4a-Runway -100% Drawings_Part 10.pdf

PDF 13 MB Posted

Attached to
511/23420. JLM; Selfridge ANGB - Airfield Improvements
Solicitation number
RFP 171 260000002245 3
Issued by
Michigan

About this file

This document consists of runway geometric construction plans for Selfridge Air National Guard Base in Michigan, prepared by the State of Michigan Department of Technology, State Facilities Administration, Design and Construction Division, in Lansing, Michigan, with design services provided by Mead & Hunt, Inc. The plans document the Runway Encroachment Solution—Project #2, an airfield improvements task to mitigate runway encroachment by extending Runway 01-19 northward. The construction drawings, issued June 5, 2026, represent 100% final submittal Type B-3 plans and include detailed geometric layouts for approximately 14,000 linear feet of runway pavement, including full-depth asphalt sections, portland cement concrete sections, pavement joints, edge lighting installations, and approach lighting systems. The plans span sheets CS142 through CS176 and cover the complete runway alignment from station 87+00 through 231+00, with additional perimeter road and fencing details. The project involves coordination with multiple taxiways (E, G, J, K, L, A), incorporation of existing drainage infrastructure (Irwin Drain relocation), and integration with the Canadian National Railroad right-of-way.

The technical specifications shown throughout the plans include doweled concrete joints, thickened edge joints, rigid-flexible pavement junctions, asphalt millings surfacing on maintenance roads, proposed edge lighting per ABI 001 and ABI 002 standards, electrical handholes, and guidance signage. The perimeter improvements include 7-foot chain-link security fencing with three-strand barbed wire, perimeter road construction with 12-foot centerline fencing and 24-inch maintenance gravel edges, gate installations (24-foot and 30-foot wide options), and relocation of Rosso Highway and Irwin Drain box culvert. Construction joint spacing is standardized at 20 feet typical with 8 lanes at 18.75 feet each throughout the runway width, and horizontal curve radii vary from 75 feet to over 1,000 feet depending on location. The plans reference standard details on sheets CP306 through CP313 for pavement sections, joint details, electrical work, and roadway cross-sections, with overall project coordinates and site conditions documented across multiple sheets serving as part of a comprehensive 467-sheet construction document set.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00

FR

FR

UD

UD

FR

C B

87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00

R R

R R

R R

R R

R R

R R

R R

R R

R R

R R R RR R

R RR R

B B

B B B B B B

B

B

B

B

B

STA 89+77.14

R 59.84

STA 89+92.05

R 59.84

STA 89+91.91

L -74.88

STA 89+77.15

L -74.88

STA 90+09.72

R 18.75

STA 89+91.78

R 18.75

STA 90+09.73

L -18.75

STA 89+91.94

L -18.76

STA 91+09.72

R 18.75

STA 92+09.72

R 18.75

STA 93+09.72

R 18.75

STA 94+09.72

R 18.75

STA 94+09.73

L -18.75

STA 93+09.73

L -18.75

STA 91+94.72

L -74.89

STA 92+09.73

L -18.75

STA 91+09.73

L -18.75

STA 90+94.72

L -74.96

STA 90+89.72

L -75.00

STA 90+89.73

L -18.75

STA 90+89.72

R 18.75

STA 90+94.72

L -18.75

STA 91+89.74

L -74.86

STA 91+89.73

L -18.75

STA 91+94.72

L -18.75

STA 91+89.72

R 18.75

STA 92+89.72

R 18.75

STA 92+89.73

L -18.75

STA 92+94.72

L -18.76

STA 92+89.74

L -74.87

STA 93+89.74

L -74.90

STA 93+89.73

L -18.75

STA 93+94.72

L -18.76

STA 93+89.72

R 18.75

STA 94+89.72

R 18.75

STA 94+89.73

L -18.75

STA 94+94.72

L -18.76

STA 94+89.74

L -75.00

STA 88+00.00

L -100.00

STA 88+00.00

L -60.95

STA 88+00.00

L -72.95

STA 88+00.00

R 100.00

STA 89+66.97

R 100.00

STA 89+66.97

R 287.99

STA 89+92.36

R 262.78 STA 93+90.18

R 262.49

STA 94+15.30

R 287.48

STA 93+90.00

R 224.72

STA 93+94.91

R 224.72

STA 94+15.00

R 224.72

STA 94+20.03

R 224.72

STA 92+94.74

L -74.94

STA 93+94.72

L -74.91

STA 94+94.74

L -74.97

STA 90+89.74

L -100.55

STA 90+94.74

L -100.55

STA 91+89.74

L -100.49

STA 92+89.74

L -100.43

STA 93+89.74

L -100.37

STA 94+89.74

L -100.30

STA 94+94.74

L -100.30

STA 91+94.74

L -100.49 STA 92+94.74

L -100.43

STA 93+94.74

L -100.36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

G

ET

JU

N E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS142

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

(EXISTING CONCRETE)

(EXISTING CONCRETE)

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

LEGEND

PROPOSED ASPHALT FULL-DEPTH PAVEMENT SECTION

PROPOSED PORTLAND CEMENT CONCRETE

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED APPROACH LIGHTING AND LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD.

REINFORCING REQUIRED

IN-PAVEMENT APPROACH LIGHT BAR

IN-PAVEMENT APPROACH LIGHT BAR W/ FLASHER

PROPOSED EDGE LIGHT PER ABI 001

ELECTRICAL HANDHOLE

GUIDANCE SIGN

RUNWAY EDGE LIGHT

TAXIWAY EDGE LIGHT

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID- FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

TIE-BAR CONSTRUCTION JOINT

E

B

C

F

H

D

R

J

NOTES:

1. SEE SHEET CP321 AND CP322 FOR JOINT DETAILS.

J

J

J

J

J

J

J

J J J J J J J J J J J J J J J J J J J J J J J J J J

C

C

C

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

C

SEE DETAIL 3/CP502 FOR

FULL-DEPTH PATCH, TYP.

