Sol 47PJ0020R0030_Attach_1 -PPQ.pdf
PDF 541 KB Posted
- Attached to
- U. S. Probation Office Renovation Federal contract opportunity
- Solicitation number
- 47PJ0020R0030
About this file
This document includes a request for proposal and related federal contract opportunity notice. The General Services Administration Public Buildings Service Region 8 is soliciting design-build services for repairs, alterations, and renovations to approximately 1,500 square feet of office space for the U.S. Probation Office in the Mike Mansfield Federal Building and U.S. Courthouse in Butte, Montana. The scope of work requires full design and construction services including architectural, engineering, and interior design to build out the new office space. Offerors must provide past performance questionnaires, pricing in CSI format allocated to shell or tenant improvements, bid bonds, and meet subcontracting requirements. The contract type is firm-fixed price and set aside for small businesses. The evaluation criteria weights past performance at 40%, relevant experience at 30%, and key personnel experience at 30%. The deadline to submit proposals is February 18, 2020.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation GSA Solicitation No. 47PJ0020R0030 Mike Mansfield Federal Building & U.S. Courthouse 400 North Main Street, Butte, MT
1 | P a g e
Request for Proposal Attachment 3: Offeror’s Past Performance Questionnaire for
GSA Solicitation No. 47PJ0020R0030
U.S. Probation Office Renovation at Mike Mansfield Federal Building & U.S. Courthouse
FOR OFFICIAL USE ONLY, SOURCE SELECTION INFORMATION (FAR 3.104)
INSTRUCTIONS: The offeror must complete Section 1, 2, and 3 on this form, contact their clients, forward this form to the client point of contact, and request the client reference complete Section 4 and the past performance questionnaire (pages 3 – 4). Client references should refer to page 5 to mark the technical complexity of work in Section 4. Any requested explanations in Sections 1 – 4 must be limited to no more than 500 characters (with spaces).
SECTION 1: CONTRACTOR INFORMATION
Contractor Name: Point of Contact:
Address: Phone Number:
Unique Entity Identifier Number (e.g. DUNS): Email Address:
SECTION 2: CONTRACT INFORMATION
Contract No.:
Delivery/Task Order Number (if applicable):
Project Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy):
Explain Differences (limited to 500 characters or less):
Original Contract Price: Final Contract Price (to include all modifications):
Explain Differences (limited to 500 characters or less):
Provide a brief description of the project to support the extent to which the submitted example of past performance meets the definition of Similar Project (see solicitation). The project description is limited to no more than 500 words.
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation
2 | P a g e
SECTION 3: CLIENT INFORMATION
Reference Name and Title:
Reference Phone Number:
Reference Email Address:
SECTION 4: PROJECT DETAILS
Technical Complexity of Work
(Refer to page 5 to verify the indicated technical complexity of work): ☐ High ☐ Medium ☐ Low
Do you concur with the information and project description provided by the offeror (sec. 1 – sec. 3) for the selected project submitted for the offeror’s past performance? ☐ Yes ☐ No (If no, please give a brief explanation of the discrepancy).
Explanation of any discrepancy (as needed):
Does the project use a design-build delivery method? ☐ Yes ☐ No
Did the offeror perform work as the prime contractor? ☐ Yes ☐ No
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation
3 | P a g e
INSTRUCTIONS: Clients should complete past performance questionnaire (PPQ) (pages 3 and 4 of this attachment) and review
Offeror’s Relevant Experience Attachment (to ensure contractor completed information is correct). Clients are also requested to complete Section 4 on page 2. The PPQ should be returned to the offeror to be submitted in response to GSA Solicitation No.
47PJ0020R0030 and the indicated client reference should sign the PPQ. If requested by the offeror, then the client may submit the completed PPQ directly to Dylan White (dylan.white@gsa.gov) and Heath Moore (heath.moore@gsa.gov).
INSTRUCTIONS: Please mark the adjective rating which best reflects your evaluation of the contractor’s performance. The client may attach pages or increase the row height to any fields that request a written response if the box does not provide sufficient space. Refer to page 6 for the definitions of adjectival ratings. Narrative responses for each rating factor (quality, schedule/timeliness of performance, management, customer satisfaction, and general) are limited to 24,000 characters. If additional space is necessary, the blocks for explanations may be expanded or page(s) may be attached to the PPQ.
QUALITY: E VG S M U N
The overall perceived quality of the services and product. ☐ ☐ ☐ ☐ ☐ ☐
Effectiveness of identification of issues in quality of work and correction of deficient work.
Effectiveness of independent technical reviews and ability to address and review comments.
Ability to develop a design within stated specifications, requirements, and the scope of work and deliver a final product in accordance with the plans and drawings.
Note: If applicable, provide an explanation of resolution measures. Describe any evident measures attributed to the quality rating.
SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N
Compliance with delivery/completion schedules including any significant intermediate milestones, including the completion of punch list items.
Timeliness responding to questions, comments, and requests for changes as well as incorporation of comments into the development of final product.
Timeliness in completion of administrative activities such as invoices, security clearances, furnishing of any O&M manuals, an
Note: Describe transparency of project schedule and any other processes or tools utilized to ensure timeliness of overall project delivery.
Describe any issues in timeliness and whether the contractor adequately implemented corrective action to maintain or improve the schedule.
mailto:dylan.white@gsa.gov mailto:heath.moore@gsa.gov
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation
4 | P a g e
MANAGEMENT: E VG S M U N
Effectiveness of management and coordination of activities to ensure incorporation of input from all stakeholders and produce a solution aligned with requirements, scope, and specifications.
Effectiveness in the management solution with overall constructability1. ☐ ☐ ☐ ☐ ☐ ☐
Effectiveness of business relationship with the design firm ☐ ☐ ☐ ☐ ☐ ☐
Effectiveness of quality control/quality assurance processes to produce a product of stated quality or better while successfully controlling costs/price.
Note: Describe efforts taken by contractor to manage the overall quality of the product. Describe how contractor’s efforts to integrate and coordinate activities contributed to achievement of project goals and objectives.
OVERALL PAST PERFORMANCE: E VG S M U N
Provide a rating of the overall customer satisfaction with the project. ☐ ☐ ☐ ☐ ☐ ☐
GENERAL PAST PERFORMANCE INFORMATION:
Would you hire or work with this firm again? ☐ Yes ☐ No
Were liquidated damages assessed? ☐ Yes ☐ No
Provide any additional remarks with specific events or actions to justify whether or not the firm would (or would not) be recommended.
“Constructability” means “…the effective and timely integration of construction knowledge into the conceptual planning, design, construction, and field operations of a project to achieve the overall project objectives in the best possible time and accuracy at the most cost-effective levels.” (Source: Construction Management Institute, Constructability (Best Practice) RT003-Topic Summary)
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation
5 | P a g e
INFORMATION: Use the following to describe or verify the technical complexity of the project.
Rating Definition Examples
Low The contract requires mature, proven technology or services of a non-complex nature, such as the production of simple items, or performance of simple operations. Contract requirements are simple, and efforts are routine. Highly skilled labor is not required in order to meet contract requirements. The contract may be for a follow-on, repetitive type, or commercial acquisition. Contract requirements can be accomplished with a low degree of management effort, and routine services may be performed with minimal supervision.
commercial-off-the-shelf supplies or parts (such as transistors) commercial services (such as grounds keeping)
Medium The contract requires mature, proven technology or services of a moderately complex nature. While the technology may be moderately complex, and the services require skilled labor, no new technology is being developed, and the technology is being used for proven applications only. No new applications of technology are being performed. Contract specifications have moderate tolerances, and may have a routine delivery schedule. A moderate degree of management oversight is required to ensure accomplishment of contract requirements.
night vision googles design and construction services for repairs and alterations to real property financial support services
High The contract requires new technology or services, or a new application of existing technology or services, with a high degree of technical uncertainty. Performance requires state-of-the-art machinery, or highly skilled personnel. Contract specifications include stringent tolerance limits, and services must be performed to exacting standards. The contract may have an accelerated delivery schedule. A high degree of management effort is required to ensure accomplishment of contract requirements.
development of new aircraft development of new weapon system
General Services Administration, Public Buildings Service Region 8 Project: U.S. Probation Office Renovation
6 | P a g e
INFORMATION: Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.
Rating Definition Note
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government’s/Owner’s benefit. The contractual performance on the element or sub-element being evaluated was accomplished with few minor problems for which corrective action taken by the contractor was highly effective.
An Exceptional rating is appropriate when the contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective action taken by the Contractor were effective.
A Very Good rating is appropriate when the contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements.
The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective, or were not fully implemented.
A Marginal rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract. Rating will be neither positive nor negative.
File details come from the government source that posted it. Updated .