AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. AMENDMENT/MODIFICATION NO. 2. EFFECTIVE DATE 3. REQUISITION NO. PAGE
4. ISSUED BY 5. ADMINISTERED BY (If other than Item 4)
6. SUPPLIER NAME AND ADDRESS 7A. AMENDMENT OF SOLICITATION NO.
7B. DATED (SEE ITEM 9)
8A. MODIFICATION OF CONTRACT / ORDER NO.
8B. DATED (SEE ITEM 10)
9. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 6 and 13 and returning is extended. is not extended. Offerors must acknowledge
10. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACT / ORDER IN ITEM 8A. IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 11.
A. THIS CHANGE IS ISSUED PURSUANT TO CLAUSE: (Specify clause by number and name)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF MUTUAL AGREEMENT.
D. OTHER: (Specify type of modification and authority)
E. IMPORTANT: Supplier is not, is required to sign this document and return
1 11 0004 07/12/2021
National Programs Facility Services CMC United States Postal Service 6 Griffin Road North
4BFNPT
Windsor CT 06006-7002
(860) 285-7322
National Programs Facility Services CMC United States Postal Service 6 Griffin Road North
4BFNPT
Windsor CT 06006-7002 x
11. DESCRIPTION OF AMENDMENT/MODIFICATION
number. YOUR OFFER MAY BE REJECTED IF ACKNOWLEDGEMENT OF THIS ADMENDMENT IS NOT RECEIVED AT THE PLACE DESIGNATED AND PRIOR TO THE HOUR AND DATE
SPECIFIED. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or email, provided each letter or email makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or email which includes a reference to the solicitation and amendment x x
4BW-21-A-0005
copies to the issuing office.
07/12/2021
OF
JODI K. GAY
The above numbered Solicitation is amended as set forth in Items 7A and 11. The hour and date specified for receipt of Offers
TELEPHONE
TELEPHONE FAX
FAX
CODE
CODE
CODE
copies of 3 jodi.k.gay@usps.gov
AMENDMENT NO.0004 IS BEING CREATED TO ANSWER QUESTIONS SUBMITTED TO THE POSTAL SERVICE FOR
FURTHER CLARIFICATION AS FOLLOWS:
1. IS CUSTODIAL/JANITORIAL A REQUIREMENT OF THIS CONTRACT?
RESPONSE: YES, CUSTODIAL/JANITORIAL SERVICES ARE A REQUIREMENT.
2. ALL COSTS ASSOCIATED WITH GENERAL SCOPE OF WORK ARE REIMBURSED TO THE CONTRACTOR. IS
THIS A COST REIMBURSABLE CONTACT?
RESPONSE: NO. RESULTANT CONTRACT WILL BE FIRM FIXED PRICING, WITH A CONTRACT LINE ITEM
Continued ...
14. UNITED STATES POSTAL SERVICE (CO's Name, Date, Signature)13. SUPPLIER (Name, Date, Signature)
Except as provided herein, all terms and conditions of the document referenced in Item 7A or 8A, as heretofore changed, remain unchanged and in full force and effect.
12. ACCOUNTING DATA A. AWARD PAYMENT TERMS B. NET CHANGE
EMAIL:
TELEPHONE:
EMAIL:
TELEPHONE:
TITLE: TITLE:
X 1
RS21C0
Highlight
RS21C0
Highlight
ITEM NO. DESCRIPTION OF GOODS/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
2 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
FUNDED FOR OUT-OF-SCOPE WORK.
3. WHAT IS THE NAME OF THE MANUFACTURERS OF THE
ELEVATORS?
RESPONSE: SCHINDLER ELEVATOR CORPORATION.
4. WHAT KIND OF ACTION? HYDRAULIC, TRACTION, ROPE?
RESPONSE: DEFINED IN F/1 OF 1.
5. HOW MANY LANDINGS FOR EACH ELEVATOR:
RESPONSE: DEFINED F/1 OF 1 FLOOR TRAVEL =
LANDINGS.
6. IS THE CONTRACTOR RESPONSIBLE FOR THIRD PARTY
ANNUAL INSPECTIONS?
RESPONSE: ELEVATOR INSPECTIONS? YES. WE HAVE A
LOCAL ELEVATOR VENDOR MAINTENANCE CONTRACT. THE
USPS CONDUCTS SEMI-ANNUAL, ANNUAL & 5-YR
INSPECTIONS. THE LOCAL ELEVATOR VENDOR
PARTICIPATES IN THE SEMI-ANNUAL WITH USPS.
7. BIANNUAL SAFETY TESTING OF BOILERS. IS THAT
REQUIREMENT EVERY 6 MONTHS OR 24 MONTHS?
RESPONSE: REQUIREMENT IS EVERY 12 MONTHS. IN
ADDITION, THE USPS CONTRACTS ITS OWN INSPECTION.
8. IS EDDY CURRENT TESTING A REQUIREMENT; IF SO
WHEN WAS IT LAST PERFORMED?
RESPONSE: RECOMMENDED BY MFG.
9. IS A THREE-YEAR TRIP TEST AND GEAR INSPECTION
REQUIRED ON MAIN SWITCHES?
RESPONSE: NO, JUST AN ANNUAL IR ON SWITCHGEAR.
10. IS ANNUAL INFRARED IMAGING REQUIRED OF
ELECTRICAL DISTRIBUTION SYSTEM, MCC PANELS?
RESPONSE: IR IS DONE EVERY OTHER YEAR.
11. IS THERE AN EMERGENCY BACK-UP GENERATOR ON
Continued ...
3 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
SITE? WHAT IS THE SIZE AND MANUFACTURER?
RESPONSE: CUMMINS M/N 1000DQFAD S/N: H100151351,
1000 KW.
12. IS ANNUAL LOAD TESTING OF THE GENERATOR A
REQUIREMENT?
RESPONSE: YES.
13. LANDSCAPING, WHO PROVIDES THE PLANTINGS? IF
IT IS THE CONTRACTOR, PLEASE PROVIDE A
DESCRIPTION.
RESPONSE: LOCAL LANDSCAPING CONTRACTOR PROVIDES
SEASONAL BED CARE, PLANTING, WEEKLY LAWN, WEEKLY
SHRUB CARE AND WEEKLY MAINTENANCE.
14. IS THE CONTRACTOR RESPONSIBLE FOR PROVIDING
FERTILIZER, WEED KILLER, ETC.
RESPONSE: LAWN SEEDING, TREATMENT, FERTILIZING
AND MAINTENANCE BY LOCAL LANDSCAPE COMPANY.
PARKING SURFACE WEEDS ARE TREATED BY CURRENT
PROPERTY MANAGEMENT.
15. HOW MANY TREES ARE ON THE PROPERTY?
RESPONSE: AVAILABLE ON THE MANDATORY SITE VISIT.
16. IS THE CONTRACTOR REQUIRED TO HAVE AN
ARBORIST EVALUATE THE TREES?
RESPONSE? YES, WHEN NECESSARY TO EVALUATE HEALTH
AND CONDITION OF TREE, ASSESS FOR GROWTH
CLOSENESS TO UTILITY POWER LINES.
17. FOR PARTS AND INVENTORY IS THERE AN EXISTING
BAR CODE SYSTEM?
RESPONSE: YES, MICROMAIN MAINTENANCE MANAGEMENT
SOFTWARE IS USED FOR ALL PARTS INVENTORY AND
GENERATING WORK ORDERS. INDIVIDUAL BARCODES ARE
GENERATED IN-HOUSE AND ENTERED IN MICROMAIN.
18. IS THERE A MINIMUM REQUIRED BENCH STOCK OF
PARTS; CAN THE USPS PROVIDE LIST?
4 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
RESPONSE: NO MINIMUM REQUIREMENT, BENCH STOCK IS
BASED ON USAGE. PARTS LIST IS TO LARGE TO LIST.
ALL FACILITY DOORS, OUTLETS, TOOLS, PARTS,
EQUIPMENT ARE BARCODED AND PART OF THE MICROMAIN
SYSTEM.
19. WILL THE BENCH STOCK BE FULLY STOCKED AT
TURN-OVER?
RESPONSE: YES.
20. WHO OWNS THE BENCH STOCK?
RESPONSE: USPS.
21. IS THE CONTRACTOR RESPONSIBLE FOR THE
REMOTE/OFF-SITE MONITORING OF THE FIRE SYSTEMS?
RESPONSE: YES.
22. WHO IS RESPONSIBLE FOR THE MAINTENANCE AND
REPAIR OF THE HONEYWELL CAMERAS?
RESPONSE: CONTRACTOR.
23. DOES THE USPS REIMBURSE THE CONTRACTOR FOR
ALL REPAIRS?
RESPONSE: THESE COSTS ARE PLANNED FOR IN ANNUAL
BUDGET $.
24. PLEASE CLARIFY IF THE FACILITY MANAGER
ON-SITE REQUIREMENT IS TO HAVE A 24/7 PRESENCE ON
SITE OR BE ABLE TO BE CONTACTED BY PHONE 24/7.
RESPONSE: ENGINEERING STAFF = ONSITE 24/7, FM
ONSITE M-F BUSINESS HOURS AND 24/7 ON CALL.
25. PLEASE CONFIRM IF THE MAINTENANCE OF THE
ELEVATORS ARE PART OF THE SCOPE OF THE
CONTRACTOR'S RESPONSIBILITY?
RESPONSE: YES.
26. IS THE MONITORING OF THE FIRE SAFETY SYSTEMS
THE RESPONSIBILITY OF THE CONTRACTOR?
5 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
RESPONSE: YES.
27. PLEASE PROVIDE THE NAME OF THE CURRENT
SUBCONTRACTOR FOR THE FIRE AND LIFE SAFETY
SYSTEMS.
RESPONSE: ADVANCE ALARMS.
28. THE SOLICITATION STATES THAT THE CONTRACTOR
WILL BE RESPONSIBLE FOR ARRANGING EXTRA TRASH
REMOVAL. IS THE MONTHLY TRASH REMOVAL SERVICE
THE RESPONSIBILITY OF THE CONTRACTOR?
RESPONSE: YES
29. PLEASE PROVIDE DATES OF THE LAST TEST OR
INSPECTION OF THE FOLLOWING EQUIPMENT?
RESPONSE:
A.) AIR COMPRESSORS: 02/2021 WAS A 5-YR
B.) AIR QUALITY: 01-2021
C.) CLEANING OF BOILER TUBES ANNUALLY, 07/2021
D.) WATER QUALITY TESTING: 01-2020
E.) LAST DATE FOR THE 5-YEAR TESTING ASSOCIATED
WITH THE FIRE AND LIFE SAFETY SYSTEMS,
DRY PIPE TESTING, AND HYDROSTATIC
TESTING. 04/2021
30. THE PM SHEETS PROVIDED LISTS THE FREQUENCY OF
THE ANNUAL BOILER INSPECTIONS AS OCCURRING EVERY
TWO (2) YEARS. PLEASE CLARIFY IF THE INSPECTIONS
ARE ANNUAL OR EVERY TWO (2) YEARS?
RESPONSE: ANNUAL.
31. PLEASE PROVIDE A LIST OF ALL SERVICES THAT
ARE BEING SUBCONTRACTED BY THE CURRENT SUPPLIER.
RESPONSE: JANITORIAL, UNIFORMS, ROOFING,
TRASH/RECYCLING, VENDING, ELEVATORS, PEST
CONTROL, TECHNICAL SUPPORT, LANDSCAPING, INTERIOR
PLANTS, PUBLIC ACCESS DOORS AND GARAGE DOORS,
WINDOW CLEANING - STREET LEVEL, GENERATOR, FLS
SYSTEM, CHILLER/BOILERS, IF UNABLE TO RESOLVE
IN-HOUSE, LOCKS/KEYS, WATER TREATMENT, DSX
6 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
BADGING SYSTEM WHEN NEEDED, WATER TESTING, IAQ
TESTING, FIRE EXTINGUISHERS, PLUMBING, IF UNABLE
TO RESOLVE IN-HOUSE, FIRST-AID, HARD
SURFACE/CARPET FLOORING, HVAC, IF UNABLE TO
RESOLVE IN-HOUSE/HVAC PROGRAMMING, AHU SYSTEMS,
IF UNABLE TO RESOLVE, GENERAL CONTRACTOR
REPAIR/PAINTING, GLASS REPAIR.
32. PLEASE CONFIRM THAT THE START DATE OF THIS
CONTRACT IS OCTOBER 01, 2021.
RESPONSE: THE ANTICIPATED CONTRACT START DATE IS
OCTOBER 01, 2021. THE CONTRACT AWARD DATE AND
START DATE MAY VARY AS TO MEET THE NEEDS OF THE
POSTAL SERVICE.