F F F F F F F F F F F

R201.99'

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

F2

CP308

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

F2

CP308

J

J

J

J

J

J

J

J

J

J

J

J J J J J J J J J J J J J J J J J J J J

J

J

J

J

J

J

J

J

J

J J

C

C

C F

C

C

C C

C

C

C

(ABI 001)

(ABI 001)

(ABI 001)

(ABI 001) (ABI 001)

(BASE BID)

R135.00'

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

AutoCAD SHX Text 14000.00'

95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00

D D

D D

D

D

D

D

C B

C B

C B

FR

UD

C B

C B

95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00

R R

R R

R R

R R R R

R R

R Y

R Y

PLZ

PLZ

PLZ

PLZ

B

B

B

STA 99+79.72

L -95.94 STA 99+99.72

L -96.05

STA 99+89.61

R 113.38

STA 99+99.85

R 124.03

STA 98+89.72

R 100.00

STA 99+09.95

R 100.06

STA 99+09.94

R 75.00

STA 98+89.72

R 75.08

STA 98+89.72

L -100.06

STA 99+09.93

L -99.99

STA 99+09.57

L -74.99

STA 99+98.90

L -141.31

STA 99+69.45

L -141.31

STA 99+76.72

L -141.31

STA 99+80.10

R 113.38

STA 100+01.87

R 126.21

STA 99+87.58

R 137.78

STA 99+99.73

L -71.00

STA 99+99.73

L -75.00

STA 100+79.73

L -71.00

STA 100+84.72

L -75.00

STA 100+84.72

L -18.75

STA 100+99.73

L -18.75

STA 100+99.72

R 18.75

STA 100+79.72

R 18.75

STA 101+79.72

R 18.75 STA 101+99.72

R 18.75

STA 101+99.73

L -18.75

STA 101+84.73

L -18.76

STA 101+79.73

L -18.75

STA 101+84.72

L -94.87

STA 101+79.77

L -94.97

STA 101+83.77

L -93.32

STA 101+93.09

L -112.61

STA 101+82.39

L -101.91

STA 102+79.74

L -75.00

STA 102+84.72

L -74.95

STA 102+84.72

L -18.75

STA 102+79.72

L -18.75

STA 102+79.72

R 18.75

STA 103+00.28

R 18.75

STA 103+00.28

L -18.75

STA 98+89.73

R 18.75

STA 98+89.73

L -18.75

STA 98+89.74

L -75.01

STA 98+94.74

L -74.99

STA 98+94.72

L -18.75

STA 99+09.73

L -18.75

STA 99+09.73

R 18.75

STA 98+09.72

R 37.43

STA 97+89.72

R 37.43

STA 98+09.72

L -37.50

STA 97+89.72

L -37.50

STA 97+94.72

L -37.51

STA 97+89.73

L -75.00

STA 97+09.72

R 18.75STA 96+89.72

R 18.75

STA 97+09.73

L -18.75

STA 96+94.72

L -18.75

STA 96+89.73

L -18.75

STA 96+89.50

L -75.04

STA 96+09.72

R 18.75STA 95+89.72

R 18.75

STA 95+89.73

L -18.75

STA 95+94.72

L -18.75

STA 96+09.73

L -18.75

STA 95+89.73

L -75.00

STA 95+09.72

R 18.75

STA 95+09.73

L -18.75

STA 100+79.73

L -18.76

STA 95+50.16

R 104.38

STA 95+50.12

R 100.00

STA 95+49.89

R 79.37

STA 95+49.85

R 75.04

STA 95+54.24

R 239.31

STA 102+12.49

L -100.00

STA 102+12.49

L -90.00

STA 102+43.26

R 100.00

STA 95+94.73

L -75.00 STA 96+94.50

L -75.00

STA 97+94.73

L -75.00

MH

MH

STA 102+43.26

R 90.00

STA 101+70.61

R 98.77

STA 101+83.60

R 115.06

STA 95+89.75

L -100.23

STA 96+89.75

L -100.17

STA 97+89.75

L -100.11

STA 95+94.74

L -100.24

STA 96+94.74

L -100.18

STA 97+94.74

L -100.12

STA 99+10.05

R 78.97

STA 102+79.72

L -90.00

STA 102+84.72

L -90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS143

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

TA

XI

W

AY

G

TA

XI

W

AY

E

(EXISTING CONCRETE)

(E

XI

ST

IN

G A

SP

H

AL

T)

(E

XI

ST

IN

G A

SP

H

AL

T)

(EXISTING CONCRETE)

(EXISTING CONCRETE)

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT

JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

TIE-BAR CONSTRUCTION JOINT

(E

XI

ST

IN

G A

SP

H

AL

T)

(E

XI

ST

IN

G A

SP

H

AL

T)

(EXISTING ASPHALT)

C

F

C

C C

C C

CC

C

C

C

C

C

C C

CC

C

C

C

C

C C

CC

CC

CC

C

C

C C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C C

CC

C C

C C

CC

C C

CC

C C C C

C

C

C

C

C C

CC

C C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

F

C

F F F F F

F F

F F

F F F F

F

F

F

F

F

F

F

F

F

F F F F F F

J J J J J

J

J

J

J

J J

J

J

J

B

C

F

H

D

R

J

SEE DETAIL 3/ CP502 FOR

FULL-DEPTH PATCH, TYP.

SEE DETAIL 3/CP502 FOR

FULL-DEPTH PATCH, TYP.

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

R 135.00'

R 160.00'

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

A6

CP308

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A6

CP308

J J J J J J J J J J J J J J J J J J J

J

J J

J J J J J J J J J J J J J J J J J J

J J

J

J

C

C

C C

C

C

C

C

J

F

(ABI 001)

(ABI 002)

(ABI 002)

(ABI 001)

B

C

C

(ABI 001)

(ABI 001)

(ABI 001)

(ABI 001)

(ABI 001)

(ABI 001)

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00

D

D

C B

C B

C B

FR

UD

UD

FR

103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00

R YR YR YR Y

R Y R Y R Y R Y

JC

-1

E E

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

STA 103+84.62

L -74.75

STA 103+79.62

L -75.12

STA 103+84.72

L -18.76

STA 103+99.73

L -18.75

STA 103+79.72

R 18.75

STA 103+99.72

R 18.75

STA 104+79.76

L -75.14

STA 104+84.72

L -74.93

STA 104+84.76

L -56.24

STA 104+99.74

L -56.23

STA 104+79.73

R 56.26

STA 104+99.73

R 56.27

STA 105+79.73

R 18.75

STA 105+99.73

R 18.75

STA 105+99.73

L -18.75

STA 105+84.72

L -18.75

STA 105+84.74

L -75.05

STA 105+79.74

L -75.05

STA 106+79.73

L -74.95

STA 106+84.73

L -74.97

STA 106+84.72

L -18.75

STA 106+99.72

L -18.75

STA 106+79.72

R 18.75

STA 106+99.72

R 18.75

STA 107+79.72

R 18.75 STA 107+99.72

R 18.75

STA 107+99.72

L -18.75

STA 107+84.72

L -18.75

STA 107+84.73

L -74.96

STA 107+79.73

L -74.95

STA 108+79.73

L -74.93

STA 108+84.73

L -74.95

STA 108+84.72

L -18.75

STA 108+99.72

L -18.75

STA 108+99.72

R 18.75

STA 108+79.72

R 18.75

STA 109+79.72

R 18.75

STA 109+99.72

R 18.75

STA 109+99.72

L -18.75

STA 109+84.72

L -18.75

STA 109+84.73

L -74.95

STA 109+79.73

L -74.92

STA 110+79.73

L -75.14

STA 110+84.73

L -74.92

STA 110+84.72

L -18.76

STA 110+79.72

R 18.75

STA 110+99.72

L -18.75

STA 110+99.72

R 18.75

STA 103+79.72

L -90.00

STA 103+84.72

L -90.00

STA 104+79.72

L -90.00

STA 105+79.72

L -90.00

STA 106+79.72

L -90.00

STA 107+79.72

L -90.00

STA 108+79.72

L -90.00

STA 109+79.72

L -90.00

STA 110+79.72

L -90.00

STA 110+84.72

L -90.00STA 104+84.72

L -90.00

STA 105+84.72

L -90.00

STA 106+84.72

L -90.00

STA 107+84.72

L -90.00

STA 108+84.72

L -90.00

STA 109+84.72

L -90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS144

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

(EXISTING CONCRETE)

C

C

C C

CC

C

F

C

C C

C

CC

C C

CC

CC

C C

CC

C

C

C C

C C

C

C

C

C C

C

C

C

C C

C

C

C

C

C C

C

C

C

C

C

C C

C

C

C

C C

C C

C C

C C

CC

C

C

C

C

C C

C

C

C

C

C

C

C

SEE DETAIL 3/CP502 FOR

FULL-DEPTH PATCH, TYP.

F F F F F F F F F F F F F F F

JJJJJJJJJJ

J J

F F

F F

F F

F F

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT

JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

TIE-BAR CONSTRUCTION JOINT

B

C

F

H

D

R

J

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

A6

CP308

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A6

CP308

J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J

J J J J J J J J J J J J J J J J J JJ J J J J J J J J J J J J J J J J J

(ABI 001)

(ABI 002)

(ABI 002)

(ABI 001)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00

DD

C B

C B

C B

C B

FR

FR

FR

111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00

G O

G O

G O

G O

G O

G O

G O

G O

G O

G Y

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G O

G Y

G O

G O

G O

G O

G O

G O

G O

R Y W Y

W Y

R Y

R Y R Y

JC

-2

PLZ

PLZ

PLZ

PLZ

W Y

W Y

STA 114+59.73

R 0.00

STA 114+60.25

R 75.16

STA 111+81.93

L -75.01

STA 111+86.93

L -75.00

STA 111+86.92

L -18.76

STA 112+03.03

L -18.75

STA 112+03.02

R 18.75

STA 111+81.92

R 18.75

STA 112+84.12

R 37.50

STA 113+03.02

R 37.50

STA 113+03.03

L -37.50

STA 112+89.12

L -37.51

STA 112+89.13

L -74.88

STA 112+84.13

L -75.00

STA 113+79.73

L -74.87

STA 113+99.73

L -75.12

STA 113+79.73

L -56.25

STA 113+94.72

L -56.24

STA 113+94.72

L -18.75

STA 113+99.72

R 75.00

STA 113+79.72

R 75.00

STA 113+79.72

R 56.25

STA 113+94.72

R 56.26

STA 113+94.72

R 18.76

STA 113+79.72

R 18.75

STA 113+79.73

L -18.75

STA 114+60.27

L -74.84

STA 114+97.00

R 100.00

STA 114+97.00

L -100.00

STA 115+00.00

R 100.00

STA 115+00.00

L -100.00

STA 114+60.25

R 90.00

STA 114+60.27

L -90.00

STA 111+81.95

L -90.02

STA 111+86.95

L -90.02

STA 112+84.11

L -90.02

STA 112+89.15

L -90.02

STA 114+60.27

L -100.00

STA 114+60.25

R 100.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS145

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

(PROPOSED PCC PAVEMENT SECTION)

(EXISTING CONCRETE)

INSTALL

NEW REIL

C

CC

C C

C

F

C

C

C C

C

C

C C

CC

CC

CC

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

C

SEE DETAIL 3/CP502 FOR

FULL-DEPTH PATCH, TYP.

F F F

F F

F F

F F

J J J J J J J J J

JJJJJJJ

J J J J

C

C

C

C

C

C

C

C

J J J J

F F F

F F F

F F F

F F F

F F F

F F F

F F F

F F F

D D D D D

H

H H

D D D D D D

H H H

D D D D D D D

H H H H

D D D D D D D D

H H H H

D D D D D D D

H H H

D D D D D D

H H

D D D D D

H

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT

JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

TIE-BAR CONSTRUCTION JOINT

B

C

F

H

D

R

J

T

T

T

T

T

T

T

T

T

T

A6

CP308

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A6

CP308

K2

CP306

K2

CP306

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 001)

(ABI 002)

(ABI 002)

(ABI 001)

(BASE BID)

(BASE BID)

20' SPACING (TYP)

LA

N

ES

8.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00

DD

D

C B

C B

C B

C B

C B

C B

FR

UD

UD

FR

C B

C B C B

119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00

P P

P P

W W

W W

W W

W W

W W

W W

W Y

W Y

JC

-3

STA 125+00.00

0.00

STA 125+10.00

0.00

STA 125+00.00

R 75.00

STA 125+09.99

R 100.00

STA 125+00.00

L -75.00

STA 125+09.98

L -100.00

STA 125+10.00

L -75.00

STA 125+10.00

R 75.00

STA 125+10.00

R 90.00

STA 125+10.00

L -90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS146

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

(PROPOSED PCC PAVEMENT SECTION)

(EXISTING ASPHALT)

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

J

H

D

H

H

H

H

H

H

H

D

H

H

H

H

H

H

D D

D D

D D

D D

D D

D D

H

H H

H H

H

D D D

D D

D D

D

J

D D D D DD D D

H F F FH H H

H F F FH H H

F F F

F F F

F F F

F F F

F F F

F F F

D D D D DD D

D D D D DD

D D D D D

HH H

HH

H

D D D D DD D

D D D D DD

D D D D D

HH H

HH

H

J J J J

R

R

R

R

R

R

R

R

J J J J

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT

JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

TIE-BAR CONSTRUCTION JOINT

B

C

F

H

D

R

J

T

K2

CP306TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K2

CP306

D2

CP306

D2

CP306

K4

CP309

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

"J" TYPE JOINT

"J" TYPE JOINT

(BASE BID)

(BASE BID)

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

LA

N

ES

8.

20' SPACING (TYP)

AutoCAD SHX Text N00°26'17"E

AutoCAD SHX Text 14000.00'

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

C

127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00

D

D

D

D

D

D

D

C B

C B

C B

C B

FR

FR

FRFR

D

C B

C B

127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00

W W

W W

W W

W W

W W

W W

W W

W W

JC

-4

STA 127+19.44

L -100.00

STA 127+43.77

L -100.00

STA 129+40.73

L -100.00

STA 130+55.32

L -100.00

STA 127+14.66

R 100.00

STA 127+37.21

R 100.00

STA 129+29.89

L -90.00

STA 130+68.96

L -90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS147

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00

C B

C B

FR

UD

UD

FR

135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00

W W W W W W W W W

WW WW WW WW W

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS148

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00

D

D

D D

C B

C B

C B

FR

FR

C B

143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00

W W W W W W W W W

W WW WW WW WW

JC

-5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS149

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00

D

D

C B

C B

C B

FR

UD

UD FR

151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00

W WW W W W W W

W WW WW WW W

JC

-6

STA 157+93.94

L -100.00

STA 156+79.04

L -100.00

STA 156+63.59

L -90.00

STA 158+06.62

L -90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS150

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

TA

XI

W

AY

J

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00

D

C B

FR

UD

UD

FR

159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00

W W W W W W W W

W WW WW WW W

JC

-7

P P

P P

STA 159+29.52

R 100.00

STA 159+91.92

R 100.00

STA 159+22.22

R 90.00

STA 159+94.68

R 90.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS151

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

TA

XI

W

AY

L

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00

D

D

FR

C B

FR

167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00

W W W W W W W W

W WW WW WW W

JC

-8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS152

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

K4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

K4

CP309

A4

CP309

A4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00

FR FR

UD

C B

C B

175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00

Y W

W W Y W Y W Y W

Y WY WW W

JC

-9

STA 180+53.48

R 100.00

STA 182+48.41

R 100.00

STA 180+56.67

R 102.91

STA 180+63.05

R 102.72

STA 180+63.04

R 94.01

STA 182+42.73

R 106.33

STA 182+14.94

R 106.52

STA 182+14.90

R 93.77

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS153

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

TA

XI

W

AY

A

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

A4

CP309TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

C

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

C C

C

J

F C

C C C

J

(ABI 001) (ABI 001)

PROVIDE EDGE LIGHT

JOINT BOX OUT. SEE

DETAIL A11/CP503

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

183+00 184+00 185+00 186+00 187+00 188+00 189+00

D

FR

UD

UD

183+00 184+00 185+00 186+00 187+00 188+00 189+00

P P

P P

Y W

Y WY WY W

Y W Y W

STA 186+78.09

L -100.00

STA 186+39.72

L -75.00

(ABI 001)

STA 188+19.72

L -95.00

(ABI 001)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS154

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

A4

CP309

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A4

CP309

"J" TYPE JOINT

"J" TYPE JOINT

(ABI 002)

(ABI 001)

(ABI 001)

(ABI 002)

C C C C

C

C

C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00

D

D

D

D

FR

FR

UD

FRUD

190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00

E

O G

O G

O G

O G

Y G

O G

O G

Y G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

O G

R R

R RY W

Y W

Y W

Y W

Y W

Y W

Y W

YW STA 197+98.00

R 75.00

STA 197+81.72

R 100.00

STA 189+99.75

L -133.09

STA 190+07.01

L -133.08

STA 190+32.15

L -141.30

STA 189+98.90

L -141.30

STA 190+46.32

L -117.26

STA 190+90.25

L -101.18

STA 191+07.52

L -100.00

STA 191+07.81

L -74.93

STA 190+90.25

L -74.92

STA 192+09.73

L -37.50

STA 191+89.73

L -37.50

STA 193+09.73

L -18.75STA 192+89.73

L -18.75

STA 193+09.72

R 18.75

STA 192+89.72

R 18.75

STA 192+09.72

R 37.50STA 191+89.72

R 37.50

STA 191+09.72

R 18.75

STA 191+09.73

L -18.75

STA 190+89.73

L -18.75

STA 190+89.72

R 18.75

STA 190+22.72

R 75.00

STA 189+96.72

R 74.98

STA 190+90.27

R 75.05

STA 191+08.04

R 75.08

STA 191+08.22

R 100.00

STA 190+90.27

R 100.00

STA 194+09.73

L -18.75

STA 193+89.73

L -18.75

STA 193+89.72

R 18.75

STA 194+09.72

R 18.75

STA 194+89.73

L -18.75

STA 195+09.73

L -18.75

STA 195+09.72

R 18.75

STA 194+89.72

R 18.75

STA 195+89.73

L -18.75

STA 196+09.73

L -18.75

STA 196+09.72

R 18.75

STA 195+89.72

R 18.75

STA 196+89.66

L -74.88

STA 197+09.74

L -75.16

STA 197+09.71

R 93.74

STA 196+90.00

R 93.87

STA 189+96.72

R 90.00

STA 190+22.72

R 100.00

STA 196+90.00

L -100.00

STA 196+93.00

L -100.00

STA 197+97.98

L -75.00

STA 197+81.72

L -99.83

STA 197+98.01

R 93.75

STA 190+87.68

L -160.84

STA 190+27.51

L -98.54

STA 189+98.92

L -172.19

STA 190+33.50

L -172.19

STA 196+93.00

R 93.87

STA 192+43.65

R 75.04

STA 192+43.55

R 100.00

STA 189+96.72

R 100.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS155

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

TA

XI

W

AY

K

(EXISTING CONCRETE)

(EXISTING CONCRETE)

(EXISTING CONCRETE)

R86.70'

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

J

J J

C

C

C

C

C

C

C

C

C

C

C

J

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

C

C

C

J

C

C C

C C

C

F F

C

C C

C C

C

F F

C C

C C

F F

C

C

C

CC

C

F F

F F C

C C

C C

C

F F

C

C C

C C

C

F F

C

C C

C C

C

F F

F

C C

C C

F

F F

D

C

C

D

D D

F

F

J

F

F

F

J

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

D

J J J J

F F F

D D D

J J J

D

C

C

JJJJ

F F F

F F F

F F F

F F F

F F F

F F F

F F F

PROPOSED PCC

PAVEMENT SECTION)

D D D

D D D

D D D

D D D

D D D

D D D

JJJ

J

J

JJ

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

D

D C

C

C

C

A4

CP309

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

A4

CP309

J5

CP307

J5

CP307

"J" TYPE JOINT (TYP)

"J" TYPE JOINT (TYP)

C C

(ABI 001)

(ABI 001)

C

C

C C

C

C

(ABI 002) (ABI 002)

(BASE BID)

(BASE BID)

(ABI 002)

(ABI 001)

(ABI 001)

TYPE J JOINT (TYP)

.7

5' (T

YP

20' SPACING (TYP)

MATCH AT

EXISTING JOINTS

(TYP)

(ABI 002)

(BASE BID)

(BASE BID)

(BASE BID)

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

199+00 200+00 201+00 202+00 203+00 204+00 205+00 206+00

FR

UD

199+00 200+00 201+00 202+00 203+00 204+00 205+00 206+00

R RB

B B B

B

B

R R

R RR R

R R R R

R R R R

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

STA 203+25.87

L -100.00

STA 203+37.98

L -75.00

STA 205+42.48

L -281.25

STA 205+32.12

L -306.25

50 kVA

STA 204+97.98

L -307.47

STA 203+97.98

L -207.46

STA 203+97.97

R 123.50 STA 204+97.97

R 123.51

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS156

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

(PROPOSED PCC PAVEMENT SECTION)

(PROPOSED PCC PAVEMENT SECTION)

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

J J

J J

H

D

D

D

D

D

D

D

H

H

H

H

H

H

H

HH

D

D

D

D

D

D

D

H

H

H

H

H

H

D

D

D

D

D

H

H

H

H

D

D

D

H

H

D

D

D D D

D

H H

HH

H

H

H

H

H

H

H

H

D

D

D

D

D

D

D

BBBBJ

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

H

H

H

H

H

H

H

H

H

H

H

H

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

MODIFIED PAVEMENT SECTION OVER EXISTING

IRWIN DRAIN. REFER TO SHEET CP307

J

J

J

J

J

J

J

J

J

J

J

J J J J J J

D

F

D D D D D D D D D D D D D D D

D D D D D D D D D D D D D D D

D D D D D D D D D D D D D D

D D D D D D D D D D D D D

D D D D D D D D D D D D

D D D D D D D D D D D

D D D D D D D D D D

D D D D D D D D D

D D D D D D D DD

D D D D D D D

D D D D D D

D

D

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

HHHHHHHHH

H

H

HFFF

F

F

F

FFF

FFF

FFF

FFF

FFF

FFF

FFF

FFF

FFF

FFF

J5

CP307

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

J5

CP307

C2

CP307

C2

CP307

"J" TYPE JOINT (TYP)

"J" TYPE JOINT (TYP) NOTE: DO NOT INSTALL FELT

ALONG THIS B JOINT

(BASE BID)

(BASE BID)

H

H

H

H

H

H

H

20' (TYP)

LA

N

ES

8.

.7

5' (T

YP

20' (TYP)

20' (TYP)

LA

N

ES

8.

SEE SHEET EA524

FOR LOCALIZER

MARKER DETAILS

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N00°26'17"E

207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00

B B

B B B

R R

R R

R R

R R

R R

R R

R R

R R

R R

R R

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

STA 207+89.98

R 75.00

STA 208+14.98

L -100.00

STA 209+89.98

R 100.00

STA 209+89.96

L -100.00

STA 207+89.98

L -281.25

STA 208+14.98

L -306.25

STA 207+89.98

L -100.00

STA 210+71.92

L -11.89

STA 210+95.92

L -11.89

STA 210+95.92

R 14.00

STA 210+71.92

R 4.00

STA 210+66.92

R 12.66

STA 210+71.92

R 21.32

STA 210+61.92

R 4.00

STA 210+61.92

R 21.32

STA 210+83.92

L -5.89

STA 210+71.92

R 26.00

STA 210+71.91

R 36.00

STA 210+85.91

R 36.00

STA 210+94.57

R 31.00

STA 211+03.24

R 26.00STA 210+61.92

R 26.00

STA 210+85.91

R 26.00

STA 211+03.23

R 36.00

STA 211+61.92

R 14.00

STA 211+71.92

R 4.00

STA 211+71.92

L -11.89

STA 211+95.92

L -11.89

STA 211+83.92

L -5.89

STA 211+61.92

R 4.00

STA 211+95.92

R 14.00

STA 212+95.92

L -11.89

STA 212+71.92

L -11.89

STA 212+95.92

R 14.00

STA 212+71.92

R 4.00

STA 212+61.92

R 14.00

STA 213+61.92

R 14.00

STA 213+71.92

R 4.00

STA 213+95.91

R 61.11

STA 214+05.91

R 61.11

STA 213+35.55

R 26.00

STA 213+35.55

R 36.00

STA 213+42.62

R 28.93

STA 212+61.92

R 4.00

STA 213+61.92

R 4.00

STA 213+71.92

L -11.89

STA 213+95.92

L -11.89

STA 213+83.92

L -5.89

STA 214+47.30

R 147.75

STA 214+50.29

R 170.30

STA 214+95.81

L -9.30

STA 214+83.98

L -9.30

STA 214+73.98

L -9.30

STA 214+56.82

R 150.80

STA 214+54.37

R 140.68

STA 213+98.84

R 68.18

STA 212+83.92

L -5.89

STA 214+65.45

R 134.79

STA 214+73.98

R 131.25

STA 214+68.98

R 131.25

STA 214+61.97

R 173.24

STA 214+66.43

R 165.40

STA 214+85.58

R 181.47

STA 214+89.96

R 137.36

STA 214+95.81

R 121.29

STA 214+70.81

R 121.29

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS157

RUNWAY 01-19

KEY MAP

M

AT

C H

L

IN

E

- P

R

EV

IO

U

S

SH

EE

T

MATCH LINE - SHEET CS160

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

B B B B B B B B

H H H H F F F

H H H H F F F

H H H H F F F

H H H H F F F

H H H

H F F F

H H H H F F F

H H H H F F F

H H H H F F F

D D D D D D D D

D D D D D D D D

D D D D D D D D

D D D D D D D D

D D D D D D D D

D D D D D D D D

D D D D D D D D

R

J

J

J

J

J

J

J

J

J

J

M

AT

C H

L

IN

E

- S

H

EE

T C

S1

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

BBBBBBBJ

H H H H F F F D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H

F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

H H H H F F F

D D D D D D D D

L5

CP308

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

L5

CP308

NOTE: DO NOT INSTALL

FELT ALONG THIS B JOINT

R

R

R

R

R

R

R

R

NOTE: DO NOT INSTALL

FELT ALONG THIS B JOINT

(BASE BID)

(BASE BID)

(BASE BID)

.7

5' (T

YP

20.00'

(TYP)

16'.0'16.0'20' SPACING (TYP)

LA

N

ES

8.

.7

5'

(T

YP

N16

CP308

N16

CP308

R10.00'

R10.00' R10.00'

R10.00' R10.00'

R1 3.

R10.00'

R13.42'

R10.00'

R13 .42

R10.00'

R13 .42

R1 0.

R 10.00'

R10.00'

R25.00'

R5.00'

R25.00'

R10.00'

AutoCAD SHX Text N00°26'17"E

215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00

D D D

D 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

PLZ

BH

#05

BH

#06

STA 217+37.12

R 1.00

STA 217+70.95

R 29.00

STA 217+46.95

L -11.89

STA 217+53.99

R 64.91

STA 217+29.31

R 60.89

STA 218+36.95

R 29.00

STA 218+46.95

R 19.00

STA 218+46.95

L -11.89

STA 218+70.95

L -11.89

STA 218+70.95

R 29.00

STA 219+36.95

R 29.00

STA 219+46.95

R 19.00

STA 219+46.95

L -11.89

STA 219+70.95

L -11.89

STA 219+58.95

L -5.89

STA 219+70.95

R 29.00

STA 220+36.95

R 29.00

STA 220+46.95

R 19.00

STA 220+36.95

R 19.00

STA 220+46.95

L -11.89

STA 220+70.95

L -11.89

STA 220+58.95

L -5.89

STA 220+70.95

R 29.00

STA 221+36.95

R 29.00

STA 221+46.95

R 19.00

STA 221+36.95

R 19.00

STA 221+46.95

L -11.89

STA 221+58.95

L -5.89 STA 221+70.95

L -11.89

STA 221+70.95

R 29.00

STA 222+36.95

R 29.00

STA 222+46.95

R 19.00

STA 222+36.95

R 19.00

STA 222+46.95

L -11.89

STA 222+58.95

L -5.89

STA 222+70.95

L -11.89

STA 222+70.95

R 29.00

STA 218+58.95

L -5.89

STA 219+36.95

R 19.00

STA 218+36.95

R 19.00

T

STA 217+70.95

L -11.89

STA 217+58.95

L -5.89

STA 217+65.83

R 41.00

STA 215+97.40

L -28.58

STA 215+87.41

L -19.18

STA 215+76.99

L -19.22

STA 215+66.98

L -9.22

STA 215+66.98

R 40.00

STA 215+76.98

R 50.00

STA 215+87.19

R 61.64

STA 215+77.33

R 60.00

STA 215+76.98

R 40.00

STA 215+76.98

L -9.22

STA 215+87.42

L -29.18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS158

KEY MAP

M

AT

C H

L

IN

E

- S

H

EE

T C

S1

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

M

AT

C H

L

IN

E

- N

EX

T

SH

EE

T

R 13.42'

R 13.42' R

.4

2'

R

.4 2'

R 13.42'

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

SEE SHEETS CS170 TO CS186 FOR PERIMETER

ROAD GEOMETRICS AND LAYOUTS

PROPOSED

PERIMETER

ROAD

R

EL

O C

AT

ED

R O

SS

O

H W

Y

R10.00'

R10.00'

R10.00'

R10.00'

R10.00'

R

.4 2'

R25.00'

R10 .00

'R10.00'

R10.00'

R 10.00'

N16

CP308

N16

CP308

RELOCATED

IRWIN DRAIN

BOX CULVERT

RELOCATED

IRWIN DRAIN

BOX CULVERT

AutoCAD SHX Text N00°26'17"E

223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 231+00

XXXXXX

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X

223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 231+00

PLZ

PLZ

PLZ

PLZ

STA 223+36.95

R 19.00

STA 223+46.95

R 19.00

STA 223+46.95

R 3.34

STA 223+46.95

L -11.89

STA 223+70.95

L -11.89

STA 223+70.95

R 29.00

STA 223+58.95

L -5.89

STA 224+36.95

R 29.00

STA 224+36.95

R 19.00

STA 224+46.95

R 19.00

STA 224+46.95

L -11.89

STA 224+70.95

L -11.89

STA 224+70.95

R 29.00

STA 224+58.95

L -5.89

STA 225+36.95

R 29.00

STA 225+46.95

R 19.00

STA 225+46.95

L -11.89

STA 225+70.95

L -11.89

STA 225+70.95

R 29.00

STA 225+36.95

R 19.00

STA 225+58.95

L -5.89

STA 226+46.95

L -11.89

STA 226+70.95

L -11.89

STA 226+58.95

L -5.89

STA 226+71.21

R 18.25

STA 226+36.95

R 29.00

STA 226+46.95

R 19.00

STA 226+36.95

R 19.00

STA 226+80.95

R 19.00

STA 226+75.95

R 27.66

STA 226+80.95

R 36.32

STA 226+80.95

R 41.00

STA 226+70.95

R 51.00

STA 226+70.95

R 41.00

STA 226+56.95

R 51.00

STA 226+48.29

R 46.00

STA 226+39.63

R 41.00

STA 226+56.95

R 41.00

STA 226+39.63

R 51.00

STA 226+70.95

R 36.32

STA 223+36.95

R 29.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS159

KEY MAP

M

AT

C H

L

IN

E

- S

H

EE

T C

S1

THICKENED EDGE JOINT

DOWELED JOINT AT EXISTING CONCRETE

DOWELED CONTRACTION JOINT

NON-DOWELED CONTRACTION JOINT

DOWELED CONSTRUCTION JOINT

RIGID-FLEXIBLE PAVEMENT JUNCTION JOINT (CONCRETE/ ASPHALT JUNCTION

WITHIN RUNWAY PAVEMENT)

ASPHALT/ CONCRETE CONTRACTION JOINT

B

C

F

H

D

R

J

R

.4 2'

R 13.42'

R 13.42'

R 13.42'

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

R10.00' R10 .00

R10.00'

R10.00'R1 0.

R1 0.

R10.00'

R10.00'

R10.00'

N16

CP308

N16

CP308

AutoCAD SHX Text N00°26'17"E

BH

#07

BH

#33

STA 213+12.92

R 395.47

STA 213+32.63

R 385.84

STA 213+12.92

R 370.47

STA 212+81.34

R 395.47

STA 212+61.62

R 395.47

STA 212+61.62

R 434.51

STA 212+75.08

R 434.51

STA 212+81.34

R 434.51

STA 212+67.64

R 458.94

STA 212+49.96

R 441.11

STA 212+59.89

R 483.01

STA 212+51.71

R 474.24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS160

KEY MAP

MATCH LINE - SHEET CS157

DRAIN AND ROSSO HIGHWAY

CONSTRUCTED UNDER

SEPARATE PROJECT

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

MATCH LINE - SHEET CS161

R25.00'

R25.11'

12'

TRUE N

PLAN

NORTH

00 30 60

TR

U E N

PLAN

NORTH

SEE SHEETS CS170 TO CS186 FOR PERIMETER

ROAD GEOMETRICS AND LAYOUTS

N16

CP308

N16

CP308

PROPOSED PERIM

ETER R

OAD

AutoCAD SHX Text N00°26'17"E

X X X X X X X X X X X X X X X X X X X X X X

BH

#08

BH

#09

STA 206+37.97

R 1026.31

STA 206+64.68

R 1021.54

STA 206+47.63

R 1003.25

STA 207+03.24

R 1036.18

STA 206+86.19

R 1017.89

STA 206+87.66

R 1055.74

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS161

KEY MAP

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

MATCH LINE - SHEET CS160

R 25.00'

R25.00'

12'

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

SEE SHEETS CS170 TO CS186 FOR PERIMETER

ROAD GEOMETRICS AND LAYOUTS

RELO

CATED R

OSSO H

WY

N16

CP308

N16

CP308

PROPOSED PERIM

ETER R

OAD

RELO

CATED IR

WIN

D

RAIN

AutoCAD SHX Text N00°26'17"E

G G

G G

G G

G G

STA 202+02.91

L -1280.00

STA 202+02.91

L -1260.00

STA 195+59.19

L -1260.00

STA 195+51.97

L -1261.06

STA 195+42.77

L -1281.08

STA 195+50.05

L -1280.00

STA 195+50.05

L -1305.00

STA 195+59.19

L -1285.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

SHEET OF 467

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

E

5, AN

SI

D

M

EA

D

H U

N T, IN

C

D

EM

IN

G W

AY

M

ID

D

LE

TO

N , W

I

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

M C

C A

M

IT

IG

AT

E R

U N

W

AY

E N

C R

O

AC

H M

EN

T

Y

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

M

JR

D

LU

PA

B

D R

P G

EO

M

ET

R

IC

S

PL

AN

CS162

KEY MAP

LEGEND

PROPOSED ASPHALT

FULL-DEPTH PAVEMENT SECTION

PROPOSED ASPHALT ON EXISTING BASE

PROPOSED PORTLAND CEMENT CONCRETE

CONCRETE REINFORCEMENT

PROPOSED APPROACH LIGHTING AND

LOCALIZER MAINTENANCE ROAD ASPHALT

MILLINGS/ AGGREGATE SURFACED ROAD

TRUE N

PLAN

NORTH

00 30 60

TR

U

E N

PLAN

NORTH

SUGARBUSH ROAD

R

.0 0'

R

.0 0'

PROPOSED PERIM

ETER ROAD

.0

0'

N16

CP308

N16

CP308

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N00°26'17"E

SD

D

D D

D D

D D

D D

.07

.03580.04

.02

.04580

.08580 .14

579.98

579.76 579.61

579.50 579.35

579.16

.96578

.67578 .56578

.49 578 .22

.94

CO

CO

S

.9

.9

.9

.9

.9

.2

.2

.9

.4

.9

.9

.7

.5

.5

.4

.4

.5

.4

.4

.4

.5

.5

.6

.8

.8

.0

.2

.4

.5

.8

.9

.9

.1

.1

.8

.5

.4

.1

.0

.9

.8

.7

.7

.6

.5

.4

.4

.5

.5

.4

.4

.4

.4

.7

.5

.5

.5

.5

.6

.3

.3

.9

.9

.9

.7

.9

.9

.9574

.2574 .6575

.4

.8

.1

.3

U

U

U

U

U

U

U

U

U

U

U

U

U

U U

U

U

U

U

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

SEE SHEET CS171

SEE SHEET CS172

SEE SHEET CS173

SEE SHEET CS174

SEE SHEET CS175

SEE SHEET CS176

EX. ROSSO HWY

NEW AIRFIELD FENCING

EX. PERIMETER ROAD

EX. SUGARBUSH

SERVICE ROAD

EX. PERIMETER

ROAD

PROPOSED PERIMETER ROAD

AIRFIELD

IMPROVEMENTS

CLEAR ZONE LIMITS

NEW FALCON

SERVICE ROAD

EX. FALCON

SERVICE ROAD

AIRFIELD

IMPROVEMENTS

CLEAR ZONE LIMITS

NEW SUGARBUSH

SERVICE ROAD

NEW PERIMETER FENCING

RELOCATED ROSSO HWY

RELOCATED IRWIN DRAIN

CANADIAN NATIONAL RAILROAD

CANADIAN NATIONAL

RAILROAD

CONTRACTOR WORK LIMITS

O

VE

R

AL

L G

EO

M

ET

R

IC

S

PL

AN

PE

R

IM

ET

ER

R

O

AD

A N

D F

EN

C

IN

G

CS170

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KL

J

SH

G

EL

W

DR

P

Y

1/

0.

JL

M

FI

LE

N

O

JU

N

E 8, AN

SI

D

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

EX

TE

N D

N O

R

TH

O

VE

R R

U N

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

SCALE: 1" = 200'

OVERALL GEOMETRICS PLANA1

NORTH

400'0 200'

SHEET 186 OF 467

8' C.L. FENCE W/BARBED WIRE

BH#01

S S

S

S

S

S S S

S

S

S

S

S S

S S

S

S

S

S

S

S

S

S

S

1+

7 +

8 + 00

9 + 00

0 + 00

1+ 00

2 + 00

3 + 00

4 + 003+ 00 4

11+

12 + 00

CONTRACTOR WORK LIMITS

CONTRACTOR WORK LIMITS

SU

G

AR

BU

SH

SE

R

VI

C E

D R

IV

E

75.00'

27.00'

20.00'

20.00'

30.00'

.0

0' 5.

0.

24.00'

52.00' 20.00'

R

.0 0'

R25.00'

PROPOSED

PERIMETER

ROAD

EX. IRWIN DRAIN

RELOCATED

ROSSO HWY

RELOCATED

ROSSO HWY

CANADIAN NATIONAL RAILROAD

N: 415360.0588 E: 13533434.5999

N: 415386.9230 E: 13533433.6595

N: 415503.0430 E: 13533781.7104

N: 415502.8804 E: 13533907.5872

N: 415578.6452 E: 13533908.1578

N: 415490.7882 E: 13533428.4309

R25.00'

R

.0 0'

R25 .00

R25.02'

24.00'

ST

A.

+0

TO

S

TA

. 9 +0

G

EO

M

ET

R

IC

S

PL

AN

PE

R

IM

ET

ER

R

O

AD

A N

D F

EN

C

IN

G

CS171

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

KL

J

SH

G

EL

W

DR

P

Y

1/

0.

JL

M

FI

LE

N

O

JU

N

E 8, AN

SI

D

TY

PE

B -3

0% F

IN

AL

S U

BM

IT

TA

L

SE

LF

R

ID

G E

AI

R

N

AT

IO

N

AL

G

U

AR

D B

AS

E, M

IC

H

IG

AN

R

U N

W

AY

E N

C R

O

AC

H M

EN

T

SO

LU

TI

O

N

PR

O

JE

C

T #2

AI

R

FI

EL

D

IM

PR

O

VE

M

EN

TS

TA

SK

EX

TE

N D

N O

R

TH

O

VE

R R

U N

MI ANGB

ST

AT

E O

F M

IC

H

IG

AN

D

EP

AR

TM

EN

T

O F

TE

C

H N

O

LO

G Y, ST

AT

E

FA

C

IL

IT

IE

S

AD

M

IN

IS

TR

AT

IO

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

LA

N C

IN

G

, M

IC

H

IG

AN

M

AN

AG

EM

EN

T, A N

D B

U D

SCALE: 1" = 40'

GEOMETRICS PLANE1

PLAN

NORTH

40' 80'0

TR

U

E N

MATCH LINE SEE SHEET CS172

1. REFER TO SHEET GC151 AND GC152 FOR GENERAL NOTES.

REFER TO SHEETS GI003 AND GI004 FOR LEGEND AND

ABBREVIATIONS.

2. THIS SHEET IS PART OF MULTI-SHEET SET OF

CONSTRUCTION PLANS AND MUST BE READ WITH THE FULL

SET TO BEST ENSURE PROPER INTERPRETATION.

3. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF

EXISTING UTILITIES PRIOR TO CONSTRUCTION.

4. REFER TO SHEETS CS180 TO CS186 FOR ROADWAY

CENERLINE ALIGNMENT INFORMATION.

5. REFER TO SHEETS CP311 TO CP313 FOR TYPICAL ROAD

SECTIONS.

GENERAL SHEET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .