This document provides questions and answers related to a solicitation for partition and miscellaneous construction services on an indefinite delivery/indefinite quantity contract covering facilities in Georgia. The solicitation seeks fixed price proposals for construction line item work including general construction, painting, carpeting, walls and framing, demolition, asbestos, carpentry, HVAC, electrical, ceilings and plumbing. Proposals are due August 9, 2019 for awards covering four geographic areas: Atlanta Regional, Atlanta Metro, Macon and Savannah. The estimated contract value ranges from $1-5 million for Macon and Savannah to $5-10 million for Atlanta Regional and Metro. The North American Industry Classification System code is 236220 and the size standard is $36.5 million. The period of performance is one base year plus four option years.
RFI Questions & Answers
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 23, 2019
RFI Questions/Answers:
Questions/Answers:
1. Is GSA requesting the prices be made using RS Means or the Construction Line Item sheet and Coefficients provided by GSA?
Answer: GSA is not asking the bidder to generate their own Unit Prices. Once the bidder signs the contract, they are agreeing to the stated Unit Prices produced or shown on the Construction Line Item list for GSA. The Unit Prices on the Construction Line Item list remains the same for the life of the contract unless changed by GSA through a request or some other action. The bidders Coefficient is the multiplier that will be used during each Period of Performance for each CLIN. The bidders Coefficient should contain their G&A, Overhead and Profit.
2. Is. The bonding requirement of 10 million per year or per contract? What is the bonding requirement per year if it is predetermined?
Answer: No. The contractor shall provide a letter from its bonding company certifying their bonding capacity up to 100% of the estimated total contract value ($10M) Atlanta Regional and Metro (Zone1 & 2) (5M) for Macon and Savannah (Zone 3 &4) in lieu of a Bid Bond.
There is no bonding requirement per year for the basic IDIQ.
However, bonding may be required at the Task order level pursuant to 28.102.
3. In reference to the Forms SF-1442, please verify what values we are to provide and enter for item number 0005, the BASE YEAR ONLY - Guarantee Minimum.
Answer: The minimum guarantee is 1,000 for the base only. The line item is for government purpose only. Do not fill in.
4. Please confirm "Construction_Line_Item_1_30_19.xlsx," is the actual file that will be incorporated in, "The Agreement."
Answer: Yes- 1/30/2019 is the most recent update
5. The "xlsx" file provided with the solicitation documents seems to reflect a date of 1/30/19. Does this date reflect the most recent update? If not, may we have the date of the most recent update?
Answer: Yes- 1/30/2019 is the most recent update
6. In the Agreement, the construction line item list is described as, "traditional," and we understand GSA currently is providing the list to contractors to price Task Orders under existing contracts. Is this list currently being used in the entire GSA 4 Region, i.e., the eight
(8) states in the "Southeast Sunbelt" or just in a geographical subset? If a subset may we have the geographic area to which it applies?
Answer: Yes- This is the list currently used by GSA Region 4.
Which covers Atlanta Regional, Atlanta Metro, Macon and Savannah.
7. Will the same list be used for each of the four solicitation opportunities, i.e, Atlanta Metro, Atlanta Regional, Macon and Savannah?
Answer: Yes- This is the list currently used by GSA Region 4.
Which covers Atlanta Regional, Atlanta Metro, Macon and Savannah.
8. Does the list include State and local taxes for materials? If so, may we have the percentage(s)?
Answer: No applicable taxes would be based on area you work in.
9. During the Pre-proposal Meeting, Government representatives stated the costs in the Construction Line Item List, which are in the "xlsx" file, tab, "Line Items," col F, "Base," will be fixed for the entire contract, i.e., Base Year through Option Year 4. Please confirm if this is correct, or if not correct, describe the circumstances and process to update the costs. Note: This question applies to current line items and not those which may be added in the future.
Answer: Yes, the Base and Options will be fixed.
10. At a later time in the Meeting, a Government representative stated some costs in the Construction Line Item List may be updated through a Contract Modification to reflect changes in the applicable DOL Wage Determination/Davis Bacon Wages. This seems to conflict with earlier statements regarding the fixed nature of the List. Is there is going to be an update process? If so, can you provide details regarding how the process will work?
Answer: No there will not be a contract modification to reflect the changes in the applicable DOL Wage Determination/Davis Bacon Wages or the construction line item list. Wage Rates will be incorporated at the task order level.
11. Is it possible to get a copy of the Attendees List for last week’s site visit meeting?
Answer: Yes, see attachment
12. Is there a specific form that you want us to use for Performance Reference?
Answer: No Standard Form used
13. Is there a specific form for SBU? We do not know what information to include for this line item.
Answer: No Standard Form used. Refer to the SBU document sheet listed in the solicitation.