This document contains an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity construction contract for the General Services Administration in Northern Illinois. The amendment provides responses to offeror questions, revises evaluation criteria, and incorporates building profiles and past performance questionnaires. Key details include that the contract is set aside for small businesses, has a maximum value of $85 million over five years including options, and will result in multiple awards for repair, alteration, and construction projects in Cook and Winnebago counties. Offerors must submit past project experience and past performance questionnaires from references by the revised proposal deadline.
Amendment 04
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_06.pdf | ||
| Amendment_05.pdf | ||
| Pre-Proposal_Conference_Agenda.pdf | ||
| Attachment_A_-_GC_Experience_Summary.docx | DOCX document | |
| Sign-In_Sheet.pdf | ||
| LI_ITEM_PRICING_SHEET.xlsx | XLSX spreadsheet | |
| HWSSC_Building_Profile.pdf | ||
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| RFP_IDIQ_for_Northern_IL.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Contract ID Code Page of Pages
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
04 October 4, 2018 47PF0018R0209
6. ISSUED BY 7. ADMINISTERED BY (If other than Item 6)
General Services Administration
AMD, Chicagoland Construction Contracting Team
230 S. Dearborn St., Suite 3600
Chicago, IL 60604
Same as Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Country, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
47PF0018R0209
X 9B. DATED (SEE ITEM 11)
September 20, 2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
() A. THIS ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN
ITEM
14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Solicitation # 47PF0018R0209, Amendment 04
Indefinite-Delivery Indefinite-Quantity (IDIQ) Contract for Construction, Repair & Alterations in Northern Illinois (including Cook and
Winnebago Counties)
See following pages for description of amendment.
You must acknowledge receipt of this and all amendments as indicated in Block 11 shown above.
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous Edition unusable
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO. AMENDMENT NO. PAGE OF PAGES
CONTINUATION OF STANDARD FORM 30
47PF0018R0209 04 2 3
Amendment 04 is issued to 1) incorporate the Building Profile for the Harold Washington Social Security Center, 2) revise the response to RFI #1 (see blue text for changes) and 3) address RFI’s received to date (RFI’s 1 – 5 were previously responded to in Amendment 03). Also, the pre-proposal conference agenda and sign-in sheet will be posted.
Q1: Is a bid bond required to be submitted with proposal? The solicitation contains conflicting instructions. SF1442, 13b – An Offer guarantee is required.
Re: Solicitation pg.5: section I.E item a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
Re: Solicitation pg.12 section II.E. item (2) ***Please note that a Bid Guarantee is not required for this solicitation. References to bid guarantees, price or performance bonds throughout this document are not relative to the line item pricing but may be relative on a task order basis.
Answer: As clarified in Amendment 02, a SF 24 (Bid Bond) is not required with your proposal.
Bid Guarantees and Payment/Performance Bonds
a. A bid guarantee is required at the task order level when a performance bond or performance and payment bond is required.
The bid guarantee shall be twenty (20) percent of the bid price or $3,000,000, whichever is less.
b. Prior to commencement of work on an awarded task order, the contractor will be required to provide Performance and
Payment Bonds or alternate payment protection, as follows:
(1) Orders less than or equal to $35,000: No additional protection required
(2) Orders over $35,000 but less than or equal to $250,000: Alternate payment protection in accordance with FAR
52.228-13, Alternative Payment Protections
(3) Orders over $250,000: Performance Bond: 100% of the awarded task order amount. Payment Bond: 100% of the awarded task order amount.
c. When additional bonding is required, the provisions of FAR 28.102-2(b)(1) and FAR 28.102-2(b)(2) shall apply.
Q2: If submitting as a Joint Venture, please confirm that both companies need to submit projects, but that the total number of projects submitted should still be 7-10 (combined) and not 7-10 projects per company (which would be 14-20 projects total). Pg. 12, item
II.F.4 states representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
Answer: All submissions shall include at least 7, no more than 10 similar projects. If proposing as a joint venture, offerors should first submit past performance records they have performed together as these experiences will receive more consideration than experiences performed separately.
Q3: Can we submit CPARS and CCASS forms in lieu of PPQs?
Answer: PPQs (Attachment B) are required; they cannot be substituted.
Q4: Can we submit previously completed PPQs from other solicitations and other government agencies (i.e. USACE) in lieu of requesting them again?
Answer: PPQs (Attachment B) are required; they cannot be substituted.
Q5: Page 10 of the RFP lists Key Team members and Spec Section 103100 – Project Management & Coordination #1.5, lists other
Administrative and Supervisory Personnel. However, they are not the same requirements. Please identify what positions are considered Key Staff that should be included in the submission.
Answer: When compiling the technical proposal the offeror should refer to the description, submittal requirements and standard for evaluation listed under each non-price factor (see C201, II.D.). For C201, II.D.(3), the key team members are defined as follows:
1. Supervisor/Executive
2. Construction Superintendent(s)
3. Project Manager(s)
4. Program Coordinator for submittal of Safety Plans to GSA
5. Scheduling Coordinator for significant tasks
6. Other key team members as determined by the Offeror
Q6: Could the GSA please provide us with an Excel Spreadsheet version of the LINE ITEM PRICING SCHEDULE?
Answer: Yes, excel spreadsheet will be provided.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO. AMENDMENT NO. PAGE OF PAGES
CONTINUATION OF STANDARD FORM 30
47PF0018R0209 04 3 3
Q7: Could the GSA please provide us with copies of ATTACHMENT A - GC EXPERIENCE SUMMARY, ATTACHMENT B:
PAST PERFORMANCE QUESTIONNAIRE, and ATTACHMENT C - OFFEROR INFORMATION in Microsoft Word format?
Answer: Yes, word version will be provided.
Q8: Please provide clarification regarding to whom completed Past Performance Questionnaires should be sent. In the Solicitation on page 11, under part (4) Past Performance as a General Contractor (GC) on Repair and Alteration Projects, Submittal
Requirements, “Completed PPQs should be submitted with the proposal.” In the Pre-Proposal Conference Agenda under Item
#4. SELECTION PROCESS, subpart d. Technical Factors Include, subpart iv., “References are required to submit past performance questionnaires directly to the CO.”
Answer: ***References should be submitted directly to the Government.*** C201, II.D. (4) – Past Performance as General Contractor on Repair and Alterations Projects, shall be revised to read:
C201, II.D. (4) - Past Performance as a General Contractor (GC) on Repair and Alteration Projects
Description:
This factor considers the past performance of the Offeror for the projects submitted under Factor 1. This factor will be evaluated based on the responses received from references. References must have thorough knowledge of the Offeror’s performance on the project for the majority of the contract performance period; the quality of the reference information supplied will be considered.
Submittal Requirements:
This factor considers the past performance of the Offeror for the projects submitted under Factor 1. References must have thorough knowledge of the details of the Offeror’s performance for the majority of the contract performance period, so that the reference may sufficiently respond to the questionnaire.
The Offeror must submit a Past Performance Questionnaire (PPQ) for each project included in its proposal for Factor 1:
Experience on Similar Projects. The contractor shall complete section 1 of the Attachment B and contractor’s reference(s) shall complete section 2. The PPQ shall be completed by the references and submitted directly to the Government point of contacts, via email at joel.doucette@gsa.gov and lisa.gonzalez@gsa.gov prior to proposal closing date. Offerors should ensure timely submittal of questionnaires.
Also include performance recognition documents received (within the last 5 years) such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including
Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members
(partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic
Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the
Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. GSA will not maintain database of PPQs submitted by
Offerors.
Standard for Evaluation:
RATING DESCRIPTON
Adequate references were provided; all references provided a favorable evaluation indicating excellent past performance on all projects.
Adequate references were provided; most references provided an above average evaluation indicating very good past performance on most projects.
Adequate references were provided; references provided an average evaluation indicating good past performance on most projects.
References were provided; references provided a below average evaluation indicating fair past performance on most projects.
References were provided; references provided an unfavorable evaluation indicating poor past performance on most projects.
0 No relevant past performance.