This request for proposal solicits general construction services for an EPDM roof replacement project. The solicitation is for the Paul Findley Federal Building and U.S. Courthouse located in Springfield, Illinois. The project includes removal and replacement of an existing single-ply EPDM membrane system, removal and replacement of an existing electric snow-melt system, installation of a complete lightning protection system, and installation of a fall protection system. This is a total small business set-aside with a NAICS code of 238160 and size standard of $15 million. The estimated cost is between $1-5 million. The period of performance is 120 calendar days to be completed in calendar year 2021. This is a negotiated procurement with evaluation factors including experience on similar projects and past performance. The closing date for proposals is April 16, 2020 with an anticipated award date of October 2020 and construction start of Spring 2021. The soliciting agency is the General Services Administration Public Buildings Service Region 5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 04 RFIs.pdf | ||
| Site Visit Appointments.pdf | ||
| Amendment 02 Site Visit.pdf | ||
| Amendment 01 Site Visit Extension Specs.pdf | ||
| EPDM Roof Specifications March 19 20.pdf | ||
| EPDM Roofing Replacement Preproposal Conference.docx | DOCX document | |
| Pre-Proposal Meeting Agenda.docx | DOCX document | |
| 19_1231_100 CD Specifications.pdf | ||
| RFP 47PF0020R0012 EPDM Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
RFP 47PF0020R0012 EPDM Roof Replacement at the Paul Findley Federal Building &
U.S. Courthouse located at 600 E. Monroe Street Springfield, Illinois Amendment 03
This is amendment is to change as follows:
(1) The RFP is hereby updated to include an additional 66 Requests for Information.
(2) The RFP is hereby updated to include an ACM report, additional information on the roof anchors, and A500 & A501 which should have been included in
Amendment 01.
(3) The pricing sheet is updated. Please refer to the documents herein for an additional pricing sheet. The anchor line item is added. The Total Evaluated Price consists of the Materials & Labor only. The offerors will be required to submit the additional SF1442 Continuation Sheet with their Price Proposal. Individual line items will be accepted or rejected at the time of award.
(4) The RFP is hereby extended to May 18, 2020 at 1 pm CST. Offerors will be required to email their proposals to joseph.loersch@gsa.gov and must be received prior to the 1 pm deadline, otherwise they will be considered late.
(5) The Davis Bacon Wages are hereby updated. They are included at the end of this amendment.
SOLICITATION NO. 47PF0020R0012
PROJECT TITLE: EPDM Roof Replacement
GOVERNMENT PRE AWARD INQUIRY FORM
Looking at this bid I see the manufacturers listed but want to know if there is time to submit for MuleHide as a manufacturer. MuleHide meets all specifications and is in fact made from the same materials and supplier as
Carlisle. Is there a form I need and I can send the required specifications?
GSA will accept brand name equal but it must meet all product specifications listed. If the products do not meet specifications, they will be rejected. If you are submitting a proposal on this RFP, it is assumed that you will provide materials that meet the specifications.
4/2/20
We were reading the technical qualifications for this project and were curious if a subcontractor's past performance and relevant experience were acceptable on behalf of the prime contractor?
No, the RFP states that the experience and past performance must come from the offeror.
4/20/20
The period of performance is 120 calendar days; all work shall be fully completed in calendar year 2021. When is the project expected to start? If the work starts several months from now, how are we supposed to account for any unforeseen condition like increase in material costs?
The expected start for this project is spring of 2021. The government will not make any recommendations on how the offeror should price their proposal.
4/20/20
4 Is there a wage scale on this project? Yes, it is at the end of the RFP 47PF0020R0012 document. 4/20/20
075323, 2.4A – Polyiso looks to be class 4 which is a high density board
(Prox. 80 PSI). This is only available in 1” thickness… The plans and specs call for 2” of polyiso, so are we supposed to use 2 layers of the HD Iso to create the 2” depth specified, or use a standard 2” Iso (20 PSI) with the 1”
HD board on top? Please clarify.
One layer of 2" thick standard density polyisocyanurate board is acceptable.
5/11/2020
DTL6/A500 calls for extruded polystyrene insulation and not polyiso. Can you please clarify.
The reference to extruded polystyrene on detail 6/A500 should be revised to polyisocyanurate.
5/11/2020
DTL3/A501 calls for 2 layers of 1” extruded polystyrene insulation at the drains & field of the roof. Please clarify.
The reference to extruded polystyrene on detail 3/A501 should be revised to polyisocyanurate.
5/11/2020
DTL2/A501 calls for ½” coverboard. The specifications call for ¼” dens deck. Please clarify.
1/4" dens deck coverboard is acceptable. 5/11/2020
075323, 3.2B – Acoustical deck batten insulation in deck flutes. It appears the existing roof deck is 2” tongue & groove wood. Please clarify.
Paragraph 075323, 3.2B can be eliminated. 5/11/2020
075323 2.2A calls for reinforced 60mil EPDM, but references standard
60mil EPDM elsewhere. Please confirm.
Use 60 mil reinforced EPDM typical 5/11/2020
DTL4/A501 – Vapor Barrier. What type of vapor barrier is required (if any) and what is the desired attachment method?
The reference to vapor barrier should be revised to insulation adhesive. See 07 53 23-2.5.B 5/11/2020
DTL3/A500 – Shows a metal flashing (of sorts) being installed beneath the copper roof panels. The plans and specs specifically call for the copper panels to not be disturbed in any way. Please clarify.
The flashing slips underneath the copper panels without removing them.
