This document is a government file related to the Rivbulio Fire Recovery IRSC, a federal contract opportunity. The file contains detailed contract requirements for road maintenance, hazard tree abatement, and related services on the Mount Hood National Forest in Oregon.
The Rivbulio Fire Recovery IRSC is a stewardship contract that will be awarded under Section 604 authority. The project area covers approximately 2,314 acres across four locations - Hillockburn-Memaloose, Fish Creek, Bull Complex, and Olallie. The total estimated volume of biomass/cull material is 48,901 CCF. The contract will require performing essential road maintenance and reconstruction, cutting of fire-damaged trees, removal of cut timber, and managing roadside slash and fuel accumulation. The anticipated period of performance is through December 31, 2027. A site visit for prospective contractors is scheduled for August 6, 2024. The Forest Service may make multiple awards under this solicitation.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rivbulio Fire Recovery IRSC – Bull Complex Mount Hood National Forest Page 1 of 34 Clackamas River Ranger District
APPENDIX C
CT5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS
FROM TO T-811b T-831 T-834 T-838 T-839 T-842 T-854
6350000 (Gravel) 8.28 18.84 10.56 C
6355000 (Gravel) 2.60 9.36 6.76 C
4600000 (Asphalt) 0.0 28.46 28.46 C
4671000 (Gravel) 6.43 11.24 4.81 C
4672000 (Gravel) 9.00 9.97 0.97 C C
DURING HAUL
FROM TO T-811b T-831 T-834 T-838 T-839 T-842 T-854
6350000 (Gravel) 8.28 18.84 10.56 C C C
6355000 (Gravel) 2.60 9.36 6.76 C C C
4600000 (Asphalt) 0.0 28.46 28.46 C
4671000 (Gravel) 6.43 11.24 4.81 C C C
(Gravel) 9.00 9.97 0.97 C C C
POST HAUL
FROM TO T-811b T-831 T-834 T-838 T-839 T-842 T-854
6350000 (Gravel) 8.28 18.84 10.56 C C C
6355000 (Gravel) 2.60 9.36 6.76 C C C
4600000 (Asphalt) 0.0 28.46 28.46 C
4671000 (Gravel) 6.43 11.24 4.81 C C C
(Gravel) 9.00 9.97 0.97 C C C
Page 2 of 34 Clackamas River Ranger District
Notes:
C = Contractor Performance Item Description of work required by the above listed T-specs is shown in the following ROAD MAINTENANCE REQUIREMENTS SPECIFICATION table
Page 3 of 34 Clackamas River Ranger District
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO CT5.31# - ROAD MAINTENANCE
REQUIREMENTS (9/04)
1 2 3 4 5 6 7 8 9 Special Dust Post
Road No. Project Travel Way Brush Abatement Season al
Haul and Specifi- X And Applic Mainte- Snow Termini cation Widt h Slope Com p Log Out *Surfacing*
Produc t Rate Width nance Remova l Block Treat
6350000 (Gravel)
8.28 – 18.84
T811b,T83 8, T854 EX AI B N/a N/a N/a N/a N/a N/a N/a N/a N/a
6355000 (Gravel)
2.60 – 9.36
T811b,T83 8, T854 EX AI B N/a N/a N/a N/a N/a N/a N/a N/a N/a
4600000 (Asphalt)
0.0 – 28.46 T854 EX AI N/a N/a N/a N/a N/a N/a N/a N/a N/a N/a
4671000 (Gravel)
6.43 – 11.24
T811b,T83
8, T854 EX AI B N/a N/a N/a N/a N/a N/a N/a N/a N/a
4672000 (Gravel)
9.00 – 9.97
T811b, T838, T854 EX AI B 4’ L, 4’ R N/a N/a N/a N/a N/a N/a N/a N/a
Notes: Forest Service approved erosion control devices will be required during road maintenance activities (including Blading, Shaping, Ditch Cleaning, and Slide and Slough Removal) and Landing Construction. These devices may include but are not limited to check dams, silt fencing, straw bales, wattles, staked bio bags, etc.
Surfacing – Roads & Landings that require spot rocking shall be approved by the
Contracting Officer.
Surfacing – Aggregate to be obtained from Agency approved commercial source that is reasonably free of seeds and organic materials from noxious weeds and invasive species of concern and shall be placed as staked in the field by the Contracting Officer through the contract administration team.
* Denotes blockage location and type to be flagged by Forest Service at time of placement.
