This solicitation requests design-build proposals for the modernization of Building 48 on the Denver Federal Center. The General Services Administration seeks to convert an existing 154,000 square foot vacant warehouse into modern office space for federal employees. Proposals will be evaluated in two phases, with up to three offerors shortlisted after Phase 1 to submit Phase 2 proposals. Design and construction services are to include structural enhancements, mechanical, electrical and plumbing system replacements, and exterior site work. The estimated contract value is between $35-50 million. This opportunity is set aside for small businesses certified in SAM.gov with a size standard of $39.5 million averaged over five years. The selected offeror will receive a firm fixed price design-build contract to complete the project in close collaboration with GSA and stakeholders.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation Number: 47PJ0020R0066

Denver Federal Center Building 48 Modernization Project

RFI #1

February 27, 2020

Question 1: The size standard for the NAICS code is 236220 $35.5M. How could a small business qualify if you require a portfolio of $50M projects that they have led?

Answer: For clarification, the size standard for NAICS code 236220 is presently $39.5M.

Determining a business size has nothing to do with the project cost. 13 Code of Federal

Regulations 121 is used for determining small business size standards and the new size standard is the average of gross revenue over a 5 year average. For construction that size it is presently $39.5M, so over a 5 year period that is a total of $197.5M. When a firm starts working larger construction projects that span 2 or 3 years, not all the project revenue is realized in 1 business Fiscal Year. As an example, $30M over a 2 year project would be ~$15M per year. Also, if a Small Business Joint Venture on a Total

Small Business set-aside project of $50M, not all revenue is going to be credited to the

Small Business, but they will get credit for being awarded a $50M project because they are the majority owner (51%) of the Small Business Joint Venture. For example, of the

$50M project, the Small Business would have revenue of ~$25.5M spread over the life of the project.

Finally, the definition of similar project for Technical Proposal Phase 1 as stated in the solicitation is as follows:

Construction was substantially completed within eight years by the proposed General

Contractor as the General Contractor or the proposed A/E as the A/E of record prior to the submission deadline for Phase 1 proposals, and the project included all of the following characteristics:

Renovation of an existing building for commercial, public, or institutional use, excluding projects where over 20 percent of the gross square footage of the building is for storage such as, for example, warehouses and airplane hangars;

Project area was not less than 80,000 gross square feet; and

Contract cost was greater than $25 million.

Clarification: The Related Notice incorrectly states the Pre Solicitation number

(47PJ0020R0006) and the correct number is 47PJ0020R0066. Pre Solicitation for this requirement was issued on January 28, 2020.