This document provides details regarding a General Services Administration (GSA) solicitation for indefinite delivery indefinite quantity (IDIQ) multiple award task order contracts (MATOCs) to provide construction services in western Washington and Oregon. GSA seeks to award two MATOC IDIQs valued at up to $40 million each to small businesses with physical offices in the region. The contracts will have a five-year period of performance. Task orders will range from $25,000 to $5 million and utilize various project delivery methods including construction, design-bid-build, bridging design-build, and design-build. Services will include design, engineering, and construction for interior and exterior projects in federal offices. A minimum of twenty task orders per IDIQ are anticipated with an average value of $75,000 to $250,000. Proposals are due January 4, 2018 and awards will be made in February 2018. The solicitation will utilize a highest technically rated with fair and reasonable price evaluation methodology.

EXHIBIT 8 Vendor Proposal Workbook

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. HTR TABLE OF EVAL FACTORS

Northwest/Arctic Region
Solicitation: 47PL0018R0001
1.0 Highest Technically Rated with Fair and Reasonable Price Table of Evaluation Factors
VolumeTitleStandard for EvaluationSubmittal RequirementsEvaluation ProcessReview Step
0Scoring TableNot scoredOfferors to complete Vendor Scoring TableCover sheet for all volumesCover sheet
IIDIQ RequirementsThis factor establishes the minimum requirements that an offeror must meet in order for the proposal to progress to the next stages of the evaluation process.Offerors are instructed to use the format in EXHIBIT 8, tab VOL I - IDIQ REQUIREMENTS. Provide supporting documentation in the same order as listed on the attachment. If an item does not pertain to an Offeror, such as Contractor Teaming Arrangements, then the Offeror shall note that the section as not applicable.Acceptability Review (Pass/Fail)1
IIProject ExperienceOfferors are instructed to refer to the standards and minimum requirements described in the Scope of Work when selecting projects for this evaluation factor. Projects submitted for this evaluation factor may be the same projects submitted for Section III - Past Performance. The offeror has sole discretion to choose any project in response to this evaluation factor. Project experience should be relevant and recent to warrant an assessment of the firms' current abilities in design and construction projects. Project experience will be considered relevant if the submitted project is commercial design and construction, completed for private or federal clients, and demonstrates the project delivery methods included in this contract as defined in the scope of work. In order to be considered recent, the project must have physically started construction and achieved CCD between the years 2014 to the close date of the solicitationThe minimum project templates to submit are two (2) projects for each PDM. A02 A maximum of two (2) project templates for each PDM is allowed. The Project Experience template may reference attached documentation such as actual project deliverables. Offerors are required to provide supporting documentation that will demonstrates the assessed score. The information must be verifiable by the Government. The Government will evaluate the documentation submitted and will independently score each offeror based upon the project documentation submitted.Initial pass/fail, then verification3
To receive maximum points the proposal must demonstrate the requirements below for each project delivery method. Evidence of each element is required. Offerors are advised that merely having relevant project experience is not the same has having the best project experience, therefore Offerors should provide the best examples for these elements. Not all elements apply to all project delivery methods
IIIPast PerformanceThe Government will evaluate the relative merits of each offerors past performance as an indicator of future performance. The Government reserves the right to consider all aspects of an offerors performance history. All projects must be for commercial construction.Offerors must submit at least five (5) but no more than eight (8) projects. Projects must be submitted using the PPQ template. Offerors with past performance evaluation ratings less than a summary score of three are strongly encouraged to provide a discussion of that particular project(s), specifically addressing what actions the firm has taken to mitigate the same/or similar contributing factors to below standard performance.Initial pass/fail, then verification4
IVPrice ProposalThe Government will evaluate the indirect rates based upon current data for the same or similar geographic areas from the Bureau of Labor Statistics (BLS). Proposed profit rates will be evaluated based on comparison to the proposals that are selected as the top six (6) highest scoring proposals. If the Government is unable to assess both price elements as fair and reasonable, then the proposal will not be eligible for further evaluation or contract award regardless of the total point score.Offerors are instructed to complete the price schedule provided in Exhibit 8 Vendor Proposal Workbook. Offerors are to include clear and convincing data to support the price proposal. Proposals that lack supporting documentation or do not sufficiently explain the Offerors approach to the price proposal may be evaluated as non-responsive to the requirements of the solicitation. Offerors should submit supporting audit information and/or statements from accounting firms regarding the proposed rates as evidence that the rates are typical and customarily used by the Offerors, not just for this proposal.Price analysis; competitive comparison, comparison to publicly posted labor rates, contractor furnished supporting documentation2

