This request for proposal solicits general construction services for an EPDM roof replacement project at the Paul Findley Federal Building and U.S. Courthouse in Springfield, Illinois. The solicitation involves removing and replacing an existing single-ply EPDM membrane system, electric snow-melt system, installing a complete lightning protection system and fall protection system. The total estimated cost is between $1,000,000 to $5,000,000. The North American Industry Classification System code is 238160 for roofing contractors with a small business size standard of $15 million. The period of performance is 120 calendar days to be completed in 2021. This is a total small business set-aside issued by the General Services Administration to be awarded as a firm-fixed price contract evaluating technical factors more than price. The pre-proposal site visit is scheduled for March 25, 2020 and proposals are due by April 16, 2020 with award planned for October 2020 and work to begin in spring 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 04 RFIs.pdf | ||
| Amendment 03 RFIs Pricing Sheet.pdf | ||
| Site Visit Appointments.pdf | ||
| Amendment 01 Site Visit Extension Specs.pdf | ||
| EPDM Roof Specifications March 19 20.pdf | ||
| EPDM Roofing Replacement Preproposal Conference.docx | DOCX document | |
| Pre-Proposal Meeting Agenda.docx | DOCX document | |
| 19_1231_100 CD Specifications.pdf | ||
| RFP 47PF0020R0012 EPDM Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
R10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable government to provide answers. Offerors may submit questions after but the government will not be required to respond.
included in this RFP. All questions must be received before close of business on May 7th to allow enough time for Each time slot is for 30 minutes and is limited to 4 people per company, first come first serve basis. 3 additional RFIs are The site visit is changed to appointment only on May4th and 5th for the following time slots, 9:00, 11:30, 1:00, 2:00, and 3:00.
DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)14.
SOLICITATION NO. 47PF0020R0012
PROJECT TITLE: EPDM Roof Replacement
GOVERNMENT PRE AWARD INQUIRY FORM
Decemeber 2016 SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
Looking at this bid I see the manufacturers listed but want to know if there is time to submit for MuleHide as a manufacturer. MuleHide meets all specifications and is in fact made from the same materials and supplier as Carlisle. Is there a form I need and I can send the required specifications?
GSA will accept brand name equal but it must meet all product specifications listed. If the products do not meet specifications, they will be rejected. If you are submitting a proposal on this RFP, it is assumed that you will provide materials that meet the specifications.
4/2/20
We were reading the technical qualifications for this project and were curious if a subcontractor's past performance and relevant experience were acceptable on behalf of the prime contracto?
No, the RFP states that the experience and past performance must come from the offeror. 4/20/20
The period of performance is 120 calendar days; all work shall be fully completed in calendar year 2021. When is the project expected to start? If the work starts several months from now, how are we supposed to account for any unforseen condition like increase in material costs?
The expected start for this project is spring of 2021. The government will not make any recommendations on how the offeror should price their proposal.
4/20/20
4 Is there a wage scale on this project? Yes, it is at the end of the RFP 47PF0020R0012 document. 4/20/20
Response Date
Question No. QUESTION GOVERNMENT RESPONSE
| RFIs Dec 12 19.pdf |
| Sheet1 |
| 2020-04-20T09:32:55-0600 | |
| JOSEPH LOERSCH | |
| I am the author of this document |
File details come from the government source that posted it. Updated .