5/11/2020
“Sally Port Roof” area shows indications of slope to a drainage scupper but does not show or specifically call for tapered insulation. Please clarify.
Provide tapered insulation to slope to the scupper 5/11/2020
Question
No.
QUESTION GOVERNMENT RESPONSE
Response
Date
Decemeber 2016 SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Is a stair tower going to be required to access the roof at the indicated staging area?
Prime contractors are responsible for determining responsibilities of the work as long as it is completed within the specifications of the project.
5/11/2020
What trade/contractor will be responsible for “patching” the existing copper roof as indicated on the drawings?
Prime contractors are responsible for determining responsibilities of the work as long as it is completed within the specifications of the project.
5/11/2020
Please confirm which contractor will be responsible for obtaining the roofing permit.
Permits are not required.
5/11/2020
Sheet A100 – Is the roofing contractor to remove and replace the sealant where the louvers meet the copper roof panels?
Yes 5/11/2020
Sheet A101 – Which trade/contractor will be responsible for repairing the tongue & groove wood roof deck, as well as providing the cross bracing near the drains?
Prime contractors are responsible for determining responsibilities of the work as long as it is completed within the specifications of the project.
5/11/2020
Which trade/contractor will be responsible for disassembling & assembling the various stair systems and metal landings on the roof(s)?
Prime contractors is responsible for determining responsibilities of the work as long as it is completed within the specifications of the project.
5/11/2020
DTL8/A500 – What kind of sequencing will be required for the cable clamp system shown as it is noted that the system needs to be flashed into the roof?
Sequencing is at the discretion of the contractor to perform the scope of work indicated. 5/11/2020
Sheet A500 from the original RFP Drawings Package was not included in
Amendment 01 Drawings Package, although it is listed in the sheet index.
Was A500 meant to be included in the updated drawings, or was that page removed intentionally?
A500 is supposed to be included in the bid package.It is included in Amendment 03.
5/11/2020
The copper counter flashing nailed to the building's parapet needs to be removed to install new EPDM roofing and term bar underneath the drip edge along the perimeter of the roof. Please clarify as to whether or not the counterflashing needs to be reinstalled after the new roofing is completed.
This counterflashing is in bad condition and would need to be reattached through the new roofing material which would void the warranty.
The copper flashing is to remain. It will need to be bent upward to install the new term bar and then rebent to its original configuration after the new roof is termination is complete. 5/11/2020
GOVERNMENT PRE AWARD INQUIRY FORM
Detail drawings 4/S-3.0 calls out for all exposed metal to be hot-dipped galvanized, through the U-bar shown is to be Stainless Steel. There is a concern with potential consequences to the integrity of the SS U-bar as well as its general appearance if it hot-dipped along with the HSS column and steel plate. Welding of the U-bar onto the plate also could not occur after the plate has been galvanized. A potential solution would be to weld a nut to the inside of the plate and use a stainless steel eye bolt in place of what is shown in the drawings. Could the owner/designer please advise on this issue?
Contractor is advised to bid as detailed.
5/11/2020
Can you give more clarification on detail 3 on page A500? No manufacturer will stand behind it as it is currently spec’d.
Slip flashing extend up underneath the existing EPDM and copper panels approximately 6" and the new EPDM is bonded to the flashing. The intent of the detail is so the copper panels do not need to be removed.
5/11/2020
Can we setup crane access from the road? 6th Street, E Monroe Street, S 7th
St? Are there specific permits we will need for blocking part of the street? Is there a limit on how long we can setup on the roads?
Contractor may make arrangements for permit to locate storage and equipment along city streets; and locate a crane on streets for loading/unloading. Contractor shall contact crystal.trent@springfield.il.us one month prior to the requirement to apply for permit. Contractor will not be authorized to use a crane on weekends which the city has downtown activities scheduled. The City stated that locating the crane in the alley behind the building would be the preferred location.
5/11/2020
Interior protection required over equipment in the attic? Is there anything that cannot get dirt, debris on it?
Contractor shall coordinate activities that will create dust with the GSA property manager, Phil Heimlich. There may be a requirement to turn off equipment prior to start of work.
Contractor will be responsible to remove debris and clean dust and debris from building floor, equipment, ductwork, conduit and piping.
5/11/2020
27 Is there structural or tapered insulation between the drains? The existing wood deck tapers to the drains. 5/11/2020
28 Flashing around the window sill? Provide slip flashing beneath copper similar to detail 3/A/500. 5/11/2020
For crane set up around the back, we may need to block some parking spots for current tenants. Do we need to include costs for their relocated parking?
Contractor shall include cost to provide seven (7) temporary parking spaces for staging area located in the southwest corner of the property. the identified staging are only is available during the building's hours of operation. All parking spaces will be available after hours of building operation.
5/11/2020
30 Additional clarification on the stair details? The bidder needs to give a more detailed question 5/11/2020
31 Can we use Polyiso insulation instead of Polystyrene insulation? Yes, polyisocyanurate insulation is the design intent 5/11/2020
GOVERNMENT PRE AWARD INQUIRY FORM
Additional tie off anchor points will need to be adjusted and additional ones added. It does not appear the system piping can be moved, but an alternative option would be to provide a unit price for additional tie-offs. There would be 2 unit prices, with one for each detail. Could you please clarify?
The pricing sheet is updated to include additional tie offs.
However, the government may accept or reject the line item pricing at the time of award and these line items are not included in the total evaluated price.
5/11/2020
Can the government please clarify what personnel the contractor shall always have on site?
All personnel on site will undergo a security clearance investigation and be issued clearance to be on site.
5/11/2020
The specifications mention a historical treatment specialist while also listing this person's credentials. Is the contractor supposed to hire a Historical treatment specialist?
Since this is a historic building, the contractor shall have a person with historical treatment credentials on site to ensure work is in compliance with the department of interiors requirements for the treatment of historic buildings as per the specifications.
5/11/2020
Can the contractor test the drains or does the contractor need to hire a licensed plumber to perform the drain testing?
The Government requires that that testing meets the specifications only.
5/11/2020
Has any asbestos been found within the roofing material? Has there been an asbestos test performed?
The roof system has been tested for ACM and the results were negative. The inspection report will be available.
5/11/2020
Can the government please specify the assembly method for the roofing material? The spec mentions multiple installation methods such as fully adhering, hot-mopping, and mechanical attachment.
Delete reference to asphalt materials; e.g. Section 07 53 23;
Paragraph 2.6 5/11/2020
Can the government please verify what sections are fully tapered verses structurally sloped?
The design intent is for flat insulation on sloped surfaces;
tapered insulation at flat areas (ie. sallyport and flat roofs over the stair towers), unless noted or detailed otherwise
5/11/2020
Can the government please verify if the contractor is to install flat stock insulation on the upper roof and full taper on the lower roof sections where walk-pads are to be located?
The upper roof has sloped wood decka nd the lower gutter areas with the walkway pads are also sloped to the drains.
Tapered insulation will be needed at the drain sumps and the areas noted in question 38 above
5/11/2020
The specification mentions a type 7 cover-board which seems to be a combo board that consists of insulation and gypsum board; however, the spec also mentions using individual insulation and cover board in 2 different pieces.
Can the government please specify what the contractor shall include in the bid?
The design intent is rigid insulation and 1/4" thick cover board.
5/11/2020
Can the government clarify if red-rosin paper shall be mechanically attached to deck, along with a self-adhering underlayment?
Red rosin paper shall be placed in accordance with roof system manufacturer.
5/11/2020
Will the government be willing to extend the bid date for the Paul Findley federal building roofing project another week? We fill that by doing so the contractors will be better able to provide a well-priced competitive proposal.
It will also give the government more time to answer questions that may be critical to the bidding process.
Please refer to Amendment 03.
5/11/2020
GOVERNMENT PRE AWARD INQUIRY FORM
Specification Section 11 01 04, 1.3 A. 3. d. states “Parapet or guardrails subject to direct loading by workers’ ropes, possibly cables, shall be designed to withstand such loading (typically 1,800 lbs) without damage to either the structure of the rigging component in contact with it."
Manufacturer has stated that the ballasted guardrail system called out on sheet S-1.0 of the project drawings will not meet this specification. Is there another specification section that this lower roof guardrail system would fall under?
The design intent is that fall protection equipment shall meet the OSHA requirements specified in SECTION 11 01 40 –
FALL PROTECTION EQUIPMENT
5/11/2020
It appears that most of the anchors are being welded on wide flange beams.
We can offer a beam wrap mechanical connection to avoid any welding, which would be less hazardous and also more cost efficient, while also meeting the exact criteria spelled out in the specifications. I have attached the wrap tech data sheet for you to reference. Will the government accept this alternate installation method?
The offeror shall price as per the details. If you want to provide an alternative you must clearly identify it in the proposal for what you are proposing and the price implication.
This allows the Government to properly evaluate.
5/11/2020
In the pre-proposal teleconference it was stated the project is intended to start in spring of 2021 weather permitting. This information cannot be located in the solicitation. Please confirm this is correct?
It is the intention of the project be completed in the spring/summer of 2021 since the fall of 2020 appears unlikely.
5/11/2020
Assuming work will start in spring 2021, will construction NTP date be determined by a negotiated or coordinated start date between GSA and the contractor based on weather and other factors at the time?
Once all security clearances have been received by the contractor, and he feels the weather during installation is compliant with manufacturer's requirement, the NTP can be issued.
5/11/2020
47 What is the anticipated date of contract award? The award is expected prior to September 30, 2020. 5/11/2020
Did GSA perform roof core cuts to determine existing roof thickness? If so, will GSA provide the report on the roof core cuts including all locations?
All roofs have fully adhered EPDM roofing. The insulation on the upper roof is made up of 2 layers of 1" extruded polystyrene and 1/2'" coverboard. The stair tower roofs have
1" polystyrene and 3" of polyisocyanurate insulation. The sloped roofs beneath the level of the copper panels do not have insualtion - EPDM is applied directly to the wood deck.
5/11/2020
Did GSA conduct a hazardous material survey for areas impacted by this project?
The roof system has been tested for ACM and the results were negative. The inspection report will be available.
5/11/2020
Is the presence of asbestos or lead containing materials suspected in areas impacted by this project?
The roof system has been tested for ACM and the results were negative. The inspection report will be available.
5/11/2020
What locations are available to the contractor for temporary power at roof level?
On the back corner of the Elevator Mechanical rooms there are panels at each end. So one at N.E. corner and one at N.W corner.
GOVERNMENT PRE AWARD INQUIRY FORM
Are electric panels available in the attic for temporary power? If so, what size & how many breakers are available?
On the back corner of the Elevator Mechanical rooms there are panels at each end. So one at N.E. corner and one at N.W corner.
5/11/2020
Please confirm contractor will be permitted to conduct work operations during normal business hours and that no or limited after hours work is required?
The ccontractor will be allowed to perform work the will not disrupted tenant operations. 5/11/2020
Please confirm in the project superintendent can also serve and project
Safety Officer?
Yes, that is acceptable.
5/11/2020
Please confirm contractor may have daily access to the roof either through interior access to the attic roof door, or by stair tower access erected by the contractor to provide daily roof access from the exterior?
The contractor shall access the roof from te exterior of the building. All scaffolding and stairs shalle restrict access to the building and roof by unauthorized personnel.
5/11/2020
If a stair tower is set up for worker access to the roof, please confirm if scaffold base must be wrapped in plywood to prevent unauthorized access and render it “anti-climb”?
The contractor shall access the roof from te exterior of the building. All scaffolding and stairs shalle restrict access to the building and roof by unauthorized personnel.
5/11/2020
It is anticipated that all entrances of the building must be operational at all times during normal business hours. Does GSA anticipate it will be necessary to cover entrances with sidewalk scaffold canopies given the nature of work above on the roof? If so, for which entrances should the contractor plan to provide canopies?
There is one main entrace located on the east end of the North elevation. The contractor is responsible for safety. He shall determine how to protect pedestrians and persons entering and exiting the building. The price proposal shall include all requirements per the specifications.
5/11/2020
Similar to the above questions, does GSA anticipate it will be necessary for the contractor to provide a sidewalk canopy along all pedestrian sidewalks to provide protection from progress of work on the above roof?
The contractor is responsible for safety. There is one main entrance located along the east end of the front elevation.
Since the contractor is responsible for safety, they shall determine if pedestrian protection is required. The price proposal shall include all requirements per the specifications.
5/11/2020
Waste management requirements for recycling designated in section 017419 may require multiple dumpsters onsite for sorting of disposed materials? Can
GSA offer additional staging area beyond the limited area noted on sheet
G100?
Due to the confinment of the site, the contractor shall contact crystal.trent@springfield.il.us (City of Springfield) to make arrangements for locating dumpsters and equipment on city property.
5/11/2020
Terms of the roof warranty designated in section 075323 paragraph 1.7 indicates GSA is seeking a special contractor warranty beyond the standard one year contractor/installer warranty, and that the term of warranty GSA is seeking is 20 years. Surety companies will typically not issue bonds for projects with installer warranties in excess of 3 years unless it is specifically stated that the installer’s warranty is not required to be bonded. Please clarify the terms of the installers/roofers warranty required for this project. It should be noted that the installer’s warranty is separate from the manufacturer’s warranty.
The warranty is a typical 20 year manufacturer's warranty on the roofing system. The special requirements include any inspections required to maintain the manufacturer's warranty as per 1.7,A,2; and the stipulated response times and requirements as per 1.7,A,3 5/11/2020
GOVERNMENT PRE AWARD INQUIRY FORM
All details needed to install and flash EPDM at various intersections with the existing copper roof are not identified in the project drawings. Is it the responsibility of the A/E or contractor to design all flashing details to meet applicable standards including warrantable standards by the manufacturer?
Details not identified in the drawings are to be submitted to the architect for review and approval prior to installation to ensure an acceptable and warrantable installation. 5/11/2020
It states in the drawings that existing copper roof is to remain. Proper installation and flashing of new EPDM will disturb existing copper roof at certain locations. As stated in question 17, EPDM installation details have not been completed identified. Where copper roof must be disturbed to properly installed the new EPDM roof, is use of new bright copper acceptable to repair the copper roof? Or is copper required to be patinated to match existing green patina?
The slip flashing shown in 3/A500 is intended to be installed with minimal disruption to the existing copper panels and no removal of the panels. Patching of the copper panels is not anticipated where the copper meets the EPDM. 5/11/2020
Section 076200 paragraph 1.2 states that the section applies to flashing at lintels and thru wall flashings, flashings and window sills. Please clarify where respective scopes of work are on the building for the referenced locations of stainless steel flashing installation? Please expand on scope of work and details for each?
The flashing pertains to detail 1/A500. References to through wall flashing can be eliminated.
5/11/2020
Pertaining to question 21 above, the balance of section 076200 identifies through wall metal flashing work. Please confirm if this is the correct spec applicable to this project?
Pertaining to question 22 (not 21) - the exiting copper flashing is to remain. Paragraph 07 62 00-2.3 can be eliminated. 5/11/2020
Sheet D100 shows the bottom right dormers not shaded as if they are not included in the EPDM roof replacement. Please confirm if this is correct?
All of the dormers are intended to have roofs replaced.
5/11/2020
Revised drawings per Amend 1 are missing sheet A500. Is that intentional? A500 & A501 is included in Amendment 03.
5/11/2020
67 Please confirm if the roof drains and downspouts need to be heat traced? No, they are not 5/11/2020
Please provide an elevation drawing showing the height of the two new roof ladders or provide an approximate height. 3/S3.1 roof to roof height is approximately 8'-0" 5/11/2020
Please confirm the extent/length of the KEEGARD guardrail. The plans show two runs- Grids 4.5 thru 7 and grids 10 thru 11.5 S1.0
The guard between grid 4.5 - 7 is 43'; the guard at grid 10-
11.5 is 21'.
5/11/2020
Will the government require multiple layers of insulation for this project?
The spec mentions 2" of insulation, but details in the plans/drawings reflect 2 layers of 1". May we use 1 layer of 2"?
Either is acceptable.
GOVERNMENT PRE AWARD INQUIRY FORM
105 S. York Rd., Suite 250 / Elmhurst, Illinois 60126 / 630.607.0060 / fax 630.607.0650 / www.ecgmidwest.com
E n v i r o n m e n t a l C o n s u l t i n g G r o u p , I n c .
December 21, 2017
Mr. Philip Hermanek GSA/PBS Southern Service Center 508 S. 8th Street Springfield, Illinois 62703
Re: Pre-Alteration Asbestos and Lead-Based Paint Assessment Report
Paul Findley Federal Building – Masonry and Stone Repairs Project 600 E. Monroe Street
Springfield, Illinois
Dear Mr. Hermanek:
In response to your request, Environmental Consulting Group, Inc. (ECG) has completed testing of suspect asbestos-containing materials (ACMs) and lead-based painted components. The samples were collected from exterior areas and roofs associated with the Masonry and Stone Repairs Project of the Paul Findley Federal Building, in Springfield, Illinois. This report provides an executive summary, an outline of the scope-of-work, and analytical results for the materials tested.
1.0 Executive Summary
On December 6, 2017, ECG collected 51 samples of suspect asbestos-containing materials (ACMs) from the exterior and roofs of the subject building. The results of testing showed that none of the building materials sampled are classified as ACMs.
Also during the inspection, ECG collected three (3) chip samples of suspect lead-based paint from the exterior window lintels.
Below are the components found to contain LBP:
• Brown and orange painted window lintels – Building exterior
Mr. Philip Hermanek y:\projects\2017\asbestos\gsa\springfield\asb and lbp chip inspection report.docx
2.0 Scope-of-Work
The scope-of-work for this project included testing suspect ACMs and LBPs prior to renovation activities. ECG representative Mr. Thad Ryniak completed the sampling on December 6, 2017.
Mr. Ryniak is an Illinois Department of Public Health-licensed Asbestos and Lead Inspector.
ECG certifications are located in Attachment A.
Asbestos Inspection Phase
3.0 Analytical Testing
Samples were sent for analysis to EMSL Analytical, Inc. (EMSL), located in Hillside, Illinois.
EMSL is recognized under the National Voluntary Laboratory Accreditation Program (NVLAP) as Laboratory #200399-0. All samples were analyzed by the Polarized Light Microscopy (PLM) method. PLM is an Environmental Protection Agency (EPA)-recognized method for determining asbestos content in bulk samples.
Analytical results and laboratory certifications are located in Attachment B.
4.0 Inspection Results
The U.S. Environmental Protection Agency (EPA) defines asbestos-containing materials (ACMs) as those materials containing greater than 1% asbestos by weight.
The table in Attachment C summarizes the results of the asbestos testing.
Lead-Based Paint Inspection Phase
5.0 Analytical Testing
The samples were sent for analysis to EMSL Analytical, Inc., which is located in Hillside, Illinois. EMSL is an American Industrial Hygiene Association (AIHA) accredited laboratory (Lab ID 102992), and is recognized under the Environmental Lead Laboratory Accreditation Program (ELLAP). The analysis was conducted in accordance with AIHA and ELLAP protocol by using Flame Atomic Absorption Spectroscopy.
Analytical results and laboratory certifications are located in Attachment B.
6.0 Inspection Result
According to the Environmental Protection Agency (EPA), Guidelines for the Evaluation and Control of Lead-based Paint Hazards in Housing (1996 Revision) define lead-based paint as having a lead content greater than 5,000 parts per million (ppm) or above 0.5% by weight. Any paint substance containing greater than or equal to 5,000 ppm or 0.5% by weight of lead must be properly handled under the guidelines set by the Illinois Department of Public Health (IDPH).
The table in Attachment D summarizes the results of the LBP testing.
7.0 Conclusions
On December 6, 2017, a total of 51 samples of suspect asbestos-containing materials were collected from the exterior and roofs of the Paul Findley Federal Building, in Springfield, Illinois. The results of testing showed that none of the building materials sampled are classified as ACMs.
Also during the inspection, ECG collected three (3) chip samples of suspect lead-based paint from the exterior window lintels.
Below are the components found to contain LBP:
• Brown and orange painted window lintels – Building exterior
Photographs of the sampled building components can be found in Attachment E.
If you have any questions or comments, please contact our office.
Sincerely, ENVIRONMENTAL CONSULTING GROUP, INC.
Thad J. Ryniak Project Manager
Attachments Attachment A – ECG Certifications Attachment B – Analytical Results and Lab Certifications Attachment C – Bulk Sampling Results Table Attachment D – Lead-Based Paint Testing Results Table Attachment E – Photo Log
Attachment A
ECG Certifications
Attachment B
Analytical Results and Lab Certifications
EMSL Analytical, Inc.
4140 Litt Drive Hillside, IL 60162
Tel/Fax: (773) 313-0099 / (773) 313-0139 http://www.EMSL.com / chicagolab@emsl.com
261711218EMSL Order:
Customer ID: ENCG51
Customer PO:
Project ID:
Attention: Phone:Thad Ryniak (312) 907-3535
Fax:Environmental Consulting Group (630) 607-0650
Received Date:105 South York Street 12/08/2017 2:55 PM
Analysis Date:Suite 250 12/11/2017
Collected Date:Elmhurst, IL 60126
Project: A171556-1232 - Paul Findley Federal Building
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
TR1206-01
261711218-0001
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
On Exterior
Limestone - Gray
Mortar
TR1206-02
261711218-0002
None DetectedNon-fibrous (Other)100%Gray/Tan/Various
Non-Fibrous
Homogeneous
On Exterior
Limestone - Gray
Mortar
TR1206-03
261711218-0003
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
On Exterior
Limestone - Gray
Mortar
TR1206-04
261711218-0004
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
On Exterior Brick -
Gray Mortar
TR1206-05
261711218-0005
None DetectedNon-fibrous (Other)100%Gray/Tan/Various
Non-Fibrous
Homogeneous
On Exterior Brick -
Gray Mortar
TR1206-06
261711218-0006
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
On Exterior Brick -
Gray Mortar
TR1206-07
261711218-0007
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
On Exterior Windows
- Gray Window Caulk
TR1206-08
261711218-0008
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
On Exterior Windows
- Gray Window Caulk
TR1206-09
261711218-0009
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
On Exterior Windows
- Gray Window Caulk
TR1206-10-Rubber
Membrane
261711218-0010
None DetectedNon-fibrous (Other)100%Gray/Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
TR1206-10-Insulation
261711218-0010A
None DetectedNon-fibrous (Other)10%Cellulose90%Brown
Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
TR1206-11-Rubber
Membrane
261711218-0011
None DetectedNon-fibrous (Other)100%Gray/Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
TR1206-11-Insulation
261711218-0011A
None DetectedNon-fibrous (Other)10%Cellulose90%Brown
Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
TR1206-12-Rubber
Membrane
261711218-0012
None DetectedNon-fibrous (Other)100%Gray/Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
TR1206-12-Insulation
261711218-0012A
None DetectedNon-fibrous (Other)10%Cellulose90%Brown
Fibrous
Homogeneous
EPDM Roof - Black
Roof Field
Initial report from: 12/11/2017 17:40:34
Page 1 of 4ASB_PLM_0008_0001 - 1.78 Printed: 12/11/2017 4:40 PM
Tel/Fax: (773) 313-0099 / (773) 313-0139 http://www.EMSL.com / chicagolab@emsl.com
261711218EMSL Order:
Customer ID: ENCG51
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
TR1206-13
261711218-0013
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Rood Flashing
TR1206-14
261711218-0014
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Rood Flashing
TR1206-15
261711218-0015
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof - Black
Rood Flashing
TR1206-16
261711218-0016
None DetectedNon-fibrous (Other)83%Cellulose
Glass
15%
2%
Tan/Black
Fibrous
Heterogeneous
Ballasted Built Up
Roof - Black Rood
Field
TR1206-17
261711218-0017
None DetectedNon-fibrous (Other)82%Cellulose
Glass
15%
3%
Tan/Black
Fibrous
Heterogeneous
Ballasted Built Up
Roof - Black Rood
Field
TR1206-18
261711218-0018
None DetectedNon-fibrous (Other)85%Cellulose
Glass
10%
5%
Tan/Black
Fibrous
Homogeneous
Ballasted Built Up
Roof - Black Rood
Field
TR1206-19
261711218-0019
None DetectedNon-fibrous (Other)95%Cellulose5%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof - Black Rood
Flashing
TR1206-20
261711218-0020
None DetectedNon-fibrous (Other)93%Cellulose
Glass
5%
2%
Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof - Black Rood
Flashing
TR1206-21
261711218-0021
None DetectedNon-fibrous (Other)92%Cellulose
Glass
3%
5%
Black
Fibrous
Homogeneous
Ballasted Built Up
Roof - Black Rood
Flashing
TR1206-22
261711218-0022
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Front of Building by
Floor Grates - Gray
Mortar on Concrete
TR1206-23
261711218-0023
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Front of Building by
Floor Grates - Gray
Mortar on Concrete
TR1206-24
261711218-0024
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Front of Building by
Floor Grates - Gray
Mortar on Concrete
TR1206-25
261711218-0025
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Beige
Roof Caulk
TR1206-26
261711218-0026
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Beige
Roof Caulk
TR1206-27
261711218-0027
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Beige
Roof Caulk
TR1206-28
261711218-0028
None DetectedNon-fibrous (Other)100%Black
Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Gray Roof
Caulk
TR1206-29
261711218-0029
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Gray Roof
Caulk
TR1206-30
261711218-0030
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Gray Roof
Caulk
TR1206-31
261711218-0031
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Black
Roof Tar
Page 2 of 4ASB_PLM_0008_0001 - 1.78 Printed: 12/11/2017 4:40 PM
Tel/Fax: (773) 313-0099 / (773) 313-0139 http://www.EMSL.com / chicagolab@emsl.com
261711218EMSL Order:
Customer ID: ENCG51
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
TR1206-32
261711218-0032
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Black
Roof Tar
TR1206-33
261711218-0033
None DetectedNon-fibrous (Other)100%Tan/Black
Non-Fibrous
Heterogeneous
Ballasted Built Up
Roof High - Black
Roof Tar
TR1206-34
261711218-0034
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Gray
Caulk on Concrete
Wall/ Pavers
TR1206-35
261711218-0035
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof High - Gray
Caulk on Concrete
Wall/ Pavers
TR1206-36
261711218-0036
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Gray
Caulk on Concrete
Wall/ Pavers
TR1206-37
261711218-0037
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Black
Roof Tar
TR1206-38
261711218-0038
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Black
Roof Tar
TR1206-39
261711218-0039
None DetectedNon-fibrous (Other)90%Cellulose10%Black
Non-Fibrous
Homogeneous
Ballasted Built Up
Roof Low - Black
Roof Tar
TR1206-40
261711218-0040
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof - Light
Gray Roof Caulk
TR1206-41
261711218-0041
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof - Light
Gray Roof Caulk
TR1206-42
261711218-0042
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof - Light
Gray Roof Caulk
TR1206-43
261711218-0043
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof - Dark
Gray Roof Caulk
TR1206-44
261711218-0044
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof - Dark
Gray Roof Caulk
TR1206-45
261711218-0045
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof - Dark
Gray Roof Caulk
TR1206-46
261711218-0046
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof on Vent
Pipe - Black Roof Tar/
Caulk
TR1206-47
261711218-0047
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
EPDM Roof on Vent
Pipe - Black Roof Tar/
Caulk
TR1206-48
261711218-0048
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
EPDM Roof on Roof -
Black Roof Tar/ Caulk
Page 3 of 4ASB_PLM_0008_0001 - 1.78 Printed: 12/11/2017 4:40 PM
Tel/Fax: (773) 313-0099 / (773) 313-0139 http://www.EMSL.com / chicagolab@emsl.com
261711218EMSL Order:
Customer ID: ENCG51
Customer PO:
Project ID:
Analyst(s)
Brian Jolly (14)
William Kipp (37)
James Hahn, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Hillside, IL NVLAP Lab Code 200399-0
Page 4 of 4ASB_PLM_0008_0001 - 1.78 Printed: 12/11/2017 4:40 PM
OrderID: 261711218
Client Sample Description ConcentrationLab ID Analyzed Lead
Collected
EMSL Analytical, Inc.
