This document is an amendment to a solicitation for a design-build services contract for the Mike Mansfield Federal Building and U.S. Courthouse Seismic Retrofit and Limited Modernization project in Butte, Montana.
The amendment provides answers to questions received regarding the solicitation. Key details include: the selected Construction Manager, confirmation that progressive collapse mitigation is not required, and clarification that only daylight-applied fragment retention film on exterior windows is required for blast mitigation. The amendment also notes that small business subcontractors may rely on their team's capabilities to meet the past experience criteria. The solicitation closing date remains July 9, 2024. The overall project involves the design and construction of a seismic retrofit to bring the historic building to current standards, along with limited modernization of building systems and architectural elements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Amendment 0005 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization Page 2
Amendment 0005, June 14, 2024 Continuation of Block 14 of Standard Form 30 Solicitation 47PJ0024R0061 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization
Amendment 0005 is issued to: 1) provide answers to questions received in writing in response to the solicitation document.
1. Answers to questions are provided as follows:
Question 19: Has the Construction Manager been selected for the project? If so, which company will be filling that role?
Answer 19: The Construction Manager as Agent (CMa) selected for this project is Johnson, Mirmiran & Thompson, Inc.
(JMT). Ms. Debbie Drews is the designated Project Manager from JMT.
Question 20: Please confirm that Factor 1A projects will receive a neutral rating for Factor 4 Technical Qualifications if the client is not willing/able to complete a new Past Performance Questionnaire in the allotted timeframe.
Answer 20: The bases of evaluation for subfactors 4A and 4B informed offerors that the Government may rely for its evaluation upon "and any A/E firm" (subfactor 4A) or "General Contractor" (subfactor 4B) "past performance information that the Government becomes aware of." (Section VI.G Non-Price Factors, Subfactors 4A and 4B)
GSA may rely upon other records of relevant past performance apart from Past Performance Questionnaires as noted above in the "Basis for Evaluation" paragraphs of subfactors 4A and 4B, and as noted in Section III.H., "Contractor Performance Information," of the solicitation.
A neutral rating will be given to offerors without a record of relevant past performance or for whom information on relevant past performance is not available.
Question 21: For the Go-No Go Factor and Factor 1, please define substantial completion and advise if this applies to design or construction.
Answer 21: Refer to the response provided to Question #13 in Amendment 0003. Refer to GSAM 552.211-70 included in
The Agreement - Draft - Mansfield Seismic Retrofit DB.
Question 22: Please confirm that a Passive House Certification will not receive additional consideration as the solicitation is a nonresidential facility.
Answer 22: Refer to The Solicitation, Section VI.G Non-Price Factors, Evaluation Factor 3: Lead Designer, which provides for additional favorable consideration may be given to the extent that “The LD as Passive House Certification.”
Question 23: The Mike Mansfield FB/CT Seismic Retrofit/Limited Modernization Program Development Study –
Butte, Montana, 100% Submittal, October 31, 2023, notes that “After careful consideration, the FSC made a risk-based decision to decline the progressive collapse and blast mitigation requirements for FSL IV, as these would have a significant impact on usable space, tenant operations, and historic attributes.
Furthermore, blast strengthening of the exterior walls to meet FSL III blast resistance requirements were also waived. Instead, the recommendation was to limit the blast mitigation measures to the installation of daylight-applied fragment retention film on the glazing for all exterior windows per ISC and GSA requirements for windows for FSL III existing facilities.” However, Attachment 08 P100 Facilities Standards for Public Buildings, sections 4.5.1 and 4.5.2 indicate that we need to be in conformance with GSA ISC Interpretation Document (Blast Design) and with General Services Administration Alternate Path Analysis & Design Guidelines for Progressive Collapse, Revision 1, January 28, 2016.
Can you confirm that the scope is to limit the blast mitigation measures to the installation of daylight-applied fragment retention film on the glazing for all exterior windows per ISC and GSA requirements for windows for FSL III existing facilities and not include progressive collapse mitigation requirements
FSL IV?
Answer 23: The scope is limited to the installation of daylight-applied fragment retention film on the glazing for all exterior windows per ISC and GSA requirements for windows for FSL III existing facilities.
https://www.acquisition.gov/gsam/part-552#GSAM_552_211_70
Amendment 0005 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization Page 3
Question 24: Are FSL III progressive collapse structural mitigations required for the project?
Answer 24: FSL III progressive collapse structural mitigations are not required.
Question 25: If small business A/E firms do not meet the Similar Project criteria, but have teamed with partners to fulfill those criteria, is there a limit to how many projects each small business A/E firm should submit to show respective qualifications in their specialties for historic, MEP, local architectural, etc? It’s my understanding that 1 project (4 page limit) should be submitted for the Seismic Project, and 1, but no more than 3 Special Projects should be submitted for the prime offeror. Is there a limit for projects considered for the small business subcontractors (see Evaluation Factor 1).
Answer 25: In accordance with The Solicitation, Section VI.G. Non-Price Factors, Evaluation Factor 1: Technical Qualifications -- Past Experience of the General Contractor and A/E Firm:
Under Evaluation Subfactor 1A,"when an offer of a small business prime contractor includes a proposed team of small business subcontractors and specifically identifies the first-tier subcontractor(s) in the proposal, the head of the agency must consider the capabilities, past performance, and experience of each first tier subcontractor that is part of the team as the capabilities, past performance, and experience of the small business prime contractor if the capabilities, past performance, and experience of the small business prime does not independently demonstrate capabilities and past performance necessary for award." Please note the requirement of similarly situated businesses at the prime and first-tier subcontractors.
Each offeror (regardless of size) shall provide sufficient documentation in order to demonstrate the extent of the Offeror’s past experience for at least one (1) but no more than three (3) SPs total completed by the A/E Firm.
All other terms and conditions remain unchanged.
The Phase 1 proposal submission remains 1:00 PM Mountain Time, July 9, 2024.
| topmostSubform[0]: |
| Page2[0]: |
| TextField1[5]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[0]: |
| Page1[0]: |
| Code[0]: 8PQ |
| Copies[0]: 1 |
| CheckBox9[0]: 1 |
| Code[2]: 8PQ |
| NameandTitleOfficer[0]: Christie VandenDries, Contract Specialist |
| Is[0]: Off |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 2 |
| AmendmentNo[0]: 0005 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: GSA PBS Acquisition Division 8PQ |
1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ8PSMMM-24-0040 |
| Dated9B[0]: 5/2/2024 |
| C13[0]: |
| Description[0]: See attached Continuation of Block 14 of Standard Form 30. |
| NotExtended[0]: 1 |
| Code[1]: |
| AmendmentNo[1]: 47PJ0024R0061 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 6/21/2024 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: Off |
| D13[0]: |
| IssuedBy[0]: GSA PBS Acquisition Division 8PQ |
1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA NameandTitleSigner[0]: