A01_SOL-47PL0018R0001_2nd_Preproposal_PPQ_template.pdf
PDF 653 KB Posted
- Solicitation number
- 47PL0018R0001
About this file
This document provides details for a federal indefinite delivery indefinite quantity multiple award task order contract solicitation for construction services. The solicitation will result in awards to two separate pools, with each pool receiving approximately six contract awards. Services will include construction, design-bid-build, bridging design-build, and design-build project delivery methods. Work will involve interior and exterior construction projects for GSA and other federal agencies in Washington and Oregon, including land port of entry facilities. The period of performance is five years with individual task order values ranging from $25,000 to $5 million. Proposals are due on January 4, 2018 with awards anticipated in February 2018. The competition is set aside for small businesses with physical offices in the stated geographic regions.
Amendment A01
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign) (Signature of Contracting Officer)
Previous edition unusable
A01
10PQ
Not Applicable
Jessica Campbell email: jessica.campbell@gsa.gov
SOLICITATION: 47PL0018R0001
TITLE: WESTERN AND SOUTHERN MATOC IDIQ FOR CONSTRUCTION
SEE PAGE TWO (2) FOR INSTRUCTIONS.
10PQ
General Services Administration, Public Buildings Service Acquisition Management Division (10PQ) 400 15th Street SW Auburn, WA 98001
Same as block 6.
47PL0018R0001
Not Applicable
47PL0018R0001
Not Applicable
1 8
01/08/2018
January 8, 2018
16B. UNITED STATES OF AMERICA
Jessica M Campbell
AMENDMENT: A01
SOLICITATION: 47PL0018R0001
TITLE: WESTERN AND SOUTHERN MATOC IDIQ FOR CONSTRUCTION
Amendment A01 is issued, effective January 8, 2018, and makes the following changes to GSA, PBS solicitation 47PL0018R0001:
1. The proposal response date is changed from February 1, 2018 to February 8, 2018, an extension of seven (7) days.
2. Offerors are instructed to use the attached pdf ‘A01 47PL0018R0001 PPQ Template’ attached to this amendment. Disregard any other references to the PPQ template located in the Proposal Workbook.
3. Due to multiple technical issue(s) the pre-proposal conference conducted on December 28, 2017, was not recorded. Participants who attended that pre-proposal conference attended anonymously; no list of the participants is available. A copy of the conference presentation and agenda are uploaded to the FBO site.
4. Due to the technical issues experienced during the initial pre-proposal conference, a second pre-proposal conference is scheduled for:
Date: January 16, 2018 Time: 1:00 pm to 3:00 pm (PST).
Location: (a). 400 15th Street SW, Auburn WA, 98001; Mt. McKinley Conference Room
(b). Teleconference 1-866-928-2008, passcode 6871643 (c). URL info: (Adobe Connect)
5. Meeting Reservation Instructions:
a. The meeting is located in the GSA Auburn Regional Office Building and virtually by teleconference.
b. Offerors are instructed to reserve their attendance in advance by email to the Contracting Officer (jessica.campbell@gsa.gov ).
c. In the reservation, indicate if the company will attend in person or by phone and the number of attendees.
PBS Past Performance Questionnaire July 2014
PBS PAST PERFORMANCE QUESTIONNAIRE
CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)
1. CONTRACTOR/OFFEROR INFORMATION
DUNs Number:
Firm Name:
Address:
Phone Number:
Contact Name:
Email Address:
Contact Phone Number:
2. GENERAL WORK INFORMATION
Work performed as: Prime Contractor Sub Contractor Joint Venture Other (Please explain):
Percent (%) of project work performed:
If a subcontractor, who was the prime (Name/Phone #):
3. CONTRACT INFORMATION
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please explain)
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. PROJECT DESCRIPTION
Complexity of Work: High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.
Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
CLIENT INFORMATION
Client Point of Contact Information
Name:
Title:
Phone Number:
Email Address:
Project Information
Contract Type:
Contract Title:
Contract Location:
Describe your role in the project:
Date Questionnaire was completed (mm/dd/yy):
Client’s Signature:
Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.
1. QUALITY: E VG S M U N
(a) Quality of technical data/report preparation efforts.
(b) Ability to meet quality standards specified for technical performance.
(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).
2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N
(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)
(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.
3. CUSTOMER SATISFACTION: E VG S M U N
(a) To what extent were the end users satisfied with the project?
(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication).
(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
(d) Overall customer satisfaction.
4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N
(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
(b) Ability to hire, apply, and retain a qualified workforce to this effort.
4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N
(c) Government Property Control.
(d) Knowledge/expertise demonstrated by contractor personnel.
(e) Utilization of Small Business concerns.
(f) Ability to simultaneously manage multiple projects with multiple disciplines.
(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.
(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).
5. COST/FINANCIAL MANAGEMENT E VG S M U N
(a) Ability to meet the terms and conditions within the contractually agreed price(s)?
(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)
Yes No
(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)
Yes No
(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)
Yes No
6. SAFETY/SECURITY E VG S M U N
(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).
(b) Contractor complied with all security requirements for the project and personnel security requirements.
7. GENERAL E VG S M U N
(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below
(c) In summary, provide an overall rating for the work performed by this contractor.
8. SUSTAINABILITY
Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)
Yes No
9. SUMMARY
Would you hire or work with this firm again? (If no, please explain in the comments section below.)
Yes No
COMMENTS SECTION
Please provide additional information below, and attach additional pages if necessary.
Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
http://www.wbdg.org/resources/gbs.php#rcas http://www.wbdg.org/resources/gbs.php#rcas
| A01_SOL-47PL0018R0001 Western and Southern MATOC IDIQ |
| A01_SOL-47PL0018R0001 pg 2 |
| Exhibit 8_Tab 5 Past Performance Questionnaire 47PL0018R0001 MATOC |
| Firm Fixed Price: Off |
| Cost Reimbursement: Off |
| Other Please explain: Off |
| Text1: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text30: |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Describe your role in the project: |
| Date Questionnaire was completed mmddyy: |
| Clients Signature: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box111: Off |
| Check Box113: Off |
| Check Box114: Off |
| Check Box115: Off |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Check Box119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Check Box122: Off |
| Check Box123: Off |
| Check Box124: Off |
| Check Box125: Off |
| Check Box126: Off |
| Check Box127: Off |
| Check Box128: Off |
| Check Box129: Off |
| Check Box130: Off |
| Check Box131: Off |
| Check Box132: Off |
| Check Box133: Off |
| Check Box134: Off |
| Check Box135: Off |
| Check Box136: Off |
| Check Box137: Off |
| Check Box138: Off |
| Check Box139: Off |
| Check Box140: Off |
| Check Box141: Off |
| Check Box142: Off |
| Check Box143: Off |
| Check Box144: Off |
| Check Box145: Off |
| Check Box146: Off |
| Check Box147: Off |
| Check Box148: Off |
| Check Box149: Off |
| Check Box150: Off |
| Check Box151: Off |
| Check Box152: Off |
| Check Box153: Off |
| Check Box154: Off |
| Check Box155: Off |
| Check Box156: Off |
| Check Box157: Off |
| Check Box158: Off |
| Check Box159: Off |
| Check Box160: Off |
| Check Box161: Off |
| Check Box162: Off |
| Check Box163: Off |
| Check Box164: Off |
| Check Box165: Off |
| Check Box166: Off |
| Check Box167: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box34: Off |
| Check Box112: Off |
| Check Box168: Off |
| Check Box169: Off |
| Text22: |
| Check Box170: Off |
| Check Box171: Off |
| Check Box172: Off |
| Check Box173: Off |
File details come from the government source that posted it. Updated .