Exhibit_I._SOO_Exhibit.pdf

PDF 58 KB Posted

Attached to
Replacement of cooling tower & Pumps at Federal Building/Courhouse, Laredo, TX
Solicitation number
47PH1118R0009
Issued by

About this file

Sequence of Operations

View the file

Other files

File Type Posted
PUMP_EXHIBIT_20180919_(1).pdf PDF
New_SOW_9-20-18.rtf RTF text file
SOO_Exhibit_Laredo_(1).docx DOCX document
09_Pre-Proposal_Record.pdf PDF
Laredo_RFI_(1).pdf PDF
SOW_10-17-18.doc DOC document
C101_The_Agreement.pdf PDF
C301_GC_Reps_&_Certs.pdf PDF
Exhibit_D.pdf PDF
Exhibit_F._Gauge_Exhibit.pdf PDF
Exhibit_B.pdf PDF
TX235_01-05-18.pdf PDF
Exhibit_H._PUMP_EXHIBIT.pdf PDF
Exhibit_A.pdf PDF
Exhibit_C.pdf PDF
Exhibit_G._Lighting_Exhibit.pdf PDF
47PH1118R0009__Form.pdf PDF
Exhibit_E.__Cooling_Tower.pdf PDF
GSA527-15b.pdf PDF
TX0311__SOW_08-09-2018.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOO Exhibit

Laredo Sequence of Operation (Chiller Plant)

Chilled Water/Hot Water System Sequence of Operation

1. The chilled water/hot water system for the building will consist of two chillers, cooling tower, condenser water pumps, chilled water pumps, hot water pumps, boiler(s) and associated automated valves to generate building chilled water/hot water for the air handling units.

2. Chillers-The chill water system, chillers and associated equipment will be enabled any time the outside air temperature is above 65 degf (adjustable). The chillers will operate as Lead-Lag and the lead chiller will be alternated on a weekly (adj.) basis with a manual BAS override capability.. If the lead chiller fails to start or the chilled water temperature rises above 3 degf above the chilled water set point the lag chiller shall be enabled. When enabled the lead chiller isolation valves will be commanded open. Once open as confirmed by the valve end switches the corresponding chiller pumps will activate to provide water flow to the chiller barrels. The chiller will then be started and will operate under its on board controls and safeties. The chilled water supply temp shall vary based on a linear reset table. When outside temp is below 65℉ (adj) chilled water temp shall adjust to 52℉ (adj). Likewise when outside temp is above 84℉ (adj) the chilled water temp shall adjust to 46℉ (adj.) When the lead chiller reaches 85%(Adj) of its rated full load KW for 15 consecutive minutes(Adj), the lag chiller shall start or if the chilled water temperature rises 3 degf(Adj) above the chilled water set point of the lead chiller. When both chillers are operating and the load decreases on the lag chiller to 25%(Adj) of its full load KW for 15 consecutive minutes (Adj), the lag chiller will shut down, the associated pumps will shut off and the associated two way automated valves will close.

3. Condenser water pumps- Each condenser pump shall be connected to a VFD. The condenser water pumps will be enabled with the chiller. The condenser water pump(s) will modulate to maintain chiller’s design pressure drop. The VFD speed (HZ) and the condenser water pressure drop (PSID) will be displayed on the BAS chiller plant graphics page.

4. Chilled water pumps- Each chilled water pump will be connected to a VFD. The chilled water pumps shall vary its speed to maintain a 10 degf differential temperature (Adj) across the chiller’s evaporator but never drop below the chiller’s minimum pressure drop. The pressure drop (psid) and VFD speed in Hz will be displayed on the BAS chiller plant graphics page.

5. Cooling Tower-Anytime one of the chillers are operating the cooling tower fans will be enabled.The cooling tower fans and bypasses will modulate to maintain a dead band of 4°F (adjustable) above Outdoor WB temperature with a minimum temperature of 65℉ and maximum of 80. Bypass shall not by pass water while the tower fan is operating. Maintain a 3 ℉ deadband (adjustable) between the fan operating and the bypass operating. Lead tower will rotate on a weekly basis. Tower failure will generate an alarm and switch to lag tower. An alarm notification will be sent by the BAS.

6. Boilers- The lead boiler and associated hot water pump will be enabled when OAT drops below 58 degf (Adj).Two boilers alternate run time weekly.(Adj) Manual override capabilities will be provided on the BAS graphics page for the boiler system.

Note: The chiller plant and boiler shall have a schedule to enable and disable based on unoccupied and occupied time schedule.