33. WHAT IS THE CURRENT MONTHLY FIRM-FIXED
PORTION PRICING FOR THIS CONTRACT?
RESPONSE: THE POSTAL SERVICE DOES NOT DISCLOSE
CONTRACT PRICING.
34. WILL THE USPS PLEASE PROVIDE THE INSPECTION
SHEET IDENTIFIED AS BEING ATTACHED TO THIS
ADDENDUM.
RESPONSE: THIS IS A BUILDING WIDE FIRE ASSESSMENT
WITH ALL STANDARD POINTS LISTED IN THE MICROMAIN
SYSTEM.
36. WILL THE USPS PLEASE PROVIDE THE SCOPES AND
DETAILS OF THE LISTED SERVICE CONTRACTS TAHT WILL
BE NEEDED IN THE ORDINARY COURSE OF THIS CONTRACT?
RESPONSE: SERVICE CONTRACTS: JANITORIAL,
UNIFORMS, ROOFING, TRASH|RECYCLING, VENDING,
ELEVATORS, PEST CONTROL, TECHNICAL SUPPORT,
LANDSCAPING, INTERIOR PLANTS, PUBLIC ACCESS DOORS
AND GARAGE DOORS, WINDOW CLEANING-STREET LEVEL,
GENERATOR, FLS SYSTEM, CHILLER|BOILERS-IF UNABLE
TO RESOLVE IN HOUSE, LOCKS|KEYS. WATER TREATMENT,
DSX BADGING SYSTEM-WHEN NEEDED, WATER TESTING,
IAQ TESTING, FORE EXTINGUISHERS, PLUMBING-IF
UNABLE TO RESOLVE IN HOUSE, FIRST AID, HARD
SURFACE|CARPET FLOORING, HVAC-IF UNABLE TO
RESOLVE IN HOUSE/HVAC PROGRAMMING.
7 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
37. IS IT THE INTENT OF THE USPS TO HAVE
CONDENSING COILS CLEANED EVERFY MONTH?
RESPONSE: CONDENSING COILS ARE CLEANED AS NEEDED
UPON INSPECTION.
38. WILL THE USPS PLEASE PROVIDE INSPECTION OR
MAINTENANCE REQUIREMENTS FOR EXHAUST FANS IN THIS
ADDENDUM?
RESPONSE: INSPECTION POINTS ARE LOCATED IN
MICROMAIN AND INSTRUCT WHAT TO LOOK FOR.
39. IS IT THE USPS INTENT TO ONLY INSPECT AHU
WITHOUT PERFORMING PM SERVICE ON THEM?
RESPONSE: INSPECTIONS AND PM'S ARE DONE MONTHLY.
IF AN INSPECTION POINT FAILS, A PM IS GENERATED
IN MICROMAIN.
40. WILL THE USPS PLEASE CONFIRM THAT THE SUMP
PUMP INSPECTIONS ARE QUARTERLY?
RESPONSE: SUMP PUMPS ARE CHECKED FOR PROPER
OPERATION ON DAILY ROUNDS EVERY 8 HOURS WITH
MONTHLY INSPECTIONS.
41. WILL THE USPS PLEASE PROVIDE THE MAINTENANCE
BOOK?
RESPONSE: ALL MAINTENANCE MANUALS ARE AVAILABLE
IN 0537, THE ENGINEERING OFFICE.
42. IS IT THE USPS INTENT NOT TO PERFORM ANY
INSPECTIONS OR PM ON THE CHILLER PUMPS?
RESPONSE: ENGINEERS CHECK THE 4 CHILLER PUMPS
EVERY SHIFT.
43. IS IT THE INTENT OF THE USPS TO HAVE
INSPECTIONS PERFORMED QUARTERLY OR FOR US TO
PROVIDE PM SERVICE ON THESE GEENRATOR ASSETS?
RESPONSE: AN INSPECTION IS ISSUED MONTHLY AND IF
A POINT FAILS, PM IS PERFORMED.
44. IS IT THE INTENT FOR THE GENERATOR
8 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
MAINTENANCE PROGRAM TO ONLY INSPECT THE
GENERATORS ON A 4 MONTHS START-UP CYCLE OR WHEN
THEY ARE USED FOR EMERGENCIES?
