This document provides details for a federal design-build contract opportunity to renovate approximately 1,500 square feet of office space for the U.S. Probation Office in the Mike Mansfield Federal Building and U.S. Courthouse in Butte, Montana. The scope of work requires design and construction services including architectural and engineering design, mechanical, electrical, and plumbing work, alterations to existing spaces, and fire protection system work. Offerors must provide past performance, experience, key personnel qualifications, and pricing in separate technical and price volumes. Pricing is requested using CSI format with allocation to shell or tenant improvement costs. The solicitation number is 47PJ0020R0030 and is set aside for small businesses. The contract type is firm-fixed-price and the NAICS code is 236200. The period of performance includes design services through 100% construction documents with construction to follow. The General Services Administration Public Buildings Service Region 8 is the contracting agency.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
8PQ
Dylan T. White, Contracting Officer
Amendment 0006 to GSA Solicitation No. 47PJ0020R0030 hereby incorporates by reference the following requests for information (RFI) and responses.
RFI #22: Will the existing wall mounted sink meet the USPO Requirement "ADA Compliant plastic laminate sink and counter with backsplash with undercounter storage with doors and adjustable shelving"?...
[See Description of Modification Continuation Page]
8PQ
GSA PBS Acquisition Division 8PQ
1 Denver Federal Center
PO Box 25546, Building 41
Denver, CO 80225-0546 USA
GSA PBS Acquisition Division 8PQ
1 Denver Federal Center
PO Box 25546, Building 41
Denver, CO 80225-0546 USA
EQ8PCS-20-0007
47PJ0020R0030
1 5
1/28/2020
12/2/2019
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Description of Modification Continuation Page
... Or will the existing lavatory need to be replaced?
Response to RFI #22: Remove existing and replace with USPO Requirement ABAAS compliant.
RFI #23: The existing toilet is not ABA compliant. Will the toilet need to be replaced to meet ABA?
Response to RFI #23: Remove existing and replace with USPO Requirement ABAAS compliant.
RFI #24: The SOW, Section 6 and USPO Requirements indicate PLAM counters; however, the DID drawings A5.0
& A5.1 show solid surface or stainless steel counters. Which type of countertop type is correct?
Response to RFI #24: PLAM counters are correct.
RFI #25: Do special requirements take priority? DID: Paint, WB1, VCT. SPO: Ceramic Tile, cove
Response to RFI #25: USPO special requirements take priority.
RFI #26: The USPO requirements show 4" rubber base, however the DID Finish schedule shows wood base. Which is correct?
RFI Response #26: The base will need to match what is existing to remain.
RFI #27: Does the reception area require 2 data drops per the USPO requirements?
Response to RFI #27: No data drops in reception / waiting area.
RFI #28: Is the GFCI outlet near the sink in the UA Toilet required per USPO special requirements or omitted per
DID drawings A3.0?
Response to RFI #28: Yes, a GFCI outlet near the sink is required.
RFI #29: Will the two radiant heaters at the windows of the outer restroom and vestibule need to be removed? Or were they omitted from the DID drawings?
Response to RFI #29: The radiant heaters do exist and were not shown in the DID. That room is proposed as 1 room and will not need 2 as before. What are the options for heating in that room with the goal to minimize the unit(s) size and space it takes up? Is it possible to decommission 1 unit, basically consolidate to 1 unit?
RFI #30: Can you confirm the adjustable shelves in the UA Storage will be provided by the Agency? Does this include blocking and installation or just the materials?
Response to RFI #30: Adjustable shelves in the UA Storage will be provided by the Contractor and installed with blocking. This can be a metal track and brackets with PLAM shelves.
RFI #31: IS CPT acceptable in the Supply storage room or will VCT be required per the USPO Requirements?
Response to RFI #31: VCT is required for flooring in the Supply Room.
47PJ0020R0030/0006
RFI #32: Will the refrigerator be provided by the Agency as an owner furnished contractor installed item or contractor furnished installed item? If it is owner furnished, then can the owner provide a make and model?
Response to RFI #32: Contractor furnished and installed item.
Break room: Refrigerator - Suggested or similar to GE - Spacemaker 5.6 Cu. Ft. Mini Fridge - Stainless steel, Model:
GCE06GSHSB. Under Counter 24" width freezer.
UA Storage: 1 Refrigerator - Under counter with NO freezer. Similar to Magic Chef 4.4 Cu. Ft., Stainless Steel, Model: HMAR440ST
RFI #33: Will the microwave be provided by the Agency as an owner furnished contractor installed item or a contractor furnished contractor installed item? If it is owner furnished, then can the owner provide a make and model?
Response to RFI #33: Contractor furnished and installed item. Microwave - in upper cabinet opening, not built in so it can be easily removed in the future. Stainless steel. Make sure the microwave has space for venting.
RFI #34: Is the breakroom sink to be a single compartment (DID drawings) or double compartment sink per USPO requirements?
Response to RFI #34: Double compartment sink.
RFI #35: Is a waterline for a future refrigerator required per USPO plumbing requirements?
Response to RFI #35: No.
RFI #36: Will relocation of existing toilet accessories be acceptable?
Response to RFI #36: No, please provide new toilet accessories per USPO requirements for UA Bathrooms.
RFI #37: Can the Government provide information on the heating load for the 24/7 cooling unit of the server closet for budgeting purposes?
Response to RFI #37: The server closet will only house the local switch, environmental monitor, access monitoring camera and UPS. Total max output would be 1,665 watts. That is with a maximum load, however, which would not occur often, if at all. Typical ongoing load would be more around 650 to 850 watts for the five devices. Offerors may convert this information to BTUs for the requested purpose. The owner does not necessarily require much for cooling as the existing devices do not generate much heat. Server Rack - to be procured and installed by
Contractor. USPO IT Specialist to provide rack specifications. Incoming from Court IT Specialist.
RFI #38: What signage will the contractor be required to provide for the project? Identification, directional, information/security signage?
Response to RFI #38: Signage is required for outside of the front door into the office identifying the space. This sign would be consistent with signage throughout the courthouse.
(End of Requests for Information)
Amendment 0006 to GSA Solicitation No. 47PJ0020R0030 hereby amends the response to RFI #15. The RFI #15 and response shown below shall supersede and take precedence over any previous RFI #15 and Response to RFI
#15.
RFI #15: Will the existing electrical require a dedicated ground to the exterior of the building and require removal and replacement of hard surfaces? The USPO Special Requirements call for one half of the outlets to be equipped with an isolated ground for "clean power". Does the isolated ground conductor have to be extended to the main electrical services on the exterior of the building (neutral/ground bonding point)? If so, it may require removal/replacement of the existing hard surfaces and trenching.
Response to RFI #15: The requirement for one half of the outlets to be Isolated Ground Receptacles is removed from the project. All the outlets shall be bonded to the solidly grounded system. No removal/replacement and trenching of hard surfaces is anticipated.
(End of Amended RFI and Responses)