This document provides details for a federal solicitation seeking architectural and engineering services. General Services Administration is soliciting proposals for design of a new 153,000 square foot courthouse annex in Hato Rey, Puerto Rico linked to existing Federico Degetau Federal Building and Clemente Ruiz Nazario U.S. Courthouse. Services required include architectural, engineering, sustainability, interior design, and related consulting. A two-stage evaluation process will shortlist firms to be interviewed. In Stage I, interested firms must submit project portfolios by January 14, 2022. Shortlisted firms will then provide additional team information for Stage II interviews. The project delivery method is construction manager as constructor with anticipated construction budget between $175-205 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Winnie Eng, Contracting Officer

Please see attached.

General Services Administration Capital Construction Branch (2PQC) One World Trade Center New York, NY 10007

General Services Administration Capital Construction Branch (2PQC) One World Trade Center New York, NY 10007

47PC0321R0013

1 3

12/16/2021

11/30/2021

Digitally signed by WINNIE ENG DN: C=US, O=U.S. Government, OU=General Services Administration, CN=WINNIE ENG + OID.0.9.2342.19200300.100.1.1=47001000023394

Reason: I am approving this document Location: your signing location here Date: 2021.12.16 14:57:31-05'00' Foxit PDF Editor Version: 11.1.0

WINNIE ENG

Amendment No. 1 for the solicitation for Architect-Engineering (A/E) Services for a New Courthouse Annex Project at the Federico Degetau Federal Building and Clemente Ruiz Nazario U.S. Courthouse, Hato Rey, PR is hereby issued as follows:

1. GSA will be conducting Site Visits at the Hato Rey Federal Complex located at 150 Carlos Chardon Avenue, Hato Rey, PR on January 10 and 11, 2022.

Due to COVID-19 building protocols and restrictions, there is a limitation on the number of visitors at the building at once. Each vendor will have a maximum of five (5) team members. Names of each attendee must be provided to the GSA on December 28, 2021 by 3:00 PM EST. The Site Visit walkthrough will be structured at 1.5-hour intervals, and will include all building specific check-ins. Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. All team members must follow Centers for Disease Control and Prevention (CDC) mask protocols, and additional requirements may be required by the building. Instructions with respect to any additional requirements will be provided prior to the walkthrough. Names of individuals not pre-registered and approved will not be allowed access to the building. The Site Visit is broken up into 1.5-hour intervals on each date as follows:

Slot 1 - 08:00 am – 9:30 am Atlantic Standard Time (AST) Slot 2 - 10:00 am – 11:30 am Atlantic Standard Time (AST) Slot 3 - 12:30 pm - 2:00 pm Atlantic Standard Time (AST) Slot 4 - 2:30 pm - 4:00 pm Atlantic Standard Time (AST)

Pre-registration is required for all attendees. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be communicated to vendors after pre-registration has been processed. Submit all Site Visit pre-registration requests via email to the Contracting Officer at winnie.eng@gsa.gov. In the Site Visit pre-registration request, please provide names of attendees, firm name, and list at least two (2) available time slot options so that GSA can work to accommodate all interested vendors. Once GSA obtains all requests, the Contracting Officer will provide confirmation of specific time slot assignments to each vendor. It is each vendor’s responsibility to ensure that the attendees come prepared to visit the specific areas of interest, and that they are best suited to understand the project scope and objectives. Vendors should supply their own masks and gloves. Laptops are not permitted.

2. Responses to the following RFIs:

2.1. Q: In sections 1 and 4 GSA asks: The A/E firm(s) will submit a portfolio of not more than five (5) similarly scoped projects with construction completed in the last ten (10) years/ submit a portfolio of up to three (3) projects completed in the last ten (10) years. Please, could this be design completed or substantial construction completed?

Solicitation No. 47PC0321R0013 Amendment No. 1

A: In both cases when determining whether the project was completed within the last ten (10) years, we will look at the construction completion.

2.2. Q: I see that this project is going to require LEED Gold. With commissioning being a prerequisite for LEED, I was curious how you all will be procuring a commissioning agent. Will this be procured through a different solicitation or will it fall under this one?

A: Commissioning agent is not part of this procurement. Construction Manager as Advisor (CMa) and Commissioning (CxA) services are planned to be a separate procurement.

2.3. Q: Is a local Architect of Record (AOR) envisioned to be part of this initial submission or would that be considered in a subsequent bid phase?

A: Only the Lead Designer will need to be identified for the Stage I submission.

3. The deadline for Requests for Information (RFIs) is extended to 3:00 PM EST on January 13, 2022.

4. The proposal due date is extended to 3:00 PM EST on January 24, 2022.

End of Amendment No. 1

Solicitation No. 47PC0321R0013 Amendment No. 1