This document is Amendment 0002 to Solicitation 47PJ0024R0061 for Design-Build Services for the Mike Mansfield Federal Building/Courthouse Seismic Retrofit & Limited Modernization project. The amendment provides answers to 11 questions received from potential offerors, including clarification on the similar project definition, the requirement for a past performance questionnaire, and the mandatory site visit. It also revises the Solicitation to expand the definition of similar projects to include construction manager as constructor (CMc) delivery method. The original solicitation was issued by the General Services Administration (GSA) Public Buildings Service Region 8 for a Phase 1 qualifications submission due July 9, 2024. The solicitation encompasses the design and construction of a seismic retrofit and limited modernization of the historic Mike Mansfield Federal Building and Courthouse in Butte, Montana.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Amendment 0002 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization Page 2

Amendment 0002, May 21, 2024 Continuation of Block 14 of Standard Form 30 Solicitation 47PJ0024R0061 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization

Amendment 0002 is issued to: 1) provide answers to questions received in writing in response to the solicitation document. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation.

The Solicitation – Phase 1, revision dated May 21, 2024.

1. Answers to questions are provided as follows:

Question 5: Will there be a pre-submittal meeting held for the Phase 1 responses?

Answer 5: There are no oral presentations or pre-submittal meetings contemplated for Phase 1 or Phase 2 of this solicitation.

Question 6: In The Solicitation Evaluation Factor 3, Submittal Requirement 1.A (page 16 of 17), the time frame given is “ten (12) years prior”. Can you please clarify what timeframe is to be used?

Answer 6: The timeframe is twelve (12) years. The Solicitation, Section VI.G. Non-Price Factors, Evaluation

Factor 3 has been updated from "ten (12)" to read "twelve (12)."

Question 7: In The Solicitation Evaluation Factor 3, Submittal Requirement 1.B (page 16 of 17), an option is given for the LD as a team. Can you please clarify how a team is designated for purposes of this response? For example, if a previous seismic retrofit had both a lead architect and structural engineer, would this be considered a “Team” for this item?

Answer 7:

Attachment 16 -- Design Excellence Policy and Procedures, Section 3.4, Portfolio Requirements states, the lead designer as a team is defined as "a team of two people." The lead designer(s) may have headed these projects with the affiliated design firm or with other entities.

Question 8: For Evaluation Subfactor 4B Past Performance of the General Contractor, is it acceptable to submit a Contractor Performance Assessment Reporting System (CPARS) Report associated with prior federal projects (which we will also list in Factor 1) in lieu of the Attachment 2 Questionnaire?

Answer 8: No. CPARs evaluations do not allow the Government to properly confirm the project is a Similar Project. For each Offeror reference, the Offeror shall complete Section 1 and then distribute the Past Performance Questionnaire (Solicitation Attachment 04 for GCs, Solicitation Attachment 05 for A/Es) to reach Reference for completion. The References shall email the completed Past Performance Questionnaire to Christie VandenDries, Contracting Officer at christie.vandendries@gsa.gov not later than the date specified for solicitation closing. The email subject line should contain the solicitation number and the name of the offeror. Completed questionnaires submitted by the Offeror will not be accepted. While the Government may elect to consider data from any source, the burden of providing detailed, current, accurate and complete past performance information by the deadline for initial submissions rests with the Offeror and its evaluator/reference. GSA may also contact and question the past performance references directly. Information specific to the Similar Project is requested within the Past Performance Questionnaire. This information must be confirmed by the Reference.

Question 9: Is the site visit mandatory for participating in this solicitation?

Answer 9: No, it is not mandatory.

Question 10: Will the GSA consider expanding the Similar Project definition for Factors 1A and 1B to include projects using an alternative delivery method such as CMAR/GCCM, not just design-build or

IPD?

Answer 10: Yes. The Similar Project definition has been expanded to include an alternative delivery method, such as CMAR/GCCM. The Solicitation, Section VI.G. Non-Price Factors, Evaluation Factor 1, Subfactor 1A and 1B, Similar Project definition has been updated to include:

The project substantially used the design–build, integrated project delivery (IPD) methods, or Construction Manager as Constructor (CMc). For the purposes of this evaluation factor, IPD is defined as the execution of a multiparty agreement in which the owner or developer contracted with a single offeror to provide all or substantially all, of the design and construction services for that

Amendment 0002 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization Page 3 project. For the purposes of this evaluation factor, CMc is defined as a project delivery method where design and construction are contracted concurrently through two separate contracts and two separate contractors. Unlike the traditional design-bid-build delivery method, under the CMc delivery method, the Government awards a separate contract to a designer (i.e., architect-engineer contractor) and to a construction contractor (i.e., CMc contractor) prior to the completion of the design documents. The Government retains the CMc contractor during design to work with the architect-engineer contractor to provide constructability reviews and cost estimating validation. The CMc contract includes design phase services at a firm-fixed-price and an option for construction at a guaranteed maximum price.

Outside of federal construction projects, CMc may sometimes also be known as Construction Manager at Risk (CMAR) or General Contractor/Construction Manager (GCCM).

Question 11: Will GSA consider expanding the Similar Project definition for Factors 1A and 1B to allow for design-build federal projects for new construction, not on the National Register of Historic Places?

Answer 11: No. The Similar Project definition will not be expanded to include new construction.

2. Changes are made to The Solicitation – VI.G. Non-Price Factors as follows:

Subfactor 1A and 1B Similar Project Definition

FROM:

TO:

Evaluation Factor 3: Lead Designer

FROM:

Amendment 0002 – D-B Services – Mike Mansfield FB/CH Seismic Retrofit & Ltd Modernization Page 4

TO:

All other terms and conditions remain unchanged.

The Phase 1 proposal submission remains 1:00 PM Mountain Time, July 9, 2024.

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 8PQ
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 8PQ
NameandTitleOfficer[0]: Christie VandenDries, Contract Specialist
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 5
AmendmentNo[0]: 0002
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: GSA PBS Acquisition Division 8PQ

1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ8PSMMM-24-0040
Dated9B[0]: 5/2/2024
C13[0]:
Description[0]: See attached Continuation of Block 14 of Standard Form 30.
NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PJ0024R0061
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 5/21/2024
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: GSA PBS Acquisition Division 8PQ

1 Denver Federal Center PO Box 25546, Building 41 Denver, CO 80225-0546 USA NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .