Amendment 5 - 47PH0824R0012.pdf
PDF 4 MB Posted
- Solicitation number
- 47PH0824R0012
About this file
This document is Amendment 5 to Solicitation 47PH0824R0012 for the Ysleta Land Port of Entry Pavement Replacement Repairs Project in El Paso, Texas. The amendment provides updates to the Division 1 specifications, including revisions to the work sequence, options, and unit prices. It also includes the RFI questions and answers that were posted in Amendment 4, as well as site maps for questions related to staging and water availability. The proposal due date remains the same, October 17, 2024 at 12:00 P.M. Fort Worth, TX local time, and only electronic submissions are allowed. The project consists of approximately 397,975 sf of pavement repair or replacement at nine sites within the Ysleta Land Port of Entry. The work includes concrete pavement replacement, surface reconstruction, joint seals, crack seals, and traffic control. The project is set aside for small business firms, with an estimated construction cost between $10,000,000 and $15,000,000.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PA05
7PQA
Yselta Land Port of Entry Pavement Replacement Repairs Project - 47PH0824R0012 See following pages for description of Amendment 5.
Due date remains the same, October 17, 2024 at 12:00 P.M. Fort Worth, TX Local Time.
7PQA
GSA/PBS/AMD/7PQA
819 Taylor Street: STE 11A09 Fort Worth, TX 76102
Same as Box 6
PA05/47PH0824R0012
10/03/2024
10/03/2024
Solicitation 47PH0824R0012 Amendment 5 Ysleta Pavement Repairs Replacement Project, El Paso, TX
Amendment No. 5 Ysleta Pavement Replacement Repairs Project, El Paso, Texas
This amendment is issued to provide the following:
The following sections to the attached Division 1 specifications (Dated October 3, 2024) have been updated as follows:
01 10 00 - 1.2 Work Sequence 01 24 00 - Options, Part 3 Execution, 3.1 Schedule of Options 01 27 00 - Unit Prices, Part 3 Execution, Unit Price Item Schedule
Also included are the RFI questions and answers that were posted in Amendment 4.
• RFI Questions and Answers, 1-62.
• Site Map for question and answer # 42 (Staging)
• Site Map for Question and Answer # 43 (Water Availability)
REMINDER: Proposal Due date remains the same, October 17, 2024, at 12:00 P.M. Fort Worth, TX Local Time. Only electronic submissions are allowed, and all submissions are to be emailed to Jason Gerloff at: Jason.gerloff@gsa.gov.
mailto:Jason.gerloff@gsa.gov
PROJECT TITLE PAGE 00 01 01 - 1
U.S. GENERAL SERVICES ADMINISTRATION
GREATER SOUTHWEST REGION
Pavement Replacement Repairs Ysleta Land Port of Entry ePM Number – 354
El Paso, Texas
100% F inal Phase Documents August 29 , 202 4
Prepared by: RICHTER ARCHITECTS 201 South Upper Broadway Corpus Christi, Texas 78401 Telephone: 361-882-1288
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT TO
UNAUTHORIZED RECIPIENTS IS PROHIBITED
Do not remove this notice Properly destroy or return documents when no longer needed.
Updated Spec i f icat ions October 3 , 2024 issued in Amendment 5 .
PAVEMENT REPLACEMENT REPAIRS PROJECT NO: 354
Ysleta Land Port of Entry; El Paso, Texas Building No: Ysleta LPOE
47PH0817D0017 Greater Southwest Region 7
SEALS PAGE 00 01 07 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 00 01 07 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. ARCHITECT:
1. David Richter, FAIA
RICHTER ASSOCIATES
201 S. Upper Broadway Corpus Christi, Texas 78401
(361) 882-1288
2. Texas Architectural Registration No. 7113
3. Responsible for Divisions 00-01 Sections; except where indicated as prepared by other design professionals of record.
B. CIVIL ENGINEER:
1. James D. Davis, Jr., P.E.
Walter P. Moore 500 N Akard Street, Suite 2300 Dallas, Texas 75201
(214) 740-6238
2. Texas Professional Engineer No. 91256
3. Responsible for Division 31-32 Sections; except where indicated as prepared by other design professionals of record.
END SECTION 00 01 07
08/29/2024
DIVISION – SECTION TITLE PAGES
TABLE OF CONTENTS 00 01 10 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - PROJECT TITLE PAGE
00 01 07 - SEALS PAGE
00 01 10 - TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 - SUMMARY
01 14 00 - WORK RESTRICTIONS
01 21 00 - ALLOWANCES
01 24 00 - OPTIONS
01 25 00 - SUBSTITUTION PROCEDURES
01 27 00 - UNIT PRICES
01 29 00 - PAYMENT PROCEDURES
01 30 00 - GSA PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)
01 31 00 - PROJECT MANAGEMENT AND COORDINATION
01 31 10 - CRITICAL PATH METHOD (CPM) SCHEDULING FOR PROSPECTUS PROJECTS
01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION
01 32 20 - PHOTOGRAPHIC DOCUMENTATION
01 33 00 - SUBMITTAL PROCEDURES
01 40 00 - QUALITY ASSURANCE AND CONTROL REQUIREMENTS GUIDANCE
01 42 00 - GENERAL REFERENCES
01 50 00 - TEMPORARY FACILITIES AND CONTROLS
01 59 30 - SECURITY REGULATIONS
01 59 50 - SAFETY AND HEALTH
01 60 00 - PRODUCT REQUIREMENTS
01 70 00 - EXECUTION REQUIREMENTS
01 73 10 - CUTTING AND PATCHING
01 73 20 - SELECTIVE DEMOLITION
01 74 19 - CONSTRUCTION NON-HAZARDOUS WASTE MANAGEMENT AND DISPOSAL
01 77 00 - CLOSEOUT PROCEDURES
01 78 10 - PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
NOT APPLICABLE
DIVISION 03 – CONCRETE
NOT APPLICABLE
DIVISION 04 - MASONRY
NOT APPLICABLE
DIVISION 05 – METALS
NOT APPLICABLE
DIVISION 06 - WOOD AND PLASTICS
NOT APPLICABLE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
NOT APPLICABLE
DIVISION 08 - OPENINGS
NOT APPLICABLE
DIVISION – SECTION TITLE PAGES
TABLE OF CONTENTS 00 01 10 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
DIVISION 09 – FINISHES
NOT APPLICABLE
DIVISION 10 - SPECIALTIES
NOT APPLICABLE
DIVISION 11 - EQUIPMENT
NOT APPLICABLE
DIVISION 12 - FURNISHINGS
NOT APPLICABLE
DIVISION 13 - SPECIAL CONSTRUCTION
NOT APPLICABLE
DIVISION 14 – CONVEYING EQUIPMENT
NOT APPLICABLE
DIVISION 20 - MEP COMMON CONDITIONS
NOT APPLICABLE
DIVISION 21 - FIRE SUPPRESSION
NOT APPLICABLE
DIVISION 22 – PLUMBING
NOT APPLICABLE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
NOT APPLICABLE
DIVISION 25 - INTEGRATED AUTOMATION
NOT APPLICABLE
DIVISION 26 - ELECTRICAL
NOT APPLICABLE
DIVISION 27 - COMMUNICATIONS
NOT APPLICABLE
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
NOT APPLICABLE
DIVISION 31 - EARTHWORK
31 11 00 - CLEARING AND GRUBBING
31 25 00 - EROSION AND SEDIMENTATION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 - ASPHALT CONCRETE PAVING
32 13 13 - CONCRETE PAVEMENT
32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS
DIVISION 33 – UTILITIES
NOT APPLICABLE
DIVISION – SECTION TITLE PAGES
TABLE OF CONTENTS 00 01 10 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
DIVISION 34 - TRANSPORTATION
NOT APPLICABLE
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
NOT APPLICABLE
DIVISION 40 - PROCESS INTEGRATION
NOT APPLICABLE
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
NOT APPLICABLE
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
NOT APPLICABLE
DIVISION 43 - PROCESS GAS & LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT
NOT APPLICABLE
DIVISION 44 - POLLUTION AND WAST CONTROL EQUIPMENT
NOT APPLICABLE
DIVISION 45 - INDUSTRIAL-SPECIFIC MANUFACTURING EQUIPMENT
NOT APPLICABLE
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
NOT APPLICABLE
DIVISION 48 - ELECTRICAL POWER GENERATION
NOT APPLICABLE
MISCELLANEOUS
ITEM 688 – PEDESTRIAN DETECTORS AND VEHICLE LOOP DETECTORS
END OF TABLE OF CONTENTS 00 01 10
47PH0817D0017 Greater Southwest Region 7
SUMMARY 01 10 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 10 00 – SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Name and Location:
1. Ysleta LPOE Select Paving Replacement and Repairs – El Paso, Texas
B. Project Summary Description: Replace select sections of pavements at the Ysleta
Land Port of Entry as defined in the design documents.
C. Architect/Engineer: The term Architect/Engineer refers to the project designer. The
Architect/Engineer’s status relative to the construction will be stated in writing by the
Contracting Officer prior to the pre-construction conference.
1. The Project was designed by:
a. Architect: Richter Architects, 201 South Upper Broadway Blvd., Corpus Christi, Texas 78401.
b. Civil Engineer: Walter P. Moore, 1301 McKinney, Suite 1100, Houston, Texas, 77010.
D. Project Delivery Method: Traditional.
E. No Key Consultants.
F. Construction Manager: TO BE DETERMINED
G. See GSA’s Partnering with the Public Building Service Policy dated March 5, 2014.
NOT APPLICABLE.
H. Commissioning: NOT APPLICABLE
I. All roles will be delineated in writing by the Contracting Officer prior to or at the pre-construction conference. The Construction Manager is: TO BE DETERMINED.
J. Construction Manager as Constructor (CMc): NOT APPLICABLE
K. The Contracting Officer for the project is:
1. Jason Gerloff
819 Taylor Street, Suite 12A
Fort Worth, Texas 76102
Ph: (817) 201-8269
47PH0817D0017 Greater Southwest Region 7
SUMMARY 01 10 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
1.2 WORK SEQUENCE
A. The work shall be conducted in multiple phases across five sites. The Contractor shall coordinate phasing and scheduling with the Port and GSA prior to the start of construction:
1. Site A (Refer to sheet C300):
a. Phase 1: Refer to sheet T500. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T501. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
c. Phase 3: Refer to sheet T502. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
d. Phase 4: Refer to sheet T503. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
e. Phase 5: Refer to sheet T504. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
f. Phase 6: Refer to sheet T505. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
2. Site B (Refer to sheet C301):
a. Phase 1: Refer to sheet T506. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T507. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
c. Phase 3: Refer to sheet T508. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
d. Phase 4: Refer to sheet T509. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
e. Phase 5: Refer to sheet T510. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
47PH0817D0017 Greater Southwest Region 7
SUMMARY 01 10 00 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
f. Phase 6: Refer to sheet T511. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
g. Phase 7: Refer to sheet T512. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
h. Phase 8: Refer to sheet T513. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
3. Site C (Bid Option #1, Refer to sheet C302):
a. Phase 1: Refer to sheet T514. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T515. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
c. Phase 3: Refer to sheet T516. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
d. Phase 4: Refer to sheet T517. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
4. Site D (Bid Option #2, Refer to sheet C303):
a. Phase 1: Refer to sheet T518. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T519. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
c. Phase 3: Refer to sheet T520. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
5. Site E (Bid Option #3, Refer to sheet C304):
a. Phase 1: Refer to sheet T521. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T522. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
47PH0817D0017 Greater Southwest Region 7
SUMMARY 01 10 00 - 4
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
c. Phase 3: Refer to sheet T523. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
d. Phase 4: Refer to sheet T524. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
6. Site F (Bid Option #4, Refer to sheet C305):
a. Phase 1: Refer to sheet T521. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T501. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
7. Site G (Bid Option #5, Refer to sheet C306):
a. Phase 1: Refer to sheet T522. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
8. Site H (Bid Option #6, Refer to sheet C307):
a. Phase 1: Refer to sheet T523. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
b. Phase 2: Refer to sheet T524. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
c. Phase 3: Refer to sheet T525. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
9. Site I (Bid Option #7, Refer to sheet C308):
a. Phase 1: Refer to sheet T525. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
10. Site J (Bid Option #8, Refer to sheet C309):
a. Phase 1: Refer to sheet T506. The following work shall be substantially complete, ready for occupancy, within XXX calendar days after notice to proceed:
1.3 WORK BY OTHER CONTRACTORS
A. The Contractor shall cooperate with CBP operations at the site which cannot be shut down for construction, including providing labor, materials, and other costs necessary to satisfactorily coordinate the Contract work with CBP Land Port of Entry operations.
1.4 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY
47PH0817D0017 Greater Southwest Region 7
SUMMARY 01 10 00 - 5
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
A. The project includes the following Government furnished property to be installed by the Contractor. The Contractor shall advise GSA at least 30-days in advance of when the property should be delivered. NOT APPLICABLE.
1.5 MISCELLANEOUS PROVISIONS
A. Work in existing facilities shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.
B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract and in conformance with Health and Safety requirements outlined in section 015950 - Safety and Health. Work out of alignment where exposed by removal of existing work shall be called to the attention of GSA. Necessary corrective work shall be as directed.
1. Replacements of existing conditions that are removed shall match similar existing conditions.
2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer. NOT APPLICABLE
3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at the time of award of the Contract.
4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished, or replaced as necessary to produce uniform and harmonious contiguous surfaces.
C. Existing structures shall remain in place.
D. Existing utility services with related meters and equipment shall remain in place.
E. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01 10 00
47PH0817D0017 Greater Southwest Region 7
WORK RESTRICTIONS 01 14 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 14 00 – WORK RESTRICTIONS
PART 1 - GENERAL
1.1 CONTRACTOR USE OF PREMISES
A. The Contractor will review and document the existing conditions surrounding the project premises. Provide documentation to GSA prior to the commencement of any construction activity.
B. The Contractor shall limit use of the premises to the work in areas indicated, and to allow for Government occupancy public use.
1. Confine operations at the site to areas indicated in plans. Do not disturb portions of the site beyond the areas in which Work is indicated.
2. Keep driveways and entrances serving the premises clear and available at all times to the Government, Government employees and to visitors. Do not use these areas for parking or storage of materials.
3. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.
4. Maintain port operations in a safe and functional condition throughout the construction period. Repair damage caused by construction operations to the satisfaction of the government. Take precautions to protect the facility, its occupants, and the public during the construction period. A representative of the Contractor shall be available to arrive on site within one (1) hour of notice should an emergency occur.
5. Keep active roadways and work areas free from accumulation of waste material, rubbish, construction debris and construction materials.
6. Space on the premises will be made available for the Contractor's storage and related activities, provided that its use will not interfere with the operations of the Government. Arrange and gain approval for use of this space through the Contracting Officer.
7. Use of the existing site access will be shared with Government activities on a first-come-first-served, wait-your-turn basis. The port is available for the delivery of materials, tools, and supplies between 8 AM and Midnight.
8. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government property, shall become the property of the Contractor, and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.
9. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into buildings. When not required for powering unloading operations, turn off engines when parked.
47PH0817D0017 Greater Southwest Region 7
WORK RESTRICTIONS 01 14 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
10. The contractor shall submit a silica work exposure plan that must be sufficient to minimize the release of visible dust and minimize the accumulation of visible airborne dust before commencing construction activities.
11. Smoking is not permitted in or around buildings, see Facilities Management Regulation (FMR) Case 2008-102—3. Also see Code of Federal Regulations (CFR) 41 CFR Part 102-74.
12. Limited parking will be available on site during working hours for building occupants. The Contractor and Contractor's employees shall make their own arrangements for vehicle parking off site as necessary.
13. Cell Phones: Contractor is to provide company cell phones during this contract.
Cell phones are only permitted in construction areas and contractor’s office space.
14. No apparatus with an open flame is allowed to be used within the port without the prior receipt of a burn permit. Contact the Field Office to obtain burn permits. Burn permits are required for each separate occurrence.
15. Permits: Refer to FAR 52.236-7
16. The work shall be sequenced to minimize disruption to port operations, visitors, and maintenance activities. To the greatest extent feasible, demolition work should not take place until supplies are on hand to perform the new work.
17. Coordinate with the GSA Building Manager and the COR for site access.
18. Coordinate with the GSA Building Manager and the COR on correct response procedures for any building system alarms occurring during or resulting from the construction process.
19. All facility systems outside the immediate construction area shall be kept fully operational during normal working hours.
20. Protect port facilities from flying debris.
21. Coordinate with the GSA building manager and CBP Port Operations as to the use of cameras within the Port.
1.2 GOVERNMENT OCCUPANCY
A. The GSA (or tenant agency) will occupy the site during the entire period of construction. Cooperate with the GSA's and CBP’s representatives during construction operations to minimize conflicts, mitigate noise, and facilitate Government usage. Perform the Work in a manner that does not interfere with the GSA and CBP (or other gov agencies) operations.
B. GSA reserves the right to occupy, place, and install equipment in completed areas of the construction prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The GSA's installation of equipment and partial occupancy shall not constitute acceptance of the total Work.
1. Upon occupancy, GSA will assume responsibility for maintenance and custodial service for the occupied portions of the work site.
47PH0817D0017 Greater Southwest Region 7
WORK RESTRICTIONS 01 14 00 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
1.3 WORKING HOURS
A. Government Occupied Hours: Government personnel are scheduled to occupy the building during the following hours on weekdays, Monday through Friday, except for established Government Holidays 6:00 AM to 6:00 PM. Any work performed after 6:00 PM shall be coordinated with Port personnel.
B. Government Unoccupied Hours: Government personnel are not scheduled to occupy the building during times not indicated as Government Occupied Hours. *Contractor's General Working Hours: The Contractor working hours shall be generally established to occur during Government Occupied Hours.
C. Contractor's Required Working Hours: The following work shall be performed during Government Unoccupied Hours:
1. Noisy and/or odor-producing work that may disrupt CBP operations in active roadways.
D. Work accomplished during Government Unoccupied Hours shall be performed at no additional cost to the Government. The Contractor shall submit a proposed schedule and gain the Contracting Officer's approval at least 48 hours before proceeding with any work during Government Unoccupied Hours.
PART 2 - PRODUCTS (NOT APPLICABLE)
END OF SECTION 01 14 00
47PH0817D0017 Greater Southwest Region 7
ALLOWANCES 01 21 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 21 00 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. GSA is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract, including Federal Acquisition Regulations (FAR) and General Services Administration Acquisition Regulations (GSAR) contract clauses, and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
1. Certain items are described in the Contract Documents as allowance items. The purpose of allowance items is to defer selection of actual products and systems to a later date when directions will be provided to the Contractor. The Contracting Officer will issue Modifications to incorporate allowance items in the Work after actual products and systems have been determined.
B. Types of allowance items may include the following:
1. Lump-sum allowance items.
2. Unit-price allowance items.
3. Quantity allowance items.
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise the contracting officer of the date when final selection and purchase of each product or system described by an allowance item must be completed to avoid delaying the Work. Allowances must be included in all schedule submissions.
1.4 ACTION SUBMITTALS
A. Submit proposals for products or systems described by allowance items in the form specified for Change Orders.
47PH0817D0017 Greater Southwest Region 7
ALLOWANCES 01 21 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
1.5 INFORMATIONAL SUBMITTALS
A. Submit copies of invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each unit-price and quantity allowance item.
B. Coordinate and process submittals for allowance items in the same manner as for other portions of the Work.
1.6 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.
B. Modifications based on an allowance item shall include cost to Contractor of specific products and systems selected by the contracting officer under allowance and shall include taxes, freight, delivery to Project site, Contractor's costs for receiving and handling at Project site, labor, installation, overhead, and profit.
1. If requested by the contracting officer, purchase additional quantities under unit-price or quantity allowances and prepare unused material for storage by the Contracting officer. Deliver unused material to the Contracting officer's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCE ITEMS
A. Modifications to an allowance item shall comply with the changes clauses and any other contract modifications procedures found in the Contract Documents.
B. Contracting officer reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance item promptly on delivery for damage or defects. Return damaged or defective products to the manufacturer for replacement.
3.2 PREPARATION
47PH0817D0017 Greater Southwest Region 7
ALLOWANCES 01 21 00 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
A. Coordinate materials and their installation for each allowance item with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCE ITEMS
A. Allowance Item No. 01: Unit-Price
END OF SECTION 01 21 00
47PH0817D0017 Greater Southwest Region 7
OPTIONS 01 24 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 24 00 - OPTIONS
PART 1 - GENERAL
1.1 SUMMARY
A. “Option” means a unilateral right in a contract by which, for a specified time, GSA may elect to purchase additional scope of work, products, materials, equipment, systems, or installation methods described in the Contract Documents.
B. The amount for an option is the total adjustment from the Base Bid to incorporate the option work into the project.
C. Option work shall include miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation, whether or not mentioned as part of the option description.
PART 2 - PRODUCTS (NOT APPLICABLE)
47PH0817D0017 Greater Southwest Region 7
OPTIONS 01 24 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
PART 3 - EXECUTION
3.1 SCHEDULE OF OPTIONS
A. The following bid options will require the use of low-embodied carbon (LEC) concrete, asphalt and steel.
B. Bid Option No. 1: Site C, specified in Division 01 10 00 Section 1.2.A.3, for the removal and replacement of existing concrete pavement and curbs, as indicated on Drawings
C302 & T514 – T517, labeled “Bid Option No. 1”.
C. Bid Option No. 2: Site D, specified in Division 01 10 00 Section 1.2.A.4, for the removal and replacement of existing concrete pavement and curbs, as indicated on Drawings
C303 & T518 – T520, labeled “Bid Option No. 2”.
D. Bid Option No. 3: Site E, specified in Division 01 10 00 Section 1.2.A.5, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C304 & T521 – T524, labeled “Bid Option No. 3”.
E. Bid Option No. 4: Site F, specified in Division 01 10 00 Section 1.2.A.6, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C305 & T501 and T521, labeled “Bid Option No. 4”.
F. Bid Option No. 5: Site G, specified in Division 01 10 00 Section 1.2.A.7, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C306 & T522, labeled “Bid Option No. 5”.
G. Bid Option No. 6: Site H, specified in Division 01 10 00 Section 1.2.A.8, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C307 & T523 – T525, labeled “Bid Option No. 6”.
H. Bid Option No. 7: Site I, specified in Division 01 10 00 Section 1.2.A.9, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C308 & T525 labeled “Bid Option No. 7”.
I. Bid Option No. 8: Site J, specified in Division 01 10 00 Section 1.2.A.10, for the removal and replacement of existing concrete pavement, curbs, and joint seals, as indicated on Drawings C309 & T507, labeled “Bid Option No. 8”.
END OF SECTION 01 24 00
47PH0817D0017 Greater Southwest Region 7
SUBSTITUTION PROCEDURES 01 25 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 25 00 – SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. The Government is providing the references included in this subsection for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract and other Division 01 Specification Sections apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Sections:
1. Division 01 21 00 Section “Allowances” for products selected under allowance:
NOT APPLICABLE.
2. Division 01 23 00 Section “Alternates” for products selected under alternate: NOT
APPLICABLE.
3. Division 01 23 00 Section “Options” for products selected under an option: NOT
APPLICABLE.
4. Division 01 60 00 Section “Product Requirements” for requirements for submitting comparable product submittals for products by listed manufacturers.
1.3 DEFINITIONS
A. Substitutions: Proposed changes to the Contract Documents by the Contractor for products, materials, equipment, and methods of construction.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or GSA that are not required in order to meet other Project requirements but may offer advantage to Contractor or GSA.
47PH0817D0017 Greater Southwest Region 7
SUBSTITUTION PROCEDURES 01 25 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
1.4 SUBMITTALS FOR CAUSE OR CONVENIENCE
A. Substitution Requests: Per Submittal Procedures Section 01 33 00 submit electronic copies through PMIS of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form:
2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Government and separate contractors that will be necessary to accommodate proposed substitution.
b. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable specification section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, energy and resource performance goals, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
d. Samples, where applicable or requested.
e. Certificates and qualification data, where applicable or requested.
f. List of similar installations for completed projects with project name, location and contact information of owner and architect/engineer of record.
g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
h. Research reports evidencing compliance with building code in effect for the project, when applicable for the proposed substitution.
i. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. Provide a schedule with a time impact analysis to allow the Government to consider the proposed substitution.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Proposed substitution complies with requirements in the Contract Documents except as indicated in the substitution request, is compatible with related materials, and is appropriate for applications indicated.
l. The Contracting Officer may require the Contractor to provide a contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
47PH0817D0017 Greater Southwest Region 7
SUBSTITUTION PROCEDURES 01 25 00 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
3. The Contracting Officer or Contracting Officer’s Representative (CO) or (COR) Action: If necessary, the Contracting Officer or COR will request additional information or documentation for evaluation. The Contractor shall be entitled to receive notice of action on submittals within a reasonable time, given the volume or complexity of the submittals and the criticality of the affected activities to Substantial Completion as may be indicated in the Project Schedule. The Contractor shall not be entitled to receive notice of action on submittals containing variations from Contract requirements in less than twenty working days.
(Coordinate with 01 33 00 Submittals).
B. Failure by the government to respond does not constitute acceptance of the proposed substitution.
1.5 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agencies to perform compatibility tests recommended by manufacturers.
1.6 PROCEDURES
A. Coordination: Modify or adjust affected work as necessary to integrate the work of the approved substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Conditions: The Contracting Officer (CO) will consider the Contractor’s request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, the CO will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan.
47PH0817D0017 Greater Southwest Region 7
SUBSTITUTION PROCEDURES 01 25 00 - 4
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
d. Requested substitution has received necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
B. Substitutions for Convenience the contracting Officer (CO) will consider requests for substitution if received within 30 days of contract award, submittals received after that time may be considered or rejected at discretion of the CO or the COR.
1. Conditions: The CO will consider Contractor's request for substitution when the following conditions are satisfied.
a. Requested substitution offers the Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional obligations the Government incurs.
b. Requested substitution does not require extensive revisions to the Contract Documents.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
e. Requested substitution has received necessary approvals of authorities having jurisdiction.
f. Requested substitution is compatible with other portions of the Work.
g. Requested substitution has been coordinated with other portions of the Work.
h. Requested substitution provides specified warranty.
i. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
END OF SECTION 01 25 00
47PH0817D0017 Greater Southwest Region 7
UNIT PRICES 01 27 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 27 00 – UNIT PRICES
1.1 GENERAL
A. Unit price is defined in the Agreement.
1.2 PROCEDURES
A. Measurement: Method of measurement for each unit price is specified in the section applicable to the work.
B. Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured at the Government's expense by an independent surveyor.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 UNIT PRICE ITEM SCHEDULE
A. Unit Price Item No. 1: Low-embodied carbon (LEC) concrete
1. Description:
2. Measurement:
3. Base Bid Quantity included in the Contract Documents:
B. Unit Price Item No. 2: Low-embodied carbon (LEC) asphalt
2. Measurement:
C. Unit Price Item No. 3: Low-embodied carbon (LEC) steel:
2. Measurement:
END OF SECTION 01 27 00
47PH0817D0017 Greater Southwest Region 7
PAYMENT PROCEDURES 01 29 00 - 1
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SECTION 01 29 00 – PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and process Requests for Payment.
1.2 DEFINITIONS
A. Schedule of Values A detailed written statement (masterformat/uniformat) furnished by the Contractor outlining the portions of the contract sum, which allocates values (price & percentage) for the various parts of the work and used as the basis for payment application and reviewing progress payments. The Agreement provides further details.
B. Request for Payment: A contractor’s invoice and request for progress payment with substantiating information consistent with approved schedule of values.
1.3 SCHEDULE OF VALUES
A. Coordination: Submit completed Schedule of Values no later than fourteen (14) calendar days prior to scheduled date of initial Requests for Payment.
B. Schedules for Phased Work: Where the work is separated into phases, provide Schedules showing values correlated with each phase using the standard format referenced below.
C. Format and Content: Contractor shall be responsible to complete the GSA Schedule of Values Workbook and compile the values into GSA’s Project Management System.
Contractor will enter values into the workbook prior to GSA’s Project Management System input and provide associated electronic baseline copy to the Contracting Officer for record. The Contractor will follow guidelines in the Schedule of Values workbook to support GSA’s Project Management System upload.
1. Identification: Complete the following Project Identification fields in the Schedule of Values:
a. Project Name
b. Project Number
c. Project Location, City, State
d. Base Contract Number
47PH0817D0017 Greater Southwest Region 7
PAYMENT PROCEDURES 01 29 00 - 2
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
e. Task Order Number
f. Modification Number
g. GSA Project Manager
h. Contractor's Name and contact information
i. Date of submittal
2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Requests for Payment and progress reports.
a. Work activity – (by division or specific work activity)
b. The dollar value of each specific work activity – both with an amount in dollars and whole cents, and as a percentage of the Contract Sum to nearest one-hundredth percent. Adjust the amounts to total to the Contract Sum and the percentages to total 100 percent.
c. Each item in the schedule of values and Requests for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. (i.e., no standalone item for Overhead, and Profit).
d. Modifications that affect value.
e. Update affected work branches and subordinate line items.
f. Resubmit the schedule of values before the next Request for Payment when
Modifications result in a change in the Contract Sum.
g. Line item for mobilization and demobilization.
h. Line item for close out (% to be negotiated with GSA COR).
3. Options: Provide a separate Schedule of Values for each exercised Option.
4. Each item in the Schedule of Values and Requests for Payment shall be complete.
Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at the government's option.
5. Revise and update workbook in GSA’s Project Management System with all items affecting scope, schedule or cost and resubmit within 14 calendar days as coordinated with project manager or contracting officer. Contractor shall provide a final as-built schedule at project completion. Update affected work branches and subordinate line items and resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum.
1.4 REQUESTS FOR PAYMENT
A. Requirements for Requests for Payment are in Section III, Terms and Conditions of the Agreement.
B. Each Request for Payment following the initial Request for Payment shall be consistent with previous Requests.
47PH0817D0017 Greater Southwest Region 7
PAYMENT PROCEDURES 01 29 00 - 3
SENSITIVE BUT UNCLASSIFIED (SBU), PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
1. Initial Request for Payment, Request for Payment at time of Substantial Completion, and final Request for Payment involve additional requirements.
C. Payment Request Times: Submit Request…