The evaluation factors include: Factor 1 - Project Management Plan and Approach (15-page limit) requiring a detailed work plan for an occupied building; Factor 2 - Prior Experience on Relevant Projects (15-page limit) with preference given to GSA projects and those completed by proposed key personnel; Factor 3 - Past Performance evaluations for relevant projects, with specific guidance for joint ventures; Factor 4 - Socioeconomic Status with higher ratings for qualifying in multiple categories; and Factor 5 - Sustainability focusing on Inflation Reduction Act requirements for materials like asphalt, concrete, glass, and steel, with emphasis on Global Warming Potential (GWP) limits. Offerors must complete Column B of the Sustainability Factor Table, and their commitments to using IRA-eligible materials with the lowest possible GWP values will be incorporated into the final contract.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase 1 Pre-Proposal Discussion Points

Factor 1 Project Management Plan and Approach

● Written plan of how you will approach the project

● 15 page limit

● Chance to show your understanding of the work and how it needs to be accomplished within the various constraints of the site and an occupied building

● Must include all items requested in the solicitation or your rating could be affected

● See solicitation for what is considered a relevant project

Factor 2 Prior Experience on Relevant Projects

● Show your experience on similar projects

● 15 page limit

● Favorable consideration for GSA Projects, Projects that were performed by the same individuals in the key personnel resumes, and the quality of projects with a similar scope and complexity

● Provide all of the information requested in the solicitation

Factor 3 Past Performance on Relevant Projects

● Evaluations forms filled out for projects from Factor #2 as well as other projects

● If submitting under a joint venture, firms should submit info as the JV or as each firm individually. If one firm does not have info it will be rated less favorable.

Factor 4 Socioeconomic Status

● If you qualify for two or more socioeconomic categories you will receive a higher rating

Factor 5 Sustainability

● Inflation Reduction Act Requirements

● Shows your commitments to using IRA-Eligible Materials: Asphalt, Concrete (and cement), glass, and steel

● Each material has a numeric global warming potential (GWP) limit

● GWP limits have been established for the best performing 20% of materials in terms of embodied carbon (Top 20% Limits), the best performing 40% of materials in terms of embodied carbon (Top 40% Limits), and better than industry average (Better Than Average Limit).

● This Evaluation Factor calls for Offeror commitments to furnishing

IRA-Eligible Materials with the lowest possible GWP values. IRA Limit Commitments proposed under this evaluation factor will be incorporated into the successful offeror’s resultant contract.

● Fill out Column B of the attached Sustainability Factor Table

● Ratings for this factor will be based on the offeror who uses IRA-eligible materials with the lowest Global Warming Potential (GWP)

● Refer to solicitation for details, all we need is the filled out table