This 40% concept design document summarizes a recommended solution for installing LED signage at the Highgate Springs land port of entry in Vermont. The proposed design involves erecting a new steel gantry structure approximately 225 feet from the inspection booths to support dynamic lane signs. Additional improvements include upgrading the existing gantry with new static signs and installing illuminated static lane number signs at the booths. Electrical and data infrastructure would be installed to connect the signage to a new server and control computer located in the main building. The estimated total cost for the recommended design is $725,479.
D
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HIGHGATE SPRINGS
LAND PORT OF ENTRY
PORT INTRODUCTION/SITE OBSERVATIONS
EXISTING ARCHITECTURE AND SIGNAGE
RECOMMENDED AND ALTERNATE SCHEMES
STRUCTURAL AND CIVIL RECOMMENDATIONS
ELECTRICAL RECOMMENDATIONS
SIGNAGE PARAMETERS
COST ESTIMATES FOR RECOMMENDATION AND ALTERNATE OPTIONS
SUPPLEMENTAL INFORMATION
APPROVED 40% CONCEPT DESIGN DIRECTION
The Alternative #2 presented at the 15% Submission Review was accepted by GSA/CBP and will continue to be developed towards the 40% design submission.
LED SIGNAGE PHASE III | 40% CONCEPT DESIGN DOCUMENT | NOVEMBER 21, 2014
HS- 2
HIGHGATE SPRINGS
HS- 3
FUTURE BYPASS
LANE
BUS
EXISTING
STATIC SIGN
EXISTING GANTRY
HEADHOUSE1
Scale 1:16 N
1. POV
2. POV
3. POV
4. POV
5. NEXUS
6. CARGO &
NEXUS (alternate)
LANE USAGE
EXISTING CONDITIONS
FIGURE HS-1: ORIENTATION PLAN
STATISTICS
Location: Highgate, Vermont Owned: GSA Traffic type: POV including Nexus, Cargo, Bus.
# of lanes and type: 5 (POV), 1 (Cargo), 1 (Bus)
PORT INTRODUCTION
This is a 24/7 Port. There are few, if any, commuters during working rush hours. POV traffic is mostly general and vacation type. Typical POV volumes are 800 - 1600 POV’s per day during the winter months and 1000-3500 POVs during peak travel season. Peak traffic occurs during the summer months, Memorial day to Labor day, and wait times during high volume periods can exceed 2 hours. NEXUS traffic is diverted to Cargo lane on high traffic periods to include holiday weekends.
Typically there is only one lane open during the midnight shift. Canada is enlarging the highway feeding into this LPOE with expectations that more traffic will use this route, which connects Montreal to Boston.
POV lane numbering starts on the west side of the main building up to Lane 5. There are (5) POV lanes (Lane 5 being NEXUS Lane during specified hours), (1) Cargo (not high/low) to the west, also used as Nexus Diversion from the usual route in Lane 5, and (1) independent bus lane to the east. Buses unload into the processing area, and bus traffic ranges from 8 to 35 buses a day. Traffic maneuvering is a challenge particularly with RVs, therefore the preferred lane for diverting higher volumes of RV’s is the Cargo lane, which offers more maneuvering room.
There is an existing Gantry supporting static advance warning signage roughly half-way between the border and Primary. The Port currently uses temporary roll-out sign for holidays. Future plans are for a Vermont DOT bypass lane to the west.
SITE VISIT OBSERVATIONS - GENERAL
This Port was part of Trip 1 for our team and was the 3rd Phase III Port we visited. We visited this site on September 10, 2014.
The main building is a two-story building above grade. The team measured an underside of primary canopy clearance of 17’-6”, which is above standard of 16’-6”. Because of its architecture, signage is unlikely to be installed on the canopy. In addition, drawings photographed on site show a different edge condition on the canopy than the as-built drawings. Because of the roadway curve immediately in front of the Primary, sight lines are a critical issue. A new gantry will be supported on concrete foundations and will require a geotechnical report and information on existing underground utilities.
