Amendment No. 2 - 47PC0319R0007

View the file

Other files

File Type Posted
Amendment_7_-_47PC0319R0007.pdf PDF
Amendment_6_-_47PC0319R0007.pdf PDF
Amendment_5_-_47PC0319R0007.pdf PDF
Amendment_4_-_47PC0319R0007.pdf PDF
Amendment_3_-_47PC0319R0007.pdf PDF
St._Thomas_Hurricane_Recovery_Preproposal_Conference_Presentation_-_47PC0319R0007.pdf PDF
Amendment_1_-_47PC0319R0007.pdf PDF
St._Thomas_USVI_Hurricane_Recovery_Pre-proposal_Site_Visit_Sign-In_Sheet_-_47PC0319R0007.pdf PDF
SF1442_-_47PC0319R0007.pdf PDF
Attachment_A2_-_Project_Fact_Sheet.pdf PDF
Attachment_A5_-_Subcontracting_Methodology_Form.pdf PDF
Attachment_A3_-_Sample_Key_Personnel_Resume_Format.pdf PDF
Draft_GC_Agreement_-_St._Thomas_USVI_Hurricane_Recovery.pdf PDF
Model_Subcontracting_Plan_Updated_May_2019_-_For_Informational_Purposes_Only.docx DOCX document
Attachment_A4_-_Past_Performance_Questionnaire.docx DOCX document
Solicitation_47PC0319R0007_-_St._Thomas_USVI_Hurricane_Recovery.pdf PDF
Attachment_A1_-_Experience_Summary_Table_47PC0319R0007.pdf PDF
GSA_Form_527.pdf PDF
Proposal_Preparation_Instructions_-_47PC0319R0007.pdf PDF
Offerors_Representations_and_Certifications_47PC0319R0007.pdf PDF
Additional_Information__-_RFP_47PC0319R0007.pdf PDF
Partnering_-_St_Thomas_USVI_Hurricane_Recovery.pdf PDF
SF24_-_Bid_Bond.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2PQC

Winnie Eng, Senior Contracting Officer

Please see attached.

General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007

General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007

47PC0319R0007

1 4

08/23/2019

08/01/2019

U.S. VIRGIN ISLANDS HURRICANE RECOVERY PROJECT

ST. THOMAS GSA-PBS, REGION 2

SOLICITATION NO. 47PC0319R0007

AMENDMENT NO. 2

Amendment No. 2 is hereby issued to respond to the following RFI’s:

6. Please indicate if it is allowed a temporary office in the project.

Response: Contractor shall plan for an off-site office at the contractor's expense.

7. What will be the limits of encroachment into the various rooms for delineating the construction area for the work necessary to perform removal and replacement of the windows?

Response: The drawings have a suggested staging plan for window replacement. The contractor is encouraged to follow it or propose a better alternative without affecting tenant operations.

8. Will the contractor be required to erect a full demising wall inside the occupied office space to segregate the work area from the occupied space?

Response: The drawings have a suggested a staging plan for window replacement that includes temporary partitions. The contractor is encouraged to follow it or propose a better alternative without affecting tenant operations.

9. Can GSA provide a list of the available hours for the various tenant spaces (preferably by room No.)? If not, will the GSA pay a shift differential for any work that has to be done after normal working hours contained in the RFP?

Response: The contractor is to plan the work under the requirement to maintain the building be fully operational. Building operating hours are Monday thru Friday from 8:00AM to 5:00PM, excluding Federal Holidays. GSA will not pay a shift differential. Any work that might interrupt the tenants’ mission will have to be planned to be performed after hours (5:00PM to 8:00AM). The contractor should prepare their price proposal and plan the execution of work accordingly.

10. During construction there will be periods where the windows in an occupied space will need to be out overnight. Will the window opening be required to be secured each night?

Response: Yes; areas will need to be secured overnight and protected from the elements.

11. Are there test results for lead testing of paint on window frames, walls, mechanical equipment, etc. be made available prior to bid?