Page 4 of 34 Clackamas River Ranger District
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO CT5.31# - ROAD
MAINTENANCE REQUIREMENTS (9/04)
Column No. Heading Entry Explanation
Any Blank Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s).
Any RC This work requirement applies only when haul of Contract related construction materials occurs.
2 Special Project Specification
Number Entry indicates Special Project Specification which applies.
3 Travel Way EX Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work.
Numbers Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.
IS, C, OS, F, or
AI
Cross slopes are designated as:
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).
A or B If compaction is required.
4 Brush and
Log Out Numeric & R and or L
Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road.
As Staked
(AS)
Limits of brushing are as staked or marked in the field.
OPT Contractor may use hand or mechanical means of brushing.
H Only hand brushing may be used.
5 Surfacing Aggregate Grading
Contractor shall place surfacing on roads listed according to the grading indicated.
D Contractor is to make deposits for listed road maintenance, including surface rock replacement.
6 Dust Abatement
OPT Product selection is Contractor's choice from those listed in Section T-812.
Product Abbr. Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T- 812; (i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts.
EX Contractor shall abate dust on the existing width.
Numbers Contractor shall abate dust to the width indicated by entry.
7 Seasonal Maintenance
W Waterbars and/or crossditching shall be required prior to expected seasonal precipitation.
Page 5 of 34 Clackamas River Ranger District
B Entrance barriers shall be installed by Contractor prior to nonuse periods.
8 Snow Removal TS Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements.
JU Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements.
Blank Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.
9 Post Haul P P denotes that work is Contractor's Responsibility to perform.
Page 6 of 34 Clackamas River Ranger District
ROAD MAINTENANCE T-SPECIFICATIONS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
SPEC.# DESCRIPTION Date T-803 Snow Removal 06/2020 T-805 Bridge Maintenance 06/2020 T-811 Blading 06/2020 T-812 Dust Abatement 06/2020 T-813 Surfacing 06/2020 T-815 Paved Surface Cleaning 06/2020 T-831 Ditch Maintenance 06/2020 T-832 Remove and End Haul Materials 06/2020 T-834 Drainage Structure Maintenance 06/2020 T-835 Roadway Drainage Maintenance 06/2020 T-836 Maintenance for Limited Use 06/2020 T-838 Maintenance for High Clearance Vehicle Use 06/2020 T-839 Maintenance for Project Use 06/2020 T-841 Vegetation Establishment 06/2020 T-842 Cutting Roadway Vegetation 06/2020 T-851 Logging Out 06/2020 T-854 Treatment and Disposal of Danger Trees 06/2020 T-891 Water Supply and Watering 06/2020 T-892 Bituminous Products 06/2020
Page 7 of 34 Clackamas River Ranger District
T-803 - SNOW REMOVAL (06/2020)
803.01 Description
This section provides for removal of snow from roads to facilitate logging operations and safe use.
Maintenance Requirements
Erect signs required by the Sign Plan in the SUPPLEMENTAL SPECIFICATIONS.
Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
Do not undercut banks. Do not blade gravel or other surfacing material off the road.
Keep roadbed, drainage ditches, drain dips, and culverts functional during operations and upon completion of operations.
Control snow removal to identify the usable traveled way and roadbed support. Reshape over-width plowing as necessary to define the usable width.
Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
Close roads to wheeled vehicles at times and in the manner specified in C(T)5.12# or the Road Rules document.
Upon seasonal completion of Contractor's Operations, effectively block the road by a snow barricade, unless otherwise approved by the Contracting Officer.
Remove snow for either public access or project use as established in the SUPPLEMENTAL SPECIFICATIONS and meet the following requirements:
Removal for Public Access (Method JU) - Remove snow from all the traveled way, including turnouts, for safe and efficient use for both timber haul and the public. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainages at locations designated by the Contracting Officer.
Removal for Project Use (Method TS) - Remove snow from all or part of the traveled way, including enough turnouts for safe and efficient use for timber haul and to protect the road. Remove intruding windfalls, debris or slough and slide material and dispose of only as necessary to provide passage for timber transportation. Removed materials may be deposited off the traveled way or outside the traveled way at locations designated by the Contracting Officer.
When directed by the Contracting Officer, replace surfacing which has been bladed off the road with in-kind material within 60 days of notification. Contracting Officer will notify Contractor in writing as to the cubic yard equivalent of bladed off material by the start of the Normal Operating Season.
Equipment
Purchaser/Contractor may use any type of equipment to remove snow, providing:
Type or use of equipment is not restricted in C(T)5.12# or Road Rules document.
Page 8 of 34 Clackamas River Ranger District
Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.
The use of plows or dozers to remove snow requires written approval by the Contracting Officer. Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the Contracting Officer.
Ice Control
Ice control may be performed byContractor when approved by the Contracting Officer in writing. Such approval will include ice control materials, application rates, and any specific requirements of use.
Page 9 of 34 Clackamas River Ranger District
T-805 - BRIDGE MAINTENANCE (06/2020)
Description
This section provides for routine maintenance of bridge decks and minor approach maintenance. All approaches to be maintained will be marked in the field and approved by the Contracting Officer prior to the start of work on any bridge.
Maintenance Requirements
General
Deck Cleaning
Clean deck, running planks, caps and scuppers of curbs by sweeping, washing and/or air- blasting so that the bridge is free of debris and dirt and all drainage openings on the bridge are clear and operating as intended. Do not allow any debris or dirt into the stream. All material shall be disposed of in accordance with T-832; sites designated by the Contracting Officer and at least 100 feet from any stream, in a location that will not contribute sediment back into the stream. Smooth out and blend with adjacent area. Do not block ditches.
Approach and Drainage Blading
All approaches designated by the Contracting Officer shall be bladed in accordance with T- 811.
Invasive Species
Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE DRAWINGS, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
Refer to Attachment 6 for known locations of invasive species of concern; prevention practices included in Solicitation provision 27 and 34 apply.
Page 10 of 34 Clackamas River Ranger District
T-811 - BLADING (06/2020)
811.01 Description
This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on C(T)5.31#
811.02 Maintenance Requirements
1. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.
2. General
a. Blade and shape the existing traveled way and shoulders, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in C(T)5.31#, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width. Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.
b. Apply water during blading when sufficient moisture is not present to prevent segregation.
Supply, haul, and apply water in accordance with Section T-891.
c. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.
d. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove material not meeting this dimension and place outside the roadbed; do not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
e. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE DRAWINGS, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
Refer to Attachment 6 for known locations of invasive species of concern;
prevention practices included in Solicitation provision 27 and 34 apply.
3. Routine Blading
a. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SUPPLEMENTAL SPECIFICATIONS upon completion of blading.
b. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage
Page 11 of 34 Clackamas River Ranger District away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
4. Compaction
Roads requiring compaction will be included in the C(T)5.31#. Unless Compaction Method B is designated in the C(T)5.31#, all traveled ways requiring compaction may be compacted by Method A. Compaction shall commence immediately following blading.
Compaction Method A: Breaking track over full width of traveled way while operating equipment.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
5. Undercutting
Undercutting roadway back slope is not permitted.
6. Intersections
At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
a. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections T-835, T-836, T-838, or T-839 are considered restricted.
b. Side roads listed for work under this Section are not restricted.
7. Cleaning of Structures
Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
8. Berms
Maintain existing berms to the condition of adjacent segments. Do not create new berms.
9. Smooth Blading
Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths. Store removed materials in a recoverable windrow until blade processing as described in this section is feasible. Watering will not be required for smooth blading.
Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Place holes through windrows for drainage every 500 feet or less to provide drainage
Page 12 of 34 Clackamas River Ranger District
T-812 - DUST ABATEMENT (06/2020)
812.01 Description
This work consists of applying dust palliatives on roads shown in the C(T)5.31# Road List.
812.02 Materials
The dust palliative materials are shown in C(T)5.31#, unless shown as Optional for Contractor's election. If Optional is shown the Contractor may use any of the products listed below. Dust palliative materials shall meet the following requirements:
1. Water (H2O): will be obtained from sources displayed on the SALE AREA MAP or listed in
SPECIFICATION T-891 Water Supply, unless otherwise approved by the Contracting Officer.
2. Lignosulfonate: Provide certification that material meets the requirements of Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)" and the Forest Service Supplemental Specification 725.02.
3. Magnesium Chloride (MgCl2): Provide certification that material meets the requirements of
Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)" and the Forest Service Supplemental Specification 725.02.
4. Calcium Chloride Liquid (CaCl2B): Provide certification that material meets the requirements of
Subsection 725.02 of the “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) " and the Forest Service Supplemental Specification 725.02.
5. Calcium Chloride Mass (CaCl2F): Provide certification that material meets the requirements of
Subsection 725.02 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)” and the Forest Service Supplemental Specification 725.02.
6. Bituminous dust palliatives: Materials manufactured specifically for dust abatement purposes which conform to the requirements of Section T-892 for each listed road in C(T)5.31#.
812.03 Methods
As shown in the SUPPLEMENTAL SPECIFICATIONS, Contractor may utilize a variety of methods to decrease or eliminate the need for dust abatement.
812.04 Equipment
1. Design, equip, and operate application equipment for spreading dust palliatives so that the material is uniformly applied at the rate and traveled way widths shown in C(T)5.31#.
2. For bituminous palliatives, provide equipment that heats and applies the bituminous material.
Provide a bituminous distributor that is self-powered and mounted on pneumatic tires and equipped with a pump and circulating spray bar, a tachometer, pressure gauges, accurate volume measuring devices such as visual volume dial or gauge calibrated to the tank, and a thermometer.
Provide equipment which is a standard commercial type of proven performance.
Page 13 of 34 Clackamas River Ranger District
3. Accomplish dilution of dust palliatives within the application vehicle with the water source protected from contamination. Circulate the resulting mixture at least five (5) minutes to ensure uniform mixing prior to application.
812.05 Maintenance Requirements
1. Limit water applications to abatement for hauling vehicles and provide at a frequency and rate which controls dust such that vehicle taillights and turn signals remain visible. Vary rates of application as needed but remain low enough to avoid forming rivulets. Accomplish the abatement by enough frequency of application without saturating and softening the traveled way. Compacted or glazed road surface or wheel tracks may be loosened as needed for water penetration.
2. Apply all other dust palliatives at the rates and times approved by the Contracting Officer.
C(T)5.31# shows the expected average application rate and may be varied to meet field conditions.
Lignosulfonate, Magnesium Chloride, and Calcium Chloride Brine are listed as gallons per square foot of the undiluted product at fifty (50), thirty-three (33), and thirty-eight (38) percent respectively.
Calcium Chloride Mass is listed in pounds per square foot at seventy-seven (77) percent concentration.
Page 14 of 34 Clackamas River Ranger District
T-812 - DUST ABATEMENT (06/2020)
3. Apply bituminous dust palliatives only when the surface to be treated contains enough moisture to obtain uniform distribution of the dust palliative unless noted differently in the SUPPLEMENTAL
SPECIFICATIONS.
4. Prior to initial application, when needed, the road will be bladed and shaped under Section T- 811-
Blading.
5. Required subsequent applications may be applied to the existing road surface without blading.
6. Dust palliatives will not be applied in a manner that spatters or mars adjacent structures or trees or placed on or across cattleguards or bridges. Discharge dust abatement material only on roads approved by the Contracting Officer.
Page 15 of 34 Clackamas River Ranger District
T-813 - SPOT SURFACING (06/2020)
813.01 Description
This work consists of placing surface aggregate as DESIGNATED ON THE GROUND, or as ordered by the Contracting Officer. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
813.02 Materials
1. Materials will be Government-furnished when stated in the SUPPLEMENTAL SPECIFICATIONS.
2. Materials furnished by the Contractor shall conform to the gradation and quality requirements of Section 703 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S. Customary Units" and FS supplements to the FP-14.
3. All materials transported onto National Forest System land shall be free of invasive species of concern. Written documentation of methods used to determine the invasive species of concern free status of any and all materials furnished by the Contractor shall be submitted for approval to the Contracting Officer before transport of any materials onto NFS System land.
The Contracting Officer shall have 5 days, excluding weekends and Federal holidays, to review the methods and inspect the materials after the required written documentation is provided by the Purchaser/Contractor. After satisfactory review and inspection or after 5 days without review and inspection, the Contractor may transport the material onto National Forest System land. Material receiving unsatisfactory review and inspection shall not be transported onto National Forest System land.
Material or methods appropriate for establishing invasive species of concern free status for the invasive species of concern are listed below.
Page 16 of 34 Clackamas River Ranger District
Invasive Species of Concern Acceptable Methods
Scientific Name Common Name
Documentation of “weed-free” certification of commercial material source
Brachypodium sylvaticum slender false brome Centaurea diffusa diffuse knapweed Centaurea jacea brownray knapweed Centaurea solstitialis yellow star-thistle Centaurea stoebe spotted knapweed Centaurea stoebe ssp.
micranthos spotted knapweed
Centaurea x moncktonii (C.
pratensis) meadow knapweed
Cirsium arvense Canada thistle Cynoglossum officinale houndstongue (gypsyflower) Cytisus scoparius Scotch broom Geranium lucidum shiny leaf geranium, shining geranium Hieracium aurantiacum orange hawkweed Hieracium caespitosum meadow hawkweed Hieracium lachenalii common hawkweed Hieracium sabaudum New England hawkweed
Rubus armeniacus Himalayan blackberry (syn. Rubus bifrons)
813.03 Maintenance Requirements
1. Thoroughly loosen the area to be surfaced to a minimum depth of 1 inch prior to placement of aggregate.
2. Mixing and Placing
When scheduled coincidentally with work under Section T-811, and included in the SUPPLEMENTAL SPECIFICATIONS, mix surfacing and existing aggregate with water until a uniform mixture is obtained prior to final shaping and compaction.
Otherwise, spread the material on the prepared area in layers no more than 4 inches in depth.
When more than one (1) layer is required, shape and compact each layer before the succeeding layer is placed. Upon completion, the surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
3. Compaction Methods
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
Either Method A or B may be used unless Method B is designated in
Page 17 of 34 Clackamas River Ranger District
C(T)5.31#.
Page 18 of 34 Clackamas River Ranger District
T-815 – Paved Surface Cleaning (06/2020)
815.01 DESCRIPTION
This work consists of removing loose material from paved traveled way, including bridge decks, paved shoulders, and paved turnouts.
815.02 MAINTENANCE REQUIREMENTS
1. The surface shall be cleaned to the existing pavement width including bridge decks and paved shoulders and paved turnouts.
2. Materials shall be moved away from road centerline on double-lane roads.
3. Bridge deck cleaning shall require all materials to be moved longitudinally off the deck. If hauling of material is required it will be ordered under T-832.
815.03 EQUIPMENT
1. Equipment shall have the capability of removing all loose material from paved surfaces without damage to the surface. Surface damage includes but is not limited to:
a. “Divots” in the paved surface;
b. Peeling of surface material;
c. Cracking or breaking of pavement edges.
2. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of three hundred and fifty (350) feet from a live stream, unless approved by the Contracting Officer.
Page 19 of 34 Clackamas River Ranger District
T-831 - DITCH MAINTENANCE (06/2020)
831.01 Description
This Section provides for routine maintenance of various types of ditches to provide drainage which is unobstructed, as shown on C(T) 5.31# or as Designated on the ground by the Contracting Officer.
831.02 Maintenance Requirements
1. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.
2. Undercutting backslopes during ditch maintenance operations is not permitted.
3. Suitable material up to 4 inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.
4. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Contracting Officer.
5. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily. Haul excess material to designated waste area under Section T-832.
6. Remove limbs and wood chunks in excess of 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.
7. Clean paved surfaces of all materials resulting from ditch maintenance work.
8. Shape lead-off ditches to drain away from the traveled way.
9. Invasive species of concern prevention practices shall be followed as listed below, and where:
a. Designated on the Ground by the Contracting Officer,
b. Included in C(T)5.31#,
c. Shown on the Drawings, or
d. As ordered by the Contracting officer.
Refer to Attachment 6 for known locations of invasive species of concern; prevention practices included in Solicitation provision 27 and 34 apply.
Page 20 of 34 Clackamas River Ranger District
T-832 - REMOVE AND ENDHAUL MATERIALS (06/2020)
832.01 Description
Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
832.02 Maintenance Requirements
1. Remove, end haul, and dispose of excess materials generated by work under other Sections of this contract.
2. Remove the slide and slough materials to a height of approximately 6 feet vertically above the road surface, upslope from the roadbed, and not more than 3 feet vertically below the road surface down slope from the roadbed. Dispose of material at designated sites as shown on the CONTRACT AREA MAP, identified in SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
3. Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831.
4. When approved by the Contracting Officer, fill slumps by compacting selected materials into roadway depressions. Compaction is by Placement Method 2.
5. Place all materials in disposal sites as specified in the SUPPLEMENTAL SPECIFICATIONS, as shown on the CONTRACT AREA MAP, or as ordered by the Contracting Officer.
a. Placement Method 1 - Side Casting and End Dumping: Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.
b. Placement Method 2 - Layer Placement: Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 12 inches thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.
6. Repair any damage to existing aggregate or pavement surfaces.
Page 21 of 34 Clackamas River Ranger District
T-834 - DRAINAGE STRUCTURE MAINTENANCE (06/2020)
834.01 Description
This work consists of cleaning and reconditioning culverts and other drainage structures.
834.02 Maintenance Requirements
1. Clean drainage structures, inlet structures, culverts, catch basins, and outlet channels specified in the SUPPLEMENTAL SPECIFICATIONS. Clean catch basins by removing the material within the area SHOWN ON THE DRAWINGS.
2. Clean the transition from the ditch line to the catch basin 10 feet or more from the catch basin.
Clean outlet channels and lead-off ditches 6 feet or more. Remove and place debris and vegetation to not enter the channel or ditch, or obstruct traffic or haul debris and vegetation to a designated disposal area in accordance with Section T-832 when shown on the SALE/CONTRACT ARE MAP, when specified in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer,
3. Hydraulic flushing of drainage structures is not allowed unless provided for in the SUPPLEMENTAL
SPECIFICATIONS.
4. Cleaning and reconditioning are limited to the first 3 feet of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow. Treat cut edges with a zinc rich coating, in accordance with AASHTO M 36M and ASTM A 849.
5. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on the SALE/CONTRACT
AREA MAP, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
Refer to Attachment 6 for known locations of invasive species of concern; prevention practices included in Solicitation provision 27 and 34 apply.
Page 22 of 34 Clackamas River Ranger District
T-835 - ROADWAY DRAINAGE MAINTENANCE (06/2020)
835.01 Description
This work consists of providing post-haul drainage on roads.
835.02 Maintenance Requirements
1. Drainage
a. Upon completion of work, shape the roadway to provide for the removal of surface water. The roadway need not be passable to vehicles. Repair and reinstall water bars, barriers or berms existing prior to the Purchaser/Contractor's operation. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.
b. Continuous blade shaping of the roadbed is not required under this specification.
c. Work to be done at staked locations shall be as indicated on the stake and/or stated in
SUPPLEMENTAL SPECIFICATIONS:
d. Any of the following methods are acceptable for use at eroded or rutted locations:
Method A: Outsloping the roadbed at not less than ½ inch per foot of width.
Method B: Insloping the roadbed at not less than ½ inch per foot of width.
Method C: Water bar roadbed at locations staked on the ground and construct as SHOWN ON THE DRAWINGS or as included in SUPPLEMENTAL SPECIFICATIONS.
e. Drainage structures located in through-fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 20 feet of the structure.
f. Either clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional or provide water bar(s) across the roadbed. Removed structures shall become Purchaser/Contractor's property to be removed from NFS land. Remove and replace any Purchaser/Contractor-installed temporary drainage structures with a water bar.
2. Slides, Slumps and Slough
a. Slides and slough may be left in place, provided they do not potentially impound water or divert water from watercourses. Reshape the various surfaces to provide drainage.
b. Provide drainage to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks. Place berms, waterbars or ditches as needed to intercept and remove runoff water from the roadbed. Surface seal cracks by covering over with native soil materials to prevent additional water entry and compact with equipment tires.
3. Entrance Devices
Upon completion of work, replace entrance devices to effectively eliminate access by motorized vehicles having four (4) wheels and a width in excess of 50 inches or by all motorized wheeled vehicles, as directed by the Contracting Officer.
4. Seeding
Seed and fertilize all disturbed areas in accordance with requirements in Section T-841.
Page 23 of 34 Clackamas River Ranger District
T-836 - MAINTENANCE FOR LIMITED USE (06/2020)
836.01 Description
This work consists of making limited use roads passable for joint use by Purchaser/Contractor and high clearance vehicles while providing drainage from the traveled way and roadbed.
836.02 Maintenance Requirements
1. Traveled Way
Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Contracting Officer, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:
i. No object extending over 4 inches above the road surface shall remain within the
12 feet usable traveled way and 10 feet turnout widths. Center the usable width on the roadbed or position away from the fill slope.
ii. Cut and remove standing or down trees, logs, brush, and limbs from the traveled way, including turnouts and turnarounds. Remove encroaching limbs to a height of 14 feet above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber meeting utilization standards or deck at agreed locations.
iii. Place all removed materials away from drainages.
iv. During use, maintain drainage structures, including dips, ditches and culverts, in a useable condition.
b. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
2. Slough and Slides
a. Slough and slides may be left in place, provided surface drainage is provided and at least 12 feet of width is available for vehicle passage.
b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet, providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.
c. Reposition slough or slide materials on the roadbed which are not capable of supporting a vehicle to provide the 12-foot width. When directed by the Contracting Officer, slough or slide material shall be removed under Section T-832.
Page 24 of 34 Clackamas River Ranger District
3. Slumps and Washouts
a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
c. Unless the Contractor Officer agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width.
Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
d. Washouts may be filled with suitable material.
4. Post haul
At the end of hauling or prior to entering seasonal shutdowns or a period of extended inactivity:
1. Shape the traveled way and disturbed roadbed to provide functional drainage.
2. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance
3. Leave roads useable for high clearance vehicles. Remove or reshape Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
Page 25 of 34 Clackamas River Ranger District
T-838 - MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (06/2020)
838.01 Description
This work consists of making limited use roads passable for project use by Purchaser/Contractor and providing drainage from the traveled way and roadbed.
838.02 Maintenance Requirements
1. Traveled Way
Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Forest Service, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, and other debris from the 12-foot traveled way. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way. Center the usable width on the roadbed or position away from the fill slope.
b. Place all removed materials away from drainages.
c. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.
d. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
The Purchaser/Contractor may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, logs, brush, limbs and other debris from turnouts, turnarounds, or other locations that interfere with maintenance.
b. Remove encroaching limbs to a height of 14 feet above the traveled way surface.
c. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber that meets utilization standards or deck at locations approved by the Forest Service.
2. Slough and Slides
a. Slough and slides may be left in place when surface drainage is provided and at least 12 feet of width is available for vehicle passage.
b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.
c. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the Forest Service, slough or slide material will be removed under Section T-832.
3. Slumps and Washouts
a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
Page 26 of 34 Clackamas River Ranger District
b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
c. Unless the Forest Service approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
d. Washouts may be filled with suitable material.
4. Post -haul
At the end of hauling or prior to seasonal shutdowns or a period of extended inactivity:
a. Shape the traveled way and disturbed roadbed to provide functional drainage.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
c. Leave roads useable for high clearance vehicles. Remove or reshape Purchaser/Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
Page 27 of 34 Clackamas River Ranger District
T-839 - MAINTENANCE FOR PROJECT USE (06/2020)
839.01 Description
Work consists of providing minimum access required for Purchaser/Contractor's operations and associated Forest Service contract administration while preventing unacceptable resource or road damage.
839.02 Maintenance Requirements
1. Purchaser/Contractor is authorized to perform the following maintenance to provide vehicle passage and drainage:
a. Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.
b. Smoothing or filling existing cross ditches and water bars.
c. Installing Purchaser/Contractor-furnished culverts or other temporary drainage structures for shallow stream crossings, as approved by the Contracting Officer.
d. Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:
i. Place all removed materials away from drainages.
ii. Limb and remove timber which meets utilization standards or deck at locations approved by the Contracting Officer. Scatter other woody materials, including limbs, off and below the roadbed without creating concentrations.
e. Clean and recondition drainage structures in accordance with Section T-831 and Section T-
834.
f. Reposition or ramp over slough and slides to provide adequate width of traveled way material.
g. Provide traveled way drainage above slumps and seal cracks in slump area. Ramp the slumps on both ends into undisturbed roadbed to provide usable width unless otherwise ordered by the Contracting Officer.
2. During use, the traveled way shall not channel water along the road. Prior to periods of anticipated rains and runoff, perform the following work:
a. Shape the traveled way and roadbed to drain.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes through use and maintenance.
c. Perform work outlined in 839.02 1 (e), (f), and (g).
d. During periods of non-use, replace original barrier or provide and maintain standard MUTCD
Type 3 barricades unless alternate barriers are approved by the Contracting Officer.
Page 28 of 34 Clackamas River Ranger District
839.03 Post Haul Requirements
1. Upon completion of project use, perform work described in the requirements of 839.02 2 and in accordance with 839.03 2 and 3 or as otherwise provided for in the SUPPLEMENTAL SPECIFICATIONS or C(T)5.31#.
2. Roads designated in C(T)5.31# to be blocked shall conform to the requirements of Section T-835.
Unless otherwise approved by the Contracting Officer, remove Purchaser/Contractor-installed temporary structures from National Forest System land. Associated commercially obtained materials shall remain the property of the Purchaser/Contractor.
3. Remove or reshape Purchaser/Contractor improvements at road junctions, as approved by the
Contracting Officer at the time of improvement.
Page 29 of 34 Clackamas River Ranger District
T-842 - CUTTING ROADWAY VEGETATION (06/2020)
842.01 Description
This work consists of cutting all vegetative growth on roadway surfaces and roadsides, including trees and other vegetation less than 4 inches in diameter measured 6 inches above the ground.
842.02 Maintenance Requirements
1. General
a. Cut brush, trees, and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation.
b. Items to remain will be DESIGNATED ON THE GROUND.
c. Work may be performed either by hand or mechanically unless specifically shown in C(T)5.31#.
Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
d. Correct damage to boles of standing trees caused by Purchaser/Contractor's operation either by treatment with a commercial nursery sealer or by removing the tree as directed by the Contracting Officer.
e. Limb trees within the cutting limits which are over 4 inches in lieu of cutting, measured at 6 inches above the ground.
f. When trees are limbed, cut limbs within 4 inches of the bole.
2. Cutting Side Vegetation
a. Show the width of vegetation to be removed in (C(T)5.31#.
b. Unless otherwise included in the SUPPLEMENTAL SPECIFICATIONS or DESIGNATED ON THE
GROUND:
i. Commence work at the edge of the traveled way and proceed away from the road centerline.
ii. Roads without a defined traveled way: The starting point for cutting will be marked on the ground or defined in the SUPPLEMENTAL SPECIFICATIONS.
c. The points for establishing cutting limits are as follows:
i. Fill and daylighted (wide roadbed) section cutting commences at the edge of the traveled way and proceeds away from the road center line.
ii. Drainage ditched section cutting commences at the bottom of the existing ditch and proceeds away from the road center line. Cutting on ditch foreslopes is not required.
iii. Unditched section cutting commences at the intersection of the cutbank and the roadbed and proceeds away from center line.
d. Provide transitions between differing increments of cutting width. Accomplish transitions in a taper length of not less than 50 feet nor more than 70 feet.
3. Debris
a. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter is not allowed to remain on roadway slopes within the treated area, in ditches, or within
Page 30 of 34 Clackamas River Ranger District water courses.
b. Remove limbs and chunks in excess of 3 inches in any dimension from the traveled way and shoulders.
c. Materials may be scattered down slope from the roadbed, outside of the work area and drainages unless otherwise listed in D. Invasive Species of Concern.
4. Invasive Species of Concern
Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on SALE/CONTRACT AREA MAP or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Refer to Attachment 6 for known locations of invasive species of concern; prevention practices included in Solicitation provision 27 and
34 apply.
Page 31 of 34 Clackamas River Ranger District
T-851 - LOGGING OUT (06/2020)
851.01 Description
This work consists of removal of fallen trees and snags which encroach within 3 feet of the roadbed on both sides.
851.02 Maintenance Requirements
1. Limb and remove timber which meets Utilization Standards in A(T)2 or deck at locations designated by the Contracting Officer.
2. Limb non-merchantable material and cut into lengths for handling. Deck outside ditches and drainages, off the traveled way and turnouts or at staked locations. The clearing width is to the edge of the roadbed for public use roads, except limited use roads. The clearing width for limited use roads is shown in T-836, T-838, or T-839, as applicable.
3. Notwithstanding B(T)2.3, blowdown timber outside Sale/Contract Area required to be removed, which meets Utilization Standards in A(T)2, when designated by the Contracting Officer is Included Timber subject to requirements of B(T)2.2.
4. Do not leave woody debris and slash in excess of 12 inches in length or 3 inches in diameter, or concentrations which may plug ditches or culverts, in ditches, drainage channels, or on backslopes, traveled way, shoulders, or turnouts.
Page 32 of 34 Clackamas River Ranger District
T-854 TREATMENT AND DISPOSAL OF DANGER TREES (06/2020)
854.01 Description
This work consists of felling and disposal of live or dead danger trees sufficiently tall to reach roads used by the Purchaser/Contractor. Any removal of logs is subject to prior agreement between the Contractor Officer and the Purchaser/Contractor.
854.02 Requirements
1. Designation of danger trees.
a. Danger trees to be felled will be documented in advance by the Contracting Officer. Trees authorized to be removed will be Marked for removal.
2. Falling, bucking and treatment for disposal.
a. Use controlled felling to ensure the direction of fall and prevent damage to property, structures, roadway, residual trees, and traffic. Stump heights measured on the side adjacent to the highest ground shall meet requirements of A(T)6. Higher stump heights are permitted when necessary for safety.
b. Felled snags and trees, which are not Marked for removal, will be left in a stable condition such that they will not roll or slide. Position logs away from standing trees so they will not roll, are not on top of one another, and are located out of roadway and drainage structures.
c. Fell, limb and remove trees which are Marked for removal and are equal or exceed the utilization standards as listed in A(T)2 or SUPPLEMENTATAL SPECIFICATIONS. Dispose of merchantable timber designated for removal in accordance with B(T)2.32 Construction Clearing or as described in SUPPLEMENTAL SPECIFICATIONS.
3. Slash treatment.
a. Dispose of slash as described in Item 2, Appendix A, Section II.
Page 33 of 34 Clackamas River Ranger District
T-891 - WATER…