Clarification Questions Solicitation 47PH0221R0002.pdf

PDF 102 KB Posted

Attached to
Full Maintenance/O&M Services for Baton Rouge, Houma & Lafayette, LA
Solicitation number
47PH0221R0002
Issued by

View the file

Other files

File Type Posted
Standard Form 30 Solicitation 47PH0221R0002 Amendment PA02.pdf PDF
Baton Rouge Houma and Lafayette OM FM Reprocurement Questions and Answers Sol 47PH0221R0002.pdf PDF
Standard Form 33 Solicitation 47PH0221R0002.pdf PDF
Solicitation 47PH0221R0002 Pre-Proposal Conference Agenda Baton Rouge Houma and Lafayette.pptx PPTX presentation
Solicitation 47PH0221R0002 Statement of Work Baton Rouge Houma and Lafayette LA Amendment PA01.pdf PDF
Standard Form 30 Solicitation 47PH0221R0002 Amendment PA01.pdf PDF
Sign-In Sheet for Wednesday March 17 2021.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0002 Baton Rouge Lafayette and Houma LA OM FM REVISED Amendment PA01.xlsx XLSX spreadsheet
Sign-In Sheet for Tuesday March 16 2021.pdf PDF
Sign-In Sheet for Monday March 15 2021.pdf PDF
Figure L-3 Past Performance Questionnaire Solicitation No. 47PH0221R0002.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0002 Baton Rouge Lafayette and Houma LA OM FM.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit C1 - Building Information Sheet LA0006BT Baton Rouge FOB and Courthouse Grounds.pdf PDF
Exhibit M1 - FM Quality Assurance Surveillance Plan Baton Rouge Houma and Lafayette.pdf PDF
Attachment 3 - Service Contract Act (SCA) Wage Determination 2015-5177 Rev No. 12 Dated 12.21.2020 East Baton Rouge Parish.pdf PDF
Exhibit C7 - PBS Waste Audits.pdf PDF
Exhibit M11 - Flag Policy.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Attachment 3 - Service Contract Act (SCA) Wage Determination 2015-5183 Rev No. 15 Dated 12.21.2020 Lafayette Parish.pdf PDF
Exhibit M10 - PV Service Description.pdf PDF
Attachment 1 - Collective Bargaining Agreement (CBA) Sol 47PH0221R0002.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit M3 - Environmental Sustainable Products and GSA Attribute Preferences.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Figure B-2 SCA DOL_CBA Wage Adjustment Spreadsheet for Full Main Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M6 - Water Treatment .pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Solicitation 47PH0221R0002 Statement of Work Baton Rouge Houma and Lafayette LA.pdf PDF
Exhibit C1 - Building Information Sheet LA0099ZZ Lafayette.pdf PDF
Exhibit C1 - Building Information Sheet LA0097BT Baton Rouge Long Fed Bldg Grounds.pdf PDF
Exhibit M9 - Preventative Maintenance (PM) 2018 GSA O_M Guide.pdf PDF
Attachment 2 - CBA Wage Determination Sol 47PH0221R0002.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Figure L-1 Combined Management Plan.xlsx XLSX spreadsheet
Attachment 3 - Service Contract Act (SCA) Wage Determination 2015-5179 Rev No. 12 Dated 12.21.2020 Terrebonne Parish.pdf PDF
Figure L-2 Management Plan Baseline.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit C1 - Building Information Sheet LA0070ZZ Houma.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification Questions from Q&A Full Maintenance O&M Services for Baton Rouge, Houma, and Lafayette

Solicitation number 47PH0221R0002

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (p. 5) and Attachment BL2 Equipment Inventory Lafayette 2020, (pp. 1, 3, & 4).

The answer to the fifth question on p. 5 declines the offeror’s request to obtain the asset list in Excel format. In Attachment BL2 PDF Document for the Lafayette facility, the make and model information is cut off for some items on pp. 1, 3, and 4. As a result, offerors cannot ascertain the full information that is attempted to be presented.

Please provide the asset lists in Excel format so offerors can view the correct asset information to develop accurate pricing.

A: The solicitation provided an inventory list (BL2 attachments). The Government will not provide them in an Excel format.

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (p. 6) and Attachment BL2 Equipment Inventory Lafayette 2020, Page 1, Asset #865883

The answer to the second question on p. 6 states the following regarding the tonnage of the chillers “This information is contained within BL2, attached to this solicitation and referenced in Section J.” In the BL2 asset list, Asset #865883 for Chiller #3 does not contain any tonnage, manufacturer, model, or serial number information.

Please provide the tonnage, manufacturer, model, and serial number information to allow offerors to develop accurate pricing.

A: The detailed inventory was provided in the solicitation (BL2 attachments).

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (p. 6) and Attachment BL2 Equipment Inventory Baton Rouge LA0006BT Inventory 2020, Page 1, Asset #1289577

The answer to the second question on p. 6 states the following regarding the tonnage of the chillers “This information is contained within BL2, attached to this solicitation and referenced in Section J.” In the BL2, Asset #1289577 for Chiller #5, the provided asset list does not contain the tonnage, manufacturer, or serial number information.

Please provide this missing information to allow offerors to develop accurate pricing.

A: There is no missing information in the equipment inventory spreadsheets for each building (BL2 attachments).

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (p. 6), Attachment BL2 Equipment Inventory Houma 2020, and Exhibit M10

The answer to the third question on p. 6 states “Houma is the only site that has PV; this information is contained within BL2.” However, in the BL2, Asset #863666 shows asset info for a solar inverter but does not contain further details of total size for the solar array. Offerors require additional information as to the size of the solar array currently present on site to develop accurate pricing for the full SOW provided in Exhibit M10, item 10a.

Please provide the size of the solar array so offerors can provide accurate pricing for these services.

A: Solar Array is located in the equipment inventory (BL2 attachments).

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (p. 22)

The Q/As document provided generator info for generator equipment currently at the Houma (LA0070ZZ) facility.

Please provide full manufacturer make, model, and serial number for this generator to ascertain fuel tank size and other info to develop accurate pricing.

A: This information was provided in the first set of questions.

Q: Amendment No. 1, Attachment Baton+Rouge+Houma+and+Lafayette+OM+FM +Reprocurement+Questions+and+Answers+Sol+47PH0221R0002.pdf (pp. 6-7)

There are three questions beginning at the bottom of p. 6 whose responses simply state, “See Amendment PA01.”

Please clarify where this information is provided in Amendment PA01 for Fire Protection and Life Safety Equipment and Systems, Electrical Switchgear and Switchboards, and Tank Inspections.

A: The question is unclear.

Q: Attachment BL6+Baton+Rouge+Contract+2018+to+2020+WO+History: Regarding Attachment BL 6, if f this listing is intended to be all inclusive, displaying Work Orders for all four sites, what is the code that we can use to decipher which location/site the work is to be performed?

A: The code is each building number, i.e., LA0006BT, LA0097BT, LA0099ZZ, and

LA0070ZZ.

Follow-Up Question: There is no building number listed on BL6 to associate each WO with a specific building. Please correct?

Response: This cannot be corrected as the code is the building number.

Q: Referencing the Building Equipment Inventory provided i n the Attachment BL2 files, the asset lists do not include enough information on the makes and models to ascertain the tonnage of the chillers. Please provide the tonnage of each Chiller currently in use at each facility.

A: This information is contained within BL2, attached to this solicitation and referenced in Section J.

Follow-Up Question: (LA0006BT) Chiller tonnage is NOT provided in BL2. Please provide?

Follow-Up Question: (LA0097BT) BL2 shows no chillers, please verify there are no chillers?

Follow-Up Question: (LA0099ZZ) Chiller tonnage is NOT provided in BL2. Please provide?

Response: (LA0006BT) Four chillers, three 218 ton and one 10ton

(LA0097BT) No chillers chill water is fed from LA0006BT

(LA0099ZZ) Three chillers, two 300ton and one 150ton.

Q: Referencing the Solicitation Section C.5.9, Fire Protection and Life Safety Equipment and Systems: (1) When was the last five-year standpipe inspection performed? (2) When was the last sprinkler internal inspection performed? (3) When was the last 5 year and 12 inspections performed on the fire extinguishers? (4) Who i s responsible for paying the elevator company to provide access to the elevator shafts for fire alarm/sprinkler testing?

A: See Amendment PA01.

Follow-Up Question: The only answer provided in PA1 was the Fire Extinguisher Report. Answers to 1, 2 and 4 were not provided in PA1. Please provide proper information?

Response: Information contained within BL Attachments provided in the solicitation.

Q: Referencing C.6.9 Electrical Switchgear and Switchboards: (1) When was the last 3-year electrical switchgear test performed? (2) When was the last IR scan performed on the electrical panels? (3) When was the last transformer inspection performed? (4) Are there any network protectors that are the contractor’s responsibility?

A: See Amendment PA01.

Follow-Up Question: No answers were provided in PA1, please provide proper answers?

Response: Information contained within BL Attachments provided in the solicitation.