Response: Please see attached Hazardous Materials Survey, dated April 29, 2015.

12. Are there asbestos testing results available for floor coverings, base molding, adhesives, ceiling tiles, etc. to be made available prior to bid?

Response: Please see attached Hazardous Materials Survey, dated April 29, 2015.

13. Will there be an area made available to the contractor for staging materials prior to installation in the building?

Response: The contractor shall plan for an off-site storage facility at the contractor's expense.

Under no circumstances will the Government will be responsible for material stored on-site or off-site.

14. Will there be a location on the site, or in the building to provide a temporary field office for supervisors of the work?

Response: The contractor shall plan for an off-site office at the contractor's expense.

15. Will the RFP include a bid alternate for performing work after normal building operational hours?

Response: No; the contractor is to plan the work under the requirement to maintain the building be fully operational. Building operating hours are Monday thru Friday from 8:00AM to 5:00PM, excluding Federal Holidays. GSA will not pay a shift differential. Any work that might interrupt the tenants’ mission will have to be planned to be performed after hours (5:00PM to 8:00AM). The contractor should prepare their price proposal and plan the execution of work accordingly.

16. Are brackets to support new solar panel and battery required to be designed by structural engineer?

Response: Yes, all components shall be designed such that they meet all applicable project criteria.

17. Who will be responsible to remove and install solar panels for installation of new roofing?

Response: The contractor is responsible for removal and reinstallation of the solar panels.

18. Can the existing solar panel mountings be re-used with the new roof?

Response: The contractor is responsible for removal and reinstallation of the panels.

Coordination with ESPC contractor (Schneider) is required for this task. The contractor can re-use solar panel mountings, unless an item is rated for one time use only.

19. Roofing demolition and installation will require removal of various existing panels for a period of time. Will the building be using utility power from WAPA during periods when solar panels are not in place resulting in reduced, or no power production by the solar system in place. Is there a contractual requirement for how long the panels to be removed can be out of service?

Response: Yes, the building has the capability to use WAPA electricity when the solar panels are not in service. There is no specified time frame requirement limiting how long the panels can remain out of service. However the Government expects the contractor to minimize the time the panels will be out of service.

20. Please advise the disposition of all government equipment and material to be removed and/or replaced. Are they to be turned back to the government or are we to include proper disposal only?

Response: The contractor shall dispose of all equipment and material removed from the building unless otherwise specified in the drawings and specifications.

21. Will there be limitations on the type of work that can be done during working hours? If so what types of noises will not be permitted?

Response: Work that will interrupt building operations shall be planned outside of building operating hours, to include but not limited to noise and odor producing type of work.

22. If work needs to be halted during court sessions, how will the contractor be compensated for lost productivity and schedule due to interruptions.

Response: The contractor will plan the work around the requirement to keep the building fully operational. Additional time or compensation will not be considered at this time. Future requests will be evaluated on a case by case basis.

23. Please confirm proposal due date.

Response: The date and time for receipt of proposals remains unchanged.

24. Please confirm if an elderly home with healthcare services can be considered as an institutional building.

Response: Yes

25. The submission of more than 3 projects on Attachment A1 – Experience Summary Table, will harm our evaluation rating?

Response: The submission of more than 3 projects on the experience summary table will not harm the evaluation; however only the first 3 projects will be evaluated.

26. Design pressures can either be Ultimate or Allowable. (Ult x .6). The structural drawings do not indicate if the wind pressures are one or the other. This will be critical for the outcome and whether it needs steel inside the frames. Please ask the Structural engineer to clarify if the loads are Ultimate or Allowable. I looked at CD-2 and do not see clarification.

Response: Per Note #1 on 2-S003, component and cladding wind pressures are determined per ASCE 7-16. Accordingly, wind pressures determined per the referenced code are ultimate wind pressures.

27. Please consider a time extension for bid submission in order to be able to prepare a responsive proposal.

Response: The date and time for receipt of proposals remains unchanged.

The date and time for receipt of proposals remains unchanged.

END OF AMENDMENT NO. 2