HS- 4
HIGHGATE SPRINGS
HS- 5
ARCHITECTURAL NARRATIVE
Primary Canopy Architecture
Constructed in 1998, the primary canopy is a light curved form, detached from the Head House and Commercial buildings, that is a unifying feature of the Port. The construction consists of sloped steel pipes, wide flange and flat metal deck structure with raised seam metal soffit. Lightness is achieved through a slight upward curve to the north and south and a fine roof edge. It appears that connectiviity is difficult within the canopy given the presence of surface mounted conduit that is further covered with netting for bird protection. Installation of the LED Signage on the canopy, in the A/E team’s opinion, would likely compromise its architectural integrity. In addition the booths stop well short of the underside of the canopy so there is not much opportunity to install the signage on the booths themselves.
SIGNAGE
Approach
The inbound road utilizes two driving lanes at the international border 950 ft from the inspection canopy. The right lane starts to divide into two lanes 780 ft from the inspection canopy. A gantry with three lane signs is located 550 ft from the inspection canopy. The signs on this gantry provide direction for autos & buses, autos, and trucks, listed left to right. 420 ft from the inspection booths the right lane diverges to the commercial inspection area (1 inspection lane). There are three signs at the gore splitting the POV plaza and commercial lane. A large static overhead sign splits autos & trucks, a smaller static sign duplicates this message, and a trailer LED sign lists the nexus hours (note, the nexus lane is on the left side). 260 ft from the inspection booths the dedicated bus lane splits to the left of the POV plaza. At this point the POV plaza enlarges and follows a shallow “S” turn displacing the center of the roadway 80 ft. Due to the “S” turn signs at the canopy would only be visible from 550 ft away. The canopy is visible from the road at a 20 degree angle from the centerline at this point.
FIGURE SN-01: OVERHEAD GANTRY SIGNS ON APPROACH ROAD FIGURE SN-01: OVERHEAD GANTRY SIGNS ON APPROACH ROAD
FIGURE SN-02: SPLIT BETWEEN POV PLAZA (LEFT) AND SINGLE CARGO LANE
FIGURE SN-03: SPLIT BETWEEN DEDICATED BUS LANE (LEFT) AND POV PLAZA
FIGURE SN-04: S-CURVE POV PLAZA
HS- 6
HIGHGATE SPRINGS
HS- 7
FIGURE SN-10: SIGNAGE @ ENTRANCE TO INSPECTION LANES
FIGURE SN-09: ADDITIONAL BUS LANE SIGNS FIGURE SN-06: SIGNS @ POV/CARGO SPLIT
Existing Signs
The port currently has a few static post mounted directional signs, identity signs, and statutory signs throughout the site. The site contains signs with multiple graphic standards including the CBP standard blue and white color scheme as well as a white and green color scheme. The primary directional signs for cars, trucks, and buses are written in English and French.
FIGURE SN-11: SIGNAGE @ CARGO LANE RPM
FIGURE SN-12: COLUMN MOUNTED STOPLIGHTS TO BE REMOVED FIGURE SN-13: LANE SIGNS
FIGURE SN-15: STATIC NEXUS LANE SIGNS FIGURE SN-14: BOOTH MOUNTED STOPLIGHTS TO REMAIN
HS- 8
HIGHGATE SPRINGS
HS- 9
1. POV
2. POV
3. POV
4. POV
5. NEXUS
6. CARGO &
NEXUS (alternate)
LANE USAGE
BUS
HEADHOUSE1
Scale 1:16 N
ALTERNATE 2B
(NEW GANTRY W/
DYNAMIC SIGNS)
ALTERNATE 1A:
(UPGRADE EXISTING STATIC SIGNS
TO DYNAMIC SIGNS)
ALTERNATE 2A:
(UPGRADE EXISTING STATIC SIGNS)
ALTERNATE 1B
(NEW GANTRY WITH
DYNAMIC SIGNS)
FUTURE BYPASS
LANE
ALTERNATE SCHEMES
FIGURE HS-2: RECOMMENDED AND ALTERNATE SCHEMES
PROPOSED DYNAMIC SIGNAGE SOLUTION
Wayfinding
Highgate Springs is a challenging site from a wayfinding perspective due to the varying usage of the cargo lane as well as the shallow curve of the POV plaza.
These issues make the location and orientation of any signage critical to ensure the best sight lines and readability of the sign messages. Any signage solution needs to direct NEXUS users and RV drivers to the cargo lane during peak times as well as provide lane information for the primary POV lanes. In addition, the location of the lane signage should be clearly and intuitively associated with each driving lane.