2. VENDOR SCORING TABLE

2.0 VENDOR SCORING TABLE

ItemStandardEvaluation (Pass / Fail)VENDOR ASSESSMENT
Volume I - IDIQ Requirements
1Standard Form 1442 (SF 1442), Solicitation, Offer, And Award (Construction, Alteration, or Repair).
2Amendment(s)
3Insurance
4Bonding Capacity
5System for Award Management (SAM)
6Excluded Parties Listing System (EPLS)
7Past Performance Information Records (PPIRS)
8Evidence of financial capacity.*
9Physical Office Located within Geographic Area
10Staffing - current number of employees, grouped by job title
11Construction License
12Compliance with Secured but Unclassified (SBU) terms
13Authorized signers for company,
14Contractor Teaming Arrangement (CTA)
ItemDescriptionMaximum Points PossibleVENDOR ASSESSMENT
VOLUME II PROJECT EXPERIENCE
1Project Delivery Method (PDM) Experience600
2Relevancy of project experience for similar project value200
3Project Owner Profile - Experience with owner-manager of commercial facilities260
4Experience with Design Management160
5Pre-Performance80
6Schedule Experience400
7Timeliness of execution - schedule / float management240
8Cost Estimating600
9Project Resource Management and Staffing240
10Staffing multiple, concurrent construction projects240
11A02 Staffing multiple, concurrent construction projects. Deleted per amendment A02.00
12Self-performance of work activities to meet expressed minimum and required maximum.600
13Change management experience400
14Subcontractor Management160
15Subcontractor Sourcing80
16Subcontract Selection80
17A02 Subcontract Management Experience - First Tier, Second Tier. Deleted per amendment A02.00
18Sustainable Design and Construction Experience160
19A02 Environmental. Deleted per amendment A02.00
20Project Controls160
21Submittals management - materials, staffing and submittal log.40
ItemDescriptionMax Point ValueVENDOR ASSESSMENT
VOLUME III - PAST PERFORMANCE
aThe four delivery methods defined in the Scope of Work.See Past Performance Score Matrix at bottom of this page for total potential points possible by average of PPQ scores.
bDesign-Build and Bridging Design-Build projects must include both design and construction deliverables.
cDesign-Build projects must be for at least $150,000 at initial contract award.
dPast performance should be for projects of similar magnitude (in dollars) to the Task Order parameters as stated in this document.
eProjects completed concurrently at multiple sites within a similar geographic range to the IDIQ contracts.
fEvidence of projects, which required systems integration to an existing building. Examples include mechanical, lighting, fire/life safety and/or security access systems.
gTimeliness of project completion to original period of performance end date.
hProjects completed in class A and greater than class A office space.
ItemDescriptionMax Point ValueVENDOR ASSESSMENT
VOLUME III - PAST PERFORMANCE - BONUS POINTS
iBonus points - Projects completed in facilities with above standard security requirements. As an example, law enforcement facilities, military installations, federal facilities, and laboratory facilities.1000
jBonus points - Provide project(s) that were completed as part of a historic preservation effort in a historically sensitive facility. Projects should identify one of the four treatment processes typically used in historic preservation projects.1000
kBonus points - Provide project(s) that involved environmentally sensitive, hazardous, or utilized the Key Sustainable Products (KSP) in the execution and/or materials used in the project.1000
lBonus points - Projects used in both the Project Experience factor and Past Performance Factor, provided the owner is able to substantiate the project experience at an acceptable quality level.1000
mDocumentation for industry awards and other forms of recognition may be provided for bonus points in this category. Industry awards and other formal recognition must be verifiable and substantial in nature.1000

3. VOL I-IDIQ REQUIREMENTS

3.0 VOLUME I - IDIQ Requirements
ItemStandardRequirementIncluded (Y/N)Complete
1Standard Form 1442 (SF 1442), Solicitation, Offer, And Award (Construction, Alteration, or Repair).Standard Form 1442 (SF 1442), Solicitation, Offer, And Award (Construction, Alteration, or Repair); Executed by authorized signers for each firm, if CTA then all CTA entities must sign the proposal.
2Amendment(s)Acknowledge and attach amendments, in sequential order, as applicable.
3InsuranceEvidence of minimum insurance requirements: Submit a commitment letter or draft insurance document that clearly documents that the Offeror either has or has the ability to obtain insurance in the stated minimums.
4Bonding CapacityBonding capacity – evidence of the Offerors ability to receive and accept bonding from recognized surety for the types of projects to be ordered under this IDIQ and at the minimum bonding level. A02 REFER TO FAR 52.216-19 ORDERING LIMITATIONS for maximum
5System for Award Management (SAM)System for Award Management (SAM): Submit a complete copy of the current records for the Offeror(s) as updated in SAM, which the Government will use to verify. Include completed provisions 52.204-8 and 52.209-7.
6Excluded Parties Listing System (EPLS)Current restrictions? Prior restrictions? Attach copy.
7Past Performance Information Records (PPIRS)Negative information (single or cumulative scores less than 3, in prior 3 years, all agencies, address)
8Evidence of financial capacity.*Evidence of sufficient financial capacity to manage multiple Task Order Contract (TOC). Sufficient financial capacity to be documented by evidence of current assets, current liabilities, long term liabilities, net assets, and net income.
9Physical Office Located within Geographic AreaPhysical location of construction office with equipment and materials, offices must be verifiable using publicly available websites.
10Staffing - current number of employees, grouped by job titleEmployee list, current number of employees of prime, number of employees of prime over prior 12 months
11Construction LicenseCurrent, valid construction license(s) for each state within the stated geographic area.
12Compliance with Secured but Unclassified (SBU) termsProvide affirmative statement of firm's ability to comply with PBS 3490.2
13Authorized signers for company,Authorized signatories to contract, role, and contact information.
14Contractor Teaming Arrangement (CTA)Contractor Teaming Arrangement (CTA) documents, per section Solicitation, Section III, 3. CTA pages 14 – 16, as applicable.
15Other Federal ContractsProvide list of active federal contracts awarded and which remain open at the time of the closing date of the solicitation.Not EvaluatedN/A
16Task Order Request for Proposal (TO RFP) Distribution ListProvide list of personnel with email and phone numbers who would receive any TO RFP.Not EvaluatedN/A
* Evidence of sufficient financial capacity is documented by a discussion of the elements below:
Current assets include all assets that may be reasonably expected to be converted into cash, or could become the equivalent of cash, within one year in the normal course of business;
(i) Current assets include, but are not limited to cash, accounts receivable, inventory, and prepaid expenses, and investments, marketable securities, and bonds that mature within one year or may be converted to cash without penalties or fees; and
(ii) Current assets must not include fixed assets, accumulated depreciation, intangible assets, or investments, marketable securities, or bonds with maturity dates of one year or longer;
(C) Current liabilities are debts and obligations expected to be due within the next year;
(i) Examples of current liabilities include accounts payable, notes payable, accrued taxes, and wages and salaries owed to workers;
(ii) Current liabilities must not include debts or claims on assets that will be due a year or more in the future or longer-term liabilities;
(D) Long-term liabilities must include all debts and obligations expected to be due one year or more in the future. Long-term liabilities include any mortgages, loans, bonds, and claims reserve funds not due within one year;
(E) Net assets are total assets less total liabilities. Financial statements and reports may otherwise refer to net assets as net position, adjusted net worth, surplus, owner’s equity, or shareholders’ equity; and
(F) Net income is the net revenue from sales, interest, or services rendered minus costs, operating expenses, and taxes. Financial statements and reports may otherwise refer to this component as comprehensive income, net earnings, or net profit;

4. VOL II-PROJECT EXPERIENCE

4.0 VOLUME II - Design and Construction Project Experience
ItemProject Experience Focus AreaRequirementPotential points per Project Experience WorksheetMaximum Points Possible (2 projects per PDM, max points assigned)
CDBBB-DBDBTOTALCDBBB-DBDBTOTAL
A021Project Delivery Method (PDM) ExperienceProject Delivery Method (PDM) template for minimum two(2) per PDM, four (4) maximum. A02 - Changed to maximum of two (2) project examples for each PDM.1001005050300200200100100600
2Relevancy of project experience for similar project valueInclude projects within stated minimum and maximum range of this IDIQ contract.3030103010060602060200
3Project Owner Profile - Experience with owner-manager of commercial facilitiesProject owner also manages property on behalf of tenants. Multiple tenant facilities, high-rise facilities, high traffic, high security, law enforcement, military. Experience partnering with property managers, operations and maintenance (O&M) contract firms, custodial firms and coordination/collaboration with other contractors on site201050501304020100100260
4Experience with Design ManagementProvide sample documentation representative of high quality basis of design documentation and resultant design deliverables. Include related engineering and as-builts.101030308020206060160
5Pre-PerformanceManagement of pre-performance construction activities, security clearances, safety, site set-up, materials management, and loading dock coordination10101010402020202080
A026Schedule ExperienceTimeliness of execution, quality of schedule, relevant experience to project schedule requirements as stated in scope of work. Initial project schedule and final project schedule at CCD. Achievement of SCD within original period of performance (POP), achievement of CCD within original POP50505050200100100100100400
7Timeliness of execution - schedule / float managementAchievement of SCD within original POP, achievement of CCD within original POP. Demonstrate shared float management3030303012060606060240
A028Cost EstimatingSubmit samples of estimates and proposals which meet the GSA minimum CSI level per the SOW. Provide schedule of values (SOV) to match submitted cost estimate.1001005050300200200100100600
9Project Resource Management and StaffingStaffing multiple concurrent projects, project superintendence, self-performance (identified by trade).3030303012060606060240
10Staffing multiple, concurrent construction projectsProject staffing – submit employee rosters identifying role and responsibility on project. Project managers, superintendents, labor, what trade performed in-house?3030303012060606060240
A0211Staffing multiple, concurrent construction projectsProject staffing - submit employee rosters identifying role and responsibility on project. Project managers, superintendents, and labor, what trade performed in-house0000000000
A0212Self-performance of work activities to meet expressed minimum and required maximum.Self-performance, typical level of self-performance by firm, actual level of self-performance, excluding project management, for projects submitted for this factor.1001005050300200200100100600
13Change management experienceChange order request, owner requested change order, constructability driven changes, differing site conditions, etc. Changes during design50505050200100100100100400
14Subcontractor ManagementProvide a list of key subcontractors; length of partnership with those subcontractors; what role each subcontractor has had in the past; and what role a subcontractor is expected to fill under this contract202020208040404040160
15Subcontractor SourcingDiscuss current practices for soliciting subcontractors for all project delivery methods.10101010402020202080
16Subcontract SelectionDiscuss how subcontract firms are selected for projects and when they are typically selected (pre-award, post award, etc.).10101010402020202080
A0217Subcontract Management Experience - First Tier, Second TierSubcontract sourcing, management, coordination, management of contracts between prime and subcontractor firs tier, management of prime of subcontractor with second tier subcontracts. Subcontractor sourcing, selection, and termination of subcontractor agreements0000000000
18Sustainable Design and Construction ExperienceSustainability - design and construction Provide samples of design submittals, product submittals, management practices, waste management, and formal reports generated.202020208040404040160
A0219EnvironmentalKey Sustainable Products, waste management, recycling, resource efficiency during construction, use of efficient materials in building0000000000
20Project ControlsProject controls, submit copies of actual documents202020208040404040160
21Submittals management - materials, staffing and submittal log.Value engineering, provide copy of actual VE proposals (as/if applicable to each PDM). Buy American Act (BAA) waiver request; submit actual request used pre or post award. Actual completed submittal log for tenant improvement project of 3,000 sq. ft. in class A office space with a project value of $150k.1010002020200040
CDBBB-DBDBTOTALCDBBB-DBDBTOTAL
650640520540235013001280104010804700
Potential points per individual projectMaximum Points Possible (4 projects per PDM, max points assigned)
13001280104010804700

5. VOL III-PAST PERFORMANCE

5.0 VOLUME III - Construction Past Performance
ItemRequirementCDBBB-DBDB
aThe four delivery methods defined in the Scope of Work.
bDesign-Build and Bridging Design-Build projects must include both design and construction deliverables.
cDesign-Build projects must be for at least $150,000 at initial contract award.
dPast performance should be for projects of similar magnitude (in dollars) to the Task Order parameters as stated in this document.
eProjects completed concurrently at multiple sites within a similar geographic range to the IDIQ contracts.
fEvidence of projects, which required systems integration to an existing building. Examples include mechanical, lighting, fire/life safety and/or security access systems.
gTimeliness of project completion to original period of performance end date.
hProjects completed in class A and greater than class A office space.
Past Performance Bonus Points
iBonus points - Projects completed in facilities with above standard security requirements. As an example, law enforcement facilities, military installations, federal facilities, and laboratory facilities.
jBonus points - Provide project(s) that were completed as part of a historic preservation effort in a historically sensitive facility. Projects should identify one of the four treatment processes typically used in historic preservation projects.
kBonus points - Provide project(s) that involved environmentally sensitive, hazardous, or utilized the Key Sustainable Products (KSP) in the execution and/or materials used in the project.
lBonus points - Projects used in both the Project Experience factor and Past Performance Factor, provided the owner is able to substantiate the project experience at an acceptable quality level.
mDocumentation for industry awards and other forms of recognition may be provided for bonus points in this category. Industry awards and other formal recognition must be verifiable and substantial in nature.

6. VOL IV-PRICE SCHEDULE

VOLUME IV: PRICE PROPOSAL

MATOC PRICE SCHEDULE
MATOC - DIRECT LABOR RATES - UNBURDENEDMaximum Ceiling Rates
CLINLABOR DISCIPLINESUNITYEAR 1YEAR 2YEAR 3YEAR 4YEAR 5
Construction Foreman
0001Early Career (< 5 years)HR
0002Mid Career (5 - 10 years)HR
Construction Superintendent (Site)
0003Early Career (< 5 years)HR
0004Mid Career (5 - 10 years)HR
0005Experienced (10 - 20 years)HR
Commercial Construction Superintendent
0006Early Career (< 5 years)HR
0007Mid Career (5 - 10 years)HR
0008Experienced (10 - 20 years)HR
Construction Manager
0009Early Career (< 5 years)HR
0010Mid Career (5 - 10 years)HR
0011Experienced (10 - 20 years)HR
Construction Project Manager
0012Early Career (< 5 years)HR
0013Mid Career (5 - 10 years)HR
0014Experienced (10 - 20 years)HR
Sr. Project Manager (>10 years experience)
0015Experienced (10 - 20 years)HR
MATOC - INDIRECT COSTS
0016Overhead, General and Administrative (G&A)%
Proposed Profit Table
0017ROM: $75k - 150k%
0018ROM: 150k - 250k%
0019ROM: $500k - $1.5M%
*ROM = Rough Order of Magnitude

7. PDM TEMPLATE-PROJECT EXP

VOLUME II - Design and Construction Project Experience

Each submitted project experience form must be supported by actual project documentation:Acronym key:
Supporting information to substantiate experience, i.e. copies of contract awards, documents which support information furnished in the project experience template such as actual project schedule (start of project and CCD), actual submittal log, actual VE (value engineering) proposal (as applicable).CNon-complex construction
DBBDesign-Bid-Build
B-DBBridging Design-Build
Mark project experience categorized by PDM (non-complex construction, design-bid-build, bridging design-build, design-build)DBDesign-Build
ItemProject Experience Focus AreaRequirementCDBBB-DBDB
A021Project Delivery Method (PDM) ExperienceProject Delivery Method (PDM) template for minimum two(2) per PDM, four (4) maximum. A02 - Changed to maximum of two (2) project examples for each PDM.
A022Relevancy of project experience for similar project valueInclude projects within stated minimum and maximum range of this IDIQ contract.
3Project Owner Profile - Experience with owner-manager of commercial facilitiesProject owner also manages property on behalf of tenants. Multiple tenant facilities, high-rise facilities, high traffic, high security, law enforcement, military. Experience partnering with property managers, operations and maintenance (O&M) contract firms, custodial firms and coordination/collaboration with other contractors on site
4Experience with Design ManagementProvide sample documentation representative of high quality basis of design documentation and resultant design deliverables. Include related engineering and as-builts.
5Pre-PerformanceManagement of pre-performance construction activities, security clearances, safety, site set-up, materials management, and loading dock coordination
A026Schedule ExperienceTimeliness of execution, quality of schedule, relevant experience to project schedule requirements as stated in scope of work. Initial project schedule and final project schedule at CCD. Achievement of SCD within original period of performance (POP), achievement of CCD within original POP
7Timeliness of execution - schedule / float managementAchievement of SCD within original POP, achievement of CCD within original POP. Demonstrate shared float management
A028Cost EstimatingSubmit samples of estimates and proposals which meet the GSA minimum CSI level per the SOW. Provide schedule of values (SOV) to match submitted cost estimate.
9Project Resource Management and StaffingStaffing multiple concurrent projects, project superintendence, self-performance (identified by trade).
10Staffing multiple, concurrent construction projectsProject staffing – submit employee rosters identifying role and responsibility on project. Project managers, superintendents, labor, what trade performed in-house?
11Self-performance of work activities to meet expressed minimum and required maximum.Self-performance, typical level of self-performance by firm, actual level of self-performance, excluding project management, for projects submitted for this factor.
A0212Self-performance of work activities to meet expressed minimum and required maximum.Self-performance, typical level of self-performance by firm, actual level of self-performance, excluding project management, for projects submitted for this factor.
13Change management experienceChange order request, owner requested change order, constructability driven changes, differing site conditions, etc. Changes during design
14Subcontractor ManagementProvide a list of key subcontractors; length of partnership with those subcontractors; what role each subcontractor has had in the past; and what role a subcontractor is expected to fill under this contract
15Subcontractor SourcingDiscuss current practices for soliciting subcontractors for all project delivery methods.
16Subcontract SelectionDiscuss how subcontract firms are selected for projects and when they are typically selected (pre-award, post award, etc.).
A0217Subcontract Management Experience - First Tier, Second TierSubcontract sourcing, management, coordination, management of contracts between prime and subcontractor firs tier, management of prime of subcontractor with second tier subcontracts. Subcontractor sourcing, selection, and termination of subcontractor agreements
18Sustainable Design and Construction ExperienceSustainability - design and construction Provide samples of design submittals, product submittals, management practices, waste management, and formal reports generated.
A0219EnvironmentalKey Sustainable Products, waste management, recycling, resource efficiency during construction, use of efficient materials in building
20Project ControlsProject controls, submit copies of actual documents
21Submittals management - materials, staffing and submittal log.Value engineering, provide copy of actual VE proposals (as/if applicable to each PDM). Buy American Act (BAA) waiver request; submit actual request used pre or post award. Actual completed submittal log for tenant improvement project of 3,000 sq. ft. in class A office space with a project value of $150k.