALS-1S

ALS-1S

ALS-1S

ALS-1S

ALS-1S

E E

E E

E E

R1 R1 R1 R1 R1 R1 R1

G O

G O

G O

G Y

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G Y

G O

G O

G O

G O

G O

G O

G O

R Y W Y

W Y

W Y

W Y

R YR YR Y

R Y R Y R Y R Y

JC

-2

R1 R1 R1 R1 R1 R1 R1 R1 R1

W Y

W Y

GS1C

G S1C

G S1C

G S1C

G S1C

G S1C

G S1C

G S1C

CP

C P

C P

C P

C P

C P

C P

C P

C P

C

STA 113+45.10

R 145.03STA 113+36.92

R 145.00

FR

FR

U D

U D

UD UD UD UD UD UD UD UD UD

UD UD UDUD UD UD UD UD UD

SD

SD

STA: 121+33.49

85.00' L

EL: 579.82

STA: 121+33.49

85.00' R

EL: 579.82

EL: 579.96

STA 120+34.44

R 953.52

EL: 580.02

STA: 119+36.52

85.00' L

EL: 579.89

STA: 119+36.52

85.00' R

EL: 579.89

STA 120+28.84

R 406.59

4800V

4800V

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E

FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS FOC-ILS

COMMCOMMCOMMT

COMM

COMM

COMM

COMMC

G

S1C G

S1C G

S1C C

P C

P C

P C

P

STA 120+37.09

R 1500.01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P

PR

O

PO

SE

D

E

LE

C

TR

IC

AL

P

LA

N

EA142

KEY MAP

TRUE N

PLAN

NORTH

00 50 100

TR

U

E N

PLAN

NORTH

M

AT

C H

L

IN

E

- S H

EE

T

EA

EXISTING 19 GLIDE SLOPE EQUIPMENT

SHELTER AND STANDBY GENERATOR

TO BE RELOCATED. SEE SHEET EA142

FOR PROPOSED NEW LOCATION

RWY 1 AND RWY19 GLIDE SLOPE RELOCATION NOTES :

1. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE TO BECOME

FAMILIAR WITH EXISTING INSTALLATION PRIOR TO BIDDING.

2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH HQ

AFFSA/XME (WHO OWNS THE ILS EQUIPMENT) AND LOCAL WORK CENTER

(WHO MAINTAINS THE WEATHER EQUIPMENT) PRIOR TO DISCONNECTING

AND RECONNECTING EXISTING EQUIPMENT.

3. ITEMS TO BE RELOCATED INCLUDE BUT NOT LIMITED TO:

a) GLIDE SLOPE EQUIPMENT SHELTER

b) GLIDE SLOPE STANDBY GENERATOR

c) SERVICE TRANSFORMER

d) GLIDE SLOPE ANTENNA MAST AND ANTENNA ELEMENTS

e) WEATHER TOWER, WIND TOWER, AND VARIOUS WEATHER INSTRUMENTS

f) MISCELLANEOUS EQUIPMENT NEEDED TO COMPLETE THE RELOCATION

3 RELOCATION SHALL INCLUDE BUT NOT BE LIMITED TO:

a) DE-ENERGIZING AND DISCONNECTING SERVICE EQUIPMENT.

b) DISCONNECTING TRANSMITTING EQUIPMENT FROM ANTENNAS.

c) DISCONNECTING POWER TO ANTENNA MAST.

d) NEW FOUNDATIONS AT NEW SITE FOR EQUIPMENT BEING RELOCATED.

e) EXTENDING 4800V PRIMARY TO NEW LOCATION.

f) PLACE AND INSTALL TRANSFORMER ON NEW CONCRETE PAD AT THE NEW

LOCATION.

g) EXTENDING 24 STRAND, SINGLE MODE FIBER OPTIC CABLE AND

TERMINATING AT THE NEW LOCATION.

h) EXTENDING 25 PR, #19 COMMUNICATION CABLE AND TERMINATING AT

NEW LOCATION.

i) RE-ENERGIZING ELECTRICAL SERVICE AT THE NEW LOCATION.

j) RECONNECTING COMMUNICATION EQUIPMENT AT THE NEW LOCATION.

k) PLACING GLIDE SLOPE ANTENNA MAST…