In order to solve the visibility issues with the S-turn the design team has proposed placing the lane signage on an advanced gantry at the head of the POV plaza.
The position of the new gantry would be orthogonal to the driving lanes to better associate the signs with the lanes. The gantry would include a cantilever section over the median between the POV plaza and cargo lane. This section would allow for the placement of a sign directing NEXUS users to the cargo lane.
A number of static signage improvements have also been proposed to improve traffic flow at the port. New static sign panels that meet DOT standards will be applied to the existing gantry along the approach road to provide better information to travelers prior to the inspection areas. In addition, illuminated static lane number signs will be installed at the booths to replace the smaller existing signs for improved visibility.
The design team investigated two primary alternates for lane signage:
Alternate #1- New gantry in POV plaza and dynamic advanced warning sign on existing gantry
Alternate #1 was developed as the preferred installation since the use of an advanced gantry was determined to be more suitable for lane identification. Here the new gantry is aligned perpendicular to the POV plaza to better associate the lane sign with the driving lane. In addition, locating a second advanced warning sign on the existing gantry would provide important information and direction to the mixed-use cargo lane during peak periods. This sign would aid directing NEXUS and RV traffic to the cargo lane in advance of the plaza during peak traffic times.
FIGURE HS-3: EXISTING PRIMARY POV PLAZA
FIGURE HS-4: RENDERING OF PROPOSED GANTRY AT PRIMARY POV PLAZA
ALTERNATIVE #2 WAS APPROVED AS
RECOMMENDED BASE BID CONCEPT
THIS CONCEPT WAS
NOT APPROVED AND
IS NO LONGER IN USE
THIS CONCEPT WAS
NOT APPROVED AND
IS NO LONGER IN USE
THIS CONCEPT WAS NOT APPROVED
AND IS NO LONGER IN USE
HS- 10
HIGHGATE SPRINGS
HS- 11
THIS CONCEPT WAS APPROVED AS RECOMMENDED BASE BID CONCEPT
Alternate #2- New gantry at the head of the POV plaza and updated static signage at the existing gantry.
Alternate #2 was developed to combine the functions of the two separate signs in Alternate #1. In this configuration a new gantry is placed above the start of the driving lanes at the head of the POV plaza. The signs at this location can still be clearly associated with the driving lanes. This gantry position also provides a mounting location for a cantilevered sign to the west to provide direction to the cargo lane. This sign could also be used to direct NEXUS and RV traffic to the cargo lane during peak traffic periods. Updated static signage at the existing gantry will improve the early warning and traffic sorting entering into the S-curve approach.
The design team also considered mounting the lane signs at the canopy. This approach produced a number of wayfinding issues causing this location to be eliminated from consideration. Signs at the canopy would be more difficult to associate with the inspection lanes due to the approach angle and viewing angle from the POV plaza. While the signs could be angled slightly and/or offset from the centerline of the driving lane they would still be difficult to see and read from the entry to the plaza. We also considered locating the signs at the booths themselves to better associate the signs with the lanes. However, the signs would need to be reduced in size with this approach in order to accommodate installation conditions, thus limiting graphic capabilities and text sizes. In addition, these signs would not be able to be placed at an optimal height necessary for visibility from a distance.
FIGURE HS-5: RENDERING OF PROPOSED GANTRY PRE-PRIMARY PLAZA
STRUCTURAL RECOMMENDATIONS
Proposed LED Signage Structural Support
The preferred signage support option for Highgate Springs in Vermont is a new standalone steel gantry supported by a concrete foundation. The gantry will span approximately 100’ across (5) lanes of traffic and will support (5) signs with an estimated weight of 290 pounds per sign. The bottom of the gantry must be set at an elevation to provide proper vehicle clearance.
The supports of the gantry should be protected from vehicle impact by installation of guardrails, bollards, or an oversized column base. The existing gantry structure will need to be assessed in order to support the new proposed static signage.
The following design criteria is to be used for design of the gantry, its foundations and connection of the signs to the gantry.
Structural Design Criteria:
The design of the LED Sign Support Gantry must be based on the GSA Facilities Standards for the Public Building Service P100, dated March 2014. This includes the 2012 International Building Code (IBC), ASCE 41-06 and ASCE 7-10. The facility is a Risk Category IV “Essential Facility”.
P100 provides specific criteria related to the design of structural components of buildings, including the following loading criteria:
Dead Loads:
• Gantry self-weight plus weight of permanent sign and electrical equipment
Wind Loads:
| • | 120 mph Basic Wind Speed (3-second gust) |
| • | Exposure Category B based on site location/conditions |
| • | Risk Category IV: Tier 2 High Performance (wind speed corresponds to approximately a |
3% probability of exceedance in 50 years)
Seismic Loads:
| • | Seismic Design Category D (to be verified with soils report) |
| • | Soil parameters to be determined with soils report |
| • | Risk Category IV, Seismic Importance Factor Ie=1.50, Component Importance Factor, |
Ip=1.5
Foundations:
• Presumably concrete spread footings. No soils report is available at this time.
Ice Loads:
• Per ASCE 7-10
Trenching and Site Demolition
Trenching is anticipated for proposed power and data conduits. Refer to electrical site plan for proposed conduit routing. Civil engineering will be required to define existing conditions and design parameters for trenching and utility layout unless GSA prefers for this to be undefined in the design-build documents.
CIVIL RECOMMENDATIONS
HS- 12
HIGHGATE SPRINGS
HS- 13
ELECTRICAL NARRATIVE
Data:
A new rack-mounted server will be added to the existing rack in the server room on the first level of the main building. Power for the rack will come from an existing installed outlet. The conduit and cable to the new sign control desktop PC will route through the lower level ceiling space to the supervisor’s office.
The LED signage cabling will be installed in 1” conduit from the canopy mounted signs to the server room. Conduit will be installed underground in trench. Inside the building, conduit will be installed in the lower level ceiling space and routed into the server room.
Power:
Power for the signs will come from an existing 208/120V, 3-phase, 4-wire branch panel in the main electrical room. Each sign will have a dedicated 20A/1P breaker. The conduit and wire will route in underground trench to a gantry. Conduit will be routed along the gantry to each sign. A new override switch will be mounted in each primary lane booth to control the affiliated sign.
Demo:
Not applicable.
EQUIPMENT MATRIX
THIS CONCEPT WAS APPROVED AS RECOMMENDED BASE BID CONCEPT
MAIN ELECTRICAL ROOM: EXISTING
PANEL 'MPE'.
LED SIGNAGE MOUNTED
TO GANTRY
ROUTE (6) 120V, 20A CIRCUITS IN (6) 3/4"C. W/ #10
THWN-2 CU WIRING FROM LED SIGNAGE TO
EXISTING PANEL. SHARE TRENCH WITH DATA
CONDUITS WHERE POSSIBLE. (TYP.)
CAT6 CABLE IN 1"C.
BETWEEN SWITCH AND
CONTROLLER PC
MAIN BUILDING LAN ROOM:
NEW SWITCH LOCATION
LOCATION FOR LED SIGNAGE
CONTROLLER/PC
---------- POWER
---------- DATA
---------- TEXT/OUTLINE
ROUTE (6) 1" CONDUITS IN TRENCH FOR
DATA CABLE FROM LED SIGNAGE TO
RACK-MOUNTED SERVER. (TYP.)
PRIMARY BOOTHS
LOCATION OF ELECTRICITY
FIGURE HS-6: LOCATION OF SITE UTILITIY CONNECTIONS
THIS CONCEPT WAS APPROVED AS RECOMMENDED BASE BID CONCEPT
HS- 14
HIGHGATE SPRINGS
HS- 15
Ideal size
510ft
220ft
VISIBILITY ARC
READABILITY ARC
THIS CONCEPT WAS APPROVED AS
RECOMMENDED BASE BID CONCEPTSIGNAGE PARAMETER DIAGRAM
HS- 16
HIGHGATE SPRINGS
HS- 17
DCW Cost Management 340% Documents Cost Plan November 20, 2014
GSA LED Signage Highgate LPOE
Scope of Work
Project Scope Description
Project Design Documents
Procurement
Site Conditions and Constraints
Inclusions
Exclusions
Sales Tax
The scope of work is the installation of LED signage for 5 lanes at the Highgate Land Port of Entry in Highgate Springs, VT. The base design concept, noted previously as alternate 2, is a gantry system at the curve approximately 225 feet from the booths. In addition to the new gantry system, the existing gantry would receive new static signage (an allowance has been provided).
40% Documents schematic drawings including narratives.
The procurement method is to utilize a design/build approach using vetted IDIQ contractors. The project will be preformed by a qualified general contractor utilizing the local sub market as able. All labor trades are to adhere the wage rules under the Davis Bacon Act. The published rates for Highgate Springs, VT are shown in the following table. A 12 week project schedule is anticipated.
Costs as presented within this report reflect the costs to conduct construction operations in a relatively remote location at a 24 hour land port of entry. The general contractor will coordinate with the LPOE to determine access.
Costs are based on work being performed during normal business hours.
Scope change and post contract contingencies Assessments, taxes, finance, legal and development charges Environmental impact mitigation
General Conditions and requirements including equipment, tools, project management, scheduling, documentation, submittals, travel, temporary facilities, badging, health and safety.
Assume electrical power is available at LPOE and no office utility connections, or fees/associated permits are required
Hazardous material handling, disposal and abatement Architectural, design and construction management fees
Overhead, profit and bonds are included and are delineated on the summary page
Wage Rates: Including Fringe Electrician 23.32$ Electrician, Low V 23.32$ Ironworker, structural 21.50$ Carpenter 18.90$ Laborer, 14.31$ Painter 19.63$ Sheet metal worker 23.25$
DCW Cost Management 440% Documents Cost Plan November 20, 2014
GSA LED Signage Highgate LPOE
Highgate LED Signage Alternate 1 Areas & Control Quantities
LANES
Areas
Lanes Program Areas
Quantity of Lanes 5
TOTAL LANES 5 Efficiency: 100% 5
SF
DCW Cost Management 540% Documents Cost Plan November 20, 2014
GSA LED Signage Highgate LPOE 5 Lanes
Highgate LED Signage Alternate 1 Summary
% $/LANE TOTAL
A10 Foundations 3% 4,000.00 20,000 A Substructure 3% 4,000.00 20,000 B20 Exterior Enclosure 24% 35,350.00 176,750 B Shell 24% 35,350.00 176,750 D50 Electrical Lighting, Power & Communications 18% 26,775.00 133,875
D Services 18% 26,775.00 133,875
E10 Equipment 16% 23,300.00 116,500
E Equipment & Furnishings 16% 23,300.00 116,500
F20 Selective Demolition 1% 1,930.00 9,650
F Special Construction & Demolition 1% 1,930.00 9,650
BUILDING ELEMENTAL COST BEFORE CONTINGENCIES 63% 91,355.00 456,775
Z10 Contingency 20.00% 13% 18,271.00 91,355
BUILDING ELEMENTAL COST INCLUDING CONTINGENCIES 76% 109,626.00 548,130
Z21 Field Requirements 8.00% 6% 8,770.08 43,850 Z22 Office Overhead & Profit 5.00% 4% 5,919.80 29,599 Z23 Bonds and insurance 1.50% 1% 1,864.74 9,324 Z24 A/E Design Build 6.00% 5% 7,570.84 37,854 Z25 Testing, training, warranty and maintenance 8% 7% 10,700.12 53,501
BUILDING CONSTRUCTION COST BEFORE ESCALATION 100% 144,451.58 722,258
Z30 Escalation to Start Date (May 2015) 0.45% 0% 644.24 3,221
RECOMMENDED BUDGET 100% 145,095.82 725,479
Per Lane Costs: 145,095.82
A B D E F
DCW Cost Management 640% Documents Cost Plan November 20, 2014
GSA LED Signage Highgate LPOE
Quantity Unit Rate Total
A10 Foundations
A1020 Special Foundations 5 Lanes 4,000.00 20,000 Reinforced concrete footing including excavation- 10' sq. x 4'd 2 EA 10,000.00 20,000
20,000 B20 Exterior Enclosure
B2010 Exterior Walls 5 Lanes 35,350.00 176,750 Structural steel framing
Pre- fabricated HSS steel gantry frame system beams and columns -factory painted 28.00 TN 4,800.00 134,400 Gantry system crane installation and rigging 24.00 HRS 1,100.00 26,400 Base plates and angles 1.50 TN 4,500.00 6,750
Sealants and coatings Waterproof caulking penetrations 5 EA 120.00 600 Paint touch-up 1 LS 1,100.00 1,100
Signage Mounting Install signage system at gantry -pre-erecting with covers and hinges 5 EA 1,500.00 7,500
176,750
D50 Electrical Lighting, Power & Communications
D5010 Electrical Service & Distribution 5 Lanes 14,565.00 72,825 Trenching and backfilling -new gantry 225 LF 44.00 9,900 Lockable in ground conduit box 1 EA 3,200.00 3,200 20 AMP circuit breakers 6 EA 1,200.00 7,200 Conduit and wire from panel to signs including ties and sleeves 1,475 LF 34.00 50,150 Override switching to each primary booth 5 EA 250.00 1,250 Sign connections 5 EA 225.00 1,125
D5020 Lighting & Branch Wiring 5 Lanes No work anticipated
D5030 Communications & Security 5 Lanes 10,355.00 51,775 Server and racking 1 EA 1,850.00 1,850 Cat 6 Cabling and conduit 1,475 LF 33.00 48,675
JasonFFox Rectangle
JasonFFox Rectangle
HS- 18
HIGHGATE SPRINGS
HS- 19
DCW Cost Management 740% Documents Cost Plan November 20, 2014
GSA LED Signage Highgate LPOE
Quantity Unit Rate Total
Sign Control PC 1 EA 1,250.00 1,250
D5090 Other Electrical Systems 5 Lanes 1,855.00 9,275 Bird control devices 5 EA 1,100.00 5,500 Grounding 5 EA 275.00 1,375 Wiremold and ancillaries 1 LS 2,400.00 2,400
133,875
E10 Equipment
E1030 Vehicular Equipment 5 Lanes 20,000.00 100,000 LED Signage, Type 112 5 EA 20,000.00 100,000 Surge suppression 5 EA 1,300.00 6,500 Existing canopy static signs, allow 1 EA 10,000.00 10,000
116,500
F20 Selective Demolition
F2010 Building Elements Demolition 5 Lanes 1,930.00 9,650 Lane closures coordinated with LPOE 1 LS 1,500.00 1,500 Temporary signage and pedestrian protection 1 LS 1,000.00 1,000 Remove existing traffic signal system from booths including monitors and lights 5 EA 300.00 1,500 Remove existing signage from existing gantry 3 EA 250.00 750 Penetrations for conduit 14 EA 350.00 4,900
F2020 Hazardous Components Abatement 5 Lanes None anticipated NIC
9,650
Meeting Notes GSA LED LPOE Package 1 Trip Report
Highgate Springs – September 10, 2014 General:
1. 24/7 Port
2. Few, if any commuters during working rush hours, mostly general and vacation traffic, 800 - 1200 vehicles a day.
3. Peak traffic during summer months, May to Labor day, peak wait times of 20 minutes, NEXUS traffic diverted to Cargo lane when wait times exceed 12 mins or so.
4. There is only one lane open at night.
5. Canada is enlarging the highway feeding into this LPOE with expectations that more traffic will use this route from Montreal to Boston
6. There are (5) POV lanes, (1) Cargo (not high/low), also used as Nexus Diversion from Lane (5) and (1) independent bus lane to the east.
7. Buses unload and they expect approx. 10 busses a day, typically Greyhound type.
8. Traffic maneuvering is a challenge particularly with RVs. Therefore, the preferred lane for RV’s is lane 5 for more maneuvering room.
9. Lane numbering starts on the west side of the Headhouse up to lane 5 with lane 6 separated from the other lanes by the Cargo Inspection Building.
10. There currently a Gantry support static advance warning signage between roughly half-way between the border and Primary. There doesn’t appear to be power to the Gantry.
11. Port currently uses temporary roll-out sign for holidays.
12. Connection to LED Signage to be in Command Center and Chief’s office.
13. The Headhouse is a (2) story building above grade.
14. They have a bad bird problem. Current Mobile Vacis Barn has been condemned due to Bird problem.
15. They are expecting a new generator project.
16. Future plans are for a Vermont DOT bypass lane to the west.
17. The team measured a underside of primary canopy clearance of 17’-6”.
18. Because of shape of canopy and clearance, signage is likely to be installed on the columns but with challenging clearance issues.
19. Lane widths were measured:
a. Lane 1 – 12’-1-1/2”
b. Lane 2 – 12’
c. Lane 3 – 12’-2”
d. Lane 4 – 15’-1”
e. Lane 5 – 12’-6”
f. Lane 6 – 20’-7”
g. Bus lane - NM
20. Drawings photographed on site show a different edge condition on the primary canopy than as-built.
21. Because of extreme curve immediately in front of the Primary, a new Gantry may be necessary possibly requiring a geotechnical report.
22. There is a potential for the existing bus lane to add a Nexus booth. The team will assess if this is an option appropriate for this project.
Structural:
1. The original drawings showing the structure of the building were available on site. Photos of the drawings were taken by the design team and a PDF copy of the drawings was requested. The primary canopy is steel framed and has a profile with a flat top and a curved soffit. The edges of the canopy taper to a thin edge which will make installation of the sign structurally challenging
2. The design team also considered the options of supporting signs from a steel member cantilevered off the steel columns supporting the canopy. This option may reduce the clear height
Meeting Notes of the lanes and therefore may not be viable. Lastly, the signs may be installed from a new gantry constructed in front of the port.
Electrical:
1. Service entrance equipment is located on the first floor.
2. This site has severe issues with birds. Netting has been installed under the canopy to prevent birds from perching on conduits.
3. Existing traffic signals and booths are fed from conduits mounted to the underside of the canopy.
New conduits will need to be installed in a similar manner and routed to the building.
4. The existing gantry is unpowered. New conduits would need to be routed underground across the truck lane and alongside the road. The size, quantity and location of existing conduits is unknown.
5. Spare capacity in existing panel boards is limited. However, Panel ‘MPE’ has sufficient unused capacity. Panel ‘MPE’ is the preferred source of new power for the LED signs.
6. The preferred location for the controlling computer is the supervisor’s podium.
Signage:
1. Description of Approach Road: The inbound road utilizes two driving lanes at the international border 950ft from the inspection canopy. The right lane starts to divide into two lanes 780ft from the inspection canopy. A gantry with three lane signs is located 550ft from the inspections canopy. The signs provide direction for autos & buses, autos, and trucks, listed left to right. 420ft from the inspection booths the right lane diverges to the commercial inspection area (1 inspection lane). There are three signs at the gore splitting the POV plaza and commercial lane. A large static overhead sign splits autos & trucks, a smaller static sign duplicates the messages, and a trailer LED sign lists the nexus hours (note, the nexus lane is on the left side). 260 ft from the inspection booths the dedicated bus lanes splits to the left of the POV plaza. At this point the POV plaza enlarges and follows a shallow "S" turn displacing the center of the roadway 80ft. Due to the "S" turn signs at the canopy would only be visible from 550ft away. The canopy is visible from the road at a 20 degree angle from the centerline at this point.
2. Wayfinding Challenges:
a. Directing NEXUS traffic through Cargo lane during peak traffic.
b. Lane signs at canopy should be rotated slightly for better visibility from sharper "S" turn at entry plaza.
c. Some RVs diverted to Cargo lane.
3. Booth Override Switch Location: Replaces existing switch for stoplights (to be demo’d)
4. Any Existing Signs to Remove: Upper column mounted stoplights to be removed.
5. Other Notes:
a. Preliminary location for signs is with a column mounted armature angled slightly (individual per lane).
b. 16mm display size preferred due to shorter reading distances.
c. 1 foot clearance between bottom of curved canopy and 16'-0" listed clearance.
d. Advanced sign at gantry necessary for when NEXUS lanes are diverted to cargo.
End of Written Report
HS- 20
HIGHGATE SPRINGS
HS- 21
Meeting Notes
Site
Approach 1:
Meeting Notes
Approach 2:
Advance Warning Gantry
Canopy
Canopy Detail
Connectiviity
Panel ‘MPE’, Section Two Panel ‘MPE’, Section Two Schedule
HS- 22
Meeting Notes
Command Center
File details come from the government source that posted it. Updated .