Q: Referencing C.6.4.4 Testing/Inspecting: (1) When was the last internal tank inspections performed? (2) When was the last multiple year fuel tank inspections performed? (3) Does GSA intend the contractor to perform all the BAS requirements listed i n the 2018 PM Guide? (4) At what frequency are the VAV box filters required to be changed? (5) What equipment i f any listed i n the inventory or included i n the pm schedule agency owned? (5) How are repairs handled on this equipment? (6) Are the window cleaning Davit or anchor point inspections the contractor’s responsibility (both annual and multi-year)? (6) When were these last performed?

A: See Amendment PA01.

Follow-Up Question: No answers to any of the above questions are in PA1. Please provide proper answers?

Response: Information contained within BL Attachments provided in the solicitation.

Q: Referencing C.5.8.3.1 BAS Control Systems and Upgrades, the RFP states that the contractor will be responsible for graphical updates to the BAS. Does this include when GSA has a project that will require updates to be made or will these be performed under the SOW of any GSA project?

A: Yes, regardless of the project, the O&M Contractor is responsible for the BAS.

Follow-Up Question: This does not answer the question clearly. Does the contractor have to pay for any GSA project work where BAS graphical updates need to be made? This is totally unreasonable because these are GSA projects, not contractor projects. Also, contractor would have no way of estimating subcontractor costs for this service nor the number of GSA projects that may require this type of update.

Please clarify or remove that the contractor is responsible for additional costs associated with GSA projects?

Response: Yes, regardless of the project, the O&M Contractor is responsible for the BAS.

Q: Referencing Section C.6.9, is it the intention of GSA in section C.6.9 to perform complete building electrical shutdown and test and inspect each bucket of the switchgear? Part of Answer says; The Contractor shall coordinate all utility shut down scheduling with the electrical utility company (Region 7, includes coordinating with Elevator Maintenance Contractor); the Contractor shall be responsible for all costs associated with the utility shutdown Please provide the name of the Elevator company so we get quotes for assistance during shutdown?

Some Electric Utilities charge a fee to shut down power to the buildings. If this is true for this contract, please provide an estimate of cost from the Electric Utility to come out and shut main power to the building off? (The incumbent contractor should have this cost if required)

A: Elevator maintenance is not included in this contract with the exception of cab lighting.

Q: Referencing C.6.13.8 Roof Anchorages, please provide the quantity of roof anchors for each building, the last annual and 10-year inspection dates and the anchor manufacturer’s inspection requirements. Also please provide any additional requirements contained in the installation certification.

A: As stated within Section C.6.13.8, the Contractor shall provide for annual third-party inspections and a ten (10) year recertification of designated roof anchorage points by qualified personnel.

Follow-Up Question: This does not answer the question. Also, no information in BL2 sheet. Please provide the number of anchor points and type and the last 10-year certification date?

Response: As stated within Section C.6.13.8, the Contractor shall provide for annual third- party inspections and a ten (10) year recertification of designated roof anchorage points by qualified personnel.

Q: Does GSA provide any office phone lines or ISP? Any GSA computers provided?

A: Yes.

Please specify what the Gov’t provides?

Response: All of the above.

Please provide ANNIVERSARY DATES OF THE LAST TESTING OF MAJOR

MAINTENANCE ITEMS AT EACH BUILDING:

● Bibb Hose and Fire Sprinkler Obstruction Tests 3 & 5 year?

● 3-yr full flow dry-pipe performed? Fire/smoke damper inspection performed?

● Boiler Certification?

● Eddy Current test?

● Generator?

● Annual ATS service?

● 3 yr. Switchgear testing?

● Annual Infrared testing?

● Annual Extinguisher Inspections?

● Hydro Testing of Fire extinguishers (6 & 12 Yr.) Please provide due dates and quantities?

● Underground Storage Tanks?

● Annual Roof Anchor Point Inspection - JM Shaw Courthouse 10 year

● Recertification of Roof Anchor Points- JM Shaw Courthouse

A: See amendment; information will also be made available during phase-in period.

Follow-Up Question: No answers were provided in PA1. Anniversary dates are needed in order to reflect costs in proper years of contract. Please provide answers?

Response: Please review the amendment. The information will also be available during the phase-in period. Information contained within BL Attachments provided in the solicitation.

Q: Referencing Section C.6.12 - Vertical Transportation Systems and C.6.12.1 Elevator Associated Equipment Maintenance, please provide the name of GSA elevator contractor for all buildings so we can request pricing for assistance when performing Fire related services in hoist areas, etc.

A: Not available.

Follow-Up Question: How can GSA not know the name of their own Elevator Contractor? Name is needed for costing assistance services during Fire testing in hoists, pits etc.. Please provide name?

Response : Not available. E levator maintenance is not included in this contract with the exception of cab lighting.