Amendment 01.pdf
PDF 141 KB Posted
- Attached to
- Emergency Generator and Fire Pump Replacement Federal contract opportunity
- Solicitation number
- 47PF0022R0090
About this file
This document contains an amendment and responses to requests for information regarding a solicitation for emergency generator and fire pump replacement services. The General Services Administration Region 5 is seeking a contractor to replace the existing diesel generator and fire pump with a new 500 kW natural gas generator and new fire pump at the Walter H. Rice Federal Building and U.S. Courthouse in Dayton, Ohio. The construction cost estimate is between $1,000,000 to $3,375,000 and the performance period is 275 calendar days upon receipt of the notice to proceed. The NAICS code is 236220 with a small business size standard of $39.5 million. The amendment provides responses to contractor questions that clarify the generator and fire pump are funded, identify the current elevator maintenance vendor, and confirm cable sizing and equipment ratings. It also states that abatement work is not required if hazardous materials identified in the report are not disturbed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 05.pdf | ||
| Amendment 04.pdf | ||
| Amendment 03.pdf | ||
| Amendment 02.pdf | ||
| 2022 08 29 Pre-Poposal Sign-In Sheet.pdf | ||
| Updates Description for Bid Adddendum 1.pdf | ||
| Bid Addendum 1 - Revised Specs.pdf | ||
| 47PF0022R0090_Rice GEN and FP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 01, Solicitation 47PF0022R0090 Emergency Generator and Fire Pump Replacement Walter H. Rice Federal Building and U.S. Courthouse, 200 West 2nd Street, Dayton, Ohio 45402
Amendment 01 is hereby issued to respond to RFI's (see attached) and provide Bid Addendum #1.
You must acknowledge receipt of this and all amendments
R5 AMD Southern Construction Contracting Team 230 S. Dearborn St.
Room 3500 Chicago, IL 60604 USA
R5 AMD Southern Construction Contracting Team 230 S. Dearborn St.
Room 3500 Chicago, IL 60604 USA
47PF0022R0090
1 1
09/07/2022
08/18/2022
Responses to RFI’s
RFP 47PF0022R0090
Emergency Generator and Fire Pump Replacement
Walter H. Rice Federal Building and U.S. Courthouse 200 West 2nd Street, Dayton, Ohio
1) Is the project funded?
Response: Yes; The project is funded.
2) Who is the GSA’s elevator maintenance vendor and contact info? At the pre-bid it was mentioned the vendor listed in the solicitation is not the current vendor.
Response:
The Murphy Elevator Company 800-752-6075 | service@murphyelevator.com
3) Please provide a roof insulation and membrane specification.
Response: The scope of work only entails the existing shed and not the main building roof.
4) Please provide a detail of the existing roof construction.
Response: The scope of work only entails the existing shed and not the main building roof.
5) E-2-3 Single Line Diagram
There are multiple transformer feeds calling for a 4-wire feed. Can the feeds to the transformers be 3-wire?
Response: Yes, the feeds to the transformers can be 3-wire.
Cable schedule calls for #8 conductors for a 100A feed. Should these be #3 conductors?
Response: Yes, use #3 AWG conductors.
Single Line Diagram calls for a 400A feed to ATS-RSB which is rated at 200A.
Response: Revise ATS from 200A to 400A.
6) The drawings identify 200-square feet of Spray-on Fire Proofing in Room B10 on the north wall near air handling units. The pipe end sealant on insulated piping, pipe wrap on insulated piping throughout; white sealant on insulated duct work throughout and finish top coat in Jury Room 910C are called out. In regards to throughout, are all the materials identified to be abated? A quantity for the fire proofing was provided, but nothing else. Is there other ACM to be abated besides the fire proofing?
Response:
Abatement is not required if areas identified in the hazardous materials report as hazardous are not disturbed or affected during construction. Please review the hazardous materials report for a list of these areas.
7) Drawing A-1-01 Partial Demolition Plan First Floor Level, MD-1-1 Generator Demolition Plan –
Basement; FP-0-1 – Hazardous Material Report; and FPD-1-1 and FPD-2-1 Basement Fire Protection Plan all possibly include areas where the fire proofing, pipe insulation and/or end cap materials may need addressed. But nothing is specifically called out. Can you please clarify the scope of the abatement?
Response:
Abatement is not required if areas identified in the hazardous materials report as hazardous are not disturbed or affected during construction. Please review the hazardous materials report for a list of these areas.
File details come from the government source that posted it. Updated .