RESPONSE: GENERAL INSPECTIONS ARE LEVEL I,
QUARTERLY, AND LEVEL II ANNUAL.
45. CAN YOU PLEASE PROVIDE A GENERATOR PM
ADDENDUM FOR THE SPECIFIC PM REQUIREMENT FOR
SERVICING THIS GENERATOR AT 0115?
RESPONSE: AN OFF-SITE VENDRO IS RESPONSIBLE FOR
STANDARD LEVEL I AND LEVEL II PM'S.
46. WILL THE USPS PLEASE PROVIDE THE AIR
COMPRESSOR INSPECTION POINTS G1 REQUIREMENTS AND
ANY PM REQUIREMENTS?
RESPONSE: AIR COMPRESSOR INSPECTION POINTS ARE
INDICATED IN MICROMAIN AND PM REQUIREMENTS ARE
PER THE MANUFACTURER'S RECOMMENDATION.
47. ARE THE AIR COMPRESSOR INSPECTIONS TO BE
PERFORMED MONTHLY OR QUARTERLY?
RESPONSE: MONTHLY AND QUARTERLY PER THE
MANUFACTURER'S RECOMMENDATION.
48. CAN THE USPS PLEASE PROVIDE A LIST OF ANY
OTHER PLUMBING DEVICES THAT WILL REQUIRE
PREVENTATIVE MAINTENANCE SERVICE?
RESPONSE: FOUR BOILER SAFETIES, CO2 DETERCTORS IN
3 ROOMS.
49. WILL THE USPS PLEASE PROVIDE THE QUANTITIES
FOR EACH OF THE DIFFERENT TYPE OF DEVICES THAT
WILL REQUIRE TO BE INSPECTED TESTED OR REQUIRE PM
SERVICES?
RESPONSE: MANUAL PULL STATIONS-101, PHOTO
DETERCTORS-427, HEAT DETECTORS-40, WATER FLOW
SWITCHES-18, VALUE TAMPERS-27, DUCT DETECTORS-41,
STROBES-48, HORN STROBES-88, PANEL
MANUFACTURER-NOTIFIER, MODEL-60, FIRE
EXTINGUISHERS-150|10#.
9 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
50. IS CURRENT EQUIPMENT ON-SITE OR ARE WE TO
PROVIDE ALL LAWNCARE SERVIVE EQUIPMENT (LAWN
MOVERS, TRACTORS, WEEDWHACKERS, ETS.) TO MAINTAIN
THE GROUNDS? AND OTHER ITEMS (SPRAYING FOR
WEEDS, FERTILIZING GRASS, PLANTS, ETC.)?
RESPONSE: THERE IS A CURRENT CONTRACT IN PLACE
FOR EXTERIOR LANDSCAPING, FERTILIZING AND BED
CARE. SEASONAL COLOR AND CARE FALL WITHIN THE
BOUNDRIES OF THIS VENDOR'S CONTRCAT.
51. ALL PARTS MUST HAVE A BARCODE TO BE TRACKED
TO THE STORAGE LOCATION AND WHERE AND WHEN IT WAS
USED, THROUGH THE WORK ORDER SYSTEM IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE
CORRECT AND CURRENT RECORD OF AMOUNT OF REPAIR
PARTS INVENTORY AND TOOLS FOR REPAIR OF
FACILITIES ON FILE AT ALL TIMES AND AVAILABLE FOR
THE COR TO REQUEST AN AUDIT AT ANY TIME. IS THIS
CONTRACTURAL PARTS OR THE ENTIRE OPERATION?
RESPONSE: ENTIRE OPERATION.
52. IS THERE AN EMS/BAS SYSTEM IS CURRENTLY IN
PLACE?
RESPONSE: YES.
53. THERE ARE TWO PANASONIC DVR'S LISTED IN THIS
ADDENDUM, HOWEVER, THERE DOES NOT APPEAR TO BE
ANY INSPECTION OR PM REQUIRMENTS IDENTIFIED. WILL
THE USPS PLEASE PROVIDE ANY INSPECTION OR PM
REQUIREMENT FOR THESE ASSETS?
RESPONSE: PANASONIC DVR'S WERE REPLACED BY CCTV
SECURITYPRO DVR'S-MODEL XVR, 32 CHANNELS. NO
DEFINED PM REQUIREMENTS.
54. PLEASE CLARIFY WHO RETAINS OWNERSHIP OF THE
MICROMAIN LICENSE IF IT IS PURCHASED TO USE THE
SAME EXISTING MAINTENANCE REPORTING AND
SCHEDULING SYSTEM AND HOW MANY LICENSES ARE
CURRENTLY UTILIZED/OWNED BY THE USPS. CURRENT
CONTRACTOR IS RESPONSIBLE FOR RENEWING ANNUAL
MICROMAIN SUPPORT AGREEMENT.
55. PLEASE CONFIRM THE CONTRACTOR IS REQUIRED TO
10 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
PURCHASE A SINGLE LICENSE?
RESPONSE: THE USPS OWNED MICROMAIN SOFTWARE WILL
REMAIN ON SITE. THE CURRENT CONTRACTOR IS
RESPONSIBLE FOR RENEWING THE ANNUAL SUPPORT
AGREEMENT.
THE POSTAL SERVICE HAS RECEIVED A NUMBER OF
QUESTIONS ASKING FOR FURTHER CLARIFICATION.
BECAUSE OF THE NUMBER OF QUESTIONS, RESPONSES
WILL BE PROVIDED IN AMENDMENT NO.0005 AND WILL BE
PUBLISHED ON SAM.GOV AND ON THE COUPA PLATFORM.
THE EVENT HAS NOW BEEN UPLOADED TO THE COUPA
PLATFORM UNDER EVENT #872. IF YOU HAVE
REGISTERED IN THE COUPA PLATFORM AS REQUESTED IN
THE BASE SOLICITATION, PLEASE SEND AN E-MAIL TO
paul.a.digrassi@usps.gov STATING THAT YOUR FIRM
IS NOW REGISTERED. PLEASE INCLUDE THE COMPANY
NAME THAT YOU ARE REGISTERED UNDER. THE SAM.GOV
WEBSITE WILL ALSO CONTINUE TO BE UPDATED WITH
AMENDMENTS AS WELL.
ATTACHMENTS:
1. MAINTENANCE SERIES HANDBOOK-MS-47, 82 PAGES.
2. MAINTENANCE MANAGEMENT ORDER MMO-001-14, 6
PAGES.
3. MAINTENANCE MANAGEMENT ORDER MMO-003-14, 8
PAGES.
4. STATEMENT OF WORK - DIESEL GENERATORS, 4 PAGES.
5. STATEMENT OF WORK - ELEVATOR MAINTENANCE, 10
PAGES.
6. STATEMENT OF WORK - HVAC MAINTENANCE, 16 PAGES.
7. STATEMENT OF WORK - LANDSCAPE SERVICES, 4
PAGES.
8. STATEMENT OF WORK - LIFE SAFETY SYSTEMS, 10
PAGES.
9. STATEMENT OF WORK - INTEGRATED PEST
MANAGEMENT, 10 PAGES.
10. STATEMENT OF WORK - SNOW REMOVAL SERVICES, 4
PAGES.
11. STATEMENT OF WORK - SOLID WASTE DISPOSAL
SERVICES, 4 PAGES.
12. STATEMENT OF WORK - UNINTERRUPTIBLE POWER
SUPPLY (UPS), 4 PAGES.
13. STATEMENT OF WORK - WATER TREATMENT, 4 PAGES.
11 11 CONTINUATION SHEET
PAGE OFREQUISITION NO.
CONTRACT/ORDER NO.
EFFECTIVE DATE
AWARD/ MASTER CONTRACT NO SOLICITATION NO.
ISSUE DATE
SOLICITATION
07/12/2021 07/12/2021
4BW-21-A-0005
14. STATEMENT OF WORK - WINDOW CLEANING, 2 PAGES
** NOTE: BLANK PAGES MAY BE INCLUDED IN PAGE
COUNT.
************ NOTICE TO OFFERORS *************
PLEASE COMPLETE HIGHLIGHTED BOXES 6 AND 13.
ONCE COMPLETED, PLEASE SCAN AND E-MAIL OR FAX
BACK THIS COMPLETED AMENDMENT NO.0004 TO
650.357.6746, OR E-MAIL AT paul.a.digrassi@usps.gov.
Period of Performance: 10/01/2021 to 09/30/2024