4140 Litt Drive, Hillside, IL 60162 Phone/Fax: (773) 313-0099 / (773) 313-0139 http://www.EMSL.com chicagolab@emsl.com
Attn: Thad Ryniak Environmental Consulting Group 105 South York Street Suite 250 Elmhurst, IL 60126
Received: 12/08/17 2:55 PM
PAUL FINDLEY FEDERAL BUILDING /A171556-1232
Fax: (630) 607-0650 Phone: (630) 607-0060
Project:
Collected:
Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*
261711276 CustomerID: ENCG51 CustomerPO:
ProjectID:
EMSL Order:
Site: ON WINDOW LINTELS Desc: BROWN AND ORANGE PAINT
261711276-0001TR1206-001 32 % wt12/11/2017
Site: ON WINDOW LINTELS Desc: BROWN AND ORANGE PAINT
261711276-0002TR1206-002 35 % wt12/11/2017
Site: ON WINDOW LINTELS Desc: BROWN AND ORANGE PAINT
261711276-0003TR1206-003 37 % wt12/11/2017
Lisa Odeshoo, Lead Lab Manager or other approved signatory
Test Report ChmSnglePrm/nQC-7.32.3 Printed: 12/11/2017 3:45:04 PM
*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.010 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.
Definitions of modifications are available upon request.
Samples analyzed by EMSL Analytical, Inc. Hillside, IL AIHA-LAP, LLC--ELLAP Accredited #102992
Initial report from 12/11/2017 15:45:04 http://www.EMSL.com mailto:chicagolab@emsl.com
OrderID: 261711276
A
IH
A
L ab or at or y
A cc re di ta tio n Pr og ra m s, LL
C ac kn ow le dg es th at
E M
SL
A na ly tic al
, I nc
L itt D riv e, H ill si de
, I L
2-
L ab or at or y
ID
: 1 al on g w ith a ll pr em is es fr om w hi ch k ey a ct iv iti es a re p er fo rm ed , a s l is te d ab ov e, h as fu lfi lle d th e re qu ire m en ts o f t he
A
IH
A L ab or at or y A cc re di ta tio n
Pr og ra m s (A
IH
A
-L A
P) , L
LC
a cc re di ta tio n to th e
IS
O
/IE
C
:2 in te rn at io na l s ta nd ar d, G en er al
R eq ui re m en ts fo r th e C om pe te nc e of
T es tin g an d
C al ib ra tio n
La bo ra to rie s i n th e fo llo w in g:
L
B
O R
A T
O R
Y A
C C
R E
D
IT
A T
IO
N
P R
O G
R A
M S
IN
D
U
ST
R
IA
L H
Y G
IE
N cc re di ta tio n Ex pi re s:
Se pt em be r 0
1, V
IR
O N
M E
N T
A L
L E re di ta tio n
Ex pi re s:
Se pt em be r 0 1, V
IR
O N
M E
N T
A L
M
IC
R O
B
IO
L O
G Y re di ta tio n
Ex pi re s:
Se pt em be r 0 1, FO
O re di ta tio n
Ex pi re s:
U
IQ
U E
S C
O
PE
S A cc re di ta tio n
Ex pi re s:
Sp ec ifi c Fi el d(
s) o f Te st in g (F oT )/M et ho d( s) w ith in e ac h
A cc re di ta tio n Pr og ra m f or w hi ch t he a bo ve n am ed la bo ra to ry m ai nt ai ns a cc re di ta tio n is ou tli ne d on t he a tta ch ed
S co pe o f A cc re di ta tio n.
on tin ue d ac cr ed ita tio n is co nt in ge nt u po n su cc es sf ul o n-go in g co m pl ia nc e w ith I
SO
/IE
5:
a nd A
IH
A
-L A
P, L
LC
re qu ire m en ts.
T hi s ce rti fic at e is no t v al id w ith ou t t he a tta ch ed S co pe o f A cc re di ta tio n.
P le as e re vi ew th e A
IH
A
LA
P, L
LC
w eb sit e (w w w
.a ih aa cc re di te dl ab s.o rg ) f or th e m os t c ur re nt S co pe
W ill ia m
W al sh , C
IH
ha ir pe rs on , A na ly tic al
A cc re di ta tio n Bo ar d he ry l O
. M or to n
M an ag in g D ir ec to r, AI
H
A La bo ra to ry
A cc re di ta tio n Pr og ra m s, LL
R ev is io n
: 0 3/
/2 at e Is su ed
: 0 7/
/2 http://www.aihaaccreditedlabs.org/
Attachment C
Bulk Sampling Results Table sb es to s R es ul ts S um m ar y
Ta bl e Pa ul F in dl ey C ou rth ou se
E.
M on ro e St re et
Sp rin gf ie ld , I llin oi s
P re pa re d by
: E C
G
:\P ro je ct s\2
7\
A sb es to s\G
SA
\S pr in gf ie ld
\B ul k Sa m pl in g
Ta bl e Pa ge
Sa m pl e
ID
M at er ia l S am pl ed L oc at io n
A sb es to s
TR
-0
G ra y m or ta r
O n ex te rio r l im es to ne
N on e D et ec te d
TR
-0
G ra y m or ta r
O n ex te rio r l im es to ne
N on e D et ec te d
TR
-0
G ra y m or ta r
O n ex te rio r l im es to ne
N on e D et ec te d
TR
-0
G ra y m or ta r
O n ex te rio r b ric k
N on e D et ec te d
TR
-0
G ra y m or ta r
O n ex te rio r b ric k
N on e D et ec te d
TR
-0
G ra y m or ta r
O n ex te rio r b ric k
N on e D et ec te d
TR
-0
G ra y w in do w c au lk O n ex te rio r w in do w s N on e
D et ec te d
TR
-0
G ra y w in do w c au lk O n ex te rio r w in do w s N on e
D et ec te d
TR
-0
G ra y w in do w c au lk O n ex te rio r w in do w s N on e
D et ec te d
TR
-1
Bl ac k ro of fi el d
- r ub be r
EP
D M ro of
N on e D et ec te d
TR
-1
Bl ac k ro of fi el d
- i ns ul at io n
EP
D M ro of
N on e D et ec te d
TR
-1
Bl ac k ro of fi el d
- r ub be r
EP
D M ro of
N on e D et ec te d
TR
-1
Bl ac k ro of fi el d
- i ns ul at io n
EP
D M ro of
N on e D et ec te d
TR
-1
Bl ac k ro of fi el d
- r ub be r
EP
D M ro of
N on e D et ec te es to s R es ul ts S um m ar y
Ta bl e Pa ul F in dl ey C ou rth ou se
E.
M on ro e St re et
Sp rin gf ie ld , I llin oi s
P re pa re d by
: E C
G ro je ct s\2
7\
A sb es to s\G
SA
\S pr in gf ie ld
\B ul k Sa m pl in g
Ta bl e Pa ge
Sa m pl e
ID
M at er ia l S am pl ed L oc at io n
A sb es to s
TR
-1
Bl ac k ro of fi el d
- i ns ul at io n
EP
D M ro of
N on e D et ec te d
TR
-1
Bl ac k ro of fl as hi ng
EP
D
M ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fl as hi ng
EP
D
M ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fl as hi ng
EP
D
M ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fi el d Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fi el d Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fi el d Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-1
Bl ac k ro of fl as hi ng
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-2
Bl ac k ro of fl as hi ng
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-2
Bl ac k ro of fl as hi ng
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-2
G ra y m or ta r o n co nc re te Fr on t o f b ui ld in g by fl oo r g ra te s
N on e D et ec te d
TR
-2
G ra y m or ta r o n co nc re te Fr on t o f b ui ld in g by fl oo r g ra te s
N on e D et ec te d
TR
-2
G ra y m or ta r o n co nc re te Fr on t o f b ui ld in g by fl oo r g ra te s
N on e D et ec te d
TR
-2
Be ig e ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-2
Be ig e ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-2
Be ig e ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec es to s R es ul ts S um m ar y
Ta bl e Pa ul F in dl ey C ou rth ou se
E.
M on ro e St re et
Sp rin gf ie ld , I llin oi s
P re pa re d by
: E C
G ro je ct s\2
7\
A sb es to s\G
SA
\S pr in gf ie ld
\B ul k Sa m pl in g
Ta bl e Pa ge
Sa m pl e
ID
M at er ia l S am pl ed L oc at io n
A sb es to s
TR
-2
G ra y ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-2
G ra y ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-3
G ra y ro of c au lk Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-3
G ra y ca ul k on c on cr et e w al l p av er s Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-3
G ra y ca ul k on c on cr et e w al l p av er s Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-3
G ra y ca ul k on c on cr et e w al l p av er s Ba lle st ed b ui lt up ro of N on e
D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-3
Bl ac k ro of ta r
Ba lle st ed b ui lt up ro of
N on e D et ec te d
TR
-4
Li gh t g ra y ro of c au lk
EP
M ro of N on e
D et ec te d
TR
-4
Li gh t g ra y ro of c
M ro of N on e
D et ec te d
TR
-4
Li gh t g ra y ro of c
M ro of N on e
D et ec es to s R es ul ts S um m ar y
Ta bl e Pa ul F in dl ey C ou rth ou se
E.
M on ro e St re et
Sp rin gf ie ld , I llin oi s
P re pa re d by
: E C
G ro je ct s\2
7\
A sb es to s\G
SA
\S pr in gf ie ld
\B ul k Sa m pl in g
Ta bl e Pa ge
Sa m pl e
ID
M at er ia l S am pl ed L oc at io n
A sb es to s
TR
-4
D ar k gr ay ro of c au lk
EP
D M ro of
N on e D et ec te d
TR
-4
D ar k gr ay ro of c au lk
EP
D M ro of
N on e D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .