Price Schedule
| Schedule B - PRICE SCHEDULE | | | | | | |
| SOLICITATION REQUEST FOR PROPOSAL (RFP): 47PK0219R0013 | | | | | | |
| O&M Robert E. Coyle Federal Building and U.S. Courthouse Fresno CA (CA0309ZZ) | | | | | | |
| Offeror: | | | | | | |
| Date: | | | | | | |
| Complete the highlighted yellow boxes only | | | | | | |
| Base Year** | Option 1 | Option 2 | Option 3 | Option 4 | Total (all 5 years) |
| 2020-2021 | 2021-2022 | 2022-2023 | 2023-2024 | 2024-2025 | |
| From | 3/1/20 | 3/1/21 | 3/1/22 | 3/1/23 | 3/1/24 | |
| To | 2/28/21 | 2/28/22 | 2/28/23 | 2/29/24 | 2/28/25 | |
| CLIN | CLIN 0100 | CLIN 1100 | CLIN 2100 | CLIN 3100 | CLIN 4100 | |
| O&M SERVICES (Monthly) | | | | | | |
| ELEVATOR SERVICES (Monthly) | | | | | | |
| Misc Work (Utility Hours) (Per Section C.37) (Monthly) | | | | | | |
| Electrical Switchgear Testing (Monthly) | | | | | | |
| Total Monthly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Total (Annual) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Standard Coefficient (1) : | | | | | | |
| Startup costs: (2) (CLIN 0001) | | | | | | $ - 0 |
| | | | | | $ - 0 |
| Grand Total (Annual) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1. The Standard Coefficient is the markup (percent of cost) to be applied to the total cost of the O&M services in the base and option years of the contract, and may be applied to the final cost of projects classified as Additional Services work. The standard coefficient is not to be applied work being classified as a repair. (per Section C.44.1). |
| 2. Startup costs may only apply to the base year of the contract and shall be a separate, lump sum cost payable during the first month of the contract. |
| ELECTRICAL SWITCH GEAR TESTING (3) | | | |
| CA0309ZZ | September 2022 | Monthly | Annual |
| 3. Electrical Testing is to be included within the firm fixed price of the contract (including in the monthly price of the year performing the test). Electrical Testing is to be done per the PM Guide and NETA specifications; however the frequency of switchgear testing is to be done every three years. Testing was last completed August 2019. Next testings will be completed on September 2022. |
| Miscellaneous Work (Utility Hours) Per Section C. 37 (Monthly) |
| Misc Work hours (Per Section C.37) (Monthly cost ) | Base Year | Option 1 | Option 2 | Option 3 | Option 4 |
| Monthly | | | | | |
| Annual | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Per C.37. MISCELLANEOUS WORK (Utility Hours), as part of the firm-fixed price (including in the monthly price) of this contract, the Contractor shall provide a total of ten (10) hours and up to $100.00 of parts and supplies per calendar month (hours and dollar amounts are not cumulative to succeeding months) when requested by the COR, to accomplish discretionary work in the buildings covered by this contract.
ENGINEER/TECHNICIAN HOURLY RATES:
4. Hourly rates listed below are proposed only once. These rates may, in the event of wage determination rate increases, be escalated in accordance with52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018). Overtime hourly rates shall be applied for work required to be performed after the Normal Working Hours of the buildings, but which is scheduled in advance. Work performed after Normal Working Hours, solely for the convenience of the Contractor, shall be paid for at the straight time rate. Emergency callback hourly rates shall be applied when a technician must be called in outside of Normal Working Hours, without advance scheduling, unless the callback was due to negligence or poor maintenance practices on the part of the contractor.
| O&M: | | | |
| Job Title | Straight time | Overtime | Emergency Callback |
| Engineer, Stationary: | $ - 0 | $ - 0 | $ - 0 |
| Engineer, Utility: | $ - 0 | $ - 0 | $ - 0 |
| HVAC Technician: | $ - 0 | $ - 0 | $ - 0 |
| General Mechanic : | $ - 0 | $ - 0 | $ - 0 |
| ELEVATORS: | | | |
| 5. When the Government requires scheduled overtime work for an elevator mechanic, i.e. work to be performed either before or after the regular working hours, the Government will only pay the “Premium Portion” rate for the off-hours work. Premium portion is calculated at .7 times the straight time rate. | | | |
| Job Title | Straight time | Overtime | Premium Portion |
| Journey-level Elevator Tech: | $ - 0 | $ - 0 | $ - 0 |
| Team rate: | $ - 0 | $ - 0 | $ - 0 |
| ADDITIONAL SERVICES HOURLY RATES, O&M: | | | |
These items are indefinite quantity (IQ) line items. These rates only apply to work which is reimbursable, i.e., either Additional Services or for Reimbursable Repairs.
| O&M: | Straight time | Overtime | |
| Engineer, Stationary: | $ - 0 | $ - 0 | |
| Engineer, Utility: | $ - 0 | $ - 0 | ` |
| HVAC Technician: | $ - 0 | $ - 0 | |
| General Mechanic : | $ - 0 | $ - 0 | |
ADDITIONAL SERVICES HOURLY RATES, ELEVATORS
| ELEVATORS: | Straight time |
| Journey-level Elevator Tech: | $ - 0 |
| Team rate: | $ - 0 |
| **ANTICIPATED PERIOD OF PERFORMANCE: |
| The period of performance is anticipated to be from 03/01/2020 thru 02/28/2025 for one base year and four options. |
| (Subject to change at the discretion of the Government) |
&P of &N
Cost breakdown - VTE
| Schedule B - PRICE SCHEDULE |
| SOLICITATION REQUEST FOR PROPOSAL (RFP): 47PK0219R0013 |
| O&M Robert E. Coyle Federal Building and U.S. Courthouse, Fresno CA (CA0309ZZ) |
| Offeror: |
| Date: |
| U.S. GENERAL SERVICES ADMINISTRATION |
| FULL ELEVATOR & COURTROOM LIFT MAINTENANCE SERVICES OFFER SHEET |
| CENTRAL CALIFORNIA FIELD OFFICE |
| In the space provided below, quote a price for furnishing all management , supervision, labor, materials and equipment for the following services: |
| O&M Robert E. Coyle Federal Building and U.S. Courthouse, Fresno CA (CA0309ZZ) |
| 2500 Tulare Street, Fresno CA 93721 |
| There are a total of 12 elevators in this building | | | | | | | | |
| 12 Elevators | | | | | | | | |
| 1 dumbwaiter | | | | | | | | |
| Full Elevator (VTE) Maintenance Services and Repairs | | | | | | | | |
| Complete the highlighted yellow boxes only | | | | | | | | |
| | | Base Year | Option 1 | Option 2 | Option 3 | Option 4 | |
| Item | Description, Location, and # of Units | Type of Machine | Monthly Prcie per Unit | Monthly Prcie per Unit | Monthly Prcie per Unit | Monthly Prcie per Unit | Monthly Prcie per Unit | Total (all 5 Years) |
| Price Breakdown: | | | | | | | |
| | #1 passenger | | | | | | |
| | #2 passenger | | | | | | |
| | #3 passenger | | | | | | |
| | #4 passenger | | | | | | |
| | #5 Judges | | | | | | |
| | #6 service | | | | | | |
| | #7 service | | | | | | |
| | #8 USMS/Prisoner | | | | | | |
| | #9 USMS/Prisoner | | | | | | |
| | #10 USMS/Prisoner | | | | | | |
| | #11 passenger | | | | | | |
| | #12 passenger | | | | | | |
| | #1 dumbwaiter | | | | | | |
| Total Monthly Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Total Annual Price | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| See EXHIBIT J.5 VTE MAINTENANCE SERVICES, REPAIRS, AND REPLACEMENTS SPECIFICATION for all requirements - full maintenance services for the Elevator systems and inspections and test schedules. Next 5 year load test is due January 2024 (subject to change). |
| Monthly price should be including full maintenance services for the Elevator systems and inspections and routine (6 months), periodic (annual) test schedules and 5 year load tests. |