Fire Alarm System Replacement - Claude Pepper Fed Bldg, Miami - Amendment 0002
Solicitation number
47PE0724R0024
Issued by

About this file

This document is a Solicitation Amendment for Solicitation Number 47PE0724R0024 titled "Fire Alarm System Replacement - Claude Pepper Fed Bldg, Miami." The amendment includes additional Requests for Information (RFIs) generated from a second pre-proposal site visit, and provides the combined RFI responses and site visit sign-in rosters as attachments. The purpose of the solicitation is to procure a Design/Build project to completely replace the existing antiquated and obsolete fire alarm system at the Claude Pepper U.S. Federal Building in Miami, Florida. The project will include the removal of the current system and the design and installation of a new fire alarm and emergency communications system compliant with industry standards. This is a 100% Small Business Set-Aside procurement issued by the General Services Administration's Public Buildings Service, Region 4. The offer due date remains August 30, 2024.

View the file

Other files

File Type Posted
T09 Pre Bid Site Visit Sign In Roster - 2nd Site Visit 47PE0724R0024 CPFB FA Replacement 2024 08 08.pdf PDF
SF 30 Atch_Claude Pepper Fire Alarm RFI Responses Amendment 0002_2024 08 19.pdf PDF
T09 Pre Bid Site Visit Sign In Roster 47PE0724R0024 CPFB FA Replacement 2024 07 16.pdf PDF
SF 30 Atch_Claude Pepper Fire Alarm RFI Responses 08 02 2024.pdf PDF
SF 30 Solicitation Amendment 47PE0724R0024_0001 2024 08 02.pdf PDF
T02 DB SOW Atch Claude Pepper As-Builts Fire Alarm All Floors 2006.pdf PDF
T10 THE AGREEMENT_RFP 47PE0724R0024-Fire Alarm Replacement-CPFB Miami 2024 07 23.pdf PDF
T02 DB SOW Atch Misc As Built and Reqts Docs Fire Alm System Replace CPFB Fwd 2024 07 22.zip ZIP file
T10 Reps and Certs 47PE0724R0024.docx DOCX document
T10 SF 1442_ 47PE0724R0024 Fire Alarm Replacement-CPFB Miami 2024 07 23.pdf PDF
T10 THE SOLICITATION_RFP 47PE0724R0024-Fire Alarm Replacement-CPFB Miami 2024 07 23.pdf PDF
T05 Wage Determination_Wage Decision FL20240215 2024 07 12.pdf PDF
T02 DB SOW Atch Claude Pepper As-Builts 5th_14th_15th FL Fire Alarm 2016.pdf PDF
T02 DB SOW Atch Claude Pepper FL ACM Report 2023 07 25.pdf PDF
T10 RFP Instructions 47PE0724R0024 Fire Alarm System CPFB Miami 2024 07 23.pdf PDF
T02 DB SOW - Claude Pepper Fed Bldg Miami_Fire Alarm Replacement 07-18-2024.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 4P1QB
Copies[0]:
CheckBox9[0]: 1
Code[2]: 4P1QB
NameandTitleOfficer[0]: Ric Sochor, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 2
AmendmentNo[0]: 0002
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Gulf Coast Branch

Gulf Coast Branch 501 E POLK ST Room: 805

TAMPA, FL 33602-3949

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ4P1PB-24-0029
Dated9B[0]: 7/23/2024
C13[0]:
Description[0]: The purpose of this amendment is to include additional RFIs generated from the second pre-proposal site visit.

1. See attached combined RFI responses, 4 pgs

2. See attached site visit sign in rosters (7/16/24 and 8/8/24, respectively) NOTE: The offer due date is not extended and remains 8/30/2024.

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PE0724R0024
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 8/19/2024
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: Gulf Coast Branch

Gulf Coast Branch 501 E POLK ST Room: 805

TAMPA, FL 33602-3949

NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .