Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2PQC
Winnie Eng, Senior Contracting Officer
Please see attached.
General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007
General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007
47PC0319R0007
1 2
09/10/2019
08/01/2019
U.S. VIRGIN ISLANDS HURRICANE RECOVERY PROJECT
ST. THOMAS GSA-PBS, REGION 2
SOLICITATION NO. 47PC0319R0007
AMENDMENT NO. 5
Amendment No. 5 is hereby issued to respond to the following RFI:
47. After conversation with few windows/glazing manufacturers specified in Spec Sections:
A. ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS - 08 41 13
B. ALUMINUM WINDOWS - 08 51 13
We are receiving information from them that the product they supply do not meet GSA specifications. They claim that the blast loads requirements in the glazing specifications exceed the blast loads tested, meaning that additional testing analysis needs to be performed.
Also, fire resistance requirements are unreachable.
Response: All of the specified systems listed in the project specifications were tested for hurricane impact (which requires physical testing) and for applicability in blast conditions (which does not require physical testing but requires analytical analysis by the contractor’s delegated engineer for the project-specified blast pressures).
With regards to the wind speed, we note the following:
It is assumed that the mullions will be controlled by blast loads over static wind pressures (potentially requiring steel bar reinforcement as was indicatively shown on the architectural window sections and details). This will be verified by the contractor’s delegated engineer.
Verification of the window assemblies to meet the required design wind pressures can be demonstrated analytically and does not require physical testing provided that the window assemblies are smaller or equal in size and are equal or stronger than the assembly that was tested for hurricane impact resistance. If the mullions need to be reinforced with steel bars to meet the blast performance criteria, this will also help with meeting the wind pressure criteria.
In some of the RFIs received, there appears to be some confusion among the manufacturers and contractors on the specified wind speed and wind pressures. The wind speed and wind pressure listed are ultimate design values per ASCE 7-16 (safety factors already incorporated), whereas some vendors may be considering these as allowable design values (safety factors not already incorporated).
The date and time for receipt of proposals remains unchanged.
END OF AMENDMENT NO. 5